Loading...
HomeMy WebLinkAbout820580_Routine Inspection_20231102for Visit: Referral Other O Denied Access Date of Visit: -3 Arrival Time: Departure Time: i 0 County Region: c;�?fo Farm Name: %`Ccriir7 Owner Email: Owner Name: /y Phone: Mailing Address: Physical Address: Facility Contact: ��/1, (jam-, Title. Onsite Representative: �r Certified Operator:,Da-r Back-up Operator: Location of Farm: Latitude: Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: �3 a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? Phone: Integrator: Certification Number:� Certification Number: d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: ❑ Yes '240 ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [].No ❑ NA ❑ NE ❑ Yes J:?No ❑ NA ❑ NE Page I of 3 511212020 Continuer! [Facility Number: Date of Ins ection: 3 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑ No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: F124� Spillway?: Designed Freeboard (in): & Observed Freeboard (in): r-151 y " 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes LD'Ko ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes O No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes eNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes EeNo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes �No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ,5No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes J�fNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): clle�6 C OS 11'f4l 13. Soil Type(s): 6J41,13 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes E1540 ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes �?No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes &No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes En'�TNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes &No ❑ NA ❑ NE _Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes Q No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes d] No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ErNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes oNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes E24�o ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: - Date of Inspection: a' 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ,,allo ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ONo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes f� No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes _0No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ErNo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑-No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes E3'No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes 1✓J No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? []Yes .2 No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require afollow-up visit by the same agency? ❑Yes ,.f�o ❑ NA ❑ NE Se- 52C� . Reviewer/Inspector Name: Reviewer/Inspector Signature: Phone: d�?6 835 -'F2,s— Date: 511212020 3 Page 3 of 3 FACILITY#:5�2 Sy FARM NAME: LAGOON LEVEL 4PERMITM9) - DUE EVERY 5 YEARS - EXPERIATIONDATE_ - CURRENT NUMBER OF - OIC CARD YES OR NO NUMBER OF ANIMALS WASTE UTILIZATION PLAN (WUP) (#20) SOILTYPES CROP TYPES ODOR CONTROL CHECK LIST YES OR NO Irrigation Plan Maps YES OR NO WASTE REPORT (uzi) -GOOD FOR 6Q DAYS BEFORE OR AFTER DATE I �.1-.� NITROGEN LEVEL W . 66 DATEZ712-3 y NITROGEN LEVEL DATE 1 ('A/ NITROGEN LEVEL A�- /�� 3 C) SOIL FFEP/ORT - EVERY 3 YEARS: DATE - P-1 (NO MORE THEN 400) - PH(Note if 4o, 1..) - Cu2N (NO MORE THEN 3000) CU ZN (IF PEANUTS NO MORE THEN 300) I RR2 (a -H Not over PAN CROP TYPES FLOW RATES NITROGEN (N) Not over PAN CROP TYPES - FLOW RATES NITROGEN (N) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) CALBRIATION pz4) - EACH REEL SHOULD BE CALIBRAT D EVERY OTHER YEAR DATE OF CALIBRATION FLOW RATES RAIN FALL(#21) -INITIAL AFTER 1" RAIN EVENT -LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED PDA NEEDED. SLUDGE pm azs) -DUE EVERY YEAR: DATE O: 1- �y'`/— P: �^, d� % RATIO OF SLUDGE O: P: e2.3 % RATIO OF SLUDGE 0: P: % RATIO OF SLUDGE 0: P: % RATIO OF SLUDGE OTHER FORMS (#22 AND #21) RAIN BREAKER FORM CROP YEILDS MORTALITY *If fields are grazed there will be no crop yields VISUAL CHECK FOUNDATION OR PIT LEAKS _ PIPE LEAKS_ LAGOON SEEPAGE LAGOON BARE AREAS TREES OR GRASS NEED TO BE REMOVED EROSION DITCHES WINTER CROP(OVERSEEDED) HARVESTED FIELDS_ GOOD HEALTHY CORPS_ CORRECT CROPS NO PONDING REELS_ FEED BINS LAGOON GARBAGE Bermuda grass: Opens March 1�t-Ends September30* Small Grain Over seed: Opens October 1-t- Ends March 31 A Corn: Opens February 15t - Ends June 30t Cotton: Opens March 15N-Ends August1A Rye: Opens September 15t-Ends March 31A Oats: Opens September IA- Ends April 15t - Wheat Opens September 1 st - Ends April 3P Soybeans: Opens April I-t - Ends September 15t Fescue: Opens August 1 st- Ends July 31 A Sorghum Hay: Opens March 15w - Ends August 31 st