Loading...
HomeMy WebLinkAboutNCC230113_NOT Closeout Documents_20231106 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of I ironmental Quality Land Resources:610 East Center Avenue, Suite 301, Mooresville,NC 28115 (704)663-1699 County: Mecklenburg Project: CLT Airport Tree Clearing Project River basin: Catawba Person financially responsible:Charlotte Douglas International Airport-JefMcSwain, Project#: MECKL-2023-016 Engineering Director Address: 5601 Wilkinson Boulevard,Charlotte,NC 28208 1. Project Location: 8641 Byrum Drive,Charlotte Pictures: No 2. Weather and soil conditions: Sunny,Workable Soils Initial inspection: No 3. Is site currently under notice of violation? No 9 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No One Onsite Title: Inspection report: Sent Report Date given/sent: October 11,2023 9. Corrective action needed: 10. Comments: Project has been completed and all necessary trees have been removed.The areas in which this project covers have now been encompassed by a larger permit(MECKL-2023-033). Permanent ground cover will no longer be necessary to close out this permit.Erosion control measures from this project may remain installed until it has been deemed necessary to remove them by the new permiee(NIECKL-2023-033).Erosion control responsibilities have now been transferred to the new FRO for areas previously covered under this permit. No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCGO I)must be requested by the permittee via a Notice of Termination(NOT)unless permit approval date was prior to April 2019. The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG0I-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Jeffrey Chandler Others present: Date of inspection: October 04,2023 Time arriving on site: 4:30 PM Time leaving site: 5:20 PM CC: