Loading...
HomeMy WebLinkAboutGW1--07077_Well Construction - GW1_20231103 • • WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: ' 1.Well Contractor Information: i GQJIWtrh (tif,.r-,ber 1. , 14.WATER ZONES 1 • Well ContractorName FROM TO . DESCRIPTION 3. '76 A ft. ft. NC Well Contractor Certification Number ft fit' I //' 15.OUTER CASING(for multi-cased wells)OR LINER(if op`Ilcahle) / I' .o-5C r:s,4 e. ,L r;/(,.N . • FROM TO DIAMETER THICKNESS MATERIAL Company Name fit. ft. I in. • /? /1 16.INNER CASING OR TUBING(geothermal closed-loop) 2.Well Construction Permit#:F CL I l C L l'I' -FROM ' TO- DIAMETER .THICKNESS • :MATERIAL List all applicable well construction perinite s;(i.e.WC.County.Sidle.-Variance,etc.)„ ft. ft. I. in. 3,Well Use(check well use): Per.%,//I:Ay E4°'; r C''.` ft. - ft. I In. Water Supply Well: • 17.SCREEN• ❑A iclllhtral .FROM TO DIAMETER SLOT SiZE THICKNESS MATERIAL °Municipal/Public fi. ft. I• in, ❑Geothermal(Heating/Cooling Supply) ❑Residential Water Supply(sinblc) rc. rt. I, .In. _ ❑Industrial/Coaimercial ❑Residential.Water Supply(shared) • qhn anon 18.GROUT ;: - g ❑Wells>100,000 GPD FROM, TO ' - MATERIAL'y, EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: ft..' • ft. ❑Monitoring ❑Recovery . ft. ft. • Injection Well:_ i uifer Recharge • fft. ft.❑A q g It tot dwater Remediation 19.SAND/GRAVEL PACK(if applicable) • ❑Aquifer Storage and Recovery . ❑Salinity Barrier FROM TO' MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stornwater Drainage • - . . ft.' . ft'. i ' ❑Experimental Technology ❑Subsidence Control . • ft. ft, i ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLING LOG(attach additional sheets if necessary) • OCieothermal Heatin Coolin Return) `FROM I TO I DESCRIITION(color,hardness Solt/rock( g thcr(explain under#21 Remarks)- type,grain sties etc) ft. 2.S.-ft. 4.Date Well(s)Completed:/j 4 �� /� .�.r: �b a��e�l��t-� Sia�v,fi CI��/ Well ro# C�-0/ 2 Srt' %D .fit: •f3-r .i 40..t-.fZ-:.5-,A,Lk /. 5a.Well Location: ft. ft. Ml e_ 6ye,f7oW^C efs Sydr.,R,v, _ k. 4( oribriy9`/ ft. ft. I-,i'' 'i. r. Facility/Owner Name Facility iDll(if applicable) ft. fit. !r'.f.-,'t,,.o k,_ i '.c kz-y„_ • • 2/Z7 Z eu.ve /3/1/4 / ft. ft. 40 173 r Physical Address.City,and Zip • ft. ft. O,v's/v w y314'l3a y'78i 8 /2211.REMARKS _ I «--,:.t . - -:. -.j t.,.,, . County tie er- �/ �� �.3i�` 7 Parcel Iiientificaiian No.(PiN) - fiQ1�Io j s/�efire C�r. at/J ee'tI v,+v wlt'l •Sb.Latitude and longitude in degrees/minutes/seconds or decimal degrees: S'ee0'ft tCIt heYI►�-E r e Io r Co.NSrri✓C{itf Pr eI et.;Is (if well field,one lat/long is sufficient) 22.Certification: 3 ,7 LII 4/c D • N 7.7,. ,3 R� R�0 W / ..r/ � -'-� o -/8'-- 6.is(are)the well(s): 11 rmanent 'or ❑Temporary Signature of Certified Well Contract Date By signing tieforot,I hereby cerlif•hut:the uellIs)was(Were)conso•ucied in accordance with 7.Is this a repair to an existing well: : OYes or .3I1V0 • ISA NCAC 02C.0100 or 1SA-NCAC 02C.0200 Well.Construction Standards and that a color • /f this is a repair;fill out known well consnuciiorl injormatimr and explain the nature of the alibis record has been provided to the/'aell o,wie, ' repair under 1t11 remarks section or on the hack of this form, 23.Site diagram or additional well details: You may use the back of this page to provide additional Well construction info 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells •(add'See Over'-in Remarks Box).You may also attach additional pages if necessary. drilled: I I 24.SUBMITTAL INSTRUCTIONS. 9.Total well depth below land surface:I!. ' , t (fit:) Submit this GW 1 within 30 des s of well Completionper the following: For multiple wells list rill depths If different(e aMPle-;3 rr 100'mid 2@100� Y, P j 10.Static water level below top of casing:. / (fit) '24a. For All Wells: Original form to Division of Water Resources (DWR), (Netter St r'level is water labove casing,use +^ Information Processing Unit,1617;MSC,Raleigh,NC 27699-1617 11.Borehole diameter: (in.) 24b.For lnlection Wells:Copy to DWR,Underground injection Control(lUC) f� �^ I Program,1.636.MSC,Raleigh,NC 27699-1636 12.Well construction method: /.1© f0..- �.M/C �: • (i.e.anger,rotary,cable;direct push,etc.) � 24c:For Water Supply and Opeti-Loop Geothermal Return'Wells:Copy to the .. '1 ,coiiny..environmental health department of the county where Metalled • • FOR WATER SUPPLY WELLS ONLY: 24d.For Water.Wells producing,over 100,000 GPD: Copy to DWR,CCPCIIA' Permit Program,•161 I MSC,Raleigh„NC 27699-1 61 1 13a.Yield(gpm) Method of test: . • 13b.Disinfection type: Amount: _:! j • Form GW-I North Carolina Department of Environmental Quality-Division of Water Resources Revised 6.6-2018 TER iiRATHEK INA SIW Boring Construction Detail i Revision#: 0 ttpI a Ca5.4 0 C.71,Zr, I Release date: 5/12/23_ , , 1 1 , Approved by: SL , . . i Well ID HC-01A Date 6 fitilt, I Oversight JiLfF 41.116..4 [lob# R23-104 Driller COey 401t, t.•71. 4//144ee/1 Des gn Constructed Notes (fill out if different) 1/2"Thermocouple pipe? ifitilWai i Thermocouple Length 59.171 —Heater Stick Up Height 30n a 14 1 I 1....11 —--SIW Stick Up Height. (1 / ----. Ground Surface 0.0' , , ., Conductive HT Grout— :iv:I') ,,,,;44 ,( Angle from Horizontal 78°, Heater Can , Schedule 80 , rt.. ,, Heater Can Length 60' *,A .-*.• .e 'Borehole Diameter 7"I Heater Can Diameter 3' 41 1 5 Gal Buckets of Graphite 2.25: VW Riser Length 51.5 ft -,I; 1,,,;,- fi: Bags of Silica 3 Screen Length 2 ft %g .4,j Screen Material ,, .4 " 1.' Bags of Cement 10 Stainless Steel ,3 ' '&. Fiberglass Ai: Rf,! 11'4 Top of#00 Sand 30'Other: tg gif i i , P4 '.'n' 5114/Slot Size 10 Bags of Sand 7.5 Screen Diameter in 64 kw ,•,A I A kt) .' Gallons of Limestone 7.5 ..:.,i Installation Method ,1 II,i i-4 e trIP i ; ;.,Iith !If; Ii'!..1 Top of Screen 50.511 , Vi= Direct Push ''At W-e,—i'P I ;,,i, .:,,,,4, ,A1 I Hollow Stem Auger n,,,e ;,ft*_.''.71;I ;),. .p.: ',i,; Mud Rotary —.g Other: g :0-: t Bottom of Screen 52.5' 4.. •,: —.r,, k',L,'v 00 ,Y,''', =,•., :- ?,:•4! \-li , .=,,,g P..,,-,01,••••',,.JA .,,kze. Fil•-.4,".4,760,'; Bottom of 800 Sand 54.5' . Conductive High Temp Grout ;: zch,, I , . " , , I , i.:;) ,:, Bottom of Borehole , 1 I Post-mstaiiation QC(to be performed 24hrs after installation) PID Log:Make/Model: 1)Confirm well is free of grout Design Constructed Time: 7.7 3 0 Reading: 6•4_ PPM Depth to bottom of well[ft bTOC]: fin' Time: 3 :, CO Reading:"6•CIP PPM if greater than or equal to Ift less than,designed alert the office Time: (41 . • Reading: 'CLCI PPM 2)Confirm groat plug reaches ground surface ' : ' Time: • ; 0 0 Reading: I 4!" V PPM repeat daily Until depth to grout is Qft , Time: 0 0 0 Reading: Id. 0 PPM Date Depth to Grout[ft bgs] ;1 Notes:I I, } • 1 • 1 „ i • ,