HomeMy WebLinkAbout20201194 v.2 in-field mod signedROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
NORTH CAROLINA
ErrOM"fh#rrrdf Quairry
North Carolina Division of Water Resources
Transportation Permitting Unit
In -Field Minor 401 Water Quality Certification, Buffer Certification and Isolated Water Permit
Modification
Project Name/ TIP Project No: James City / U-5713/R-5777AB Date: 11/9/23
DOT Division: 2 County: Craven DWR Project No. / Permit Type: 20201194 v.2
DOT Staff:
ACE Staff:
Modification E
Wendi Johnson
DWR Staff: Garcv Ward
DWR Regional Office: Washington
An additional 20 linear feet of temporary stream impacts occurred at Site 18 (culvert 5) due to the addition of a temporary
diversion outlet.
On the downstream side of culvert 5 at Site 18 a temporary pipe and impervious dike are needed to route drainage from
adjacent wetland WT. Additionally, 24 inch pipes will be used for diversions during the construction sequence in lieu of
diversion ditches.
Modification Sketch:
See attached drawings
e-�jQE North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
In -Field Modification
Page 2 of 3
This in -field modification is required for the following reason(s):
The information contained in the application or presented in support thereof is incorrect in the
following manner:
Lx Conditions under which the original certification was issued have changed in the following manner:
Temporary stream impacts are needed during the construction sequence of culvert 5 at Site 18.
This in -field modification is valid only if issued by an authorized agent of the Division of Water Resources,
Transportation Permitting Unit'
This in -field modification authorizes the NCDOT to
to temporarily impact an additional 20 linear feet of stream at Site 5 and use diversion pipes in lieu of diversion
ditches during the construction of culvert 5
in Craven County. The project shall be constructed as described in the Modification
Description and Sketch on Page 1 of this document dated 11/9/2023 to improve/construct the
culvert at Site 18. The approved design is that described in the Modification Description and Modification
Sketch on Page 1 of this document dated 11/9/2023. Any further changes to the original Water Quality
Certification dated January 15, 2021_may require a formal written modification request.
The description of the proposed action provides adequate assurance that the proposed action in the
Neuse River Basin in conjunction with the proposed development will not result in a violation of applicable
Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that
this activity will not violate the applicable portions of Section 301, 302, 303, 306, 307 of PL 92-500 and PL
95-217 if conducted in accordance with the application and conditions hereinafter set forth. Should your
project change, you are required to notify the DWR and submit a new application. If the property is sold,
the new owner must be given a copy of this Certification and approval letter and is thereby responsible for
complying with all conditions. For this approval to remain valid, you are required to comply with all the
conditions listed below. In addition, you should obtain all other federal, state, or local permits before
proceeding with your project including (but not limited to) Sediment and Erosion control, Coastal
Stormwater, Non -discharge and Water Supply watershed regulations. This Modification Approval shall
expire on the same day as the expiration date of the corresponding Corps of Engineers Permit.
Conditions(s) of Modification Approval:
1. All the authorized action activities and conditions of the certification associated with the original
Water Quality Certification dated January 15, 2021 and all other corresponding modifications still
apply except where superseded by this certification.
2. Additional Conditions:
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
In -Field Modification
Page 3 of 3
Failure to construct the proposed action as described in the Modification Description and Sketch on
Page 1 of this document and/or violations of any condition herein set forth may result in revocation of this
modification approval and may result in criminal and/or civil penalties. This modification approval shall
become null and void unless the above conditions are made conditions of the Federal 404 and/or Coastal
Area Management Act Permit. If the Corps of Engineers requires a formal written modification to the 404
permit for the proposed action, the NC DWR must require a formal written modification to the 401 WQC,
and therefore, this in -field modification is invalid. If additional (wetland, stream, buffer) impacts for this
project (now or in the future) exceed (one tenth of one acre, 300 linear feet, or one-third of an
acre/150 linear feet, respectively), or if mitigation is required above and beyond the current mitigation
requirement for this project, this in -field modification is invalid and a formal written modification is
required.
This in -field modification is effective upon the date the last party signs this document. This in -field
modification is made upon mutual agreement between DOT and DWR as indicated by the signatures
below and is, therefore, not subject to appeal by either party. Appeals by third parties must be made
within sixty (60) days of notification pursuant to the contested case provisions of the Administrative
Procedure Act, NC Gen. Stat. §150B-23 et seq.
DWR Staff Signature:
Date: 11 /9/23
DOT Staff Signature:-�'`-
Date: 11-9-2023
USACE Staff Signature:
Date:
— An authorized agent of the Transportation Permitting Unit is defined as DWR staff that are DOT -funded and
review and issue 401 Water Quality Certification for DOT projects. These staff include Central Office and Regional
Office personnel.
e:5�fQE North Carolina Department of Environmental Quality I Division of Water Resources
f , 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
err M rw�r�`
919.707.9000
DETAIL 10-1
MEDIAN V DITCH
I Notro Scelel
Shoulder Should.
Paint 3. � Point
/ \o
FROM STA. 298+00 -L- TO STA. 301+00 -L- LT
FROM STA. 306+50 A- TO STA. 309+50 AL LT
DETAIL 10-5 DETAIL 10-6
TOE PROTECTION LATERAL BASE DITCH
(Not ro Scala) Net 1. Scale)
Nelurol
N°Nr°I \p6 S\°� Ground 3y \ Fill
Ground F�\ d D 3'. 1"�. Slope
d GEOTEXIIIE Min. D=2 Ft.
d=1.5 H. Geotextile Max. d=2 H.
'When B is , 6.0' B=4 H.
Type of Liner= CL B RIPRAP Type of Liner= CL B RIPRAP b=5 H.
FRO -Y TO FR - 50 -Y22 C- T
STA. 14+60 -Y22RPC- STA. 16+15 22RPC- T
GARY A CAHOON
GARY A CAHOON M
CARLSON & WILLIAMS SRASONAL HIGH'
JE HOMES, LLC DUE GROUNDWATER TABLE \
k oG I I 1
\
O DRY L NENTIO
BA IN I{s8 . s
• G B9TTOM ELL 2 .0' is
SEE DETAIL 8
C B RIPRAP PUE
0 Imp
./��.-x-
PUE
I v
RCP-Ift� F F
B
__---_____________�__�_--SRY2FA-
--15"RCP-IV \ I _ao
+ w--------------
J co_ W ----------------
s
0 Lu _-------------
L-------------
Submitted 10/19/23
DETAIL 10-3 DATE: 09-08-2023
MEDIAN V DITCH
( Not ro Smle) (Nor ro Scalel \
Shoulder Shoulder D=1.5
Point t Ground 3.yD6i.Fil" Min. H.
L=.l p.
B=2 F. 1'x
b=5 H.
FROM STA. OS 50 -L- TO STA. 309+50 -L- MED A�
FROM STA. 51+50-5RY21A- tqSTA.S +22-SRY21A- LT N
DETAIL 10-7
DETAIL 10-8 DETAIL 10-9
TOE PROTECTION LATERAL BASE DITCH CULVERT INLET CHANNEL W/RIP RAP
(Nor ra Scolel (Nol to S.
(Nar ro 6roIN
Nama
N"rurol Gmund ��/r-T1-'�ti/g,3'I -r '!'
x N°turo ,6.1 cu\o9° Ground 3�/ D 3'� 1"F1. Fill ChannFill i.
ele
D 1
Ground b Slope
Min. D=1.5 k. Min. D=3.0 H. B Georenile
"-" B=3 F. Mex. d=3.0 Ft.
d=1.5 t b=5 F. B=7.0 Ft. (VARIABLE AT CHANNEL TIE)
1=2.0 t. GeotexXle
Type of Line.= CL'I' RIPRAP (BANKS ONLY)
Type of Liner= CL B RIPRAP / R M STA. 52+66 �RY21A- TO Est. 35 TONS, Est. 60 SY GF
JSTA. 53+68-SRY21A- LT
gROM STA. 16 7 -Y22RPC- TO STA.-1Y+ 0 -122RPC- RT OM ST . 16+15 -Y22RPC- TO STA. 16+35-Y22RPC-
j DENOTES EXCAVATION
\
50' 25' 0
SCALE: 1"=100'
50'
100,
PROJECT REFERENCE NO.
U-5713IR-5777AB
ROADWAY DESIGN
ENGINEER
aalV
\\ STREAM SJ -
A�
IN WETLAND o cl WETLAND WT RId�A
/. d: / LATERAL 2' BASE DIT
DENOTES IMPACTS IN
--
SURFACE WATER
DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
-Y22RPB- PC Sto.IO,tQP.00 =
CL B RIPRAP
Al"',
Pii
BL- POT Sto. 303+/5.66' 47.00' LT
SRY2/A- PC Sta. 47+Ioito
-PUE PUE PUE i v
_az- -
wsa --
R MO E
- -----------T ---�`-
J-- ------------------------------------
SEE DETAIL 10-13
NC
2/D- - c�
\
ENVIRONMENTALLY SENSITIVE
AREA SHALL NOT BE IMPACTED.
CONTRACTOR TO PLACE
-Y22RP - PT
6
FENCING AT SITE PRIOR
-L- POT 10G-
A = 04e0 '00"
TO CLEARING & GRUBBING
DETAIL 10-15
TRAPEZOIDAL GRASSED SWALE
,WROCK CHECK DAM
(Not r° Scale)
WATER QUALITY 6" OF FREEBOARD
ROCK CHECK
NATURAL GROUND LINE
FLM,
10-YR. STORM
EFEF R1YE3L9
ELEVATION
BASE OF SWALE
CLASS B RIP -RAP
I'OF A57 STONE
PROFILE
6" OF
CLASS B RIP -RAP
FREEBOARD 10-YR STORM EVENT
NATURAL GROUND Ij
T L1
p0.
F0ER
1.0'
3T
1 � /
SEE DETAIL 10-4
SITE 18
/ 4P
Y - PT Sto.
12+89.19_
IA- tG.
+ /.
J
O
PUE
C.
F
___MEDIAN-'V'-P1TQI
----
.---3f
----
2GI-A
I
\ TOE PROTECTION
ON FILL SLOPE ONLY
EST 41 TONS CL B RIPRAP
SHEET NO.
ENGINEER
Balfour Beatty Mi a I u�jj_',(
CULVERT TLET CHANNEL W/RIP RA
DOCUMENT NOT CONSIDERED FINAL
BANK STAB TION
UNLESS ALL SIGNATURES COMPLETED
EST. 30 TONS RAP
EST. 50 SY 'G O'. TIL
SEE DETAIL 10.10
^
PERMIT
DRAWING
SITE 19
1
SHEET
31 OF 55
LATERAL 3' BASE D CH
„✓ROCK CHECK D'
S \
S
\ SEE DETAIL 10� & - ETAIL 10.15
CL B RI PI
NaF-
-
` UE�EST. 14T
JRY VERT 1.0' a F
Ia
0
I C
Lo
Q
R
N
III
:N CBCC 4" P-1
Q
in U)
-
_ _ - _ _
M
CD
2GI 1 "RCP-IIr--
m Lo
IL
F L SUMP
r
SEE AN,.1 1
fe_ _, ,o_____---
1
_ __Y______ __ _-
w CD
---
MEDIAN 'V' DITCH
z M
-
+
LIJ
JOw
' RCP -II 2GI 18" RCP -III
U M =
FALSE SUMP
ADDITIONAL TS IMPACTS
~ Q �
Q LLJ
- - - -- -
FOR CONST. PHASING
20 LF
U) ui
0.001 AC
I
- 42" RCP -III.. .. .. 2G A
I CJ
lfr -
CD
d +
�00
N Q
6� HW
7FTSi _ ? - as eS
U)
\ EST.193 SY GEOTEXTILE
WETLAND WU
c
l 00.00 -
SEE DETAIL 10-5 1moo'
DENOTES FILL IN
-44, 2e 47.00' RT F F
WETLAND
LATERAL Bg DITCHS -'
v//CL B BRAP
W
\
EST.
41 T11.S il-BI' PRAP
fR tR
\
DENOTES MECHANIZED -._---SEE
CLEARING
L146WGEAI ILE T
DETAIL 0-6
EST. 20 TO
CULVERT INLET ANNEL W/RIP RAP EST. 89
axis
B K STABILIZATION
EST. 35 TONS CL I RIPRAP
PC Sto. /4+45.38I
EST. 6 SY GEOTEXTILE
SEE DETAIL 14
DETAIL 10-10
DETAIL 10-13
CULVERT OUTLET CHANNEL W/RIP RAP
SPECIAL CUT BASE DITCH
I NM Io Swle)
N aN
Groo"�M-round
Fill Exist
( Net ro Scalel
N°Nml Front
SITE 2 0
BURY INVERT 1.0'
PUE
II
II
13
I \
j A ¢�
IEErc P ® E4TIOIW _
!l L B RIPRAP
BANK STABILIZATION
EST. 30 TONS CL I RIPRAP _
EST. 60 SY GEOTE)TILE
SEE DETAIL 10-14
STREAM SJ
\
eho.,el
Ground Dimh
F\°r
ALCOKE HOLDINGS, LL
Min, D=3.0 F. B Gaorexrile
Mux. d=3.0 Ft.
Slope
F Min. DFl. R.
\
Typ U. (VARIABLE RI CHANNEL TIE)
Type Liner, CL 'I' RIPRAP ONLY)
B-4 F.
DETAIL 10-12
FALSE SUMP
of (BANKS
Esr. 70 TONS, Es+. 50 SY GF
FROM STA. 298+00 -lr TO STA. 299+00 -L- RT
Not 10 Sc le
( ° I
LT)
STA. 52+36-SRY21A- LT (58 LT TO 94 L
DETAIL
DETAIL 10-14
Medinn DH°h _
y
DETAIL 10-11
RIP RAP AT EMBANKMENT
RIP RAP BANK STABILIZATION
(Nor se 6cel.)
I
INot to Smle)
N.-
.-d3,.�\ec
(See Chat 20' �I
GI
�-S-
etc.
1o'min.
S=Ditch Slope rk Proposed Ditch
NOTES:
11 DO NOT USE INSIDE CLEAR RECOVERY AREA.
2' NOT PRACTICAL TS USE SLOPES 5%.
Ditch 1.0'min. A-1.5'
Grade
GaMaNila a Ditch T. 2 L Ditch G
B=4 H. 0.0% To 2.O% 20' Over 4.0%
S
3 FOR PERMANENT STRUCTURES IN GRASS SWALE.
RE
nax. d=] F.
LmRrh = 50 F. Over 2.0% 70 4.0% 30' Over 1
dl CHECK DAMS SHOULD BE SPACED SUCH THAT
THE BASE OF THE UPSTREAM CHECK IS AT THE
GEOTE%TILE
Type of Liner= CL T RilaRup STA. 299+1 -L- LT
SAME ELEVATION THE TOP OF THE
Esr. 30 TONS, Esr. 60 BY GF
STA. 11+58 -Y RPB- LT
DOWNSTREAM CHECK.
Type of Liner= 9 TONS,CL B RIPRAP
STA. 308+87
STA. 16+35 -Y2 RPB- LT
LT / STA. 310+32 -q RT
STA. 52+AA-SRY21A- TOhYA. 53+AA-SRY21A- LT FROM
Geotex1ile= 13 SY
STA. 52+18 -SRY21A- TO STA. 512+28-SRY21A-
FOR -L- PROFILE SEE SHEETS 26 & 27
FOR -Y22RPB- PROFILE SEE SHEETS 49
FOR -Y22RPC- PROFILE SEE SHEETS 50
FOR -SRY2/A- PROFILE SEE SHEET 65
SEE SHEET 3A-I TO 3A-3 FOR CURVE DATA
Submitted 10/19/23
/ �1Z3 ! DATE: 09-08-2023 ,e, •� - �r m r� --8l� PROJECT REFERENCE 7 SHEET NO.
DETAIL 10-1 ` 23 DETAIL 10-3 \ m � ,(��- � 6' Bz�
MEDIAN V DITCH \j 1,u £I \ ` e �l U• �l�- 0 �- �r30' �Z �1e01 U-57/3�R-5777A8 10
((\\ IN ��-- `� MEDIAN V DITCH \"
3] (Not to Stole) \ / J Y (No110 Scalel Noluml (Not to Smlel \ \ 1� `'� f V ---� ROADWAY DESIGN HYDRAULICS
Shoulder Shovldx ((( / / Shoulder ` Shoulder b C U \ / ENGINEER ENGINEER
Paim P.im Point Point \ \
/ 0
Ground 3.] 3. 1"iFt. Fill 1
t\ f \ f\ D Slope 2�
e M
i
n.t. H. Fy t` I
B=2 FI _ j �18 12� a`- t.1g� �1q
ti _ a
S . 2 +00 -L- TO STA. 301- .-L- / \ RO S A. OS 50 O STA-309450 � I I o'
. 30 +50 -L- TO S "9+50 I(}{ T �' 9 � � FROM STA. 51+50 SRY21A- ST 15 22 -SRY2 A-1LT / ~
DETAIL 10-5 N DETAIL 10-6 DETAIL 10-7 DETAIL 10-8 DETAIL 10-9
TOE PROTECTION LATERAL BASE DITCH TOE PROTECTION LATERAL BASE DITCH CULVERT INLET CHANNEL W/RIP RAP \ Er -
Not to Scala) (N.11. Scale) ( Noma Scale) (NW to Soele) (No r. sc.lel
� bb '{ b �{ Ne STREAM SJ 51- I` t� �21
Q\� Neturol r- F\ Natural Ground _
Natural 3.\\5\oPa Grovnd 3'! D� 1"fit. Slope rx N°furol ,5.1 S\oPa [x Ground 3�] D 3� 1"Ft. FillChannel D \ t a a I N Z-t-�- LIStbRI Balfour Beatty STVi
Ground Q d Ground b Slope l
9 Min. D=1.5 k. Mi.. D=3.0 Ft. B Gemenile / ZZ-
d GEOTEXDIE Min. D=2 Ft. i.�' I� - "^ B=3 H. Mex. 1=3.0 H. 9 I �CULV TLET C...... 4 DOCUMENT NOT CONSIDERED FINAL
d=1.5 H. d=1.5 Ft. \ ?
Geotextile Max. d=2 Ft. b=4.0 FL Geot..file b=5 H. B=7.0 H. (VARIABLE AT CHANNEL TIE) 1 / BANK S7 - 710N UNLESS ALL SIGNATURES COMPLETED
'When B is < 6.0' B=4 Ft. x Type of Liner= CL'I'RIPRAP (BANKS ONLY � � 9 � I /EST. 30 5
Type of Uner= CL B RIPRAP T f Liner= CL B RIPRAP R M STA. 52+ 21A- Est 35 TONS, Est. 60 SY GF y 1
Type of Liner= CL B RIPRAP b=5 H. Type ° G
1--t5T[. 53+68 - Y21 LT s
RO -Y TO . RIM STA. 16 -Y22RPC- TO STA.-ttf, -Y22RPC- RT bz N P / 6+35 -Y22RPC- R - \\ \J�� s�E 5 SITE 19 PERMIT D RAW I N G
STA. 14+60-Y�.2�tP FR16+15. 502-Y2C z � ,��
ati� a I DENOTES EXCAVATION �1
� � e _ C4 � SHEET 32 OF 55 IN WETLAND '< < WETLAND WT N w 1 2 1,
cam, J LCl I lE B C7
3
v1ROC 3 E K
cARYAHooN cAt�v A cAHooNM°� \N�' DENOTES IMPACTS IN _ F ; �' S DETAIL -\\ $TACL23
UE"B
SURFACE WATER 9 )!1 �� T. R 5 \ �£
\�.JJ SITE 18
CARDS WLLCLIAM $' •HIGH' %�j , II I� N „. \ " DENOTES TEMPORARY �e� �� �,
E 6 GRO(IEDWA GAWRE f� iL I I I0� IMPACTS IN SURFACE WATER -
_ I
ICI \ -Y2 RPB PC Sta. /0 .00 = \ ���-ems o
/ a ml , " N� -POT Sto.303+1566'47.00 LT � '
RI LL ))�� R Z\. F L Lii
/Y ENTIO z/"'0 x.l ,z•.p ' \\ 1 EST® O /-- � \ gL1R \ �� ' N ( $I - CB ,; - + SRY2/A- PC Sta. 47+1 95 �' / a, \�
• \ G B O ELLF. 2 .0' s eus L �j ti I � N. � 1 EST. 7 SY GF I / .� 6 N d'
E DETALL 8 i 1 I I1PUE PU PUE PUE PUE 2^ / I * r L0
C B RIPRAP / PUE=APE - i z o \ N / 1
" " 6j FYI
.15" 1 N 7 ---� tr.. F ` _ -
I O __ - RCP -IF '°� F p -� �� __ - \ SB " C _ _ (n
O
- ce v - - --t --nr -
a
CD
U I�
15" RCP -I \ � GI-
LL
2
- - �� C 16.1 P1 _ - - _ CC_
--- - - - -- --
(N
J � -
___ ---
EZ- •xcP _ _ _ _ _ ME 'V' tl__ __ - ____ ._ -- __--
y_ __ _ _ __ _ ___
-SEF- J _mac \���s;y------=:r -n _•<_ ---- --- __= ---- - M3fE-0E7T4tti�i----�br---- --- In
�-MEDIi'V'DITCHEE- _------- Z--_-----__--9 -- „�rtT-- _ra+z
OLu
--- ----- s� -- �� Q -- -- -- _
W o _ _ _ -
--- t�� ---- --- - ------------
zo ,R ��------ �_ ---- --- ----- - MEN v DtT -- - _ - - _ - ____ - _ -
CO W -------- -- - - _ -
------��-------_------ -
U N = Z=s=sz-r-------Z6� -24 ,z,�,FE DET P�3- bI� --- - _ - ADD OR ITIONAL
PHASING LLJ
_ 2GI n CP 2GI 18 RCP III
Cf)
��6- -9Z -SZ- ` _- --- ----- -
_ 6IFALSE Q UJ
- - ---
-- -�------=.MOVf
�-' Q------_12--- 9Z - -- - --- --- ------------------
-------- _ ____ ____ _------------ ----- -
Co
Q I- W---------- ------------ --- - -
W-------- ------ ------ -- - -- ---- -- - - -- - --- - = =_ = - - - r 0 0 - - - - - - - - -
------- __ ------
J
__ _ -
-- ----- -
�26-*'^_�-25- � �21 18� 17- � _
enm _
25-26- ______25- -24 -23 1 �l __ __ _____ --16 _ -_5 _ ___ __ - I O
�-5 U O
• 2a .- _�-a _ - __ - - 2Z -
�_18 `YI f- .
EZ- -`��. Lj
.. ..
.. .. .. /
I Q
0 LnC��
+ q , -SRY2/D- 2 i \ 6� \ P G \ HW
co
Q - ES C. CUT 4' BAS�-B�TCH- o✓ 23 \a/\l L 9� \�> SITE 18 �F N '89
(nE DETAIL 10-131 POT Sta. 43+53.92 \ \ �2 ///� � LPL `�PCR���O¢�Clr-�ANOLN��j ZZ / bz 1� BURY IN T 1 0'
�S ENVIRONMENTALLY SENSITIVE \ �l 5/.�l b'- at>.sY eEof xr * 1�`
A TY ,JUNIOR mz - -s WETLAND WU J
R MMERCE, AREA SHALL NOT BE IMPACTED. / 6 CONTRACTOR TO PLACE - 2RPP�- PT to l o .op =�ZZ DENOTES FILL IN U �/� 'ti
ti FENCING AT SITE PRIOR -L= 04-0 000° + 4. 2.47.0 F F WETLAND
ti TO CLEARING & GRUBBING < E
DENOTES MECHANIZED ,,1 ��-
Z-' -� S. 2 T L B RIPRAP
\� DETAIL 10-15 i Q
TRAPEZOIDAL GRASSED SWALE CLEARING - t7 EL-W�BI%RAP EST. 89 XT"LP
\ BI%/ T B11'1 TON \\ .wROCK CHECK DAM / / Q.
e.\ \\... (Notro Scale) a �.E3T QIJS`�CL I IF P ETA( 7
\ \ WATER QUALITY 6" OF FREEBOARD V'm ' PC Sto. /4+45.38I EST. 6 $. EOTE E
EE IL
\ ROCK CHECK SDETA1 `1
NATURAL GROUND LINE @�py�
(\ FLM - 10-YR.STORm DETAIL 10-10 DETAIL 10-13 el N BILIZATION
1\ FFm LD _ ELEVATION CULVERT OUTLET CHANNEL W/RIP RAP SPECIAL CUT BASE DITCH EST. 30 TO CL I RIP
'p �)y
S \ \ \ BASE OF SWALE Nm� rn I Not to Smle) ( Not to Scale) �f EST. 60 SY GEOTEXTILt
_ an, I SITE L0 SEE DETAIL 10-14
C \ \ CLASS B RIP -RAP Ground 3T Nr.una
C Fill Ez sr ] 3, NaNml \ , From
O �� 1'OF AS] STONE Ch.nnel Ground 3� A' o Ditch ALCOKE HOLDINGS, LL
O I% \ PROFILE \ ] D Y\a�a` slape STREAM SJ
Min. D=3.0 F. B Geotexrile
a \ Mi.. Fr. DETAIL 10-12
Mox. d=3.0 k.
\ FREEBOARD CLASS B RIP -RAP B=7.0 Ft. (VARIABLE AT CHANNEL TIE) B-4 FI. FALSE SUMP
L 10-YR STORM EVENT Type of liner= CL'I' RIPRAP (BANKS ONLY)
10 \ NATURAL GROUND I Est. 30 TONS, Est. 50 SY OF FROM STA. 298+00 -L- TO STA. 299+00 -L- RT ( Not 10 Scale)
�6P _.t__ Median Ditch
DETAIL 10-14
\ E0. STA. 52+36-SRY21A- LT (58 LT TO 94 LT) 9" � 2'
E \ \\ , „\,..... 3.\O0. DETAIL 10-11 RIP RAP BANK. STABILIZATION
\ 1.0' RIP RAP AT EMBANKMENT Nmarol (See Chart Below) -,- 20'�I ZGI(Notto Smle) Ground 3,., A' o` �-$- TYPICAL SECTIONa$=Ditch Slope Proposedc
_ \ \ NOTES: Di1cA Gemeeae Ditch Grade L Ditch Grad. L
1) DO NOT USE INSIDE CLEAR RECOVERY AREA. 1.0'min. 1.5' B=4 H.
h \ ]I NOT PRACTICAL TO USE ON SLOPES > 5%. Grade 0.0% To 2.0% 20' Over 4.0% To 6.0% 40' FOR -L- PROFILE .SEE .SHEETS 26 & 27
n \ N 3 FOR PERMANENT STRUCTURES IN GRASS SWALE. max. d-] Ft.
r \ \ S d) CHECK DAMS SHOULD BE SPACED SUCH THAT Length = 50 H. Over 2.0% 7o 4.0% 30' Over 6.0% 50' FOR-Y22RPB- PROFILE SEE SHEETS 49
N THE BASE OF THE UPSTREAM CHECK IS AT THE GEOTE%TILE Type of Liner- CL T Rip-Rop $TA. 299+1 -L- LT FOR -Y22RPC- PROFILE SEE SHEETS 50
SAME ELEVATION AS THE TOP OF THE Est. 30 TONS, Ear. 60 SY GF STA. 29 -Y RPB- LT
1 \ \ DOWNSTREAM CHECK. FOR -SRY2/A- PROFILE SEE SHEET 65
\ \ Type of Uner= 9 TONS,CL B RIPRAP $TA. 308+87 - - MED SEE SHEET 3A-1 TO 3A-3 FOR CURVE DATA
( \ \ Geotex1ile= 13 SY STA.16+35 -Y2 RPB- LT
to \ FROM STA. 52+66-SRY21A- TO A. 53+68-SRY21A- LT FROM STA. 52+18 -SRY21A- TO STA. +28-SRY21A- LT / STA. 310+32 - - FIT
Submitted 10/19/23
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
11
13+25 to 14+69-SRY21 D-
ROADWAY FILL
0.26
0.03
12
13+57 To 13+85-SRY21A-RT
42" RCP
< 0.01
< 0.01
13
27+60 to 28+56-SRY21 D-
ROADWAY FILL
< 0.01
123
29+88 to 3011-SRY21A-
1 at 6'x6' RCBC
0.03
< 0.01
107
22
OUTLET CHANNEL
< 0.01
34
14
27+04 to 27+60-SRY21 D-
1 at 6'x6' RCBC
< 0.01
100
15
26+88 to 27+07-SRY21 D-RT
ROADWAY FILL/ 6' BASE DITCH
< 0.01
< 0.01
< 0.01
16
37+88 to 38+86-SRY21A-
ROADWAY FILL
0.08
< 0.01
17
40+43 to 41 +01 -SRY21 A-
42" RCP
0.01
< 0.01
18
15+58 to 16+45-Y22RPC-
1 at TxT RCBC
< 0.01
< 0.01
78
10
16+08 to 16+34-Y22RPC-RT
INLET BANK STABILIZATION
35
52+15 to 52+41-SRY21A-
1 at TxT RCBC
0.02
< 0.01
116
16
52+30 to 52+38-SRY21A-LT
OUTLET BANK STABILIZATION
29
16+67 to 16+87 -Y22RPC- RT
CONST. PHASING
< 0.01
20
19
52+45 to 53+60-SRY21A-LT
ROADWAY FILL/T BASE DITCH
0.02
0.03
0.01
TOTALS*:
0.36
0.03
0.05
0.09
0.01
621
68
0
*Rounded totals are sum of actual impacts
NOTES:
Site 12: JS Non-Mit
Site 15-There will be an additional 0.010 ac of wetland impacts considered as a "total take".
Site 17: JS Non-Mit
Site 18: In -field permit modification for construction phasing, 20LF & 0.001ac Temp. Surface Water Impacts
2018 Feb
Submitted 10/19/23
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
20
15+58 to 16+10-Y22RPC-RT
DITCH
< 0.01
0.01
21
14+56 to 15+95-SRY22A-
72" RCP
0.12
0.03
16+37 to 16+90-SRY22A-RT
ROADWAY FILL
< 0.01
16+00 to 16+21-Y22RPA-RT
ROADWAY FILL
< 0.01
< 0.01
18+73 to 20+28-Y22RPA-RT
ROADWAY FILL/6' BASE DITCH
0.11
0.02
0.02
22
14+36 to 14+62-SR1-LT
48" RCP
< 0.01
< 0.01
14
10
14+40 to 14+56-R1-LT
OUTLET BANK STABILIZATION
25
23
14+74 to 16+76-SRY21C2-RT
ROADWAY FILL
0.06
0.08
24
19+15 to 19+78-SRY21C2-RT
ROADWAY FILL
< 0.01
SHEET 55 OF 55
0.29
0.03
0.16
< 0.01
< 0.01
39
10
SHEET 52 OF 55
1.62
0.07
0.39
0.09
< 0.01
624
51
SHEET 53 OF 55
0.31
0.06
0.12
0.04
< 0.01
281
28
SHEET 54 OF 55
0.36
0.03
0.05
0.09
0.01
621
68
TOTALS*:
2.57
0.19
0.72
0.22
0.03
1565
157
0
*Rounded totals are sum of actual impacts
NOTES:
There will be an additional 0.010 acres of permanent wetland impact due to total take of wetlands at Site 15.
2018 Feb