Loading...
HomeMy WebLinkAboutGW1--07071_Well Construction - GW1_20231103 • • WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: I.�)Well Contractor Information: • 11 /,i-d-py. ilii.t er' 1 14,WATER ZONES l Well Contractor Nitrite ' ' FROM TO DESCRIPTION . �!7�Arr. rr. • ft, ft.NC Well Contractor Certification Number 15.OUTER CASING(for multi-cased wells)OR LINER(if hp [Kahle) (,:i .s$C CL,4:1 e. /I ,-':_9. .FROM-f �^/ l[/ TO. (1DIAMETF•It' THICKNESS .MATERIAL Company Name v . .ft. ft. • M. ! 2.Well Consh action Permit#:N/� C EI j L -�L�v 16.INNER CASING OR TUBING(geothermal closed-loop) FROM TO- DIAMETER THICKNESS MATERIAL List all'applicable well construction pe nits(Le UlC.County,Slate,Variance,etc.) ft, ft. in, ' 3.Well Use(check well use): Per.),t/`f i A.9 40 a'' Y e 6e. -ft. ft. In. Water Supply Well: 17.SCREEN . I l lAgrieultltral FROM• TO DIAMETER. SLOT SIZE THICKNESS • MATERIAL OMunicipal/Public ft. rt: in. ❑Geothermal(Heating/Cooling Supply) ,OResidential Water Supply(single) ❑IndustriaUCommercial ft. fr. I. in. ❑Residential W• ater Supply(shared) IS:GROUT ;i_ , , . ❑Wells> 100,000 GPD FROM ' TO ' MATERIAL' •EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: ❑Monitoring ❑Recovery Injection Well: ft. ft. OAquiferRecharge th roundwaterRemediation ft. ft. -1 - • • ❑Aquifer Storage and Recovery ❑Salinity Battier • 19,:SAND/GRAVEL PACK HI applicable) . - FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stonnwater,Drainage • . . . rt. • rt: ❑Experimental:Technology ❑Subsidence Conu•ol ft. ft. OGeothelmal(Closed Loop) OTracer 20.DRILLING LOG(attach additional'sheets if necessary) , • ❑Geothermal(I-leating/Cooling Return) •then(explain under#21 Remarks) FROM TO DESCRIPTION(color,hardness,sol0rock type,grain s{xe,etc.1,� 4.Date Wells Com Ieted: !1 I ,Felli e h edit- � re,/Sfw.v1 t4•C:t 6.7 () P Well ID# / I C ,C. 2a 2 S ft• fi, f A / 5a.Weli Location: 1 ft: It. 'ALL avc, ,v i 1 le t=- ',:?-; ; _ J'�t�ur C �I�s'���t-zf'vv,Q..:�•i�t' 1� �6 y�y��1 ft. ft. �•'''-'•'�.,�r�;, `� ';�`-' Facility/Owner Name Facility ID//(if applicable). ft• ft. NOVa ;• ft. • ft. III/V 2iz.74 et;eve &lice fJe;ersye,",v.,•.1/ei 28' "YZ • Phyran!Address,City,and Zip ft, ft. I ,.,:,,-•:._:'.,:, - - - • ©N-Si l CO • 4i314'13e'178)8 , 2211:REMARKS'. • . . • �" - County' Parcel Identifiication No.(PIN). /lee lhf l• c ...n/L+J; 'j�L� VCa j�e.t- j(f re al tiv&el 5b.Latitude and longitudeindegrees/minutes/seconds or decimal degrees: She �GIieASeti�'If►a r e fore��srrw-cf+t1A+� It ai�S (if well field,one lat/long is sufficient) 1�/G 17 '� 22.Certification: -N 6.is(are the wells: llrman ' 1Alf........(//0-1/,/,‘, „4,5",...-2..3 f O ent or ❑Teo ora Certified Well Con ' � P � Date Hp signing this form,I herebj•certifs.that the we (.$)was(were)constructed in accordance w'irh 7.Is this a repair to an existing well: ' ❑Yes or &I • ISA NCAC 02C.0100 or/SA NCAC 02C.0200 ifel!Constr•,rction Standards and that a copy If this is a repair fill out known well cen.d1,uc/ion inlormatio,,arid explain the nanny of the q/Yhis record has been provided to the well ownen repair under#21 remarks'see ion or nit the hack of this fora:. 23.Site diagram or additional well details: You may use the back of this page to provide additional well construction info 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same (add'See Over'in Reinaiks Box).You may also attach additional pages if necessary. construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells drilled: 24.SUBMITTAL INSTRUCTIONS. 9.Total well depth below land surface: j 1 For multiple wells lie,all rlepthc ifdilferent(example-3@200'and 2©100') (f t) Submit this GW�1 within 30 days of well completion per the following: �10.Static.water level below top of casing: /( (ft,) •24a. For All Wells: Original form to Division of Water Resources (DWR), lJ'tcal level is above casing,rose information'Processing Unit,1.617!MSC,Raleigh,NC 27699-I617 11.Borehole diameter: 7 . . (ill,) 24b.For Injection Wells: Copy to DWR,Underground Injection Control(IUC) Program,1.636 MSC,Raleigh,NC 27699,163E 12.Well construction!Method: Rt0 te4-5.✓1/i.4. (i.e.Huger,rotary,cable,direct push,etc.) 24c.For.Water Supply and'Open-'Loop Geothermal Return Wells:•Copyto the county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: • '..' f i • • 24d.For Water Wells producing over 100,000 GPD:Copy to DWR,CCPCIJA (gP ) Method of "Permit Program,1611 MSC,Raleigh,NC 27699-161.1 13a.Yield m • test I 13b.Disinfection type: Aniount: . Form OW-I North Carolina Department of Environmental Quality-Division of Water Resources . Revised 6.6-2018 j 1 s,3%t :TERRe4THERM ISTD'Heater Boring`Construction Detail Revision#:_0 a c.f.11c*rr r Release date:_5/12/23_ Approved by: St Well ID HC-028 Date ', t�- e9 — 5 Oversight ' I SA;tn,.fi Job# R23-104 Driller ,Ca/` N •k/Al. 464/ / Constructed ( (fill out if Design different) Notes -Length of Can Stick-Up(ft)/ Height of Can Stick-up Above ' 1/2"Thermocouple pipe? Ground(in) 3.5'/30" Z• 486. Thermocouple Length 87.67' -Le of VEW Stick-Up(R)/ Height of Riser Stick-Up Above ! i Ground(in) 1'/16" Z. Ground Surface_0.0' _ _ ____' _ _ a HeaterCan ��_.._ Conductive NTGrout i, � �i"� �~� I Angle from Horizontal 35° Schedule 80 of . ' f 7�" 03,01 • _'v.Borehole Diameter 7' 0 "c,'• . 430 _ , Top of#00 Sand 3' ttr �� Rt,-0-r Top of Screen 5' = Heater Can Length 91 ft 5 Gal Buckets of Graphite 11 Heater Can Diameter 3 in r Bags of Silica 1.5 Screen Length 17.5 ft jai Bags of Cement 4.5 Riser Length 7 ft e r,..k_t* { Screen Diameter 1 in '3� y h Bottom of Screen 22.5' r p s Installation Method ,} `t CC Push 5,e, ;."1 i,. Bags of#00 Sand 28 IIII Sonic hi 4. 4 l�If ,4. Gallons of Crushed ow Stem Auger Mud Rotary' �t., Limestone 28 w is ] F Other: .+ c, ° zit*,Bottom of#00 Sand 76.5' e'/'; k`$ k,4'Bottom of Heater Can 87.5' - f e.1 r. Bottom of Borehole 87.5' Post-Installation QC(to be performed 24hrs after installation) AID Log:Make/Modeh 1)Confirm well is free of grout Design Constructed Time: ,/Z fora Reading: 0,0 PPM Depth to bottom of well[ft bTOC: ea' Time: g f<ro Reading: 064 PPM if greater then or equal to ift less than designed alert the office Time: Z t..O Reading: Q,p PPM 2)Confirm grout plug reaches ground surface Time: -g stso) Reading: mio PPM repeat daily until depth to grout is Oft. Time: Y:clh, Reading: 0.0 PPM Date! Depth to Grout[ft bgs] Notes: I (PM i