Loading...
HomeMy WebLinkAboutSW1210802_Supplemental Info Review_20231107 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 11/7/2023 4:32:54 PM (Supplemental Submittal) Accept by Kaitlin Peck 11/8/2023 7:32:52 AM(Supplemental Info Submittal) • The task was assigned to Kaitlin Peck 11/7/2023 4:32:55 PM =DEQ • Submittal from 11/7/2023 Permit Information: Please provide specific permit details below. ................................................................................................................................................................................................................................................................................................................................................................................................ What Type of Permit? Choose one: * NPDES Industrial or MS4 Permit State Stormwater(Post-Construction)Permit Other Permit Number* SW1210802 Begins with"SW","NCG",or"NCS" What DEQ Office is Reviewer:Please correct if misidentified,close this review form,and reassign task to the appropriate contact. the Primary Contact? Central Office * Washington Regional Office(Attn: Carl Dunn) Wilmington Regional Office(Attn:Christine Hall) ................................................................................................................................................................................................................................................................................................................................................................................................ Project Name* Pardee Partners Mills River-Site Owner/Operator* Henderson County County: Henderson Submitter Name:* Jared DeRidder, PE Who is submitting this information? E-mail Address:* jderidder@wgla.com Phone Number* (828)687-7177 Additional E-mail for (Optional) Submittal Confirmation: State Stormwater (Post-Construction) Information Uploads Choose file type and upload attachment(Reviewer may remove unnecessary submittals) File Type* Recorded Document File Upload Click the upload button,or drag and drop files to attach !Pardee MR Closeout—Private Drainage Easement- 2.53MB High Density SW1210802-3.20.2023.pdf Only PDF files are accepted. File Type* O&M Agreement/Plan File Upload Click the upload button,or drag and drop files to attach !Pardee MR Closeout—O&M Agreement-High 3.86M6 Density SW1210802-3.20.2023-2.pdf Only PDF files are accepted. File Type* As-Built-Certification File Upload Click the upload button,or drag and drop files to attach !Pardee MR Closeout—Certifications-High Density 4.65M6 SW1210802-3.20.2023.pdf Only PDF files are accepted. File Type* Recorded Document File Upload Click the upload button,or drag and drop files to attach !Pardee MR Closeout—Plat-High Density 307.8KB SW1210802-3.20.2023.pdf Only PDF files are accepted. Is this project funded No with ARPA grant Yes funds?* Uploads contain NO Confidential YES Information* NOTE:The following information cannot be claimed as confidential:the name and address of any permit applicant or permittee,permit applications,permits,effluent data,information required by NPDES application forms provided by the Director inclusive of all forms and attachments[Ref.40 CFR 122.7(b)and(c)]. Notes about the attachments: Copies of hard-copy documents sent to Mr.Jim Farkas on 3-14-2023. Records include: -Recorded Plat -Recorded Maintenance Access Easement -Recorded Operation and Maintenance Agreement -Signed As-Built Permittee Certification -Signed As-Built Designers Certification General MDC -Signed As-Built Designers Certification for Bioretention Cell Project. * By checking the box and signing box below, I certify that: • I have given true,accurate,and complete information on this form; • I agree that submission of this Supplemental Information form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act) d I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the"Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the Supplemental Information Upload form. Full Name:* Jared L. DeRidder Signature: o1,?wW e drift Date Submitted: 11/07/2023 Initial Review Verify Permit No.* IMPORTANT:REVIEWER SHOULD VERIFY and revise here if necessary. SW 1210802 Who needs a Copy?* Reviewer selections will only be required for offices checked here. Central Office Staff Regional Office Stormwater Contact State Stormwater RO Staff No Copy Needed Central Office Reviewer:* Notifies CO Staff with Email Jim Farkas Any Comments or Added Info for CO Staff Reviewer? Review Date* 11/08/2023