Loading...
HomeMy WebLinkAboutNCS000597_Compliance Evaluatoin Inspection_20231018 Compliance Inspection Report Permit:NCS000597 Effective: 06/01/22 Expiration: 05/31/26 Owner: Galvan Industries SOC: Effective: Expiration: Facility: Galvan Industries- Harrisburg County: Cabarrus 7320 Millbrook Rd Region: Mooresville Harrisburg NC 28075 Contact Person:Laurens G Y Willard Title: Phone: 704-455-5102 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 10/18/2023 Entry Time 09:30AM Exit Time: 12:OOPM Primary Inspector:Matthew J Gigante Phone: 704-663-1699 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Stormwater Discharge, Individual Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCS000597 Owner-Facility:GalvanIndustries Inspection Date: 10/18/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: A stormwater inspection was conducted on October 18, 2023.Aiding this inspection was Edward Watson with the Division of Water Resources. During the inspection, only the documentation of employee training and detailed site map were present from the Stormwater Pollution Prevention Plan (SWPPP).All sections of the SWPPP must be up to date and available on site. Qualitative monitoring was being conducted on site per permit requirements. However, only outfalls 1 and 5 were being sampled for analytical monitoring. As of this inspection, no representative outfall status has been approved by NCDEQ. All outfalls with stormwater discharges associated with industrial activity must be sampled for analytical monitoring of parameters outlined in the permit. Additionally, multiple no-flows have been reported for the outfalls sampled. It was recommended that due to the high number of no-flows being reported, the site should document no-flow events in the discharge monitoring reports with photographic evidence. The site is currently in Tier 3 status for copper and zinc. No corrective action plan for the benchmark exceedances has been received by NCDEQ. During the inspection a document outlining actions taken on site was produced when this was stated. This document is not a corrective action plan for benchmark exceedances, but an outline of zinc management and installation of metal removing SCMs required by the permit in sections B-10 and B-11. All outfalls on site were observed with no visible issues at the time of the inspection. Based upon the inspection conducted the facility is not compliant. The facility must: - Begin documenting no-flows with photographic evidence. -Submit an action plan for the tier III benchmark exceedances of copper and zinc to NCDEQ Mooresville Regional Office. - Immediately begin analytical monitoring for all other industrial stormwater outfalls on site. -Within 30 days, submit a copy of the full Stormwater Pollution Prevention Plan to the NCDEQ Mooresville Regional Office. Page 2 of 3 Permit: NCS000597 Owner-Facility:GalvanIndustries Inspection Date: 10/18/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ #Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? ❑ ❑ ❑ #Does the Plan include a BMP summary? ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ #Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? ❑ 0 ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: Only the site map and documentation of employee training were present at the time of the inspection. No further Stormwater Pollution Prevention Plan documentation was provided. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑ Comment: Qualitative monitoring reports were present and conducted per permit requirements. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Analytical monitoring reports were present for outfalls 1 and 5. Per the permit, all outfalls that discharge stormwater associated with industrial activity must be sampled for analytical monitoring. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ #Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ #Has the facility evaluated all illicit(non stormwater)discharges? ❑ 0 ❑ ❑ Comment: All outfalls on site were observed with no visible issues at the time of the inspection. Page 3 of 3