Loading...
HomeMy WebLinkAboutGW1--07017_Well Construction - GW1_20231102 WELL CONSTRUCTION RECORD GW-1 I For Internal Use Only: 1.Well Contractor Information: tlX1Ii6-tvx lttuber 1 Well Contractor Namc 14.WATER ZONES FROM TO DESCRIPTION 3876A ft. n. NC Well Contractor Certification Number n• ft. IS.OUTER CASING(for multl-cased wells)OR LINER(if ap likable) (2.n�.1•C a.c,(e. br-/ f ri i✓D FROM I TO ) DIAMETER THICKNESS MATERIAL Company Name J ft. n, )n 2.Well Construction Permit# A ('.'ERC j /� ['�,[ 16.INNER CASING OR TURING(geothermal closed-loop) it 5:Ice FROM TO DIAMETER THICKNESS MATERIAL List all applicable well construction pe its(i.e.UIC.County,State,Variance,etc.) It. ft. in. Per-0, 3.Well Use(check well use): /r Ai°`' i'e ft. ft. In. Water Supply Well: 17.SCREEN ❑Agricuhttral FROM TO DIAMETER SLOT SIZE TNICKNE35 MATERIAL ❑Municipal/Public rt, It.OGeothermal(Heating/Cooling Supply) ❑Residential Water Supply(single) ❑Industrial/Commercial n• n. In. ❑Residential Water Supply(shared) IS.GROUT ❑hTigation ❑Wells> 100,000 GPO FROM TO Non-Water Supply Well: MATERIAL EMPLACEMENT METHOD&AMUUNTV n. ft. ❑Monitoring ❑Recovery Injection Well: /'� , ft. ft. Recharge uidlt'dwater Remediation ft. ft. ❑Aquifer Storage and Recovery ❑Salinity Barrier 19.SAND/GRAVEL PACK(If applicable) FROM I TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test OStormwater Drainage • • ft. • ft. ❑Experimental Technology OSubsidence Control ft. ft. • OGeothermal(Closed Loop) ❑Tracer 20,DRILLING LOG(attach additional sheets If necessary) OGeothermal(Heating/Cooling Return) then(explain under#21 Remarks) FROM TO DFSCRIPTtUN(color,hordes raturoek �y� •• hardness, h'Fe,grain saes,eta.) 4.Date Well(s)Completed: 0 Well iD# / /— R• Z S. ft. "F'"` r�j td�Pi 5 rc / ,(a tt 1aC7 fl �� �� 2 S n, 1d f' f,-j .,C „rk-z sati I 5a,Well Location: n. ft. mac. oive J our C'�wers S` ei- , ,lC S--� 1( sy'eb a i''b yyvl°y ft. rt. - Facility/Owner Name Facility ID#(if applicable) ft. rt. 2/2.7 Z,cu,Are i31� /3;enso/v✓,-i/e f 285 yed n• tl ', Physical Address,City,and Zip ft. ft. t/N-1s/0 to y j 9d13d y•7813 21.REMARKS County Parcel identification No.(PiN) "V//a " 1 44...se r a,, toe Sb.Latitude and longitude in degrees/minutes/seconds or decimal degrees: St'.ect,fzt4 e/tctierne-'E-t`e for CtwArsr(f i o ft,el eta i is Orwell field,one lalloog is sufficient) y. �1�Q j / f 22,Certification: 1 6.Is(are)the well(s): Icrmanent or ❑Temporary >naEH lure ofCertifiedZeWell Contractor �^�r� )(✓ -��f `213 �' Date 7.Is this a repair to an existing well: OYea or �O By signing this form,I hereby certij•that the twills)was(were)constructed in accordance with if C this is a repuir,,Jill out known well construction iyfouation and explain the nature of the of h record hasO100 bee provided to th or ISA NCACa tell o700 Well Construction Standards and that a corm repair under lt2/remarks section or an the hark of this forni. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 2 2 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: (ft.) For multiple we/Ls list all depths if different(example-3@200'and 2@/00� Submit this GW 1 within 30 days of well completion per the following: 10.Static water level below top of casing: /(P (ft.) 24a. For All Wells: Original form to Division of Water Resources (DWR), If water level is above casing,use'+v If Processing Untt,1617 MSC,Raleigh,NC 27699-1617 11,Borehole diameter: 8 (in.) 24b.For Infection Wells:Copy to DWR, Underground injection Control(IIIC) Program, 1636 MSC,Raleigh,NC 27699-1636 /� 12.Well construction method: /1 0 fa .040 C (i.e.auger,rotary,cable,direct push,etc.) 24c.For Water Supply and Open-Loop Geothermal Return Wells;Copy to the county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD:Copy to DWR,CCPCUA Permit Program,1611 MSC,Raleigh,NC 27699-1611 13a.Yield(gpm) Method of test: 13b.Disinfection type: ADiount: Revmed 6-r,-mist Form OW-I North Camlina Department of Environmental Quality-Division of Water Resources obi TERRATHERM Multi-Phase Extraction Well Revision U. ,rwr�r,.•,., Release date:_5/.12/23_ Construction Detail Approved by. St..._--. Well ID M-5 Date ^1 9 V 3�VV! Oversight :$4 Vid lob it R23-104 Driller ('G __.__ i er iy Design Constructed Notes (fill out if Well Diameter 4" different) Borehole Diameter 8" Stick Up Height Ground Surface 0.0' HT Grout Angle from Horizontal 90' Top ofiY00Sand 1' C ngMateral Carbon Steel T•_-,, op of Screen 3' Riser Length 6 ft Screen Length 17 ft Bogs of NO0 Sand 12 s'Q Rags of Cement 25 1..�5 _, Bags of Silica Screen Material Stainless Steel Borehole Diameter 8" Fiberglass PVC ----- Other: Slot Size 1(1 " Bottom of Sand 20' Bottom of Screen 20' I • •tion Method 111 Soni HT Grout--- Hollow Stem Auger Sump Length 2' Mud Rotary Other: Bottom of Sump 22'1 Bottom of Borehole dr Post-Installation QC(to be performed 24hrs after installation) PID Log:Make/Model: 1)Confirm well is free of grout Design Constructed Time: 7 3t03.. Reading: (3,e PPM Depth to bottom of well]ft bTOC1: 75' Time: a _ )11A Reading: O PPM if greater than or equal to 1ft less than designed alert the office Time: 4; dam Reading: 1. PPM 2)Confirm grout plug reaches ground surface Time: Reading: PPM repeat daily until depth to grout is Oft bgs Time: Reading: PPM Date Depth to Grout(ft bgs] Notes: r " �q