Loading...
HomeMy WebLinkAbout820400_ROUTINE_20231016Facility No. & W V V G Owner Time In L0;35 Time Out . Dam �D Z (D 23 Farm Name �r P Vimegraro' pact 1 I to gT /� farm Site Rej a mes m Jperator'Illil�thy IohP� No._L70HSP -c8 izie, twig lack -up NorfoiK No. HOC Circle: General . or NPDES Wean —Feed Desi n Current Design Current Wean —Finish �{�p Farrow — Feed C� Farrow — Firiish Feed _ Finish Gills / Boars Farrow —.Wean I Other. FREEBOARD: Design mil_ N A IQ Observed Crop Yield Rain Gauge `_ Soil Test Wettable Acres Weekly Freeboard Daily Rainfall SpraylFreeboard Drop Weather Codes Waste Analysis: Date 120 min Inspections Nitrogen (N) Sludge Survey Calibration/GPM / Waste Transfers Rain Breaker PLAT 1-in Inspections Date Nitrogen (N) PuillField i soil Crop Pan Window . O i�eeq (0MP AVIC) flow 'on Is ba4 neell +fineay w.e24 cons agronomic Rate i)cpd 0 W V�Y�JIVU VI YI YIG� I�CJV U�GGD Facility Number !T ti - 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: 9 Compliance inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: Qm C Farm Name: 2FJ Owner Email: Owner Name: Premag farms Phone: 1 Mailing Address: Physical Address: Facility Contact: j Q r'fjQ IQ m h Title: Ousite Representative: A the Certified Operator: ON if)4 0, S Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feedei Farrow to Finish Gilts Boars Other Latitude: Phone: Region: Frtt Integrator: Sin I+htl �1 4 Certification Number: 1 2 Z)4 (Q Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Non-l-I,a per Design Current Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes N No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes EQ No ❑ NA ❑ NE ❑ Yes EgNo ❑ NA ❑ NE ❑ Yes EjNo ❑ NA ❑ NE Page 1 of 3 511212020 Continued Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Q _h C Spillway?: Designed Freeboard (in): _ Observed Freeboard (in): H 52 _ 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes IN No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes No ❑ Yes No ❑ NA ❑ NE ❑NA ❑NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes I No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable ,Crrop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): C� IC'pC, 13. Soil Type(s): Not CC) I 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ki No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? Yes [:]No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes 1� No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. [—]Yes No ❑ Yes No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes j� No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Tra�nss ers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain minbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 511212020 Continued 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the appropriate boxes) below. ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes N No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes q No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes IN No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes N No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes CRNo ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes 1� No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes "�� No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). farm �ol1Quted flow We W on iW WTIPP phase I+Ip d (Antrvvs wow, appil Moud_eS -et_6 a4 Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: l l 1 `(J%l ll Date: 0(2(VI23 511212020