Loading...
HomeMy WebLinkAbout20201194 v.2 in-field mod signedROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director NORTH CAROLINA ErrOM"fh#rrrdf Quairry North Carolina Division of Water Resources Transportation Permitting Unit In -Field Minor 401 Water Quality Certification, Buffer Certification and Isolated Water Permit Modification Project Name/ TIP Project No: James City / U-5713/R-5777AB Date: 11/9/23 DOT Division: 2 County: Craven DWR Project No. / Permit Type: 20201194 v.2 DOT Staff: ACE Staff: Modification E Wendi Johnson DWR Staff: Garcv Ward DWR Regional Office: Washington An additional 20 linear feet of temporary stream impacts occurred at Site 18 (culvert 5) due to the addition of a temporary diversion outlet. On the downstream side of culvert 5 at Site 18 a temporary pipe and impervious dike are needed to route drainage from adjacent wetland WT. Additionally, 24 inch pipes will be used for diversions during the construction sequence in lieu of diversion ditches. Modification Sketch: See attached drawings e-�jQE North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 919.707.9000 In -Field Modification Page 2 of 3 This in -field modification is required for the following reason(s): The information contained in the application or presented in support thereof is incorrect in the following manner: Lx Conditions under which the original certification was issued have changed in the following manner: Temporary stream impacts are needed during the construction sequence of culvert 5 at Site 18. This in -field modification is valid only if issued by an authorized agent of the Division of Water Resources, Transportation Permitting Unit' This in -field modification authorizes the NCDOT to to temporarily impact an additional 20 linear feet of stream at Site 5 and use diversion pipes in lieu of diversion ditches during the construction of culvert 5 in Craven County. The project shall be constructed as described in the Modification Description and Sketch on Page 1 of this document dated 11/9/2023 to improve/construct the culvert at Site 18. The approved design is that described in the Modification Description and Modification Sketch on Page 1 of this document dated 11/9/2023. Any further changes to the original Water Quality Certification dated January 15, 2021_may require a formal written modification request. The description of the proposed action provides adequate assurance that the proposed action in the Neuse River Basin in conjunction with the proposed development will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Section 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and conditions hereinafter set forth. Should your project change, you are required to notify the DWR and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. For this approval to remain valid, you are required to comply with all the conditions listed below. In addition, you should obtain all other federal, state, or local permits before proceeding with your project including (but not limited to) Sediment and Erosion control, Coastal Stormwater, Non -discharge and Water Supply watershed regulations. This Modification Approval shall expire on the same day as the expiration date of the corresponding Corps of Engineers Permit. Conditions(s) of Modification Approval: 1. All the authorized action activities and conditions of the certification associated with the original Water Quality Certification dated January 15, 2021 and all other corresponding modifications still apply except where superseded by this certification. 2. Additional Conditions: North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 919.707.9000 In -Field Modification Page 3 of 3 Failure to construct the proposed action as described in the Modification Description and Sketch on Page 1 of this document and/or violations of any condition herein set forth may result in revocation of this modification approval and may result in criminal and/or civil penalties. This modification approval shall become null and void unless the above conditions are made conditions of the Federal 404 and/or Coastal Area Management Act Permit. If the Corps of Engineers requires a formal written modification to the 404 permit for the proposed action, the NC DWR must require a formal written modification to the 401 WQC, and therefore, this in -field modification is invalid. If additional (wetland, stream, buffer) impacts for this project (now or in the future) exceed (one tenth of one acre, 300 linear feet, or one-third of an acre/150 linear feet, respectively), or if mitigation is required above and beyond the current mitigation requirement for this project, this in -field modification is invalid and a formal written modification is required. This in -field modification is effective upon the date the last party signs this document. This in -field modification is made upon mutual agreement between DOT and DWR as indicated by the signatures below and is, therefore, not subject to appeal by either party. Appeals by third parties must be made within sixty (60) days of notification pursuant to the contested case provisions of the Administrative Procedure Act, NC Gen. Stat. §150B-23 et seq. DWR Staff Signature: Date: 11 /9/23 DOT Staff Signature:-�'`- Date: 11-9-2023 USACE Staff Signature: Date: — An authorized agent of the Transportation Permitting Unit is defined as DWR staff that are DOT -funded and review and issue 401 Water Quality Certification for DOT projects. These staff include Central Office and Regional Office personnel. e:5�fQE North Carolina Department of Environmental Quality I Division of Water Resources f , 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 err M rw�r�` 919.707.9000 DETAIL 10-1 MEDIAN V DITCH I Notro Scelel Shoulder Should. Paint 3. � Point / \o FROM STA. 298+00 -L- TO STA. 301+00 -L- LT FROM STA. 306+50 A- TO STA. 309+50 AL LT DETAIL 10-5 DETAIL 10-6 TOE PROTECTION LATERAL BASE DITCH (Not ro Scala) Net 1. Scale) Nelurol N°Nr°I \p6 S\°� Ground 3y \ Fill Ground F�\ d D 3'. 1"�. Slope d GEOTEXIIIE Min. D=2 Ft. d=1.5 H. Geotextile Max. d=2 H. 'When B is , 6.0' B=4 H. Type of Liner= CL B RIPRAP Type of Liner= CL B RIPRAP b=5 H. FRO -Y TO FR - 50 -Y22 C- T STA. 14+60 -Y22RPC- STA. 16+15 22RPC- T GARY A CAHOON GARY A CAHOON M CARLSON & WILLIAMS SRASONAL HIGH' JE HOMES, LLC DUE GROUNDWATER TABLE \ k oG I I 1 \ O DRY L NENTIO BA IN I{s8 . s • G B9TTOM ELL 2 .0' is SEE DETAIL 8 C B RIPRAP PUE 0 Imp ./��.-x- PUE I v RCP-Ift� F F B __---_____________�__�_--SRY2FA- --15"RCP-IV \ I _ao + w-------------- J co_ W ---------------- s 0 Lu _------------- L------------- Submitted 10/19/23 DETAIL 10-3 DATE: 09-08-2023 MEDIAN V DITCH ( Not ro Smle) (Nor ro Scalel \ Shoulder Shoulder D=1.5 Point t Ground 3.yD6i.Fil" Min. H. L=.l p. B=2 F. 1'x b=5 H. FROM STA. OS 50 -L- TO STA. 309+50 -L- MED A� FROM STA. 51+50-5RY21A- tqSTA.S +22-SRY21A- LT N DETAIL 10-7 DETAIL 10-8 DETAIL 10-9 TOE PROTECTION LATERAL BASE DITCH CULVERT INLET CHANNEL W/RIP RAP (Nor ra Scolel (Nol to S. (Nar ro 6roIN Nama N"rurol Gmund ��/r-T1-'�ti/g,3'I -r '!' x N°turo ,6.1 cu\o9° Ground 3�/ D 3'� 1"F1. Fill ChannFill i. ele D 1 Ground b Slope Min. D=1.5 k. Min. D=3.0 H. B Georenile "-" B=3 F. Mex. d=3.0 Ft. d=1.5 t b=5 F. B=7.0 Ft. (VARIABLE AT CHANNEL TIE) 1=2.0 t. GeotexXle Type of Line.= CL'I' RIPRAP (BANKS ONLY) Type of Liner= CL B RIPRAP / R M STA. 52+66 �RY21A- TO Est. 35 TONS, Est. 60 SY GF JSTA. 53+68-SRY21A- LT gROM STA. 16 7 -Y22RPC- TO STA.-1Y+ 0 -122RPC- RT OM ST . 16+15 -Y22RPC- TO STA. 16+35-Y22RPC- j DENOTES EXCAVATION \ 50' 25' 0 SCALE: 1"=100' 50' 100, PROJECT REFERENCE NO. U-5713IR-5777AB ROADWAY DESIGN ENGINEER aalV \\ STREAM SJ - A� IN WETLAND o cl WETLAND WT RId�A /. d: / LATERAL 2' BASE DIT DENOTES IMPACTS IN -- SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER -Y22RPB- PC Sto.IO,tQP.00 = CL B RIPRAP Al"', Pii BL- POT Sto. 303+/5.66' 47.00' LT SRY2/A- PC Sta. 47+Ioito -PUE PUE PUE i v _az- - wsa -- R MO E - -----------T ---�`- J-- ------------------------------------ SEE DETAIL 10-13 NC 2/D- - c� \ ENVIRONMENTALLY SENSITIVE AREA SHALL NOT BE IMPACTED. CONTRACTOR TO PLACE -Y22RP - PT 6 FENCING AT SITE PRIOR -L- POT 10G- A = 04e0 '00" TO CLEARING & GRUBBING DETAIL 10-15 TRAPEZOIDAL GRASSED SWALE ,WROCK CHECK DAM (Not r° Scale) WATER QUALITY 6" OF FREEBOARD ROCK CHECK NATURAL GROUND LINE FLM, 10-YR. STORM EFEF R1YE3L9 ELEVATION BASE OF SWALE CLASS B RIP -RAP I'OF A57 STONE PROFILE 6" OF CLASS B RIP -RAP FREEBOARD 10-YR STORM EVENT NATURAL GROUND Ij T ­L1 p0. F0ER 1.0' 3T 1 � / SEE DETAIL 10-4 SITE 18 / 4P Y - PT Sto. 12+89.19_ IA- tG. + /. J O PUE C. F ___MEDIAN-'V'-P1TQI ---- .---3f ---- 2GI-A I \ TOE PROTECTION ON FILL SLOPE ONLY EST 41 TONS CL B RIPRAP SHEET NO. ENGINEER Balfour Beatty Mi a I u�jj_',( CULVERT TLET CHANNEL W/RIP RA DOCUMENT NOT CONSIDERED FINAL BANK STAB TION UNLESS ALL SIGNATURES COMPLETED EST. 30 TONS RAP EST. 50 SY 'G O'. TIL SEE DETAIL 10.10 ^ PERMIT DRAWING SITE 19 1 SHEET 31 OF 55 LATERAL 3' BASE D CH „✓ROCK CHECK D' S \ S \ SEE DETAIL 10� & - ETAIL 10.15 CL B RI PI NaF- - ` UE�EST. 14T JRY VERT 1.0' a F Ia 0 I C Lo Q R N III :N CBCC 4" P-1 Q in U) - _ _ - _ _ M CD 2GI 1 "RCP-IIr-- m Lo IL F L SUMP r SEE AN,.1 1 fe_ _, ,o_____--- 1 _ __Y______ __ _- w CD --- MEDIAN 'V' DITCH z M - + LIJ JOw ' RCP -II 2GI 18" RCP -III U M = FALSE SUMP ADDITIONAL TS IMPACTS ~ Q � Q LLJ - - - -- - FOR CONST. PHASING 20 LF U) ui 0.001 AC I - 42" RCP -III.. .. .. 2G A I CJ lfr - CD d + �00 N Q 6� HW 7FTSi _ ? - as eS U) \ EST.193 SY GEOTEXTILE WETLAND WU c l 00.00 - SEE DETAIL 10-5 1moo' DENOTES FILL IN -44, 2e 47.00' RT F F WETLAND LATERAL Bg DITCHS -' v//CL B BRAP W \ EST. 41 T11.S il-BI' PRAP fR tR \ DENOTES MECHANIZED -._---SEE CLEARING L146WGEAI ILE T DETAIL 0-6 EST. 20 TO CULVERT INLET ANNEL W/RIP RAP EST. 89 axis B K STABILIZATION EST. 35 TONS CL I RIPRAP PC Sto. /4+45.38I EST. 6 SY GEOTEXTILE SEE DETAIL 14 DETAIL 10-10 DETAIL 10-13 CULVERT OUTLET CHANNEL W/RIP RAP SPECIAL CUT BASE DITCH I NM Io Swle) N aN Groo"�M-round Fill Exist ( Net ro Scalel N°Nml Front SITE 2 0 BURY INVERT 1.0' PUE II II 13 I \ j A ¢� IEErc P ® E4TIOIW _ !l L B RIPRAP BANK STABILIZATION EST. 30 TONS CL I RIPRAP _ EST. 60 SY GEOTE)TILE SEE DETAIL 10-14 STREAM SJ \ eho.,el Ground Dimh F\°r ALCOKE HOLDINGS, LL Min, D=3.0 F. B Gaorexrile Mux. d=3.0 Ft. Slope F Min. DFl. R. \ Typ U. (VARIABLE RI CHANNEL TIE) Type Liner, CL 'I' RIPRAP ONLY) B-4 F. DETAIL 10-12 FALSE SUMP of (BANKS Esr. 70 TONS, Es+. 50 SY GF FROM STA. 298+00 -lr TO STA. 299+00 -L- RT Not 10 Sc le ( ° I LT) STA. 52+36-SRY21A- LT (58 LT TO 94 L DETAIL DETAIL 10-14 Medinn DH°h _ y DETAIL 10-11 RIP RAP AT EMBANKMENT RIP RAP BANK STABILIZATION (Nor se 6cel.) I INot to Smle) N.- .-d3,.�\ec (See Chat 20' �I GI �-S- etc. 1o'min. S=Ditch Slope rk Proposed Ditch NOTES: 11 DO NOT USE INSIDE CLEAR RECOVERY AREA. 2' NOT PRACTICAL TS USE SLOPES 5%. Ditch 1.0'min. A-1.5' Grade GaMaNila a Ditch T. 2 L Ditch G B=4 H. 0.0% To 2.O% 20' Over 4.0% S 3 FOR PERMANENT STRUCTURES IN GRASS SWALE. RE nax. d=] F. LmRrh = 50 F. Over 2.0% 70 4.0% 30' Over 1 dl CHECK DAMS SHOULD BE SPACED SUCH THAT THE BASE OF THE UPSTREAM CHECK IS AT THE GEOTE%TILE Type of Liner= CL T RilaRup STA. 299+1 -L- LT SAME ELEVATION THE TOP OF THE Esr. 30 TONS, Esr. 60 BY GF STA. 11+58 -Y RPB- LT DOWNSTREAM CHECK. Type of Liner= 9 TONS,CL B RIPRAP STA. 308+87 STA. 16+35 -Y2 RPB- LT LT / STA. 310+32 -q RT STA. 52+AA-SRY21A- TOhYA. 53+AA-SRY21A- LT FROM Geotex1ile= 13 SY STA. 52+18 -SRY21A- TO STA. 512+28-SRY21A- FOR -L- PROFILE SEE SHEETS 26 & 27 FOR -Y22RPB- PROFILE SEE SHEETS 49 FOR -Y22RPC- PROFILE SEE SHEETS 50 FOR -SRY2/A- PROFILE SEE SHEET 65 SEE SHEET 3A-I TO 3A-3 FOR CURVE DATA Submitted 10/19/23 / �1Z3 ! DATE: 09-08-2023 ,e, •� - �r m r� --8l� PROJECT REFERENCE 7 SHEET NO. DETAIL 10-1 ` 23 DETAIL 10-3 \ m � ,(��- � 6' Bz� MEDIAN V DITCH \j 1,u £I \ ` e �l U• �l�- 0 �- �r30' �Z �1e01 U-57/3�R-5777A8 10 ((\\ IN ��-- `� MEDIAN V DITCH \" 3] (Not to Stole) \ / J Y (No110 Scalel Noluml (Not to Smlel \ \ 1� `'� f V ---� ROADWAY DESIGN HYDRAULICS Shoulder Shovldx ((( / / Shoulder ` Shoulder b C U \ / ENGINEER ENGINEER Paim P.im Point Point \ \ / 0 Ground 3.] 3. 1"iFt. Fill 1 t\ f \ f\ D Slope 2� e M i n.t. H. Fy t` I B=2 FI _ j �18 12� a`- t.1g� �1q ti _ a S . 2 +00 -L- TO STA. 301- .-L- / \ RO S A. OS 50 O STA-309450 � I I o' . 30 +50 -L- TO S "9+50 I(}{ T �' 9 � � FROM STA. 51+50 SRY21A- ST 15 22 -SRY2 A-1LT / ~ DETAIL 10-5 N DETAIL 10-6 DETAIL 10-7 DETAIL 10-8 DETAIL 10-9 TOE PROTECTION LATERAL BASE DITCH TOE PROTECTION LATERAL BASE DITCH CULVERT INLET CHANNEL W/RIP RAP \ Er - Not to Scala) (N.11. Scale) ( Noma Scale) (NW to Soele) (No r. sc.lel � bb '{ b �{ Ne STREAM SJ 51- I` t� �21 Q\� Neturol r- F\ Natural Ground _ Natural 3.\\5\oPa Grovnd 3'! D� 1"fit. Slope rx N°furol ,5.1 S\oPa [x Ground 3�] D 3� 1"Ft. FillChannel D \ t a a I N Z-t-�- LIStbRI Balfour Beatty STVi Ground Q d Ground b Slope l 9 Min. D=1.5 k. Mi.. D=3.0 Ft. B Gemenile / ZZ- d GEOTEXDIE Min. D=2 Ft. i.�' I� - "^ B=3 H. Mex. 1=3.0 H. 9 I �CULV TLET C...... 4 DOCUMENT NOT CONSIDERED FINAL d=1.5 H. d=1.5 Ft. \ ? Geotextile Max. d=2 Ft. b=4.0 FL Geot..file b=5 H. B=7.0 H. (VARIABLE AT CHANNEL TIE) 1 / BANK S7 - 710N UNLESS ALL SIGNATURES COMPLETED 'When B is < 6.0' B=4 Ft. x Type of Liner= CL'I'RIPRAP (BANKS ONLY � � 9 � I /EST. 30 5 Type of Uner= CL B RIPRAP T f Liner= CL B RIPRAP R M STA. 52+ 21A- Est 35 TONS, Est. 60 SY GF y 1 Type of Liner= CL B RIPRAP b=5 H. Type ° G 1--t5T[. 53+68 - Y21 LT s RO -Y TO . RIM STA. 16 -Y22RPC- TO STA.-ttf, -Y22RPC- RT bz N P / 6+35 -Y22RPC- R - \\ \J�� s�E 5 SITE 19 PERMIT D RAW I N G STA. 14+60-Y�.2�tP FR16+15. 502-Y2C z � ,�� ati� a I DENOTES EXCAVATION �1 � � e _ C4 � SHEET 32 OF 55 IN WETLAND '< < WETLAND WT N w 1 2 1, cam, J LCl I lE B C7 3 v1ROC 3 E K cARYAHooN cAt�v A cAHooNM°� \N�' DENOTES IMPACTS IN _ F ; �' S DETAIL -\\ $TACL23 UE"B SURFACE WATER 9 )!1 �� T. R 5 \ �£ \�.JJ SITE 18 CARDS WLLCLIAM $' •HIGH' %�j , II I� N „. \ " DENOTES TEMPORARY �e� �� �, E 6 GRO(IEDWA GAWRE f� iL I I I0� IMPACTS IN SURFACE WATER - _ I ICI \ -Y2 RPB PC Sta. /0 .00 = \ ���-ems o / a ml , " N� -POT Sto.303+1566'47.00 LT � ' RI LL ))�� R Z\. F L Lii /Y ENTIO z/"'0 x.l ,z•.p ' \\ 1 EST® O /-- � \ gL1R \ �� ' N ( $I - CB ,; - + SRY2/A- PC Sta. 47+1 95 �' / a, \� • \ G B O ELLF. 2 .0' s eus L �j ti I � N. � 1 EST. 7 SY GF I / .� 6 N d' E DETALL 8 i 1 I I1PUE PU PUE PUE PUE 2^ / I * r L0 C B RIPRAP / PUE=APE - i z o \ N / 1 " " 6j FYI .15" 1 N 7 ---� tr.. F ` _ - I O __ - RCP -IF '°� F p -� �� __ - \ SB " C _ _ (n O - ce v - - --t --nr - a CD U I� 15" RCP -I \ � GI- LL 2 - - �� C 16.1 P1 _ - - _ CC_ --- - - - -- -- (N J � - ___ --- EZ- •xcP _ _ _ _ _ ME 'V' tl__ __ - ____ ._ -- __-- y_ __ _ _ __ _ ___ -SEF- J _mac \���s;y------=:r -n _•<_ ---- --- __= ---- - M3fE-0E7T4tti�i----�br---- --- In �-MEDIi'V'DITCHEE- _------- Z--_-----__--9 -- „�rtT-- _ra+z OLu --- ----- s� -- �� Q -- -- -- _ W o _ _ _ - --- t�� ---- --- - ------------ zo ,R ��------ �_ ---- --- ----- - MEN v DtT -- - _ - - _ - ____ - _ - CO W -------- -- - - _ - ------��-------_------ - U N = Z=s=sz-r-------Z6� -24 ,z,�,FE DET P�3- bI� --- - _ - ADD OR ITIONAL PHASING LLJ _ 2GI n CP 2GI 18 RCP III Cf) ��6- -9Z -SZ- ` _- --- ----- - _ 6IFALSE Q UJ - - --- -- -�------=.MOVf �-' Q------_12--- 9Z - -- - --- --- ------------------ -------- _ ____ ____ _------------ ----- - Co Q I- W---------- ------------ --- - - W-------- ------ ------ -- - -- ---- -- - - -- - --- - = =_ = - - - r 0 0 - - - - - - - - - ------- __ ------ J __ _ - -- ----- - �26-*'^_�-25- � �21 18� 17- � _ enm _ 25-26- ______25- -24 -23 1 �l __ __ _____ --16 _ -_5 _ ___ __ - I O �-5 U O • 2a .- _�-a _ - __ - - 2Z - �_18 `YI f- . EZ- -`��. Lj .. .. .. .. .. / I Q 0 LnC�� + q , -SRY2/D- 2 i \ 6� \ P G \ HW co Q - ES C. CUT 4' BAS�-B�TCH- o✓ 23 \a/\l L 9� \�> SITE 18 �F N '89 (nE DETAIL 10-131 POT Sta. 43+53.92 \ \ �2 ///� � LPL `�PCR���O¢�Clr-�ANOLN��j ZZ / bz 1� BURY IN T 1 0' �S ENVIRONMENTALLY SENSITIVE \ �l 5/.�l b'- at>.sY eEof xr * 1�` A TY ,JUNIOR mz - -s WETLAND WU J R MMERCE, AREA SHALL NOT BE IMPACTED. / 6 CONTRACTOR TO PLACE - 2RPP�- PT to l o .op =�ZZ DENOTES FILL IN U �/� 'ti ti FENCING AT SITE PRIOR -L= 04-0 000° + 4. 2.47.0 F F WETLAND ti TO CLEARING & GRUBBING < E DENOTES MECHANIZED ,,1 ��- Z-' -� S. 2 T L B RIPRAP \� DETAIL 10-15 i Q TRAPEZOIDAL GRASSED SWALE CLEARING - t7 EL-W�BI%RAP EST. 89 XT"LP \ BI%/ T B11'1 TON \\ .wROCK CHECK DAM / / Q. e.\ \\... (Notro Scale) a �.E3T QIJS`�CL I IF P ETA( 7 \ \ WATER QUALITY 6" OF FREEBOARD V'm ' PC Sto. /4+45.38I EST. 6 $. EOTE E EE IL \ ROCK CHECK SDETA1 `1 NATURAL GROUND LINE @�py� (\ FLM - 10-YR.STORm DETAIL 10-10 DETAIL 10-13 el N BILIZATION 1\ FFm LD _ ELEVATION CULVERT OUTLET CHANNEL W/RIP RAP SPECIAL CUT BASE DITCH EST. 30 TO CL I RIP 'p �)y S \ \ \ BASE OF SWALE Nm� rn I Not to Smle) ( Not to Scale) �f EST. 60 SY GEOTEXTILt _ an, I SITE L0 SEE DETAIL 10-14 C \ \ CLASS B RIP -RAP Ground 3T Nr.una C Fill Ez sr ] 3, NaNml \ , From O �� 1'OF AS] STONE Ch.nnel Ground 3� A' o Ditch ALCOKE HOLDINGS, LL O I% \ PROFILE \ ] D Y\a�a` slape STREAM SJ Min. D=3.0 F. B Geotexrile a \ Mi.. Fr. DETAIL 10-12 Mox. d=3.0 k. \ FREEBOARD CLASS B RIP -RAP B=7.0 Ft. (VARIABLE AT CHANNEL TIE) B-4 FI. FALSE SUMP L 10-YR STORM EVENT Type of liner= CL'I' RIPRAP (BANKS ONLY) 10 \ NATURAL GROUND I Est. 30 TONS, Est. 50 SY OF FROM STA. 298+00 -L- TO STA. 299+00 -L- RT ( Not 10 Scale) �6P _.t__ Median Ditch DETAIL 10-14 \ E0. STA. 52+36-SRY21A- LT (58 LT TO 94 LT) 9" � 2' E \ \\ , „\,..... 3.\O0. DETAIL 10-11 RIP RAP BANK. STABILIZATION \ 1.0' RIP RAP AT EMBANKMENT Nmarol (See Chart Below) -,- 20'�I ZGI(Notto Smle) Ground 3,., A' o` �-$- TYPICAL SECTIONa$=Ditch Slope Proposedc _ \ \ NOTES: Di1cA Gemeeae Ditch Grade L Ditch Grad. L 1) DO NOT USE INSIDE CLEAR RECOVERY AREA. 1.0'min. 1.5' B=4 H. h \ ]I NOT PRACTICAL TO USE ON SLOPES > 5%. Grade 0.0% To 2.0% 20' Over 4.0% To 6.0% 40' FOR -L- PROFILE .SEE .SHEETS 26 & 27 n \ N 3 FOR PERMANENT STRUCTURES IN GRASS SWALE. max. d-] Ft. r \ \ S d) CHECK DAMS SHOULD BE SPACED SUCH THAT Length = 50 H. Over 2.0% 7o 4.0% 30' Over 6.0% 50' FOR-Y22RPB- PROFILE SEE SHEETS 49 N THE BASE OF THE UPSTREAM CHECK IS AT THE GEOTE%TILE Type of Liner- CL T Rip-Rop $TA. 299+1 -L- LT FOR -Y22RPC- PROFILE SEE SHEETS 50 SAME ELEVATION AS THE TOP OF THE Est. 30 TONS, Ear. 60 SY GF STA. 29 -Y RPB- LT 1 \ \ DOWNSTREAM CHECK. FOR -SRY2/A- PROFILE SEE SHEET 65 \ \ Type of Uner= 9 TONS,CL B RIPRAP $TA. 308+87 - - MED SEE SHEET 3A-1 TO 3A-3 FOR CURVE DATA ( \ \ Geotex1ile= 13 SY STA.16+35 -Y2 RPB- LT to \ FROM STA. 52+66-SRY21A- TO A. 53+68-SRY21A- LT FROM STA. 52+18 -SRY21A- TO STA. +28-SRY21A- LT / STA. 310+32 - - FIT Submitted 10/19/23 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 11 13+25 to 14+69-SRY21 D- ROADWAY FILL 0.26 0.03 12 13+57 To 13+85-SRY21A-RT 42" RCP < 0.01 < 0.01 13 27+60 to 28+56-SRY21 D- ROADWAY FILL < 0.01 123 29+88 to 3011-SRY21A- 1 at 6'x6' RCBC 0.03 < 0.01 107 22 OUTLET CHANNEL < 0.01 34 14 27+04 to 27+60-SRY21 D- 1 at 6'x6' RCBC < 0.01 100 15 26+88 to 27+07-SRY21 D-RT ROADWAY FILL/ 6' BASE DITCH < 0.01 < 0.01 < 0.01 16 37+88 to 38+86-SRY21A- ROADWAY FILL 0.08 < 0.01 17 40+43 to 41 +01 -SRY21 A- 42" RCP 0.01 < 0.01 18 15+58 to 16+45-Y22RPC- 1 at TxT RCBC < 0.01 < 0.01 78 10 16+08 to 16+34-Y22RPC-RT INLET BANK STABILIZATION 35 52+15 to 52+41-SRY21A- 1 at TxT RCBC 0.02 < 0.01 116 16 52+30 to 52+38-SRY21A-LT OUTLET BANK STABILIZATION 29 16+67 to 16+87 -Y22RPC- RT CONST. PHASING < 0.01 20 19 52+45 to 53+60-SRY21A-LT ROADWAY FILL/T BASE DITCH 0.02 0.03 0.01 TOTALS*: 0.36 0.03 0.05 0.09 0.01 621 68 0 *Rounded totals are sum of actual impacts NOTES: Site 12: JS Non-Mit Site 15-There will be an additional 0.010 ac of wetland impacts considered as a "total take". Site 17: JS Non-Mit Site 18: In -field permit modification for construction phasing, 20LF & 0.001ac Temp. Surface Water Impacts 2018 Feb Submitted 10/19/23 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 20 15+58 to 16+10-Y22RPC-RT DITCH < 0.01 0.01 21 14+56 to 15+95-SRY22A- 72" RCP 0.12 0.03 16+37 to 16+90-SRY22A-RT ROADWAY FILL < 0.01 16+00 to 16+21-Y22RPA-RT ROADWAY FILL < 0.01 < 0.01 18+73 to 20+28-Y22RPA-RT ROADWAY FILL/6' BASE DITCH 0.11 0.02 0.02 22 14+36 to 14+62-SR1-LT 48" RCP < 0.01 < 0.01 14 10 14+40 to 14+56-R1-LT OUTLET BANK STABILIZATION 25 23 14+74 to 16+76-SRY21C2-RT ROADWAY FILL 0.06 0.08 24 19+15 to 19+78-SRY21C2-RT ROADWAY FILL < 0.01 SHEET 55 OF 55 0.29 0.03 0.16 < 0.01 < 0.01 39 10 SHEET 52 OF 55 1.62 0.07 0.39 0.09 < 0.01 624 51 SHEET 53 OF 55 0.31 0.06 0.12 0.04 < 0.01 281 28 SHEET 54 OF 55 0.36 0.03 0.05 0.09 0.01 621 68 TOTALS*: 2.57 0.19 0.72 0.22 0.03 1565 157 0 *Rounded totals are sum of actual impacts NOTES: There will be an additional 0.010 acres of permanent wetland impact due to total take of wetlands at Site 15. 2018 Feb