Loading...
HomeMy WebLinkAboutGW1--07102_Well Construction - GW1_20231103 . 1 • 1 , WELL CONSTRUCTION RECORD(GW-1) 1 I For Internal Use Only: 1.'Well Contractor Information: •1 6%IIct;/vN W&./YJ1•er I y . . Well Contractor Name. WATER ZONES 1 I FROM TO" I DESCRIPTION NC Well Contractor Certification Number ' ft ft. I. i / I/0 15.OUTER CASING(tor multi cased wells)OR LINER(Nan !feeble) 0. dL T C icGC f,�"I.l�J�✓ FROM 1 TO !DIAMETER .`�•THICKNESS 4I MATERIAL , Company Name ft. rt. .l' I in. 2.Well Construction Permit' �.1/ ,Q [I�/�� /� 16:INNER CASING OR TUBING(geothermal closed-loop) . - //7 /1 Z rl -Ae .FROM TO . DIAMETER THICKNESS MATERIAL List all applicable Well coasn'trction lie urGs(Le..1//C,CO,,,sjt,State;Variance,ere.) ft: ft. I ! . in. 3.Well Use(check well use): Pert.;//, AY 6a a ; lee _ ft. ft, In. Water Supply Well: . • ..17.SCREEN' i • ❑Agricultltral ❑M FROM =TO " DIAMETER SLOT SiZE THICKNESS MATERIAL' • unicipal/Public ft, ft, , tn• OGeothermal(Heating/Cooling Supply) ❑Residential Water Supply(single) . ❑Industrial/Conunercial ft a: ln. • Residential Water.Supply(shared) • ❑Irrigation 18.GROUT , OWells>100,000•GPO FROM. TO .• MATERIAL''' EMPLACEMENT METHOD&AMOUNT7 Non-Water Supply Well: ft.• •ft. .i , - • ❑Monitoring • ❑Recovery Injection Well: . , ft. ft.• + °Aquifer Recharge lil3GroundwaterRemediation ft. ft. • ❑Aquifer-Storage and Recovery ❑SAlinity Barrier' • 19.SAND/GRAVEL PACK(ifuppllcable) • • . FROM •• TO M1IATERiAL EMPLACEMENT METHOD ❑Aquifer Test OStonnwater Drainage .. ft. - ft: ❑Experimental.Technology ❑Subsidence Control ft. ft. . ❑Geothermal(Closed Loop) ❑Tracer • 20.DRILLING LOG(attach additional sheets if necessary) ' ❑Geothermal(Heating/Cooling Return) tier(explain under#21 Remarks) FROM TO DFSCRIPTION'(coioq Hardness,colt-rock reps,grain srze.crr.i_ ft. ft. -— - �j �+ t,• .ZS - iP.'hed®ekgrolsoi.:.rt►Q c�hc7 4.Date Well(s)Completed:/0—✓,) 2-3 Well II)#f f C 0 2 L•' ..7.-7) _ft. frr• y stir fZ S"aw Sa,Well Location: ft. ft. " /�L/e_ vnvc:}it,urelavvers S��c�t uv,�'SVt'' SeitY9y ft. • - rt, .. Facility/Owner Name Facility iDi!(ifapplieable) ft. it. "' '''''.:;• •2ix'7Z ,gvAreAlvdjTip.tYsoNt6viei • 2 - V ft. tr. NOV 2Q23 Physical Address,City,and Zip ' ft. ft•- ONslo(�.a • . A1.114,1.30y•78)8. 21 , _ ,,._�= — . REMARKS County •1 -7... iff!oz-a.ef-e',a. +'v 1, • Parcel Identifcntion.No.(PIN) � � �GtJ/�/tj ���►c i"�y1 fy.pc,;(`r.7.4., GL7(?I' Sb.Latitude and longitude in degrees/minutes/seconds or decimal degrees: Sn!e ,f' aG}I ed�'eht�rna.•f•'t`-e fo.t'C[,,,sttc d f e0 Ar el eta its(ifwcll field,one lot/longis sufficient) I. L u 7 22.Certif'cation: I 9.0 N 77. 36td•tfU vl, 6.Is(are)the.well(s): tlrmanent or ❑Tempot•ary Signature ofCertified ell Con)rnotor' Date By signing thisfornr,I hereby cc,lily t1 r (s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or 51‘ - 1SA NCAC 02C.0100 or RSA NCAC 02C.0200 Well.Construction Standards and that a color ' Olds is a renal);fill known well construction info,ntatio,and explain the nature of the of this record has been provided to the ire//owner. repair wider(121 remarks section or air'tieback of ibis fdmnt. • • 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only I GW-1 is needed. Indicate:TOTAL NUMBER dwells •(add'See Over'in Remarks Box).You May also attach additional pages if necessary. drilled: • 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: • I ,/ b.• ' ft• For multiple wells list all depths i[di(ferent(exa,rple I3 rr 200'dnrl2C100' ( ) Submit this GV1'-1 within 30 days of well completion per the following: . /V I 10.Static water top of casing: ,, •24a. For All Wells: Original fo�rl to Division of Water Resources (DWR), /f water tic is above level below use"+ ( ) information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 11.Borehole diameter: . on.) • 24b.For.Iniectton Wells:Copy t i DWR,Undergraiirid Injection Control(RUC) Program, 1.63E MSC,Raleigh,NC 276 1299-1636 • .,Well construction method: h:1 d.�0.;J .!UI`C .huger,rotary,cable;direct push,etc:) • •• 24c:For Water Supply rind Open-Loop Geothermal Return Wells:Copy to the c• ounty•environmental health department-of the county Where-installed FOR WATER SUPPLY WILLS ONLY:• • . 'I 24d.For Water Wells Producing:over 100,000 GPD: Copy to DWR,CCPCUA •13a.Yield(gpm) Method of.tesf: Permit Program;'1611 MSC,Raleigh,NC 27699,1611 13b.Disinfection type: Amount: - 4 I • • Form OW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised fi-1.O I R `' I51 D Heater Boring Construction Detail Revision#:_i •TERRATHERM Release date: 6/14/23_ °�" """�M' Approved by: 5 Well ID !HC-02E Date ' 4 n �`� Job#I R23-104 Oversight 1 t3 2 L 01 �' Driller ‘„#/e , i I 1 L, J O � NI r ;4)a le �- j / Constructed (fill out if Design different) Notes Length of Can Stick-Up(ft)/ j, Height of Can Stick-up Above 1/2"Thermocouple pipe? 'wad rP*R r' Ground(in) 5'/30" Thermocouple Length 77.29' -Length of VEW Stick-Up(ft)/ I' Height of Riser Stick-Up Above Ground(in) 1.5'/6" 0 In Ground Surface,MO' ------- I, Heater Can Conductive HT Grout `.% a•" ' ', • .ngle from Horizontal 22° t Schedule 80 'Y (f) `, '�y'.Borehole Diameter 7" f rt , _46 Top of#00 Sand 21.5' F _ `- Top of Screen 24 5 p t.t Heater Can Length 81.5 ft ',1,;‘A 5 Gal Buckets of Graphite 2.75 '�"'� Heater Can Diameter 3 in =L.� � _�`� Bags of Silica 3.75 Screen Length i/a OP ft r � Bags of Cement 12 Riser Length 29 ft ,k P..'A ( ` Screen Diameter 1 in r s 1 Bottom of Screen a4:9' 319.s Installation Method I ' '4t: Direct Push , Bagsof1100Sand 14 Ho ow Stem Auger ;1'- ' Gallons of Crushed Mud Rotary tc. �� t Limestone 14 Other:, t ., ,,�% , r fC Bottom of#00 Sand 61.5' ti ?Bottom of Heater Can 76.5' N :A, t l 1 ` Bottom of Borehole Post-Installation QC(to be performed 24hrs after installation) PID Log:Make/Model: 1)Confirm well is free of grout Design I Constructed Time: oQ ;fl d7 ! I Reading: f)a O PPM EP ' c Depth to bottom of well[ft bTOC R1 R1 Time: Q -, I I Reading: c)'' , 0 PPM if greater than or equal to 1ft less than designed alert the office Time: 0 LI ( I Reading: Q. ,Cj PPM 2)Confirm grout plug reaches ground surface Time: ;,Q5 1 1 Reading: , d.j PPM""'" r Notes: repeat daily until depth to grout is Oft. I Time: I D: I.- 1 I Reading: 6'ti ILO PPM /,--7- Date ` ,Depth to Grout[ft bgs]; ) S : I t I of