HomeMy WebLinkAboutGW1--07056_Well Construction - GW1_20231102 WELL CONSTRUCT ON RECO '
For internal Use Only:
I.Well Contractor information:
t(i (,' A iv - _ ---M.3�hTF,It 7CtNFS
wetl C'oaoatxor Name - iRdM1i _.. ,_TO riCRIPTION
--- 3O ,. t it. ri,
NC Well Connector Certification?srrmbcr ft. ft
15.t)VTER CASING_fnr multi-eased well) OR LINER fif lNOM ...
c em,poay Nam L r7tOlri otAmErER THICKNESS MATERIAL___17,
ft in.
Z.Well (� I6.INNER C".A.SING t)R 1111RtNGAgeesthermal closed-logy .. �."'W_ VW_�CWIstnietiorPermit#:iyA cot4 6 ; er _To nIAMEISR IMC10E:SLS MATERJAty
List all applicable well eotottrtcttan per n.
�(�rs, (i.e..UJC County,Stale,Variance,ere.), rt. • __ `
cheek wen one): -- _ _.______..._.._.
3.Well Use n. r!. in.
Supply Weil: 17.SC'T REN _ -..
l7 icuieattel FR -4__ To nrAMCTfta SLOT SIZE THICKNESS--..........-____..........-
---
Wider MATlr-RIA).- ry
OM unicipaliPublic Ft, rt, in,
DOcothennal(Heating/Cooling Supply) QResidential Water Supply(single) -
°htdustrinUCommercinl °Residential Water Supply(recta
PP. tled) _ _
1R.GROUT _._.....,...._
Ohrication DI/Veils> 100,000 GPI) room iv
Pion-Water Supply Well: - - MATERIAL; p1ilPtAehtP1 MfTlf(Ip3 tni<iu
-ft. ft
❑Monitoring ❑Recovery __ __ _.-
ttjeetion Well: ._.. t!. ft.
C7Ayuifer Recharge EL n. —-
g ervundwiuer Retnedie +tion _
°Ayuifrr Storage and Recovery OSalinity Barrier , 19•SAND/GRAVEL PACK(il-wxTpiical )
PROM TO MATERIAL eel Pt�ctnraNr METHOD
1lAyurfer Test OStormwater Drainage ft. ft.. .
lExperimental Technology OSubsidtnce Control
ft. h.
°Geothermal(Closed Loop) °Trac:er r---__.
0 21).DRILLING LOG(*tomb additional
sheets
` s}erlIf n ecesaory) -
ors arriON(mbr,htrdness,tolunx4r rc,t;+r.,�.t:LOCieothertnal Heating/Cooling Return) •her(explain under l2l Remelts) ra(MTn
a.11)ate Weli(i)Completed: Well Tll1t �� -j y +�0 ft* . " S" ' 1 acr.�'1)ale / i.CI
50.Well Location: te It — —w
/e Orve.J'sw,tr e er%Ssrtt mist- t�',t. I! j}0 silt if ir R
FrivilitylOtener Name Paeility t Me It•vdran ft. ft. , a 1f.....
let
2147 t t) e /3/VVri J etc ,,✓>•j. /,. 2t.5'y‘ ft. ft. NOV J 2 2023 ___...,.
Physical Address,City,and Zip ft; ft.
Cranny Parcel identification No.(PiN) f 0X _ _
_.
5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: gee.4, A e+t Ac-h_° "r t (-foe co,,v,�tr"a�►JC tit,w>el t`tot r S
(it'well field,one tat/long is sullietent) 22.Certification:
W --,�--_--- _ I c Its 23
6.is(are)the well(s)t lW rmanent or OTempaorary Signature of Certified Well Contra tnr Date
.is this aHy signing this form.t hereby ectlifj that the neeilto)was(nekav)e'on.soireted in accarr/cnn•r%vats
repair to an existing well: CD Yes or tileVr, 114 NCAC 62C. 0100 or lid Wale MC.0100 Well Cbhstnrrtion Standar*aid that a cop
it this is a reptitr,"till Out know,,nWil(onsntaaian itifininattan and t'.rplaat the nature of the, of this record has hues,pra,.9ded ro the,met mrwer.
repair under 021+errant,section or an the bat*of this fitiar
23.Site diagram or additional well details:
You may use the back of this page to provide additional well construction info '
tl.For(:eoprobeiDYT'or Closed-Loop Geothermal Wells having the same
construction only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over in Remarks Box).You may also attach additional page if necessary,
drilled:
24.SUBMITTAL INSTRLtCTiONS
9.Total well depth below land surface: /_ 1 't' .2
For natlttple neat Ito all deptks ifdii rent(examipl (i(20a"am It 10s1a» (0) Submit this C;W-1 within 30 days of well completion per the following:
W.Stadc water level below top of caning: '( ) 24a. For All Wells: Original form to Division of Water Resources (DWR).
if denser level is above,casing,asc„+ (N information Processing I1ntt1617 MSC,Raleigh,NC 27699-I ti l 7
11,Borehole diameter! g (in.) 24b.For Inlet**,Ws11s:Copy to DWR,Underground Injection Control.(10C)
t Program,1636 MSC,Raleigh,NC 27699-1636
12.Well construction method: i f Gl l9 rVt t '""'""_ 24e.For Water SupplyaridWells;Open-Loop Geothermal Return ells.Copy to the
(i:e.auger,feisty,cable,dim.,yeah,*KO
county environmental ealth department of the county where installed
FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPO: Copy to DWR.CCPCt1A
13a.Yield m permit Program, 1611 MSC,Raleigh,NC 21 9-1611
(gP ) Method of test:
13h.Disinfection type: Amount:
Form OW-I •- ..
'0,4 TERRATHERM SIW Boring Construction Detail Revision#: 0
Release date:_5/12/23_
Approved by: SL
Well ID 14-34 Date 'Q `p<a "a"S
Oversight tb
1 '1 Job# R23-104
'
Driller i_' i.,A Ill'/(Y Gal r
Design Constructed Notes
(fill out If
different)
1/2"Thermocouple pipe?
Thermocouple Length 58.67' -Heater Stick Up Height 30"
—SIW Stick Up Height 18"
Ground Surface 0.0' '
Conductive HT Grout 111,Angie from Horizontal 90°
Heater Can
Schedule 80
Heater Can Length 59.5' Borehole Diameter 7"
Heater Can Diameter 3'
Gal Buckets of Graphite 1a5 1/.Q
SIW
Riser Length 51.5 ft Bogs of Silica k ti
Screen Length 2 ft
Screen Material Bags of Cement / 3
Stainless Steel
Fiberglass Top of#00 Sand 30'
Other:
SIW Slot Size 10 Bags of Sand 7.5 1 Screen Diameter 1"
Gallons of Umestone 7.5
Installation Method
Sonic Top of Screen 50'
Direct Push
Hollow Stem Auger
Mud Rotary
Other: Bottom of Screen 52'
U
Bottom of 800 Sand 54'
Conductive High Temp Grout - t a 6 1
,�, `0' Bottom of Borehole 57'
Post-Installation QC(to be performed 24hrs after installation) BID Log:Make/Model:
1)Confirm well is free of grout Design Constructed Time: 1 ! :3,0 Reading: (�.('1 PPM �'
Depth to bottom of well[ft bTOC]: FA c' —Time. t�� -pp ,C,
if greater than or equal to Ift less than designed alert the office Time: ° Reading: Q, 0 PPM e V G
2)Confirm grout plug reaches ground surface Time. 0 Reading: 8)6 ( PPM
repeat daily until depth to grout is Oft. Time: Reading: y 1 PPM
Date Depth to Grout[ft bgs) Notes: