HomeMy WebLinkAboutNCC203189_NOT Signed Certification_20231106 NCGO1 Notice of Termination (NOT) Certification Form
Directions:
Print this form, complete, scan and upload to the electronic NOT(Rescission)form.
Then, mail the original signed form to the NC DEMLR Stormwater Program at:
Division of Energy, Mineral & Land Resources Stormwater Program
512 N. Salisbury Street, 6th Floor
1612 Mail Service Center
Raleigh, NC 27699-1612
DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED.
THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.22]
General Permit Certificate of Coverage (COC) No.: Nk e- G c o3 ) G 1IG
Name of Project: j� 4(e 2o2o — 013 / Cor,o Pc9e1 1 EA-0 Sri Cam--�
Per NC General Statute 143-215.6E(i), any person who knowingly makes any false statement, representation, or
certification in any application, record, report,plan, or other document filed or required to be maintained under this
Article or a rule implementing this Article. . .shall be guilty of a Class 2 misdemeanor which may include a fine not
to exceed ten thousand dollars ($10,000).
Under penalty of law, I certify that:
I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for
the subject facility. I am familiar with the information contained in this request,and to the best of my knowledge
and belief, such information is true, complete, and accurate.
Legally Responsible Organizational Entity (must match eNOT):
*Legally Responsible Person (must match eNOT): -3 Cry es /„. 40-h
*Title of Legally Responsible Person: 0 otY+tti I Ct, m re,
Print Name&Title of Signed if Authorized Individual Differs from Legally Responsible Person:
*Signature: C151/0"-G1—!---/-61
Date: 8 / O ��
* IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the
construction activity, such as a president,secretary, treasurer, or vice president, or a manager that is authorized in
accordance with Part IV,Section B, Item (6)of the NCG010000 permit.
For more information on signatory requirements,see Part IV,Section B, Item(6)of the NCG010000 permit.