Loading...
HomeMy WebLinkAboutWQ0039437_FTSE Application Return_20231107From:Smith, J Chris To:chris.petree@timmons.com; katherine.ellis@timmons.com Cc:John Best; Wild, Elaine Subject:RE: WQ0039437 - Hidden Valley Pump Station Date:Tuesday, November 7, 2023 9:10:37 AM Attachments:image002.png image001.png All, The additional information requested September 18, 2023 regarding permit application WQ0039437 has not been received as of November 7, 2023. The project application is being returned as incomplete. If you wish to pursue permitting for this project, please submit a completed application accompanied by a new application fee. *Please note that the fee for fast track sewer extension permits has increased to $600 as of October 3, 2023 [as stipulated in the 2023 House Appropriations Act, House Bill 259, Water Quality and Stormwater Fees, Section 12.14(a)]. Per Subchapter 2T of North Carolina Administrative Code Title 15A: 15A NCAC 02T. .0107 Staff Review and Permit Preparation: (e) If an application is accepted and later found to be incomplete, the applicant shall be advised how the application or accompanying supporting information may be modified to make it complete. The staff shall advise the applicant: (1) that the 90 day processing period required in G.S. 143-215.1(d) and Rule .0108 of this Section begins on the date the additional information is received; and (2) that if all required information is not submitted within 30 days, the project will be returned as incomplete. Any resubmittal of a returned application shall be accompanied with a new application fee. Best, DEQ is updating its email addresses to @deq.nc.gov in phases from May 1st to June 9th. Employee email addresses may look different, but email performance will not be impacted. J. Chris Smith, LSS (he/him/his) Environmental Specialist, Raleigh Regional Office DWR North Carolina Department of Environmental Quality Office: (919) 791-4257 chris.smith@deq.nc.gov North_Carolina’s_Riparian_Buffer_Protection_Program From: Smith, J Chris Sent: Monday, September 18, 2023 1:50 PM To: chris.petree@timmons.com Cc: John Best <john.best@timmons.com>; Wild, Elaine <elaine.wild@deq.nc.gov> Subject: WQ0039437 - Hidden Valley Pump Station Chris, I spoke with John Best earlier today regarding this application while we were discussing some others, so I expect he will be reaching out to you. The Gravity Sewer Design Summary on page 3 of the application needs to be updated to include all of the gravity line(s) to be permitted; both previously permitted line lengths and new requests. Any line lengths being replaced/changed need to be adjusted to reflect the change and then new line lengths included in the table as well. I explained the needed changes to John, so please confer with him about my comments and let me know if you have any questions. From 15A NCAC 02T. .0107 Staff Review and Permit Preparation: (e) If an application is accepted and later found to be incomplete, the applicant shall be advised how the application or accompanying supporting information may be modified to make it complete. The staff shall advise the applicant: (1) that the 90 day processing period required in G.S. 143-215.1(d) and Rule .0108 of this Section begins on the date the additional information is received; and (2) that if all required information is not submitted within 30 days, the project will be returned as incomplete. Any resubmittal of a returned application shall be accompanied with a new application fee. Thanks, Chris DEQ is updating its email addresses to @deq.nc.gov in phases from May 1st to June 9th. Employee email addresses may look different, but email performance will not be impacted. J. Chris Smith (he/him/his) Environmental Specialist, Raleigh Regional Office DWR North Carolina Department of Environmental Quality Office: (919) 791-4257 chris.smith@deq.nc.gov North_Carolina’s_Riparian_Buffer_Protection_Program From:Katherine Ellis To:Smith, J Chris Cc:Ashley Kabat; Chris Petree Subject:RE: [External] RE: WQ0039437 Hidden Valley Pump Station Date:Thursday, November 2, 2023 3:25:58 PM Attachments:image002.png image001.png CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Chris, There were constructability concerns with the plans that were submitted, so I am currently updating them. The updates will be done next week. Can I resend the application then? Thank you, Katherine Ellis Project Engineer I TIMMONS GROUP | http://www.timmons.com 5410 Trinity Rd. Suite 102 | Raleigh, NC 27607 Office: 919.532.3280 | Fax: 919.859.5663 Katherine.Ellis@timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here From: Smith, J Chris <chris.smith@deq.nc.gov> Sent: Thursday, November 2, 2023 2:59 PM To: Katherine Ellis <Katherine.Ellis@timmons.com> Subject: RE: [External] RE: WQ0039437 Hidden Valley Pump Station CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Katherine, Please respond to the message below sent 10/23/2023. DEQ is updating its email addresses to @deq.nc.gov in phases from May 1st to June 9th. Employee email addresses may look different, but email performance will not be impacted. J. Chris Smith, LSS (he/him/his) Environmental Specialist, Raleigh Regional Office DWR North Carolina Department of Environmental Quality Office: (919) 791-4257 chris.smith@deq.nc.gov North_Carolina’s_Riparian_Buffer_Protection_Program From: Smith, J Chris Sent: Monday, October 23, 2023 4:03 PM To: Katherine Ellis <Katherine.Ellis@timmons.com> Subject: RE: [External] RE: WQ0039437 Hidden Valley Pump Station Katherine, This project was originally permitted for 1988 linear feet (LF) of 12” gravity sewer (among other things). The narrative provided states that approximately 35 LF of 12” DIP is being upsized/replaced with 16” DIP. The values in the table in section VII. of the application show that the modified permit will include 35 LF of 16” C900 PVC, 1217 LF of 12” PVC, and 781 LF of 12” C900. This results in a total LF of 2033 feet (35 LF 16” and 1998 LF 12”). If the modification is for replacement the values should add up to the original 1988 LF. If line is being added please make the correction to the narrative. If the materials are changing it should be reflected in the project narrative. Please make the necessary changes to the application. Let me know if you have any questions. Best, DEQ is updating its email addresses to @deq.nc.gov in phases from May 1st to June 9th. Employee email addresses may look different, but email performance will not be impacted. J. Chris Smith, LSS (he/him/his) Environmental Specialist, Raleigh Regional Office DWR North Carolina Department of Environmental Quality Office: (919) 791-4257 chris.smith@deq.nc.gov North_Carolina’s_Riparian_Buffer_Protection_Program From: Katherine Ellis <Katherine.Ellis@timmons.com> Sent: Tuesday, October 17, 2023 5:13 PM To: Smith, J Chris <chris.smith@deq.nc.gov> Cc: Chris Petree <Chris.Petree@timmons.com>; Ashley Kabat <Ashley.Kabat@timmons.com> Subject: [External] RE: WQ0039437 Hidden Valley Pump Station CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Chris, Attached is the updated Fast Track Application for Hidden Valley Pump Station. The previously permitted wastewater generated was added to the table in Section VI. Thank you, Katherine Ellis Project Engineer I TIMMONS GROUP | http://www.timmons.com 5410 Trinity Rd. Suite 102 | Raleigh, NC 27607 Office: 919.532.3280 | Fax: 919.859.5663 Katherine.Ellis@timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here From: Katherine Ellis Sent: Thursday, October 12, 2023 4:39 PM To: chris.smith@deq.nc.gov Cc: Chris Petree <Chris.Petree@timmons.com>; Ashley Kabat <Ashley.Kabat@timmons.com> Subject: WQ0039437 Hidden Valley Pump Station Hi Chris, Attached is the updated Fast Track Application for Hidden Valley Pump Station. The Gravity Sewer Design Summary on page 3 of the application was updated to reflect all the gravity lines to be permitted, including previously permitted line lengths and new requests. Please let me know if you need any other information. Thank you, Katherine Ellis Project Engineer I TIMMONS GROUP | http://www.timmons.com 5410 Trinity Rd. Suite 102 | Raleigh, NC 27607 Office: 919.532.3280 | Fax: 919.859.5663 Katherine.Ellis@timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.