Loading...
HomeMy WebLinkAboutNCG020049_Representative Outfall Status Initial Request_20231108 uuican Materials Company November 8, 2023 Mr.Zahid Khan, Regional Engineer NCDENR Division of Division of Energy, Mineral and Land Resources Land Quality Section Mooresville Regional Office 610 East Center Ave. Mooresville, North Carolina 28115 RE: Vulcan Construction Materials NCG020049 Representative Outfall Status Request Dear Mr. Khan: Please find enclosed a Request for Representative Outfall Status (ROS) for the following Vulcan Construction Materials Facility: • Pineville Quarry located in Mecklenburg County, North Carolina. This request consists of the following: • Representative Outfall Status Request Form. • Current facility Outfall and Drainage Area information. • Two copies of the facility's SPPP Site Map(s) including all Outfalls and Drainage Areas. • There is no monitoring data available for outfal 1110-004 and 110-005. Please feel free to contact me at(704) 547-7076 should you have any questions or comments. Sincerely, n Tony Johnson Environmental Engineer cc: Rusty Medlin CHARLOTTE REGIONAL OFFICE—VULCAN CONSTRUCTION MATERIALS,L.L.C. 11020 David Taylor Drive,SUITE 400,CHARLOTTE,NC 28262,TELEPHONE 704-S49-1540,FAX 704-549-4137 FOR AGENCY USE ONLY Division of Ener gy, Mineral & Land Resources Date Received Year Month Day Stormwater Program } National Pollutant Discharge Elimination System Environmental REPRESENTATIVE OUTFALL STATUS (ROS) Quality REQUEST FORM if a facility is required to sample multiple discharge locations with very similar stormwater discharges, the permittee may petition the Director for Representative Outfall Status(ROS). DEQ may grant Representative Outfall Status if stormwater discharges from a single outfall are representative of discharges from multiple outfalls. Approved ROS will reduce the number of outfalls where anal ica!sampling requirements apply. If Representative Outfall Status is granted,ALL out are still subject to the qualitative monitoring requirements of the facility's permit—unless otherwise allowed by the permit(such as NCG020000)and DEQ approval. The approval letter from DEQ must be kept on site with the facility's stormwater Pollution Prevention Plan. The facility must notify DEQ in writing if any changes affect representative status. For questions, please contact the DEQ Regional Office for your area (see page 3). (Please print or type) 1) Enter the permit number to which this ROS request applies: Individual Permit (or) Certificate of Coverage JNJCi; SJ I I I I N C G O 2 0 10 Q 2) Facility Information: Owner/Facility Name Vulcan Materials Company r Pineville Quarry Facility Contact 10526 Old Nations Ford Road Street Address City Charlotte State NC ZIP Code 28273 County Mecklenburg E-mail Address johnsonto@vmcmail.com Telephone No. 704 525-9678 Fax: 704 549-4137 3) List the representative outfall(s)information(attach additional sheets if necessary): Outfall(s) 110-013 is representative of Outfall(s) 110-004, 110-005 Outfalls' drainage areas have the same or similar activities? Yes No Outfalls'drainage areas contain the same or similar materials? Yes No Outfalls have similar monitoring results? ❑Yes i . No n No data* Outfall(s) is representative of Outfall(s) Outfalls' drainage areas have the same or similar activities? w Yes A No Outfalls'drainage areas contain the same or similar materials? n Yes o No Outfalls have similar monitoring results? o Yes - No n No data* Outfall(s) is representative of Outfall(s) Outfalls' drainage areas have the same or similar activities? o Yes No Outfalls'drainage areas contain the same or similar materials? o Yes No Outfalls have similar monitoring results? ❑Yes No . No data* *Non-compliance with analytical monitoring prior to this request may prevent ROS approval. Specific circumstances will be considered by the Regional Office responsible for review. Page 1 of 3 SWLI-ROS-2009 Last revised 12/30/2009 Representative Outtall Status Request 4) Detailed explanation about why the outfalls above should be granted Representative Status: (Or,attach a letter or narrative to discuss this information.) For example,describe how activities and/or materials are similar. Soil rock is and wilt be stored in the drainage areas to 1 10-004,110-005 and 110-013. Once designed elevations are achieved,these areas will be stabilized with adequate groundcover. All three outfalls drain to the same Watercourse"s Branch. All three outfalls drain into the same 5) Certification: North Carolina General Statute 143-215.6 B(i)provides that: Any person who knowingly makes any false statement,representation,or certification in any application,record, report, plan,or other document filed or required to be maintained under this Article or a ru',e implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the[Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). 1 hereby request Representative Outfall Status for my NPDES Permit. I understand that ALL outfalls are still subject to the qualitative monitoring requirements of the permit, unless otherwise allowed by the permit and regional office approval. I must notify DEQ in writing if any changes to the facility or its operations take place after ROS is granted that may affect this status. If ROS no longer applies, I understand I must resume monitoring of all outfalls as specified in my NPDES permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true,complete,and accurate. Printed Name of Person Signing: Tony Johnson Title: Environmental Engineer 11.8-2023 (Signature of Applicant) (Date Signed) Please note: This application for Representative Outfall Status is subject to approval by the NCDEQ Regional Office. The Regional Office may inspect your facility for compliance with the conditions of the permit prior to that approval. Final Checklist for ROS Rect_uest This application should include the following items: ❑ This completed form. ❑ Letter or narrative elaborating on the reasons why specified outfalls should be granted representative status, unless all information can be included in Question 4. ❑ Two(2)copies of a site map of the facility with the location of all outfalls clearly marked, including the drainage areas, industrial activities,and raw materials/finished products within each drainage area. Summary of results from monitoring conducted at the outfalls listed in Question 3. Any other supporting documentation. Page 2 of 3 sw1-1-R0s-21;-n9 Last revised 1213012009 Representative Outfall Status Request Mail the entire package to: NCDEQ DEMLR at the appropriate Regional Office (See map and addresses below) Notes The submission of this document does not guarantee Representative Outfali Status(ROS)will be granted as requested. Analytical monitoring as per your current permit must be continued,at all outfalls,until written approval of this request is granted by DEQ. Non-compliance with analytical monitoring prior to this request may prevent ROS approval. Specific circumstances will be considered by the Regional Office responsible for review. For questions, please contact the DEQ Regional Office for your area. ille not— Asheville Regional Office 2090 U.S. Highway 70 Swannanoa, NC 28778 Washington Regional Office 943 Washington Square Mall Phone (828) 296-4500 Washington, NC 27889 FAX (828) 299-7043 Phone (252) 946-6481 Fayetteville Regional Office FAX (252) 975-3716 Systel Building, 225 Green St., Suite 714 Wilmington Regional Office Fayetteville, NC 28301-5094 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 433-3300 FAX 910/486-0707 Phone (910) 796-7215 FAX (910) 350-2004 Mooresville Regional Office 610 East Center Ave. Winston-Salem Regional Office Mooresville, NC 28115 585 Waughtown Street Winston-Salem, NC 27107 Phone (704) 663-1699 Phone (336) 771-5000 FAX (704) 663-6040 Water Quality Main FAX (336) 771-4630 Raleigh Regional Office Central Office 1628 Mail Service Center 1612 Mail Service Center Raleigh, NC 27699-1628 Raleigh, NC 27699-1612 Phone (919) 791-4200 Phone (919) 807-6300 FAX (919) 571-4718 FAX (919) 807-6494 Page 3 of 3 SWU-ROS-2009 Last revised 12/30/2009 SECTION 5.0 DISCHARGE SAMPLING AND ANALYSIS The General Permit requ�res sampling and analysis of point source discharges that fall in the following categories. Mine dewatering andior discharges of process wastewater. including commingled stormwater. Stormwater discharges from other plant areas where the stormwater has contacted areas directly related land disturbance and process areas.. Stormwater discharges from on-site vehicle maintenance areas. 5.1 Process Water and Stormwater SamplingiAnalysis Program Refer to Table 1 for required sample frequency and analytical parameters. There are three (3) appropriate sampling location at the Pineville Quarry which will be used to sample various process water and stormwater discharges Each outfall to be sampled is listed below along with a brief description of each outfall's type of discharge. Representative Ouffalls to be Sampled; Outfall Latitude 1 Receiving Outfall Type Source of Discharge No. Longitude Stream 35007'08"1 Little Sugar Commingled Mine pit dewatering 110-001 80054'02" Creek Process Water and Stormwater 110-003 35006'58"/ Kings Branch Stormwater Stormwater associated with industrial 80053'35" activity. This sample location is representative of all discharges from yard and material stockpile areas. 110-013 35007'32"1 Kings Branch StorrTlwater Stormwater associated with industrial 80°53'3Z activity. This sample location is representative of all discharges from soil and rock storage area. Note; There are a total of 5 discharge points(4 Stormwater, 1 process water) at the Pineville Quarry site. Mine dewatering flows and runoff from yard, process, material stockpiling, and stripping areas which drain to the pit are pumped, if necessary, to off-site discharge at Outfall 110-001 The shop area also drains to the pit which discharges as process water. Thus, no vehicle maintenance stormwater sampling is required. Outfall 110-003 is a discharge point for the runoff from a small material stockpile and yard area at the southeast part of the site which do not drain to the pit. Outfall 110-013 is a discharge point for the runoff from soil and rock storage area. Outfall 110-004 is a discharge point for the runoff from soil and rock storage area. Outfall 110-005 is a discharge point for the runoff from soil and rock storage area. 8 The following table summarizes the total additional outfalls at this site which will not require sampling. The abovementioned outfalls that will be sampled have been linked to the following outfalls based on the overall type of discharge each additional outfall will represent. All outfall locations are indicated on the partial mine map in Appendix 1. Documentation of representative outfall status should be kept on site within the Mineral Mining Plan. Remainina Outfalls(not to be sampled)_ Outfall Latitude 1 I Receiving Outfall Source of Discharge Corresponding No. Longitude Stream Type Representative Outfall* 110-004 35007'39"( Kings Stormwater Stormwater associated with industrial 110-013 80053'30" Branch activity. This sample location is representative of all discharges from soil and rock storage area. 110-005 35007'327 Kings Stormwater Stormwater associated with industrial 110-013 80053'30" Branch activity. This sample location is representative of all discharges from soil and rock storage area. 'Listed representative outfall s the appropriate sample po'nt designated for that type of discharge;no grab sample needs to be taken for these additional listed outfalls 4 YAM OEM 0010 .,, ..,•.� ILI ■ „ PINEVILLE QUARRY 300' 10526 OLD NATIONS FORD ROAD Uuliun SCALE: AS SHOWN CHARLOTTE, NC J ■� • •LOCATION Is Company ■� DRAINAGE■�