Loading...
HomeMy WebLinkAboutGW1--07010_Well Construction - GW1_20231102 WELL CONSTRUCTION RECORD(GW-I) For Internal Use Only: 1.j )Well Contractor Information: (fi I i r/lld-rN We e t t4.WATER ZONES Well Contractor Namc FROM TO DESCRIPTION NC Well Contractor Certification Number ft. ft. / 1S.OUTER CASING(for multi-eased wells)OR LINER(if ap Ilcable) CO..SC C.4 e br lb i✓4J FROM I TO f DIAMETER I THICKNESS MATERIAL Company Name it• ft. In. 2.Well Construction Permit#: 16.INNER CASING OR TUBING(geothermal closed-loop) A t-L 1 C L.r 1 JLe FROM TO DIAMETER THICKNESS MATERIAL List all applicable well construction p its(i.e.UK'.County,State,Variance,e etc.)„ ft. R. in. 3.Well Use(check well use): Peer•,ifb~9 W et-' +r H ft. in. Water Supply Well: 17.SCREEN ❑Agricultural ❑M FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL unicipal/public ft, ft. in. ❑Geothermal(Heating/Cooling Supply) ❑Residential Water Supply(single) ft. ft. In. °lndustrial/Commercial ❑Residential Water Supply(shared) °]rrigation 18.GROUT Wells>100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: ft. ft. ❑Monitoring ❑Recovery _ ft. R Injection Well: • //�� ❑Aquifer Recharge �dr•Ldwater Remediation ft. ft. ❑Aquifer Storage and Recovery ❑Salinity Barrier 19.SAND/GRAVEL PACK(if applicable) • FROM TO MATERIAL EMPLACEMENT METHOD °Aquifer Test ❑Stormwater Drainage • ft. • ft. ❑Experimental Technology ❑Subsidence Control ft. ft. OGeothermal(Closed Loop) ❑Tracer 20.DRILLING LOG(attach additional sheets if necessary) ❑Geothermal(Heating/Cooling Return) then(explain under#21 Remarks) FROM DESCRIPTION(color,hardness,soil/oek type,grain size.size,cu.j_ TO G J D ft. 2 S. ft. .,,(�.401/ rh obis r of 3a.N1 U'tv_1 arl 4,Date Well(s)Completed:i "D - Well iD# N / Z 2 S rt. 7.7 ,rt• 1 _�) LJ /'fS�1 a nr12.�0L/v i� 5a.Well Location: D. It. / - /3BC.' O/e-}iour CIS 4,e(x refu , -S,/e /ir A 02.16 Yy99Y ft. N. _ Facility/Owner Name Facility ID#(if applicable) ft. it. NOV ) ) 2/27 t jetli.e /3/1/6.T err eA/W;i/ef 2 8s•Sid R. ft. Physical Address,City,and Zip it. ft. ,.-'--' 00V-5/0w y3 1/3D1/78 18 21.REMARKS County Parcel Identification No.(PIN) / Tel- 00.-a.'�N..s:&//,,.-f-,O_ _ 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: S•e A'b�1 eische_/no-'E-t`c.for C t%M 1j r f-'a w d e tc%i is (if well field,one lat/long is sufficient) 22.Certification: 3ti.7y/4/00 N - '77, .3dlivD / 6.ia(are)the well(s): tBPermanent or ❑Temporary 23 Signature of Certified Well Contractor rta~~4%CC / DAte By signing this form,1 hereby certify that the wr//(s)was(were)conraxaved in accordance with 7.Is this a repair to an existing well: ❑Yes or Q11‘ 15A NCAC 02C.0100 or ISA NCAC 02C.0200 Well Construction Standards and that a copy lfthee is a repair fill out known well construction information and explain the nature of the of this record has been provided to the well owner. repair under#21 remarks section or on the hark of this form. 23.Site diagram or additional well details: You may use the back of this page to provide additional well construction info 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same (add'See Over'in Remarks Box).You may also attach additional pages if necessary. construction,only I GW-1 is needed. Indicate TOTAL NUMBER of wells drilled: 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: 2.. (ft.) For multiple wells list all depths if different(example-3(a�100'and 2@1011) Submit this GW 1 within 30 days of well completion per the following: 10.Static water level below top of casing: 49 (f 24a. For AD Wells: Original form to Division of Water Resources (DWR), (Twofer level is above cashing,use"+ t) information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 11.Borehole diameter: 6 (in.) 24b.For Injection Wells:Copy to DWR,Underground Injection Control(IUC) ,p e� Program, 1636 MSC,Raleigh,NC 27699-1636 /1 12.Well construction method: O 1�0.SOW 24.For Water Supply and Open-Loop Geothermal Return Wells:Co to the (i.e,auger,rotary,cable,direct grub,ere.) county environmental health department of the county where installed py FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD:Copy to DWR,CCPCl/A 13a,Yield m Permit Program, 1611 MSC,Raleigh,NC 27699-1611 (BP ) Method of test: 13b.Disinfection type: Amount: - Revised 6-6-701 ti Form GW-I North Carolina Department of Environmental Quality-Division of Water Resources IWO TERRATHERM ISTD Heater Boring Construction Detail Revision#: 0 Release date: 5/12/23 Approved by: SL Well ID H-12 Date Oversight .. V t1 Job# R23-104 Driller Fe eJ +5/7� ,,,,dam jy Constructed (fill out if Design different) Notes --Stick Up Height � ' 0� C, 1/2"Thermocouple pipe? \ _;" ; . 4 24" � Thermocouple Length 27,67 _-- Ground Surface 0.0' Heater Can Conductive HT Grout— Angle from Horizontal 90° Schedule 40 Borehole Diameter 6" Heater Can Length 28 ft 5 Gal Buckets of Graphite 1.25 Bags of Silica 1.75 Heater Can Diameter 3 in Bags of Cement 6 Installation Method Direct Push Hollow Stem Auger Mud Rotary Other: Bottom of Heater Can 26' Bottom of Borehole 26' act. Post-Installation QC(to be performed 24hrs after Installation) PID Log:Make/Model: 1)Confirm well is free of grout Design Constructed Time: Reading: PPM Depth to bottom of well(ft bTOC 711' Time: Reading: PPM if greater than or equal to lit less than designed alert the office Time: Reading: PPM 2)Confirm grout plug reaches ground surface Time: Reading: PPM repeat daily until depth to grout is Oft. Time: Reading: PPM Date Depth to Grout[ft bgsj Notes: