Loading...
HomeMy WebLinkAboutNCC203189_NOT Signed Certification_20231106 NCGO1 Notice of Termination (NOT) Certification Form Directions: Print this form, complete, scan and upload to the electronic NOT(Rescission)form. Then, mail the original signed form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street, 6th Floor 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.22] General Permit Certificate of Coverage (COC) No.: Nk e- G c o3 ) G 1IG Name of Project: j� 4(e 2o2o — 013 / Cor,o Pc9e1 1 EA-0 Sri Cam--� Per NC General Statute 143-215.6E(i), any person who knowingly makes any false statement, representation, or certification in any application, record, report,plan, or other document filed or required to be maintained under this Article or a rule implementing this Article. . .shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request,and to the best of my knowledge and belief, such information is true, complete, and accurate. Legally Responsible Organizational Entity (must match eNOT): *Legally Responsible Person (must match eNOT): -3 Cry es /„. 40-h *Title of Legally Responsible Person: 0 otY+tti I Ct, m re, Print Name&Title of Signed if Authorized Individual Differs from Legally Responsible Person: *Signature: C151/0"-G1—!---/-61 Date: 8 / O �� * IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president,secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,Section B, Item (6)of the NCG010000 permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of the NCG010000 permit.