Loading...
HomeMy WebLinkAboutHE-0013_Drainage Redlines_202309129/12/2023DRAINAGE REDLINE PLANS - VICINITY MAPVICINITY MAP PROJECT BEGIN PROJECT END SOUTHERN RR LAURINBURG & -L- POC Sta. 13+00.00 BEGIN CONSTRUCTION BEGIN TIP PROJECT HE-0013 -L- POT Sta. 43+00 END CONSTRUCTION END TIP PROJECT HE-0013 -SR2- POT Sta. 10+00.00 -L- POT Sta. 35+30.58= -SR2- POT Sta. 13+48.42 -SR1- POT Sta. 27+10.13= -SR1- POT Sta. 10+00.00 -L- POC Sta. 21+52.82= -DR1- POT Sta. 10+00.00 -L- POC Sta. 15+57.20= TO LAURINBURG - D R1- TO ABERDEEN ABERDEEN ROAD US 15-501 -L--SR2-R AILR O A D C O MP A N Y L A URINB UR G & S O UT HER N = 0.568 MILES = 0.000 MILES = 0.568 MILES TOTAL LENGTH OF TIP PROJECT HE-0013 LENGTH STRUCTURE TIP PROJECT HE-0013 LENGTH ROADWAY TIP PROJECT HE-0013 SCOTLAND COUNTY US 15-501 (ABERDEEN RD) NORTH OF DRAINAGE, PAVING, AND GRADING 25 50 10050 25 50 10050 5 10 2010 =ADT INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION FUNC CLASS = DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. 2018 STANDARD SPECIFICATIONS GRAPHIC SCALES PLANS PROFILE (VERTICAL) LOCATION: TYPE OF WORK:09/08/99HE-0013DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 00 9/12/2023HE-0013_Hyd_PSH_01.dgnmedwardsCONTRACT:TIP PROJECT:HE-0013ARTMEN N ASO H DEPT O F TRA S PORTTIONTATEOFNRTCAR O LI NAMichael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Pkwy INTERNATIONAL HYDRAULICS ENGINEER ROADWAY DESIGN ENGINEER NCDOT CONTACT PROJECT ENGINEER TODD H. BUCKNER, PE PROJECT DESIGN ENGINEER JUSTIN BLACKMAN See Sheet 1B For Conventional Symbols See Sheet 1A For Index of Sheets X XMINOR ARTERIAL REGIONAL TIER -DR1- Sta. 10+85.00 END CONSTRUCTION LAURINBURG pop. 15,895 CI TY LI MI TS ( I N)LAURI NBURG CITY LIMITS (IN) LAURINBURG 50700.1.1 THE LIMITS ESTABLISHED BY METHOD II. 2. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO BOUNDARIES OF THE CITY OF LAURINBURG. 1. PROJECT IS PARTIALLY LOCATED WITHIN THE MUNICIPAL NOTES: GREGORY DAVIS, PE 65% ROADWAY PLANS -SR1- -SR2- Sta. 13+92.69 END CONSTRUCTION -SR1- Sta. 30+57.32 END CONSTRUCTION SR 1301 (PLANT RD) PE 2021 7,300 Cemetery CampbellPl a nt RdPlant Rd Heck Norton RdHeck Norton Rd401 BYP 401 BUS BUS15 BYP 501 15 NAD 83/ 2011 -L-LC POINT GRADE .02 .02.08 .02 FDPS 2' INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER ENGINEER 2A-1HE-0013 PAVEMENT DESIGN6/2/999/12/2023HE-0013_Hyd_PSH_02A1.dgnmedwardsDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Pkwy INTERNATIONAL NOTE: PAVEMENT EDGE SLOPES 1:1 UNLESS SHOWN OTHERWISE. P A V E M E N T S C H E D U L E W C1 LAYERS. AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE TYPE S9.5C, D1 D2 IN LAYERS NOT TO EXCEED 2.0". AN AVERAGE RATE OF 112 LBS. PER SQ. YD. PER 1" DEPTH TO BE PLACED PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C, AT C2 (SEE STANDARD WEDGING DETAILS) VARIABLE DEPTH ASPHALT PAVEMENT " OR GREATER THAN 4" IN DEPTH.2 1IN LAYERS NOT LESS THAN 2 AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH TO BE PLACED PROP. VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0C, E2 IN DEPTH. " 2 1BE PLACED IN LAYERS NOT LESS THAN 3" OR GREATER THAN 5 AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH TO PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.0C, EARTH MATERIALT R1 AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE TYPE I19.0C, CONCRETE EXPRESSWAY GUTTER BEGIN MILLING COURSE SURFACE TO EXISTING25' MINIMUM SEE PROFILE FOR LIMITS FULL DEPTH OF DETAIL 1 U U INCIDENTAL MILLING DETAIL GRADE - TIE END PROFILE (3" MAX) SURFACE COURSE V2 C1 TYPICAL SECTION NO.1 .02 4:1.02 GROUND ORIGINAL MATCHLINE AMATCHLINE A4'2'VAR. 0'-12' GRADE TO THIS LINE T C1 D1 E1 R1 C1 D1 GRADE TO THIS LINE 11" C1 D1 T E1 E1 U W TYPICAL SECTION NO.1A -L- Sta. 13+00.00 TO Sta. 43+00.00 -L- Sta. 17+40.06 TO Sta. 20+90.06 .02 GROUND ORIGINAL 4:1T.08.02 FDPS 2' 3:1 MAX GROUND ORIGINAL /// /// /// /// U C EXISTINGL Detail Showing Method of Wedging No. 1 C2 C1C1 E2 D1 D2 D2 D1 E2 3" MIN.3" MIN. " MIN.2 12" MIN.2 12 LL VARIABLE POINT GRADE C SURVEY C EXISTING U Detail Showing Method of Wedging No. 2 " MIN.2 12 3" MIN. E2 C1 C2 D2 D2 D1 E2 " MIN.2 12 3" MIN. 12'6'VAR. 0'-12'12'VAR. 0'-6'VAR. 0'-6'12'6' 3:1 MAX 9' W/ GR9' W/ GR V3 MILLED RUMBLE STRIP V3 V3 FINAL PAVEMENT DESIGN V2 0" TO 3" VARIABLE DEPTH MILLING E1 AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. PROP. APPROX. 4" ASPHALT CONCRETE BASE COURSE TYPE B25.0C, K1 N1 V1 V1 U V1 EXISTING PAVEMENT 1.5" MILLINGPROP. 12" CLASS IV SUBGRADE STABILIZATION GEOTEXTILE FOR SOIL STABILIZATION GEOTEXTILE CROSS- MACHINE DIRECTION (CD) ROLL WIDTH 13' MIN (TYP) SURVEY LINE GEOTEXTILE MACHINEDIRECTION (MD)(PLAN VIEW) 12" (TYP) 12" (TYP) SOIL STABILIZATION GEOTEXTILE FOR GEOTEXTILE FOR SOIL STABILIZATION PLACEMENT OR LANE LINE (100% COVERAGE REQUIRED) E.O.P. SUBGRADE E.O.P. SUBGRADE MIN (TYP) 18" OVERLAP SUBDRAIN PIPE 6" PERFORATED GRADE TO THIS LINE FDPS VAR. SUBSURFACE DRAIN DETAIL SEE STANDARD DRAWING 815.02 DETAIL 3 USE SUBSURFACE DRAIN DETAIL -SR2- STA. 10+18 TO 13+21 LT OR RT -SR1- STA. 24+25 TO 30+13 LT OR RT -SR1- STA. 10+18 TO 13+12 LT OR RT -L- STA. 28+50 TO 47+00 LT OR RT -L- STA. 13+00 TO 17+50 LT OR RT DETAIL 2 SHALLOW UNDERCUT DETAIL -L- STA. 14+25 TO 41+75 LT/RT USE SHALLOW UNDERCUT DETAIL 12" CD=CROSS-MACHINE DIRECTION GRADE TO THIS LINE N1K1 CD 12" .08 .02 .08 .02 .08 4:1 .02 .08 .02 POINT GRADE POINT GRADE LC LC -SR1- -SR2- 4:1 4:16'12'12'12'6'4:18' FDPS 2' FDPS 2' FDPS 2' FDPS 2' .02 .02.02 .02 .02 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER ENGINEER 2A-2HE-0013 PAVEMENT DESIGN6/2/999/12/2023HE-0013_Hyd_PSH_02A2.dgnmedwardsDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Pkwy INTERNATIONAL PAVEMENT SCHEDULE T EARTH MATERIAL U EXIST. PAVEMENT W WEDGING V1 D2 C1 D1 E1 3" S9.5C 4" I19.0C 4" B25.0C C2 VAR. S9.5C VAR. I19.0C E2 VAR. B25.0C .08 .02 POINT GRADE LC -DR1- 4:1 FDPS 2' .02 FDPS 2' .02 .08.02 TYPICAL SECTION NO.4 E1 C1 T GRADE TO THIS LINE GRADE TO THIS LINE C1 E1C1E1 TT T C1 E1 7" T C1 E1 GRADE TO THIS LINE T C1E1 TYPICAL SECTION NO.2 TYPICAL SECTION NO.3 -DR1- Sta. 10+18.71 TO Sta. 10+85.00 GROUND ORIGINAL 4'11'11'4'8' -SR1- Sta. 27+34.17 TO Sta. 30+57.32 -SR1- Sta. 10+18.00 TO Sta. 26+98.12 -SR2- Sta. 10+18.02 TO Sta. 13+92.69 GROUND ORIGINAL GROUND ORIGINAL 3:1 M A X GROUND ORIGINAL 3:1 MAX GROUND ORIGINAL 3:1 MAX 4:1GROUND ORIGINAL 8'6'12'12'6' V2 7" 7" V3 MILLED RUMBLE STRIP VAR. DEPTH MILLING 1.5" MILLING R1 EXPRESSWAY GUTTER N1 K1 CL IV SUBGRADE STAB. GEOTEXTILE FOR STAB. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 4HE-0013 9/12/2023HE-0013_Hyd_PSH_04.dgnmedwards8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NAD 83/ 2011 POC Sta. 24+00.00 - SHEET 5MATCH TO -L- POT Sta. 16+00 - SHEET 5MATCH TO -SR1- 905 JONES FRANKLIN ROAD RALEIGH, NORTH CAROLINA 27606 SUNGATE DESIGN GROUP, P.A. NC COA No. C-0890 Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Pkwy INTERNATIONAL FOR -SR1- PROFILE SEE SHEET 8 FOR -DR1- PROFILE SEE SHEET 8 FOR -L- PROFILE SEE SHEET 7221221221222222222222222223223223 223 223224224224 224 2242 2 4 224224224225225225 22522 5225225225225 225 225225 225225226226226 226226226226226226226226226 226226226226226227227227227 227227 227227227 227227 227227227 227227227227227 227 2272 2 7 228228 228 228 228228228228228 228 228 228 228228228228228 228 2282282 2 8 228228 228228228228229229229 229229229229 229 2292292292292292 2 9 229229229 229229229229 2 3 0 2 3 0 230230230230230230 230 230 2302302302 3 0230230230230230 230230230230230230 230230231 231 2312312312 3 1 231231231231 231231231231 231232 232 232 2 3 2 2 3 2 232232 232232 232232 2322322 3 2 2 3 2 232232 232232232233 233 233 2 3 3233 233233 233233233 233233 233233233233233 233 233233233233233233234 234234234234 234 234 234234234234234 234234234 234 2342342342342342 3 4 2 3 4234234234234 234234234 234 234 2342342342342342342342342342342342 3 4 234234234234234 234234234234234 2 3 4 234234234234234234234234234234234234235 235 235235235 235235235235235235 235235235235 2 3 5 2352352 3 5 235235235235235 2 3 5 235235235235235235235 235235 235235235235 235235235 235235235235235 235235235235236236236236 2362362362362362362 3 6236 237237 237237237237237 2372382 3 8 238 2382382382 3 8 239239 23923924024024024124124224218" RCP 18" RCP 24" RCP 15" RCP 15" RCP 15" RCP 18" RCP24" RCP FOOT BRIDGE72" CHL72" CHL CONC36" CHL36" CHL72" C HL 18" RCP INV=222 .09 'INV=221.66' 15" R C P INV=220.40' 48" CMP INV=220.22' INV=221.86' INV=220.67'48" RCPINV=220.79' 18" RCP INV=223.58' INV=224.49'INV=224.50' BURIED JB LT STEPS 2' WD WALL LT LT CONC G GR STEPS STEPS 1SFD DECK GRGR BST BST 39' BSTSR 1301 (PLANT ROAD) 22' BST INV=227.99'INV=228.13' LTLTLTLT INV=231.44'BSTCONC GR G R S CONC SWING WOODS WOODS WOODS WOODS IN V=224.67' IN V=224.48'24" RCPINV=221.14'HW CONC 2' WD WALLINV=233.11'INV=233.17'MON CONC NC 15/501 (ABERDEEN ROAD) 27' BST S SSS METER POWER I N V =222.52' 72" C HL LA URINB UR G & S O UT HER N R AILR O A D C O MP A N Y 2 3 20 21 23 24 25 NEW WILL LLC JOEL D & REBECCA LUCAS DANIEL A MADDEN CHARLES D NICHOLS CHARLES D NICHOLS 1001 CAROLINE DR LLC JOHN & JEFF SCHWARZ LLC DB 1739 PG 118 DB 1722 PG 139 DB 1615 PG 132 DB 10E PG 90 DB 1437 PG 157 DB 1758 PG 822 DB 370 PG 232S 88°11'07" W218.72'N 01°48'53" W 103.20' N 39°19'26" W255.67' N 50°45'15" E 366.05' N 39°19'26" W 60.02' S 15°29'09" E199.67' S 15°29'09" E426.27'S 86°05'17" W305.45'EIP EIP EIP S 70°54'32" W399.65' MON CONC EIP 24.85' 80.00' EXISTING R/W EXISTING R/W E XISTIN G R AILR O A D R/WE XISTIN G R AILR O A D R/WE XISTIN G R AILR O A D R/WEXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W MON CONC N 39°23'19" W 60.12' N 50°46'12" E 341.27' S 52°45'46" W448.54' L A U RIN B U R G CIT Y LI MITS LAURI NBURG CI TY LI MI TSPOSSIBLE CONNECTION END NOT FOUNDBL-101 BL-102 TTTHHTT CHHTTSEOI EOI EOIEOIEOIEOIAT&T, COPPER, UNK. S PNG, 2", STEEL AT&T, COPPER, UNK. S AT &T, C OPPE R, U N K. S AT&T DUCT BANK SPECTRUM, CONDUIT, UNK. S AT&T, COPPER, UNK. S 12 ", AC P PNG, 2", STEEL 60.00'D B 1561 P G 41 60' E ASE ME NT SCOTLAND COUNTY, 6", PVC 19 DB 1762 PG 933 DEVELOPMENT CORPORATION SCOTLAND COUNTY ECONOMIC 18 SCOTLAND COUNTY ECONOMIC DEVELOPMENT CORPORATION MB N PG 223 MBM PG 223 DB 1561 PG 41 22 SCOTLAND COUNTY ECONOMIC DEVELOPMENT CORPORATION MB N PG 223 MB M PG 223 DB 1561 PG 41 4 RYDER TRUCK DB 8P PG 183 R AILR O A D R/WE XISTIN G INV=N/A JB 18" RCP 30" CMP18" CMP INV=226.56' INV=225.95' 18" RCP 18" R CP GI P A VE D D RIVE -SR1- POT Sta. 10+00.00 -L- POC Sta. 21+52.82= -L- -L- POC Sta. 13+00.00 BEGIN CONSTRUCTION BEGIN TIP PROJECT HE-0013 -DR1- POT Sta. 10+00.00 -L- POC Sta. 15+57.20= 100.00' STORAGE 100.00' TAPER 250.00' DECELERATION15 20-L- PC Sta. 10+00.00 -DR1- PC Sta. 14+79.17 -DR1- PT Sta. 15+66.4212'12'12'12'12'12'12'12'12'12'12'12'12'12'PS2'PS2'PS2'PS2'PS2'PS2'PS2'GUTTER EXPRESSWAY PROP. CONC. 11'11' PS2'PS2' 12'12'12' PS 2' PS 2' .003 .003 .00 .01.01 .02.02EXIST.EXIST..02.0212'12'12'PS2'PS2'+40.06(TYP.)19'(TYP.)19'PI Sta 15+22.80 D L = 87.26' T = 43.63' R = 2,500.00' PI Sta 17+62.65 D L = 1,525.29' T = 762.65' R = 2,475,958.60' -L--DR1- SE = NC SE = EXISTING -SR1- SE = .04 RUNOFF = 76'15.02 .02 .01 .01 .00 .02-SR1- PC Sta. 11+85.68 -SR1- PT Sta. 15+79.79 PI Sta 14+37.10 D L = 394.12' T = 251.42' R = 250.00' (TYP.) 19'(TYP.)19'15'R 1 4'R10'R 10'R 12' 10' 10'R 68'33'46'20'R20'R(TYP.)(TYP.)(TYP.)(TYP.) +62.30 5 0' R 50'R 2 5'R+42.70 .03 .04 +16.01 +54.46.03.04100' TAPER NOITARELECED '051 12'12'PS2'PS2'12'TAPER 100' +67.31 -DR1- POT Sta. 10+85.00 END CONSTRUCTION EGAROTS '84.26455.00' RT +00.00 -DR1- EX. R/W +45.00 -L- EX. EASEMENT 45.00' RT +35.00 -DR1- 60.00' RT +00.00 -SR1- 70.00' RT +40.00 -SR1- 70.00' RT +79.79 -SR1- EX. R/W +40.00 -L- 55.00' RT +75.00 -L- EX. R/W 55.00' RT +55.00 -L- EX. R/W +35.00 -L- 85.00' LT +20.00 -L- 130.00' LT +00.00 -L- 155.00' LT +10.00 -L- 170.00' LT +25.00 -L-135.00' LT +50.00 -L- 180.00' LT +35.00 -L- 145.00' LT +60.00 -L- EX. R/W +20.00 -L- EX. R/W +25.00 -L- EX. P/L 45.00' LT +10.00 -DR1- 65.00' RT +70.00 -L- 55.00' RT +00.00 -L- EX. R/W +25.00 -L- EX. R/W +92.34 -L- EX. R/W +12.13 -L- 35.00' LT 60.00' LT +00.00 -SR1- NO FLOW n=0.06 A A 2.5' 2.5' 1:11:1 AADITCH VEGETATED HEAVILY CONDITION FAIR SECTION DESTROYED OUTLET 4' RCP CONDITION FAIR CONDITION FAIRCONDITION FAIR CONDITION FAIR CONDITION FAIR CONDITION FAIR CONDITION FAIR CONDITION GOOD 18" CMP CONDITION GOOD 18" RCP n=0.04 B B 5' 5' 1:1 1:1 B B STANDING WATER 0"-1" (-)0.3000 %(+)0.3000 %(-)0.3000%(+)0.3000%(+)0.2825 %(-)1.5183 %(+)0.3000%(-)0.1010% (-)0.3733%(+)1.2482% MUDDY LIGHT VEGETATION ELEV=234.91-SR1- STA. 11+00.00SAGELE V=235.54 -SR1- ST A. 13+50.00 C REST ELEV=226.26 -L- STA. 13+00.00 EXIST SAG ELEV=234.91 -SR1- STA. 16+00.00 SAG (-)0.3000%(+)0.3000%66" RCP-IV SEE DETAIL 4-1 SPECIAL 2' BASE DITCH GTD GTD GTD GTD 0403 0410 0409 0408 0407 CONDITION UNK. RETAIN RETAIN RETAINRETAINRETAIN REMOVE REMOVE REMOVE REMOVE ELE V=227.87 - D R1- ST A. 10+90 E XIST S A G 18"TB 2GI TB 2GI TB 2GI 0406 RE MO VE RCP-V 2@48" E0404 E0403 E0402 RETAIN SEE DETAIL 4-7 W/ CL 'I' RIP RAP BANK STABILIZATION PIPE OUTLET REMOVE 18" RCP-IV 18" RCP-IV SEE DETAIL 4-3 W/ CL 'I' RIP RAP BANK STABILIZATION PIPE INLET RETAIN 3:1 3:1D ( Not to Scale) TAIL DITCH B d FROM STA. 11+82 -L- LT DETAIL 4-6 Ground Natural Ground Natural Geotextile B= 6 Ft. d= 4.0 Ft. Min. D= 4.0 Ft. (TYP) a Minimum of 1ft Tuck Geotextile On Banks Only Type of Liner= CL 'I' Rip-Rap SEE DETAIL 4-6 SLOPE=0.333% EST 240 CY DDE EST 361 SY GF EST 220 TONS ON BANKS ONLY W/CL 'I' RIP RAP TAIL DITCH RETAIN GTD 30" RCP-V0402 CAPA 2@83"X57" 0404 d 3:1B D ( Not to Scale) 3:1 FROM STA. 15+30 TO STA. 15+64.5 -L- LT FROM STA. 10+90 TO STA. 12+00 -DR1- LT DETAIL 4-2 Ground Natural Ditch Slope Front Geotextile B=5.0 Ft. d=3.5 Ft. Min. D=3.5 Ft. Minimum of 1ft (TYP) Tuck Geotextile a Type of Liner= CL 'I' Rip-Rap, Keyed-In SPECIAL 5' BASE DITCH d 3:1B D ( Not to Scale) 3:1 FROM STA. 13+03.7 TO STA. 15+30 -L- LT DETAIL 4-4 Ground Natural B=5.0 Ft. d=3.5 Ft. Min. D=3.5 Ft. SPECIAL 5' BASE DITCH Ditch Slope Front Geotextile Minimum of 1ft (TYP) Tuck Geotextile a On Banks Only Type of Liner= CL 'I' Rip-Rap, Keyed-In SEE DETAIL 4-2 W/CL 'I' RIP RAP EST 537 SY GF EST 329 TONS BASE DITCH SPECIAL 5' SEE DETAIL 4-5 EST 367 SY GF EST 200 TONS W/CL 'I' RIPRAP BASE DITCH SPECIAL 2' SEE DETAIL 4-4 EST 810 SY GF EST 485 TONS ON BANKS ONLY W/CL 'I' RIPRAP BASE DITCH SPECIAL 5' SEE DETAIL 4-2 EST 124 SY GF EST 88 TONS W/CL 'I' RIPRAP BASE DITCH SPECIAL 5' SHEAR=0.74 LB/SF V=2.70 FPS d=3.56 FT Q10=160 CFS n=0.052 SLOPE =0.0033 FT/FT % IMPERVIOUS=33% DA=176 AC STA. 11+82 -L- LT SHEAR=0.99 LB/SF V=3.05 FPS d=3.43 FT Q10=160 CFS n=0.052 SLOPE =0.0046 FT/FT % IMPERVIOUS=33% DA=169 AC STA. 13+04 TO STA. 15+65 -L- LT SHEAR=3.47 LB/SF V=5.28 FPS d=2.35 FT Q10=150 CFS n=0.055 SLOPE =0.0236 FT/FT % IMPERVIOUS=33% DA=156 AC STA. 10+90 -DR1- LT 0411 0412 0401 0402 ( Not to Scale) DETAIL 4-3 Ground Natural Ground Natural d* PIPE INLET BANK STABILIZATION of Ditch Slopes on Jurisdictional Streams *Rip-Rap to be Installed to 2ft Outside Top Directed by Engineer Riprap in Locations Place Geotextile Under (Typ) a Minimum of 1ft Tuck Geotextile Until Refusal (Typ) Channel Bottom Press Riprap into BANKEXI STI NG BANKEXISTING (MATCH EXTG.) CHANNEL BED STA. 13+48.7 -SR1- LT Est.= 17 Tons Class 'I' Rip-Rap, Keyed-In. d=4.0 Ft. Length=15.0 Ft. Est. 32 SY Geotextile 0405 E0401 (Variable) Channel Bed (TYP) a Minimum of 1ft Tuck Geotextile (TYP) 2ft RCP-IV 15" d 3:1B D ( Not to Scale) OR FLATTER3:1 FROM STA. 16+46.9 TO STA. 17+44 -L- RT FROM STA. 15+64.5 TO STA. 17+18 -L- LT DETAIL 4-5 Ground Natural Ditch Slope Front Geotextile B=2.0 Ft. d=1.5 Ft. Min. D=1.5 Ft. Minimum of 1ft (TYP) Tuck Geotextile a Type of Liner= CL 'I' Rip-Rap, Keyed-In SPECIAL 2' BASE DITCH SEE DETAIL 4-5 EST 210 SY GF EST 126 TONS W/CL 'I' RIPRAP BASE DITCH SPECIAL 2'Flatter3:1 or D B ( Not to Scale) Flatter3:1 or FROM STA. 13+24.4 TO STA. 16+00 -SR1- RT FROM STA. 10+50 TO STA. 13+16 -SR1- RT FROM STA. 13+57.8 TO STA. 15+50 -SR1- LT FROM STA. 10+50 TO STA. 13+48 -SR1- LT FROM STA. 15+00 TO STA. 15+36.6 -L- RT FROM STA. 10+67 TO 11+25 -DR1- RT DETAIL 4-1 B= 2.0 Ft. Min. D= 1.5 Ft. Ground Natural SPECIAL 2' BASE DITCH Slope Ditch Front SEE DETAIL 4-1 BASE DITCH SPECIAL 2' SEE DETAIL 4-1 BASE DITCH SPECIAL 2' SEE DETAIL 4-1 BASE DITCH SPECIAL 2' SEE DETAIL 4-1 BASE DITCH SPECIAL 2' TB 2GI TB 2GI ( Not to Scale) Elevation Natural Bed STA. 13+21 -SR1- RT Ground Natural Ground Natural PIPE OUTLET CHANNEL STABILIZATION DETAIL 4-7 1.5' Type of Liner= CL 'I' Rip-Rap - Keyed-In, Est. 33 Tons, Est. 52 SY Geotextile Length= 20 Ft. Geotextile* in Locations Directed by Engineer *Place Geotextile Under Riprap INV=224.1 INV=227.4 TOP=231.4 INV=228.4 TOP=232.4 INV=229.6 TOP=233.6 BURIED 1.0' INV=222.3 BURIED 0.8' INV=220.9 BURIED 1.0' INV=221.9 BURIED 1.0' INV=226.5 BURIED 1.0' INV=226.6 BURIED 0.8' INV=221.3 INV=227.2 INV=223.6 TOP=227.5 INV=223.9 TOP=225.9 INV=224.8 INV=223.5 HW HW HW C F F F F F C F F F F F F F F F F F F F F F F F F F F F CCC C C C C C C C C C C C F C C C C C C C F CCCCCCC F F FCCCC CCCCCCCC CC C C C F F DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 5HE-0013 9/12/2023HE-0013_Hyd_PSH_05.dgnmedwards8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NAD 83/ 2011 POC Sta. 24+00.00 - SHEET 4MATCH TO -L- POT Sta. 37+00.00 - SHEET 6MATCH TO -L- FOR -SR2- PROFILE SEE SHEET 9 FOR -SR1- PROFILE SEE SHEET 9 FOR -L- PROFILE SEE SHEET 7POT Sta. 16+00 - SHEET 4MATCH TO -SR1- POT Sta. 29+00 - SHEET 6MATCH TO -SR1- 905 JONES FRANKLIN ROAD RALEIGH, NORTH CAROLINA 27606 SUNGATE DESIGN GROUP, P.A. NC COA No. C-0890 Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Pkwy INTERNATIONAL 228228228 228228229229229 229229 229229229229 229229229230230230 230230230 230230230230230230230230230230 230230230230230230230230230 230230230230230230 230 2302 3 0 231231231231231 231231231231231231 231 231231231231231231 231 2 3 1231 231 231231231 231231 232232232232232232232 232 232232232232232232 232 232232232232 232232232232232 232232232232232232232 2322332332332332332 3 3 233 233 233233233233 2 3 3 233 233 233 233233233 233233233233233233 233233233 2332332332 3 3 233233233233233233233233233233 233 233 233233 233234 234234234234234 2342342342342342 34234234234 234234234234234 234234234 234234234234234234 234234234234234234 234234234234234234 234234 2342 3 4 2342342342342342342342342342342342342342342342 3 4 234 234234234234 234234234 2342342342342342 3 4 234234 2 3 4 234234234234234 2 3 4 234234234 234234234 2342 3 4 234234234234234234234234234234234234 234 234 234 2342342342342342342342342342342342342342342342 3 42342342342 3 4 234234234234 234234 234234 2 3 4 234234234234234234 2342342342 3 4 234234234234234234 234234234 234 234 234234234 234234234234234234234 234234234234234234234234234234 234 234234234234 234 2342342342342342342342342 3 4 234234234234 234234234234234234234234 234234234234234234235235 235235235235 235 235 235235 235235 235235 235235235235235235235235235235235235235235235235235235235235235235235235235235235235235 235235235235235235235235235235235235235235235235235235235235 2352352352352352352352352 3 5 235 235235 235 2352 3 5 2352352352 35235235235236 236236 236236236 236236236 236 2362362362362362 3 6 236 236236236236236236236236 236236237237 2372372372372 3 7 23823823823823923924" RCP 18" RCP18" RCP18" RCP18" HDPE 12" H DPE 15" RCP AREA UNDER CONSTRUCTIONSOIL36" WD INV=231.77' INV=231.72'INV=231.76'BSTINV=231.34' INV=231.05' INV=232.47' INV=232.40'SOILSOIL SOIL WOODS WOODS WOODS WOODS SSS IN V=228.06'IN V=228.95' 15" RCP 4 5 6 7 8 18 19 SCOTLAND COUNTY ECONOMIC DEVELOPMENT CORPORATION DB 1762 PG 933 N 66°41'14" W32.88'S 82°49'49" W 24.52' N 01°13'24" E 290.16'N 18°48'20" E410.37' EIP MON CONC S 6 2 ° 2 5' 3 2 " W12 3 8. 9 9'S 87°56'02" E383.37'EIP EIP EIP EIP S 88°48'32" W671.78'EXISTING R/W EXISTING R/W EIP MON CONCS 89°09'57" W162.40'N 01°22'06" W 158.84'S 89°09'57" W162.90'0.09' R/W-EIPEIP3.70' R/W-EIPN 46°46'09" W382.62' BL-103 TTEOIPNG, 2", STEEL AT&T, COPPER, UNK. S PNG, 2", STEEL AT&T, COPPER, UNK. S AT&T, COPPER, UNK. S AT&T, COPPER, UNK. S MB N PG 223 MBM PG 223 DB 1561 PG 41 DB 14Z PG 282PIEDMONT NATURAL GAS COMPANY, INC.50.00' SCOTLAND COUNTY, 6", PVC SCOTLAND COUNTY, 6", PVC RYDER TRUCK DB 8P PG 183 WESTWOOD ASSOCIATES DB 7N PG 483 JAMES SMITH DB 1708 PG 127 JAMES SMITH DB 1708 PG 127 WESTWOOD ASSOCIATES WRONG DEED? DB 3S PG 135 18A BM 12 PG 362 DEVELOPMENT CORPORATION SCOTLAND COUNTY ECONOMIC S 15°29'09" E426.27' N 01°14'12" W 453.04' 18" RCP FESFES GRAVEL DRGR DRGR DR18" RCP 18" RCP FES FES FES FES DEVELOPMENT CORPORATION SCOTLAND COUNTY ECONOMIC INV=226.26' INV=224.88'87"x63" CMAP-SR2- POT Sta. 10+00.00 -L- POT Sta. 35+30.58= -SR2- POT Sta. 13+48.42 -SR1- POT Sta. 27+10.13= 100.00' TAPER2530 35250.00' DECELERATION -L- PT Sta. 25+25.29 12'12'12'12'12'12'12'12'12'12'12'PS2'PS2'PS2'PS2'PS2'PS2'12'12'12' PS 2' PS 2' 12'12'12' PS 2' PS 2'-SR2-12'12'PS2'PS2'.02.02 .02.02 .02.0212'12'12'PS2'PS2'-L-.02.0212'12'12'PS2'PS2'.02.02+00.87PI Sta 17+62.65 D L = 1,525.29' T = 762.65' R = 2,475,958.60' -L- SE = NC -SR1- SE = .04 SE = .04 RUNOFF = 76'RUNOFF = 76'2025-SR1- PC Sta. 22+99.74 -SR1- PRC Sta. 24+78.30 -SR1-.00.01.01.02.02.01.01.01.00.00.003.003.00.01.01.02.0212'12'PS2'PS2'12'12'PS2'PS2'(TYP.) 19' (TYP.) 19' (TYP.) 19' (TYP.) 19' PI Sta 23+91.22 D L = 178.56' T = 91.49' R = 333.00' PI Sta 25+68.23 D L = 175.67' T = 89.93' R = 333.00' -SR1- PT Sta. 26+53.97 23'20'R(TYP.)30'R3 0'R30'R 30'R20' R20'R 27'26' 20'R 10 'R (TYP.) 40' 18'10'R(TYP.)(TYP.) 1 0'R( T YP.) 9'10'R(TYP.)10' 10'R 5 5 'R200'R 200'R60'R +11.46100' TAPER .02+11.07.03.04.04.04.03.03.02.02.01.01(TYP.)19'.02.03.04(TYP.) 19'+25.51+68.77+80.17150' DECELERATION +79.79NOITARELECED 15'R 9' 100.00' STORAGE -SR2- POT Sta. 13+92.69 END CONSTRUCTION 20'R 35.00' LT +05.00 -SR1- 150.00' LT +90.00 -SR1- EX. R/W +10.00 -L- 35.00' LT +50.00 -SR1- 60.00' LT +00.00 -SR1- 35.00' LT +75.00 -SR1- 60.00' RT +15.00 -SR1- 75.00' RT +50.00 -SR1- 75.00' RT +50.00 -SR1- 60.00' RT +00.00 -SR1- 60.00' RT +25.00 -SR1- 35.00' LT 60.00' LT +00.00 -SR1- 85.00' RT +70.00 -L- 35.00' RT +15.00 -SR2-EX. P/L +90.00 -SR2- 65.00' LT +00.00 -SR2- EX. R/W +83.40 -L- EX. R/W +91.98 -L- 35.00' LT +66.19 -SR1- 35.00' LT +76.93 -SR1- 35.00' LT +40.00 -SR1- EX. R/W +75.00 -L-85.00' RT +10.00 -L- 135.00' LT +65.00 -SR1- 35.00' RT 60.00' RT +00.00 -SR1- CONDITION FAIR CONDITION POOR CONDITION FAIR WITH DEBRIS COMPLETELY FILLED CONDITION UNK. CONDITION FAIR CONDITION POOR CONDITION GOOD W/FES 18" RCP CONDITION GOOD W/FES 18" RCP CONDITION GOOD W/FES 18" RCP NO FLOW n=0.06 C C 2.5' DITCH VEGETATED HEAVILY C C 3'1.5:1 1.5:1 D D 3" FLOW n=0.04 D D 5' 6' 1:1 1:1 MUDDY LIGHT VEGETATION n=0.06 E E 4' E E DITCH VEGETATED HEAVILY 2.5' 1.5:1 1.5:1 STANDING WATER 1"-2" H H n=0.06 H H 3' DITCH VEGETATED HEAVILY 1.5:1 1.5:1 4' NO FLOW F F n=0.06 F F 1' DITCH VEGETATED HEAVILY 1' NO FLOW G G n=0.06 G G 3' DITCH VEGETATED HEAVILY 3.5:1 3.5:1 NO FLOW 2:1 2:1 2.5' I I n=0.04 I I 4' 6' 1:1 1:1 STANDING WATER 1.6' SOIL. IS FILLED WITH 1' OF SURVEY SHOTS, PIPE LOCATE. BASED ON COULD NOT CONDITION UNK. (+)0.3000%(-)0.5441%(+)0.3000%(-)0.3000% (+)0.3000% (-)0.5441% (+)0.1845%(-)0.1010% (-)0.0205%(+)0.1845% ELEV=236.43 -SR1- STA. 21+39.16 CREST ELEV=234.13-SR1- STA. 26+10.84SAG ELEV=235.34 -L- STA. 27+78.08 SAG ELEV=236.57 -L- STA. 35+60.00 CREST POND DRY DETENTION POND DRY DETENTION 050130" RCP-VELEV=234.91 -SR1- STA. 16+00.00 SAG ELEV=234.08 -SR1- STA. 27+51.44 SAG (-)0.5441%(+)0.3000% LEAVES SOME MUDDY 0506 0507 SEE DETAIL 5-2 SPECIAL 4' BASE DITCH 0508 05093:1D B ( Not to Scale) Flatter4:1 or FROM STA. 24+00 TO STA. 26+65 -SR1- RT FROM STA. 18+00 TO STA. 23+40 -SR1- RT DETAIL 5-2 B= 4.0 Ft. Min. D= 3.0 Ft. Ground Natural SPECIAL 4' BASE DITCH Slope Ditch Front SEE DETAIL 5-2 SPECIAL 4' BASE DITCH SEE DETAIL 5-2 SPECIAL 4' BASE DITCH SEE DETAIL 5-1 SPECIAL 2' BASE DITCH RETAIN RETAIN RETAIN RETAIN 15" RCP-III REMOVE RETAIN 18" RCP-III RE MO VE 0502 0505 INSTALLED NOT BEING 18" RCP 18" RCP-III HW/D=0.69 Q10=3.9 CFS PIPE SLOPE =0.0525 FT/FT Tc=15.0 MIN I10=5.4 IN/HR C=0.36 DA=2.0 AC STA. 34+70 -L- LT HW/D=0.32 Q10=0.9 CFS PIPE SLOPE =0.005 FT/FT Tc=10.0 MIN I10=6.4 IN/HR C=0.47 DA=0.3 AC STA. 32+70 -L- RT HW/D=1.16 Q10=43 CFS PIPE SLOPE =0.0015 FT/FT Tc=23.0 MIN I10=4.6 IN/HR C=0.65 DA=14.45 AC STA. 23+70 -SR1- RT TO CHANGE. IS SUBJECT (ENCIRCLED) DRAINAGE EST 22 SY GF EST 11 TONS CL 'I' RIP RAP SEE DETAIL 5-6 EST 73 SY GF EST 45 TONS LENGTH=24' W/CL 'I' RIP RAP BANK STABILIZATION PIPE OUTLET 24" RCP-V 30" RCP-IV 24" RCP-IV SEE DETAIL 5-4 SLOPE=8.08% EST 22 CY DDE EST 75 SY GF EST 42 TONS W/CL 'I' RIP RAP HEAD DITCH SEE DETAIL 5-7 EST 87 SY GF EST 50 TONS W/CL 'I' RIP RAP BASE DITCH SPECIAL 2' SEE DETAIL 5-9 EST 327 SY GF EST 102 TONS W/CL 'B' RIP RAP SPECIAL 2' BASE DITCHRETAINDITCH 18" RCP AND CLEANOUT RETAIN AND SEE DETAIL 5-5 SLOPE=1.36% EST 58 SY GF EST 86 CY DDE EST 33 TONS LENGTH=22' W/CL 'I' RIP RAP TAIL DITCH 3:1 3:1D ( Not to Scale) TAIL DITCH B d STA. 20+67 -SR1- LT DETAIL 5-5 Ground Natural Ground Natural Geotextile B= 4 Ft. d= 3 Ft. Min. D= 2.5 Ft. (TYP) a Minimum of 1ft Tuck Geotextile Type of Liner= CL 'I' Rip-Rap SEE DETAIL 5-10 SLOPE=0.28% EST 39 CY DDE HEAD DITCH SEE DETAIL 5-1 BASE DITCH SPECIAL 2' EST 37 CY CHANNEL EXISTING FILL IN EST 270 CY CHANNEL EXISTING FILL IN SEE DETAIL 5-10 SLOPE=0.64% EST 240 CY DDE HEAD DITCH B 3:13:1D ( Not to Scale) HEAD DITCH STA. 23+15 -SR1- RT STA. 17+13 -SR1- RT DETAIL 5-10 B= 3.0 Ft. Min. D= 2.0 Ft. Ground Natural Ground Natural 3:1 3:1D ( Not to Scale) HEAD DITCH B d FROM STA. 29+12.7 -L- LT DETAIL 5-4 Ground Natural Ground Natural Geotextile B= 3 Ft. d= 1.5 Ft. Min. D= 1.5 Ft. (TYP) a Minimum of 1ft Tuck Geotextile Type of Liner= CL 'I' Rip-Rap d 3:1B D ( Not to Scale) OR FLATTER4:1 FROM STA. 35+79.1 TO STA. 37+00 -L- RT DETAIL 5-9 Ground Natural Ditch Slope Front Geotextile B=2.0 Ft. d=1.5 Ft. Min. D=1.5 Ft. Minimum of 1ft (TYP) Tuck Geotextile a Type of Liner= CL 'B' Rip-Rap, Keyed-In SPECIAL 2' BASE DITCH (Variable) Channel Bed (TYP) a Minimum of 1ft Tuck Geotextile (TYP) 2ft 0503 0504 SEE DETAIL 5-1 BASE DITCH SPECIAL 2' SEE DETAIL 5-1 BASE DITCH SPECIAL 2'SEE DETAIL 5-1 BASE DITCH SPECIAL 2'3:1D B ( Not to Scale) Flatter4:1 or FROM STA. 10+62.6 TO STA. 13+00 -SR2- LT FROM STA. 27+50 TO STA. 28+50 -SR1- RT FROM STA. 16+00 TO STA. 17+50 -SR1- RT FROM STA. 32+90 TO STA. 34+21 -L- RT FROM STA. 31+00 TO STA. 32+50 -L- RT FROM STA. 28+50 TO STA. 30+00 -L- LT DETAIL 5-1 B= 2.0 Ft. Min. D= 1.5 Ft. Ground Natural SPECIAL 2' BASE DITCH Slope Ditch Front SEE DETAIL 5-1 BASE DITCH SPECIAL 2' BY OTHERS INSTALLED 87"X67" CMPA SEE DETAIL 5-7 EST 141 SY GF EST 77 TONS W/CL 'I' RIP RAP BASE DITCH SPECIAL 2' d 3:1B D ( Not to Scale) OR FLATTER4:1 FROM STA. 34+32.8 TO STA. 34+60.8 -L- RT FROM STA. 34+80 TO STA. 35+00 -L- LT FROM STA. 34+20.7 TO STA. 34+60 -L- LT DETAIL 5-7 Ground Natural Ditch Slope Front Geotextile B=2.0 Ft. d=2.0 Ft. Min. D=2.0 Ft. Minimum of 1ft (TYP) Tuck Geotextile a Type of Liner= CL 'I' Rip-Rap, Keyed-In SPECIAL 2' BASE DITCH ( Not to Scale) DETAIL 5-3 Ground Natural Ground Natural d* PIPE INLET BANK STABILIZATION of Ditch Slopes on Jurisdictional Streams *Rip-Rap to be Installed to 2ft Outside Top Directed by Engineer Riprap in Locations Place Geotextile Under (Typ) a Minimum of 1ft Tuck Geotextile Until Refusal (Typ) Channel Bottom Press Riprap into BANKEXI STI NG BANKEXISTING (MATCH EXTG.) CHANNEL BED STA. 21+00 -L- RT d=3.0 Ft. Length=16.0 Ft. SEE DETAIL 5-3 EST 52 SY GF EST 31 TONS LENGTH=16' W/ CL 'I' RIP RAP BANK STABILIZATION PIPE INLET SEE DETAIL 5-8 EST 41 SY GF EST 20 TONS W/CL 'I' RIP RAP BANK STABILIZATION ( Not to Scale) STA. 20+67 -L- LT Ground Natural Ground Natural (Variable) CHANNEL BED EXI STI NG BANKd* BANK STABILIZATION of Ditch Slopes on Jurisdictional Streams *Rip-Rap to be Installed to 2ft Outside Top Directed by Engineer Riprap in Locations Place Geotextile Under (Typ) a Minimum of 1ft Tuck Geotextile Until Refusal (Typ) Channel Bottom Press Riprap into Keyed-In Est.= 20 Tons of Class 'I' Rip-Rap, d= 4.0 Ft. Length= 33 Ft. 48" RCP-IV SEE DETAIL 5-5 TAIL DITCH DETAIL 5-8 4 8" RCP-I V( Not to Scale) Elevation Natural Bed STA. 34+25.8 -L- RT Ground Natural Ground Natural PIPE OUTLET CHANNEL STABILIZATION DETAIL 5-6 1.5' Type of Liner= CL 'I' Rip-Rap - Keyed-In Geotextile* in Locations Directed by Engineer *Place Geotextile Under Riprap INV=230.9 INV=230.6 INV=228.8 INV=228.5 HW INV=230.0INV=229.8 INV=229.2 INV=229.3 INV=232.6 INV=232.4 INV=230.5INV=230.1 HW F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F FFFF F F FCF F F C F F F F F F F F F F F F F F F F F F F F FF F FC F F F C C F F C C C C C C C F C C C C C F C C C C C C C C C C C C C C C CC C C C C C F CCCCCC C C C C C F NAD 83/2011 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 6HE-0013 9/12/2023HE-0013_Hyd_PSH_06.dgnmedwards8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED POT Sta. 37+00.00 - SHEET 5MATCH TO -L- FOR -SR1- PROFILE SEE SHEET 9 FOR -L- PROFILE SEE SHEET 8POT Sta. 29+00 - SHEET 5MATCH TO -SR1- 905 JONES FRANKLIN ROAD RALEIGH, NORTH CAROLINA 27606 SUNGATE DESIGN GROUP, P.A. NC COA No. C-0890 Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Pkwy INTERNATIONAL 233 233 234234 234234234234 234 234234234 234234234234234 234 234234234234 2342342342342342342342342 3 4 234 234234234 2342342 3 4 234 234234234234234235235235235235 235235 235235235235235235235235235 2352 3 5 2352352352352352 3 5 235235235 235 235235235235235235 235 235235235 235235235 235235236236236236236236236236236236236236236236 236 236236236236236236236236 236236236236237237 23723715" RCP 15" RCP 15" RCP 15" RCP 15" RCP 15" RCP 15" RCP 18" RCP AREA UNDER CONSTRUCTION SOIL 9' GR10' GRNC 15/501 (ABERDEEN ROAD) 27' BST 9' GR9' GR9' GR12' SOILWOODS EIP EIP EIP 9 10 1112 13 14 15 16 17 18A 150.00'1.31' R/W-EIP1.77' R/W-EIPN 51°04'03" W126.11'N 88°10'51" W288.35'S 88°47'14" W166.93'N 34°18'13" E 45.98'N 34°18'13" E 244.83'N 34°18'13" E 175.58'N 34°18'13" E 99.27' S 5 7°0 8'50" W310.48'N 6 7 ° 1 3' 5 6 " E1 0 1. 7 2' N 01°14'12" W 453.04'N 6 7 ° 1 4' 5 8 " E2 7 5. 3 0'0.70' R/W-EIPS 62°13'03" E898.03'N 82°50'18" W551.17'EIP EIP EIPN 76°14'47" E129.44' EIP EXISTING R/W EXISTING R/W N 01°22'06" W 88.91'N 89°09'52" E163.18'N 51°04'03" W662.39'N 75°51'11" W226.64'N 83°04'03" W447.88'S 88°47'36" W274.55'S 88°47'14" W301.24'S 88°47'14" W131.89'N 01°12'46" W 200.00'24.18'BL-104 BL-105 TTTPNG, 2", STEELPNG, 2", STEEL AT&T, COPPER, UNK. S AT&T, COPPER, UNK. S AT&T, COPPER, UNK. S AT&T, COPPER, UNK. S15' SOILN 34°18'13" E 227.17' 70.00' 70.00'MB 12 PG 362PIEDMONT NATURAL GAS COMPANY, INC.MB 12 PG 362PIEDMONT NATURAL GAS COMPANY, INC.SCOTLAND COUNTY, 6", PVC SCOTLAND COUNTY, 6", PVC 50.00'PER CITY OF LAURINBURG UTILITIES DIRECTOR50' UTILITY EASEMENTCRAIG & DIANE VAN PELT MB 9 PG 33 DB 1628 PG 71 PHILIP H MCRAE BM 11 PG 198 DB 1237 PG 268 WALTER & GAIL MCRAE DB 562 PG 298 WALTER & GAIL MCRAE DB 1284 PG 294 ROBIN S OSWALD DB 1316 PG 13 SAMUEL E & ELEANOR SNEAD DB 4K PG 67 WALTER & GAIL MCRAE DB 9L PG 286 WALTER & GAIL MCRAE DB 13J PG 333 WALTER & GAIL MCRAE DB 9L PG 286 BM 12 PG 362 DEVELOPMENT CORPORATION SCOTLAND COUNTY ECONOMIC DEVELOPMENT CORPORATION SCOTLAND COUNTY ECONOMIC 18 MB N PG 223 MBM PG 223 DB 1561 PG 41 DEVELOPMENT CORPORATION SCOTLAND COUNTY ECONOMIC 8 JAMES SMITH DB 1708 PG 127 6 WESTWOOD ASSOCIATES WRONG DEED? DB 3S PG 135 CONC FLOOR FES FES 18" RCP -L- -L- POT Sta. 43+00.00 END CONSTRUCTION END TIP PROJECT HE-00134045 12'12'12'12'12'PS2'PS2'PS2'-L- POT Sta. 49+69.02 3015 12'PS2'12'PS2'.02.0212'12'12'PS2'PS2'.02.02EXIST.EXIST.300' TRANSITION +50.12PS2'30-SR1- -SR1- POT Sta. 31+37.46 -SR1- POT Sta. 30+57.32 END CONSTRUCTION30'R15'R(TYP.) 12' 98' 97'30'R(TYP.) 12'10'R30'R 35.00' LT +57.32 -SR1- 35.00' RT +57.32 -SR1- 35.00' RT 60.00' RT +00.00 -SR1- CONDITION FAIR CONDITION FAIRCONDITION GOOD W/FES 18" RCP NEEDS CLEANOUT CONDITION FAIR CONDITION FAIR DIRT FULL OF CONDITION FAIR CONDITION POOR (+)0.1497%(-)0.0084% ELEV=236.41 -L- STA. 45+15.00 EXIST SAG ELEV=235.47 -SR1- STA. 29+28.56 CREST (+)1.3420%(-)0.3000% 15" RCP CLEANOUT RETAIN AND SEE DETAIL 6-1 SPECIAL 2' BASE DITCH ELEV=233.1 18" RCP FES TIE TO EXISTING OF SURVEYED 18" RCP FES INVERT (233.1'). SPECIAL 2' BASE DITCH WAS CUT TO ELEVATION 24" RCP AT STA. 34+26 -L- RT. PROPOSED CURRENTLY FLOWS TO OUTLET OF EXISTING FROM SOUTH TO NORTH. THIS DRAINAGE AREA SOUTH. SITE DEVELOPER HAS PIPES DRAINING DRAINAGE AREA IS DRAINING FROM NORTH TO HW/D= 2.33 Q10=14 CFS PIPE SLOPE = 0.002 FT/FT Tc=21.0 MIN I10= 4.8 IN/HR C= 0.33 DA= 8.8 AC STA. 37+87 -L- RT RETAIN RETAIN RETAIN RETAIN RETAIN RETAINRETAINRETAIN COMBINED. ARE BEING TWO DRIVES TO CHANGE. IS SUBJECT (ENCIRCLED) DRAINAGE SEE DETAIL 6-1 SPECIAL 2' BASE DITCH 3:1D B ( Not to Scale) Flatter4:1 or FROM STA. 38+57.2 TO STA. 40+00 -L- RT FROM STA. 37+00 TO STA. 37+18 -L- RT DETAIL 5-1 B= 2.0 Ft. Min. D= 2.5 Ft. Ground Natural SPECIAL 2' BASE DITCH Slope Ditch Front F F F F F F F F F F F F F F F F F F CF F F F F F F C F C C C F F F C DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED5/28/99SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 7HE-0013 9/12/2023HE-0013_Hyd_PSH_07_pfl.dgnmedwardsDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 210 220 230 240 190 200 210 220 230 240 190 200 210 220 230 240 190 200 210 220 230 240 190 200 FOR -L- ALIGNMENT, SEE SHEET 4 FOR -L- ALIGNMENT, SEE SHEET 5 905 JONES FRANKLIN ROAD RALEIGH, NORTH CAROLINA 27606 SUNGATE DESIGN GROUP, P.A. NC COA No. C-0890 Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Pkwy INTERNATIONAL 11 12 13 14 15 16 17 18 19 20 21 22 23 24 DS > 50 mph DS > 50 mph -L- EL. 226.26' -L- POC Sta. 13+00.00 BEGIN GRADE -L- POC Sta. 21+52.82-SR1- POT Sta. 10+00.00 =-L- POC Sta. 15+57.20-DR1- POT Sta. 10+00.00 =235.70'GRADE PROPOSED PI = 20+00.00 EL = 235.00' (+)1.2482%(+)0.3000% VC = 150' K = 158 PI = 22+75.00 EL = 235.82' (+)0.3000%(-)0.1010% VC = 150' K = 374 GROUND EXISTING -L- STA. 23+12.21 CREST 24 25 26 27 28 29 30 31 32 33 34 35 36 37 DS > 50 mph DS > 50 mph -L--L- POT Sta. 35+30.58-SR2- POT Sta. 10+00.00 =235.70'236.54'GRADE PROPOSED PI = 28+00.00 EL = 235.29' (-)0.1010%(+)0.1845% VC = 150' K = 525 GROUND EXISTING PI = 35+00.00 EL = 236.58' (+)0.1845%(-)0.0205% VC = 150' K = 732 -L- STA. 27+78.08SAG-L- STA. 35+60.03CREST (+)0.4601% ELEV=228.0 PI STA 17+18 -L- LT DITCH W/CL 'I' RIP RAP END SPECIAL 2' BASE (+)3.3225% 0.5000% (-) ELEV=222.9 PI STA 15+64.5 -L- LT DITCH W/CL 'I' RIP RAP BEG SPECIAL 2' BASE ELEV=221.7 PI STA 13+03.7 -L- LT ON BANKS ONLY W/CL 'I' RIP RAP BEG SPECIAL 5' DITCH ELEV=222.7 PI STA 15+30 -L- LT ON BANKS ONLY W/CL 'I' RIP RAP END SPECIAL 5' BASE DITCH ELEV=222.9 PI STA 15+64.5 -L- LT W/CL 'I' RIP RAP END SPECIAL 5' BASE DITCH ELEV=222.7 PI STA 15+30 -L- LT W/CL 'I' RIP RAP BEG SPECIAL 5' BASE DITCH DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 226.3 = 107 = <2 = <2 = 110 = 226.4 = 210 = 229.9 = 169 2@48" RCP-V Sta. N/A (PLANT RD)* *PIPE IS NOT SHOWN IN PROFILE ELEV=225.9 PI STA 15+20 -L- RT 0.6024% (+) (+)4.0165% DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 227.9 = 124 = 2+ = 2 = 98 = 227.4 = 200 = 228.4 = 156 2@83"X57" CAPA Sta. 15+96 -L- 2@83"X57" CAPA ELEV=227.2 PI STA 17+44 -L- RT DITCH W/CL 'I' RIP RAP END SPECIAL 2' BASE ELEV=223.3 PI STA 16+46.9 -L- RT DITCH W/CL 'I' RIP RAP BEG SPECIAL 2' BASE ELEV=226.0 PI STA 15+00 -L- RT BEG SPECIAL 2' BASE DITCH ELEV=226.0 PI STA 15+36.6 -L- RT END SPECIAL 2' BASE DITCH (-)0.4000%(-)0.6870% ELEV=228.0 PI STA 34+20.7 -L- LT DITCH W/CL 'I' RIP RAP BEG SPECIAL 2' BASE ELEV=232.2 PI STA 35+00 -L- LT DITCH W/CL 'I' RIP RAP END SPECIAL 2' BASE ELEV=230.0 PI STA 34+32.8 -L- RT DITCH W/CL 'I' RIP RAP BEG SPECIAL 2' BASE 0.3571% (+) (+)2.0878%ELEV=230.9-L- LTPI STA 29+12.7(-)1.9139%(+)1.4891% ELEV=230.5 PI STA 35+79.1 -L- RT W/CL 'B' RIP RAP BEG SPECIAL 2' BASE DITCH ELEV=233.0 PI STA 37+00 -L- RT W/CL 'B' RIP RAP CONT SPECIAL 2' BASE DITCH ELEV=230.1 PI STA 34+60.8 -L- RT DITCH W/CL 'I' RIP RAP END SPECIAL 2' BASE DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 235.3 = 27 + = 500 + = 50 = 22 = 233.3 = 23 = 233.3 = 8.0 30" RCP-V Sta. 29+24 -L- 30" RCP-V ELEV=230.1 PI STA 34+60 -L- LT DITCH W/CL 'I' RIP RAP END SPECIAL 2' BASE ELEV=231.1 PI STA 34+80 -L- LT DITCH W/CL 'I' RIP RAP BEG SPECIAL 2' BASE 5.3435%(+)5.5000%(+) ELEV=232.1 PI STA 28+50 -L- LT BEG SPECIAL 2' BASE DITCH ELEV=232.2 PI STA 30+00 -L- LT END SPECIAL 2' BASE DITCH ELEV=233.2 PI STA 31+00 -L- RT BEG SPECIAL 2' BASE DITCH ELEV=232.6 PI STA 32+50 -L- RT END SPECIAL 2' BASE DITCH ELEV=232.4 PI STA 32+90 -L- RT BEG SPECIAL 2' BASE DITCH ELEV=231.5 PI STA 34+21 -L- RT END SPECIAL 2' BASE DITCH DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED5/28/99SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 8HE-0013 9/12/2023HE-0013_Hyd_PSH_08_pfl.dgnmedwardsDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 210 220 230 240 190 200 210 220 230 240 190 200 220 230 240 210 200 220 230 240 210 200 FOR -L- ALIGNMENT, SEE SHEET 6 FOR -SR1- ALIGNMENT, SEE SHEET 4 905 JONES FRANKLIN ROAD RALEIGH, NORTH CAROLINA 27606 SUNGATE DESIGN GROUP, P.A. NC COA No. C-0890 Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Pkwy INTERNATIONAL 220 230 240 210 200FOR -DR1- ALIGNMENT, SEE SHEET 4 220 230 240 210 200 10 11 12 13 14 15 16 37 38 39 40 41 42 43 44 45 46 47 48 49 -L- EL. 236.42' -L- POT Sta. 43+00.00 END GRADE236.54'GRADE PROPOSED GROUND EXISTING (-)0.0205% -SR1- DS > 30 mph GRADE PROPOSED GROUND EXISTING 10 11 12 13 14 15 16234.91'PI = 11+00.00 EL = 234.85' (-)0.3000%(+)0.3000% VC = 75' K = 125 PI = 13+50.00 EL = 235.60' (+)0.3000%(-)0.3000% VC = 75' K = 125 PI = 16+00.00 EL = 234.85' (-)0.3000% VC = 75' K = 125 DS > 30 mph DS > 30 mph EL. 235.10' -L- POC Sta. 21+52.65, 18.00' RT -SR1- POT Sta. 10+18.00 BEGIN GRADE -SR1- STA. 11+00.00SAG-SR1- STA. 13+50.00 CREST -SR1- STA. 16+00.00SAGEL. 228.11' -DR1- POT Sta. 10+85.00 END GRADE GRADE PROPOSED EXISTING GROUND -DR1- EL. 229.27' -L- POC Sta. 15+70.29, 18.00' RT -DR1- POT Sta. 10+22.26 BEGIN GRADE (-)1.8489% 37 38 39 40 41 42 43 44 45 46 47 48 49 -L- EL. 236.42' -L- POT Sta. 43+00.00 END GRADE236.54'GRADE PROPOSED GROUND EXISTING (-)0.0205% -SR1- DS > 30 mph GRADE PROPOSED GROUND EXISTING 10 11 12 13 14 15 16234.91'PI = 11+00.00 EL = 234.85' (-)0.3000%(+)0.3000% VC = 75' K = 125 PI = 13+50.00 EL = 235.60' (+)0.3000%(-)0.3000% VC = 75' K = 125 PI = 16+00.00 EL = 234.85' (-)0.3000% VC = 75' K = 125 DS > 30 mph DS > 30 mph EL. 235.10' -L- POC Sta. 21+52.65, 18.00' RT -SR1- POT Sta. 10+18.00 BEGIN GRADE -SR1- STA. 11+00.00SAG-SR1- STA. 13+50.00 CREST -SR1- STA. 16+00.00SAGELEV=233.1 PI STA 38+57.2 -L- RT BEG SPECIAL 2' BASE DITCH ELEV=233.3 PI STA 40+00 -L- RT END SPECIAL 2' BASE DITCH (+)0.1401% ELEV=233.0 PI STA 37+00 -L- RT W/CL 'B' RIP RAP CONT SPECIAL 2' BASE DITCH ELEV=233.4 PI STA 37+18 -L- RT W/CL 'B' RIP RAP END SPECIAL 2' BASE DITCH (+)2.0878% (+)0.4464% ELEV=230.2 PI STA 16+00 -SR1- RT CONT SPECIAL 2' BASE DITCH (-)0.4362% 0.4887% (-) ELEV=229.0 PI STA 13+24.4 -SR1- RT BEG SPECIAL 2' BASE DITCH DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 234.9 = 182 = 25 + = 25 = 160 = 234.2 = 190 = 235.2 = 141 66" RCP-IV Sta. 13+34 -SR1- 66" RCP-IV (+)0.8554% ELEV=232.3 PI STA 10+50 -SR1- RT BEG SPECIAL 2' BASE DITCH ELEV=231.0 PI STA 13+48 -SR1- LT END SPECIAL 2' BASE DITCH ELEV=232.3 PI STA 10+50 -SR1- LT BEG SPECIAL 2' BASE DITCH ELEV=231.0 PI STA 13+16 -SR1- RT END SPECIAL 2' BASE DITCH ELEV=231.6 PI STA 15+50 -SR1- LT END SPECIAL 2' BASE DITCH ELEV=230.0 PI STA 13+57.8 -SR1- LT BEG SPECIAL 2' BASE DITCH 0.3448% (-)(+)2.3636% ELEV=225.9 PI STA 12+00 -DR1- LT W/CL 'I' RIP RAP END SPECIAL 4' DITCH ELEV=225.0 PI STA 10+67 -DR1- RT BEG SPECIAL 2' BASE DITCH 30" RCP-V DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 227.3 = 22 + = 100 + = 25 = 19 = 227.0 = 22 = 227.2 = 4.6 30" RCP-V Sta. 11+13 -DR1- ELEV=223.3 PI STA 10+90 -DR1- LT W/CL 'I' RIP RAP BEG SPECIAL 4' DITCH ELEV=224.8 PI STA 11+25 -DR1- RT END SPECIAL 2' DITCH DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED5/28/99SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 9HE-0013 9/12/2023HE-0013_Hyd_PSH_09_pfl.dgnmedwardsDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 220 230 240 210 200 220 230 240 210 200 220 230 240 210 200 220 230 240 210 200 225 235 245 215 205 225 235 245 215 205 FOR -SR1- ALIGNMENT, SEE SHEET 5 FOR -SR1- ALIGNMENT, SEE SHEET 6 FOR -SR2- ALIGNMENT, SEE SHEET 5 905 JONES FRANKLIN ROAD RALEIGH, NORTH CAROLINA 27606 SUNGATE DESIGN GROUP, P.A. NC COA No. C-0890 Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Pkwy INTERNATIONAL DS > 30 mph -SR1- GRADE PROPOSED GROUND EXISTING -SR1- POT Sta. 27+10.13-SR2- POT Sta. 13+48.42 =16 17 18 19 20 21 22 23 24 25 26 27 28 29234.91'DS > 30 mph EL. 234.11' -SR1- POT Sta. 27+34.17 BREAK FOR INTERSECTION EL. 234.35' -SR1- POT Sta. 26+98.12 BREAK FOR INTERSECTION (+)0.3000% PI = 21+50.00 EL = 236.50' (+)0.3000%(-)0.5441% VC = 75' K = 89 PI = 26+00.00 EL = 234.06' (-)0.5441%(+)0.3000% VC = 75' K = 89 DS > 30 mph DS > 30 mph PI = 16+00.00 EL = 234.85' VC = 75' K = 125 (-)0.3000% PI = 27+80.00 EL = 233.97' (+)1.3420% VC = 90' K = 55 (+)1.3420% PI = 29+00.00 EL = 235.58' VC = 90' K = 55 235.40'DS > 30 mph -SR1- STA. 16+00.00SAG-SR1- STA. 21+39.16CREST -SR1- STA. 26+10.84SAG-SR1- STA. 27+51.44SAGGRADE PROPOSED EL. 235.11' -SR1- POT Sta. 30+57.32 END GRADE -SR1- DS > 30 mph GROUND EXISTING 29 30 PI = 29+00.00 EL = 235.58' (-)0.3000% VC = 90' K = 55235.40'-SR1- STA. 29+28.56CREST 10 11 12 13 14 15 16 GRADE PROPOSED DS > 30 mph EL. 234.46' -SR2- POT Sta. 13+92.69 END GRADE 205 EXISTING GROUND -SR2- PI = 11+00.00 EL = 235.33' (-)1.0558%(-)0.3000% VC = 75' K = 99 EL. 236.20' -L- POT Sta. 35+29.73, 18.00' RT -SR2- POT Sta. 10+18.02 BEGIN GRADE ELEV=230.9 PI STA 17+50 -L- RT END SPECIAL 2' BASE DITCH ELEV=230.2 PI STA 16+00 -L- RT CONT SPECIAL 2' BASE DITCH (+)0.4464%(-)1.0667% ELEV=232.0 PI STA 18+00 -SR1- RT BEG SPECIAL 4' BASE DITCH ELEV=229.2 PI STA 23+40 -SR1- RT END SPECIAL 4' BASE DITCHELEV=228.8-SR1- RTPI STA 21+00(+)0.1667% ELEV=229.3 PI STA 24+00 -SR1- RT BEG SPECIAL 4' BASE DITCH ELEV=229.8 PI STA 26+65 -SR1- RT END SPECIAL 4' BASE DITCH (+)0.3000% ELEV=230.3 PI STA 28+50 -SR1- RT END SPECIAL 2' BASE DITCH ELEV=230.0 PI STA 27+50 -SR1- RT BEG SPECIAL 2' BASE DITCH (+)0.1887% DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 234.1 = 110 + = 500 + = 25 = 81 = 232.9 = 94 = 233.4 = 24 48" RCP-IV Sta. 20+82 -SR1- 48" RCP-IV (+)1.0110% DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 234.1 = 23 = 100 = 25 = 20 = 233.5 = 23 = 234.1 = 11 24" RCP-IV Sta. 10+63 -SR2- DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 233.9 = 18 + = 500 + = 25 = 15 = 232.2 = 18 = 232.7 = 4 24" RCP-V Sta. 13+82 -SR2- 24" RCP-IV 24" RCP-V ELEV=230.5 PI STA 10+62.6 -SR2- LT BEG SPECIAL 2' BASE DITCH ELEV=232.9 PI STA 13+00 -SR2- LT END SPECIAL 2' BASE DITCH