HomeMy WebLinkAboutNCG020049_Representative Outfall Status Initial Request_20231108 uuican
Materials Company
November 8, 2023
Mr.Zahid Khan, Regional Engineer
NCDENR Division of Division of Energy, Mineral and Land Resources
Land Quality Section
Mooresville Regional Office
610 East Center Ave.
Mooresville, North Carolina 28115
RE: Vulcan Construction Materials
NCG020049
Representative Outfall Status Request
Dear Mr. Khan:
Please find enclosed a Request for Representative Outfall Status (ROS) for the following Vulcan
Construction Materials Facility:
• Pineville Quarry located in Mecklenburg County, North Carolina.
This request consists of the following:
• Representative Outfall Status Request Form.
• Current facility Outfall and Drainage Area information.
• Two copies of the facility's SPPP Site Map(s) including all Outfalls and Drainage Areas.
• There is no monitoring data available for outfal 1110-004 and 110-005.
Please feel free to contact me at(704) 547-7076 should you have any questions or comments.
Sincerely,
n
Tony Johnson
Environmental Engineer
cc: Rusty Medlin
CHARLOTTE REGIONAL OFFICE—VULCAN CONSTRUCTION MATERIALS,L.L.C.
11020 David Taylor Drive,SUITE 400,CHARLOTTE,NC 28262,TELEPHONE 704-S49-1540,FAX 704-549-4137
FOR AGENCY USE ONLY
Division of Ener
gy, Mineral & Land Resources Date Received
Year Month Day
Stormwater Program
} National Pollutant Discharge Elimination System
Environmental REPRESENTATIVE OUTFALL STATUS (ROS)
Quality REQUEST FORM
if a facility is required to sample multiple discharge locations with very similar stormwater discharges, the
permittee may petition the Director for Representative Outfall Status(ROS). DEQ may grant Representative
Outfall Status if stormwater discharges from a single outfall are representative of discharges from multiple
outfalls. Approved ROS will reduce the number of outfalls where anal ica!sampling requirements apply.
If Representative Outfall Status is granted,ALL out are still subject to the qualitative monitoring
requirements of the facility's permit—unless otherwise allowed by the permit(such as NCG020000)and DEQ
approval. The approval letter from DEQ must be kept on site with the facility's stormwater Pollution
Prevention Plan. The facility must notify DEQ in writing if any changes affect representative status.
For questions, please contact the DEQ Regional Office for your area (see page 3).
(Please print or type)
1) Enter the permit number to which this ROS request applies:
Individual Permit (or) Certificate of Coverage
JNJCi; SJ I I I I N C G O 2 0 10 Q
2) Facility Information:
Owner/Facility Name Vulcan Materials Company r Pineville Quarry
Facility Contact 10526 Old Nations Ford Road
Street Address
City Charlotte State NC ZIP Code 28273
County Mecklenburg E-mail Address johnsonto@vmcmail.com
Telephone No. 704 525-9678 Fax: 704 549-4137
3) List the representative outfall(s)information(attach additional sheets if necessary):
Outfall(s) 110-013 is representative of Outfall(s) 110-004, 110-005
Outfalls' drainage areas have the same or similar activities? Yes No
Outfalls'drainage areas contain the same or similar materials? Yes No
Outfalls have similar monitoring results? ❑Yes i . No n No data*
Outfall(s) is representative of Outfall(s)
Outfalls' drainage areas have the same or similar activities? w Yes A No
Outfalls'drainage areas contain the same or similar materials? n Yes o No
Outfalls have similar monitoring results? o Yes - No n No data*
Outfall(s) is representative of Outfall(s)
Outfalls' drainage areas have the same or similar activities? o Yes No
Outfalls'drainage areas contain the same or similar materials? o Yes No
Outfalls have similar monitoring results? ❑Yes No . No data*
*Non-compliance with analytical monitoring prior to this request may prevent ROS approval. Specific
circumstances will be considered by the Regional Office responsible for review.
Page 1 of 3
SWLI-ROS-2009 Last revised 12/30/2009
Representative Outtall Status Request
4) Detailed explanation about why the outfalls above should be granted Representative Status:
(Or,attach a letter or narrative to discuss this information.) For example,describe how activities and/or
materials are similar.
Soil rock is and wilt be stored in the drainage areas to 1 10-004,110-005 and 110-013. Once designed elevations are
achieved,these areas will be stabilized with adequate groundcover.
All three outfalls drain to the same Watercourse"s Branch.
All three outfalls drain into the same
5) Certification:
North Carolina General Statute 143-215.6 B(i)provides that:
Any person who knowingly makes any false statement,representation,or certification in any application,record,
report, plan,or other document filed or required to be maintained under this Article or a ru',e implementing this
Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case
under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device
or method required to be operated or maintained under this Article or rules of the[Environmental Management]
Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed
ten thousand dollars($10,000).
1 hereby request Representative Outfall Status for my NPDES Permit. I understand that ALL outfalls are still
subject to the qualitative monitoring requirements of the permit, unless otherwise allowed by the permit
and regional office approval. I must notify DEQ in writing if any changes to the facility or its operations
take place after ROS is granted that may affect this status. If ROS no longer applies, I understand I must
resume monitoring of all outfalls as specified in my NPDES permit.
I certify that I am familiar with the information contained in this application and that to the best of my
knowledge and belief such information is true,complete,and accurate.
Printed Name of Person Signing: Tony Johnson
Title: Environmental Engineer
11.8-2023
(Signature of Applicant) (Date Signed)
Please note: This application for Representative Outfall Status is subject to
approval by the NCDEQ Regional Office. The Regional Office may inspect your
facility for compliance with the conditions of the permit prior to that approval.
Final Checklist for ROS Rect_uest
This application should include the following items:
❑ This completed form.
❑ Letter or narrative elaborating on the reasons why specified outfalls should be granted representative
status, unless all information can be included in Question 4.
❑ Two(2)copies of a site map of the facility with the location of all outfalls clearly marked, including the
drainage areas, industrial activities,and raw materials/finished products within each drainage area.
Summary of results from monitoring conducted at the outfalls listed in Question 3.
Any other supporting documentation.
Page 2 of 3
sw1-1-R0s-21;-n9 Last revised 1213012009
Representative Outfall Status Request
Mail the entire package to:
NCDEQ DEMLR at the appropriate Regional Office (See map and
addresses below)
Notes
The submission of this document does not guarantee Representative Outfali Status(ROS)will be granted as
requested. Analytical monitoring as per your current permit must be continued,at all outfalls,until written
approval of this request is granted by DEQ. Non-compliance with analytical monitoring prior to this request
may prevent ROS approval. Specific circumstances will be considered by the Regional Office responsible for
review.
For questions, please contact the DEQ Regional Office for your area.
ille
not—
Asheville Regional Office
2090 U.S. Highway 70
Swannanoa, NC 28778 Washington Regional Office
943 Washington Square Mall
Phone (828) 296-4500 Washington, NC 27889
FAX (828) 299-7043
Phone (252) 946-6481
Fayetteville Regional Office FAX (252) 975-3716
Systel Building,
225 Green St., Suite 714 Wilmington Regional Office
Fayetteville, NC 28301-5094 127 Cardinal Drive Extension
Wilmington, NC 28405
Phone (910) 433-3300
FAX 910/486-0707 Phone (910) 796-7215
FAX (910) 350-2004
Mooresville Regional Office
610 East Center Ave. Winston-Salem Regional Office
Mooresville, NC 28115 585 Waughtown Street
Winston-Salem, NC 27107
Phone (704) 663-1699 Phone (336) 771-5000
FAX (704) 663-6040 Water Quality Main FAX (336) 771-4630
Raleigh Regional Office Central Office
1628 Mail Service Center 1612 Mail Service Center
Raleigh, NC 27699-1628 Raleigh, NC 27699-1612
Phone (919) 791-4200 Phone (919) 807-6300
FAX (919) 571-4718 FAX (919) 807-6494
Page 3 of 3
SWU-ROS-2009 Last revised 12/30/2009
SECTION 5.0 DISCHARGE SAMPLING AND ANALYSIS
The General Permit requ�res sampling and analysis of point source discharges that fall in the following
categories.
Mine dewatering andior discharges of process wastewater. including commingled stormwater.
Stormwater discharges from other plant areas where the stormwater has contacted areas
directly related land disturbance and process areas..
Stormwater discharges from on-site vehicle maintenance areas.
5.1 Process Water and Stormwater SamplingiAnalysis Program
Refer to Table 1 for required sample frequency and analytical parameters. There are three (3)
appropriate sampling location at the Pineville Quarry which will be used to sample various process
water and stormwater discharges Each outfall to be sampled is listed below along with a brief
description of each outfall's type of discharge.
Representative Ouffalls to be Sampled;
Outfall Latitude 1 Receiving Outfall Type Source of Discharge
No. Longitude Stream
35007'08"1 Little Sugar Commingled Mine pit dewatering
110-001 80054'02" Creek Process Water
and Stormwater
110-003 35006'58"/ Kings Branch Stormwater Stormwater associated with industrial
80053'35" activity. This sample location is
representative of all discharges from yard
and material stockpile areas.
110-013 35007'32"1 Kings Branch StorrTlwater Stormwater associated with industrial
80°53'3Z activity. This sample location is
representative of all discharges from soil
and rock storage area.
Note; There are a total of 5 discharge points(4 Stormwater, 1 process water) at the
Pineville Quarry site.
Mine dewatering flows and runoff from yard, process, material stockpiling, and
stripping areas which drain to the pit are pumped, if necessary, to off-site discharge
at Outfall 110-001 The shop area also drains to the pit which discharges as process
water. Thus, no vehicle maintenance stormwater sampling is required.
Outfall 110-003 is a discharge point for the runoff from a small material stockpile
and yard area at the southeast part of the site which do not drain to the pit.
Outfall 110-013 is a discharge point for the runoff from soil and rock storage area.
Outfall 110-004 is a discharge point for the runoff from soil and rock storage area.
Outfall 110-005 is a discharge point for the runoff from soil and rock storage area.
8
The following table summarizes the total additional outfalls at this site which will not require sampling. The
abovementioned outfalls that will be sampled have been linked to the following outfalls based on the overall
type of discharge each additional outfall will represent. All outfall locations are indicated on the partial mine
map in Appendix 1. Documentation of representative outfall status should be kept on site within the Mineral
Mining Plan.
Remainina Outfalls(not to be sampled)_
Outfall Latitude 1 I Receiving Outfall Source of Discharge Corresponding
No. Longitude Stream Type Representative
Outfall*
110-004 35007'39"( Kings Stormwater Stormwater associated with industrial 110-013
80053'30" Branch activity. This sample location is
representative of all discharges from soil
and rock storage area.
110-005 35007'327 Kings Stormwater Stormwater associated with industrial 110-013
80053'30" Branch activity. This sample location is
representative of all discharges from soil
and rock storage area.
'Listed representative outfall s the appropriate sample po'nt designated for that type of discharge;no grab sample needs to
be taken for these additional listed outfalls
4
YAM
OEM
0010
.,, ..,•.�
ILI
■ „ PINEVILLE QUARRY
300' 10526 OLD NATIONS FORD ROAD Uuliun
SCALE: AS SHOWN CHARLOTTE, NC
J ■� • •LOCATION
Is Company ■�
DRAINAGE■�