Loading...
HomeMy WebLinkAboutNC0025321_System Performance Annual Report 2022_20230131WASTEWATER SYSTEM PERFORMANCE REPORT January 1, 2022 — December 31, 2022 Town of Waynesville Public Works Department 129 Legion Drive Waynesville, NC 28786 (828)456-3706 Town of Waynesville Wastewater Treatment Plant Facility Name: Permit Number: Operator In Responsible Charge (ORC) Total Gallons Treated in 2022: Town of Waynesville Wastewater Treatment plant NC0025321 Jeffery Evans WWTP Superintendent (828) 713-7920 Jeffreyevans@waynesvillenc.Gov Month Avg. Daily Discharge (mgal/day) Monthly Flow (mgal) Daily Max mgd Daily Min mgd Jan-22 3.98 123.53 6.12 2.16 Feb-22 4.63 129.56 6.12 1.85 Mar-22 4.5 139.57 6.12 3.25 Apr-22 3.77 113.08 5.93 2.6 May-22 3.61 112.06 6.12 1.07 Jun-22 2.15 64.35 4.18 1.24 Jul-22 3.13 96.98 6.12 1.25 Aug-22 3.23 100.04 6.11 2.22 Sep-22 3.28 98.5 6.11 1.95 Oct-22 2.78 86.03 4.37 1.81 Nov-22 3.27 98.07 6.12 2.07 Dec-22 4.33 134.16 6.12 2.58 2022 Total Flow MGD 1295.93 2022 Yearly Gallons 1295930000 Description of Treatment Process The Town of Waynesville W WTP Is a 6 MGD activated sludge treatment plant and includes influent flow measurement, bar screen, primary clarifiers, gravity sludge thickeners aeration, secondary clarifiers, gaseous chlorine disinfection, and gaseous sulfur dioxide dichlorination. Solids are belt filter pressed and hauled to the White Oak Landfill. The treated wastewater is discharged into the Pigeon River under permit number NC0025321. Summery of Violations During 2022 The Town of Waynesville W WTP was issued NOVs for February, March, April, May, August, October, November, And December. There was one NOD issued in January for a frequency violation on Bis(2- Ethylhexyl) Phthalate - concentration (CO100). The NOVs were for TSS, BOD, Fecal coliform, and DO. The NOVs received was due largely to the age of the plant. We are currently in the process of a nearly 30-million-dollar plant upgrade. This biggest culprit of failing the permit limit is the secondary clarifiers are under sized and function poorly. The have -to -have extensive maintenance due to the engineered design. Every effort is made to stay proactive of the maintenance, however there are still numerous mechanical issue the must be handled reactively. Public Notification This report will be available for public viewing on the Town of Waynesville's website (W W W.townofwaynesvi I lenc.gov) Certification i certify under the penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report will be made available to the customers of the named system Jeff Stines Public works director Town of Waynesville Public Works Department