Loading...
HomeMy WebLinkAbout20230245 Ver 2_Georgianna NOBI_202310101 AGREEMENT TO ESTABLISH THE GEORGIANNA NUTRIENT OFFSET BANKING INSTRUMENT IN THE  NEUSE RIVER BASIN FOR NUTRIENT OFFSET CREDITS PURSUANT TO THE NEUSE RIVER BASIN  NUTRIENT MANAGEMENT STRATEGY  TABLE OF CONTENTS  I.PREAMBLE .......................................................................................................................... 2  II.LOCATION AND GEOGRAPHIC SERVICE AREA ......................................................... 2  III.AUTHORITIES ..................................................................................................................... 3  IV.ESTABLISHMENT OF BANK PARCEL ............................................................................ 3  V.PRE-CONSTRUCTION DOCUMENTATION .................................................................... 4  VI.POST CONSTRUCTION DOCUMENTATION .................................................................. 6  VII.CALCULATION OF CREDITS ........................................................................................... 9  VIII. CREDIT RELEASE SCHEDULE ....................................................................................... 11  IX.PROCEDURE FOR DEBITING AND CREDITING ......................................................... 12  X.BANK PARCEL CLOSURE ............................................................................................... 13  XI.GENERAL PROVISIONS .................................................................................................. 13  ATTACHMENTS  A ‐ Division of Water Resources Authority Document  B –Ledger Templates  C‐ Project Credit Table (example)  1.Nutrient Offset Payment Rule: http://reports.oah.state.nc.us/ncac/title%2015a%20‐%20environmental%20quality/chapter%2002%20‐ %20environmental%20management/subchapter%20b/15a%20ncac%2002b%20.0703.pdf 2.Riparian Buffer Mitigation Rule: http://reports.oah.state.nc.us/ncac/title%2015a%20‐%20environmental%20quality/chapter%2002%20‐ %20environmental%20management/subchapter%20b/15a%20ncac%2002b%20.0295.pdf 3.NC Session Law 2019‐ 86 " Nutrient Offset Credits": https://ncleg.gov/EnactedLegislation/SessionLaws/HTML/2019‐2020/SL2019‐86.html 4.Buffer Interpretation/ Clarification # 2008‐ 019 for diffuse flow: https://files.nc.gov/ncdeq/Water%20Quality/Surface%20Water%20Protection/401/Buffer%20Clarification%2 0Memos/Diffuse‐Flow‐for‐Buffer‐Mitigation‐Sites‐Buffer‐Clarification‐Memo‐20080819.pdf 5.Clarified Procedures for Calculating Buffer Mitigation Credits and Nutrient Offset Credits (November 2019): https://files.nc.gov/ncdeq/Water%20Quality/Surface%20Water%20Protection/401/Mitigation/Issues‐‐‐ Resolutions‐Ver‐1.0‐buffer‐mitigation‐nutrient‐offset.pdf 6.NCDWR – Methodology and Calculations for Nutrient Reductions on the Bank Parcel: https://files.nc.gov/ncdeq/Water%20Quality/Planning/NPU/Nutrient%20Offset%20Rule/Ag‐Buffer‐Credit.pdf 2 I. PREAMBLE    This Nutrient Offset Banking Instrument (“Instrument”) regarding the establishment, use, operation,  and maintenance of the Georgianna Bank (“Bank Parcel”) to provide Neuse Nutrient Strategy nutrient  load reduction credit (“Nutrient Offset Credits”) is made and entered into by and among Wildlands  Holdings X, LLC acting as the Bank Sponsor (“Sponsor”) and the North Carolina Department of  Environmental Quality – Division of Water Resources (“DWR”).  This Instrument is in accordance with  15A NCAC 02B .0703 and the Consolidated Mitigation Rule 15A NCAC 02B .0295, which became  effective on April 1, 2020 and November 1, 2015 respectively (Reference Numbers 1 and 2).    The purpose of the Bank is:    A. To restore and preserve riparian vegetation adjacent to streams and agricultural ditches with the  intent to improve water quality, reduce nutrient loads, enhance flood attenuation and restore  wildlife habitat along unnamed tributaries and ditches within the Neuse River Basin.    B. To convert agricultural land uses within riparian areas adjacent to streams and/or agricultural  ditches into a dense and diverse, hardwood vegetated state with the intent to significantly  reduce nutrient loadings associated with agricultural practices into streams and ditches.      C. To provide buffer mitigation and nutrient offsets and sell any resulting Nutrient Offset Credits to  third parties in specific areas within the Neuse River Basin for development (both existing and  proposed) or to offset NPDES‐permitted wastewater nutrient sources requiring such mitigation  or offset.    II. LOCATION AND GEOGRAPHIC SERVICE AREA    A. The Geographic Service Area (“GSA”) is the designated area wherein a Bank can reasonably be  expected to sell Riparian Buffer Credits and/or Nutrient Offset Credits for impacts due to  development activities.      B. The GSA for this Bank Parcel is limited to the United States Geological Survey (“USGS”) 8‐digit  Hydrologic Unit Code (“HUC”) 03020201 of the Neuse River Basin, excluding the Falls Lake  Watershed.     C. Sale or transfer of Nutrient Offset Credits shall be limited to the 8‐digit HUC 03020201 in the  Neuse River Basin, excluding the Falls Lake Watershed in accordance with 15A NCAC 02B .0703,  unless otherwise authorized by the DWR in accordance with Session Law (S.L.) 2019‐86     D. The Georgianna Bank Parcel is comprised of land currently used for crop production. Table 1.0  provides site‐specific details of the Bank Parcel Proposed under this Instrument.                 3 Table 1.0 – Bank Parcel Details  Bank Parcel  Name/DWR  Project #  County  8‐Digit USGS  Hydrologic Unit  Code  Project Location  Named  Receiving  Stream  Primary Land  Use/s  Georgianna/  2023‐0245v1 Wayne 03020201 78.157332° W,  35.300949° N  Neuse  River Agriculture    III. AUTHORITIES    A. The Banks will be used to provide Nutrient Offset Credit in accordance with the requirements in  the DWR Authority document referenced herein as “Attachment A” and attached to this  Instrument.      B. Projects eligible for utilization of the credits are those requiring authorization under the  requirements of Attachment A and any new approved North Carolina (“State”) statutes and rules  for the Neuse Nutrient Sensitive Waters Management Strategy.    C. The selling of credits generated from the Bank Parcel approved under this Instrument shall be  consistent with approved State statutes and rules for the Neuse Nutrient Sensitive Waters  Management Strategy.    D. Nutrient reduction activities and buffer mitigation activities proposed under this Instrument and  corresponding Nutrient Offset Plan to generate Nutrient Offset Credits shall be consistent with  State statutes and rules for the Neuse Nutrient Sensitive Waters Management Strategy that are  in place at the time a complete Nutrient Offset Plan is submitted to DWR.    IV. ESTABLISHMENT OF BANK PARCEL    A. In accordance with 15A NCAC 02B .0295 and 15A NCAC 02B .0703, DWR has provided a “Site  Viability Letter” for the Bank Parcel proposed under this Instrument.  The Site Viability Letter is  not an approval of the site to generate Nutrient Offset Credits, but is a preliminary review of the  Bank Parcel that details and confirms existing land use conditions, defines the riparian sites  (Enhancement, Preservation, or Restoration), and identifies features (streams, ditches, ponds,  etc.) that meet general criteria to be suitable to generate Nutrient Offset Credits. Table 2.0 below  outlines when a Site Viability Letter was issued by DWR for the Bank Parcels proposed under this  Instrument:    Table 2.0 – Site Viability Letter Details  Bank Parcel  NC DWR Site  Evaluation  Viability Letter  Received  Viability Letter  Expiration Date  Georgianna May 31, 2023 September 11,  2023  September 11,  2025  B. A valid Site Viability Letter is required prior to submittal of each Nutrient Offset Plan.  Site Viability  Letters will either expire on the dates listed in the table above or upon submittal of an individual  As‐Built Report to the DWR, whichever comes first.  If a Site Viability Letter expires prior to  4 submittal of a complete Nutrient Offset Plan as described in Section V to DWR, then the Sponsor  must submit a formal request to DWR for a new Site Viability Letter for that Bank Parcel.    C. The Bank Parcel proposed for inclusion under this Instrument shall require a Nutrient Offset Plan  be submitted to, and approved, by the DWR prior to use of the individual Bank Parcel for nutrient  offset purposes or the sale or transfer of any associated credits. The contents of the Nutrient  Offset Plan are provided in Section V.  D. The Nutrient Offset Plan submitted under this instrument will be placed on public notice and  made available for public commenting for 15 calendar days.  E. Nutrient Offset Credit may be achieved on the Bank Parcel through restoration of the riparian  areas adjacent to streams and ditches where agriculture was determined by DWR to be the  predominant land use.  On the Bank Parcel, the width of the riparian restoration area will begin  at the top of bank or the rooted herbaceous vegetation and extends landward a minimum of 50  feet and a maximum of 200 feet on all sides of the surface waters.  A conservation easement will  be secured to include the tops of all channel and ditch banks and will extend out a maximum of  200 feet from streams and viable ditches.  The viability of features to generate nutrient offset  credit is provided in the Site Viability Letters for the Bank Parcels and referenced in Table 2.0  of this Instrument.    F. The Bank Parcel is expected to provide Nutrient Offset Credits in accordance with 15A NCAC 02B  .0703 as follows:     1. Converting agricultural land uses within riparian areas to non‐agricultural land uses by  placing a perpetual conservation easement around riparian areas along streams,  ephemeral channels, and viable ditches in accordance with 15A NCAC 02B .0703 (g).    2. Planting hardwood trees on a Restoration Site as defined in 15A NCAC 02B .0295 (b)  adjacent to streams, ephemeral channels, and viable ditches where agriculture has been  determined by DWR to be the predominant land use.     3. Diffused flow will be maintained onsite to the maximum extent practicable.  The Buffer  Interpretation/Clarification Memo #2008‐019 may be applied where maintenance of  diffuse flow onsite is unattainable.    I. The total area of riparian restoration activities on the Georgianna Bank Parcel is expected to be  approximately 49.7 acres.  V. PRE‐CONSTRUCTION DOCUMENTATION  Nutrient Offset Plan    A. The Nutrient Offset Plan submitted under this Instrument shall be submitted to DWR for review  and must be approved by DWR prior to any construction on the Bank Parcel.  The BPDP will  describe any changes that have occurred to the site between the date of the Site Viability Letter  and the date the BPDP is submitted to DWR. The Nutrient Offset Plan shall include detailed  information consistent with the sections below concerning; 1) site location (8‐digit HUC is  5 required); 2) existing conditions with current photos; 3) proposed buffer mitigation and nutrient  offset activities including a detailed vegetation plan; 4) monitoring and maintenance plans; 5)  financial assurances; 6) A Project Credit Table (see Attachment C) showing associated buffer  /nutrient credit calculations, which shall include credit generation, service area, and accounting  as appropriate for each regulatory authority; 7) stream buffer determination letter from DWR; 8)  Site Viability Letter from DWR;  9) service area figure for each mitigation type proposed under  this Instrument, and 10) all pertinent information including but not limited to permitting, bank  stabilization, culvert removal, installation of any utilities indirectly or directly affecting the Bank  Parcel, endangered or threatened species, presence of historical sites and an Environmental Data  Resources (EDR) report to evaluate environmental risk associated with the land proposed for the  Bank.    B. The Sponsor will obtain all applicable federal, state and local documentation, permits, or  authorizations needed to construct and maintain the Bank Parcel. This Instrument does not  qualify as, or substitute for, such documentation, permit, or authorization.    C. Any restoration activities or proposed construction within the stream channels, riparian buffers  and other riparian areas on the Bank Parcel to produce Nutrient Offset Credit must be approved  by DWR in writing prior to implementation. The failure of the Sponsor to comply with this  requirement may result in a revised or reduced credit release schedule.    D. Requests for deviation from the approved Nutrient Offset Plan must be submitted to DWR in  writing. Written approval from the DWR must be received prior to implementing any deviation  from the approved Nutrient Offset Plan.    Property Disposition & Long‐Term Management     E. Prior to the release of any credits, the Sponsor shall record permanent conservation easements  at the Wayne County Register of Deed's office that is sufficient to ensure protection, operation,  and maintenance of restored riparian buffers and other riparian areas for the duration specified  in the approved Nutrient Offset Plan.    F. The form of the conservation easement shall be consistent with the standards employed by the  State of North Carolina in the protection of restored riparian buffers and riparian areas and shall  be approved by the DWR prior to the release of any credits.    G. The Sponsor shall not grant additional easements, right of ways, or any other property interest in  or to the project areas, without prior approval from the DWR.     H. The Sponsor agrees to assign the conservation easement and its interests in perpetuity to a  qualified holder under NC General Statute (“GS“) 121‐34 et seq. and 170(h) of the Internal  Revenue Code prior to the submittal of the Year 4 Monitoring Report. The holder shall be a land  trust or stewardship program that will hold and enforce the conservation easement and the  interests in perpetuity. The Sponsor shall choose a land trust or stewardship program that is  accredited by the Land Trust Accreditation Commission and/or has been approved by DWR prior  to the end of the fourth year monitoring period. A land trust must be certified under 501(c)(3) of  the Internal Revenue Code.    6 I. In the event the Sponsor is also the owner of the underlying fee interest in the property the  conveyance of the conservation easement to a land trust or stewardship fund must be arranged  at the outset of the approved Nutrient Offset Plan.    Financial Assurances for Bank Parcel Development    J. Following approval of the Nutrient Offset Plan, the Sponsor shall provide  Performance/Maintenance Bonds from a surety company that is rated no less than an “A‐“ as  rated by A.M. Best, to construct the sites according to the approved Nutrient Offset Plan.  It is the  Sponsor’s responsibility to confirm that the surety company is rated no less than an “A‐” with  each annual bond renewal.      K. The amount of the Performance Bond shall be 100% of the estimated cost for implementation of  the riparian restoration and other related activities for the construction of the Bank Parcel as  described in the approved Nutrient Offset Plan. No bond shall be less than $150,000.00 to cover  construction costs.    L. Alternatively, in lieu of posting a Performance Bond, the Sponsor may elect to construct the Bank  Parcel  prior to the first credit release.    M.  Once DWR has released all credits for completion of all items listed below, then the Bank Sponsor  will be released from its performance obligations under the performance bond required in Item J  and K of this section:    1. Instrument and Nutrient Offset Plan Approved by DWR, Conservation Easement Recorded,  Financial Assurance Posted;  2. All riparian earthwork & mitigation activities, planting and installation of monitoring devices  completed, easement boundaries adequately marked, all applicable permits obtained, site  visit performed by DWR;  3. Monitoring financial assurance posted and approval of As‐Built report;    N. To comply with this section, DWR must be the Obligee on all performance bonds.  VI. POST CONSTRUCTION DOCUMENTATION  As‐Built Report     A. The Sponsor agrees to perform all necessary work, in accordance with the provisions of this  Instrument and corresponding BPDP, to establish, maintain, and monitor Neuse Riparian Buffers  or other riparian areas until Items B (1) and (2) of Section X have been satisfied.    B. Within 30 calendar days after completing the establishment of the nutrient offset areas, the  Sponsor will submit written notification to DWR documenting that all nutrient offset activities  have been completed.  Failure to submit written notification within 30 days may result in a  modified credit release schedule or a delay in the issuance of credit releases.  Notification shall  include all the following:    1. Short summary of activities completed as required per the approved Nutrient Offset Plan;  7 2. Figures representing all riparian restoration, riparian enhancement and riparian  preservation activities where applicable;  3. Figures representing location of all monitoring plots installed;  4. Detailed planting plan‐ including type of species planted, density of species planted, and  any modifications to the planting plan from what was approved in the Nutrient Offset  Plan;  5. Description of how the conservation easement boundaries were marked; and  6. Any major changes to the conservation easement boundary or to the amount of Nutrient  Offset Credits from what was proposed in the approved BPDP.    C. The Sponsor will submit an as‐built plan and report to the DWR for the Bank Parcel after  completing the establishment of the nutrient offset areas. The As‐Built report will describe any  deviation from the approved Nutrient Offset Plan and will document all the following:    1. Riparian restoration and enhancement planting details and other construction activities  that were required in the Nutrient Offset Plan, confirmation that all boundary markers  are installed, invasive species control, monitoring device locations, vegetation plot  locations, and photo point locations.     2. Boundary Survey of the conservation easement area, signed and sealed by a licensed  surveyor, including an inventory of the final mitigation areas for Nutrient Offset Credits  in both square feet and acres.    3. As‐built map of the nutrient offset areas showing where riparian activities were  performed and any deviations to the Bank Parcel from what was approved in the Nutrient  Offset Plan.    4. Aerial map of the nutrient offset areas that was included in the approved Nutrient Offset  Plan.    Financial Assurance for Monitoring and Maintenance    D. After completion of the riparian restoration and mitigation activities on the Bank Parcel, a  separate Performance/ Maintenance Bond will be secured for 100% of the estimated cost to  implement the monitoring and maintenance plan as described in the approved Nutrient Offset  Planand As‐Built Report. The Bond must be from a surety company that is rated no less than an  “A‐' as rated by A.M. Best, and it is the Sponsor's responsibility to confirm the surety company is  still rated no less than an “A‐“ with each annual bond renewals.    E.  A Performance/Maintenance Bond shall be secured each year for a minimum of five years, and  until DWR has released all Nutrient Offset Credits to the Bank Sponsor. Upon DWR approval, the  bond may be lowered each year based on the adjusted cost to complete the monitoring. No bond  shall be less than $100,000 to cover monitoring and maintenance costs initially.    F. Once DWR has released 100% of all credits for completion of all Bank Parcel milestones described  in Table 3 of Section VIII, the Bank Sponsor will be released from its performance obligations under  the performance bond required in D and E in this section.    8 G. To comply with this section, DWR must be the Obligee on all performance bonds.    Monitoring and Maintenance Reports    H. The Sponsor shall monitor the Bank Parcel as described in the Nutrient Offset Planuntil such time  as DWR determines that the performance standards described below have been met. The  monitoring period shall be a minimum of five consecutive years for each Bank Parcel.    I. Performance Standards for Vegetation: Native hardwood trees or native hardwood tree and shrub  species should be planted at a density sufficient to provide 260 stems per acre after five years. A  minimum of four (4) native hardwood trees or four (4) native hardwood tree and shrub species  must be planted. No one species shall be greater than 50% of the planted stems. A list of species  for planting will be detailed in the Nutrient Offset Planfor approval. Native hardwood tree  volunteer species may be included to meet performance standards as determined by the DWR.    J. A "stem" means a woody seedling, sapling, shrub or tree, no less than 10 centimeters in height  and shall apply, on the Bank Parcels, to the minimum height that a planted tree or shrub shall be  at initial planting.  Volunteer stems that are less than 10 centimeters shall not be quantified and  included in the annual vegetation data included with the monitoring reports.    K. If the performance standards of the vegetation are not met, supplemental plantings may be  required. Supplemental plantings will be utilized until the required densities have been achieved  and maintained for five years. Bank Parcel maintenance, such as ensuring diffused flow, managing  invasive species, and pest control will be included in the Nutrient Offset Plan.      L. Monitoring Reports for Nutrient Offset Credit:  Reporting criteria of the vegetation shall be based  on the Carolina Vegetation Survey (CVS) ‐ EEP Protocol for Recording Vegetation Level 2 Plot  Sampling only version 4.0 or any updated versions of this protocol in place at the date of  acceptance of the Nutrient Offset Plan. The Sponsor shall submit to the DWR an annual  monitoring report no later than December 31 of each year for a minimum of five consecutive  years after the first full growing season for each Bank Parcel under this instrument. Vegetation  data shall not be collected prior to late August of each year.  This report will describe the  conditions of the Bank Parcel, including an evaluation of the performance standards of the  vegetation contained within the approved Nutrient Offset Plan. Reports shall contain the  following:    1. A U.S. Geological Survey map showing location of the Bank Parcel;  2. A detailed narrative with supporting photos summarizing the condition of the Bank Parcel  along with any maintenance or remediation performed that year; and  3. A map, survey, or other figures showing locations of sampling plots, permanent photo  points, and location of transects, Etc.; and  4. Monitoring data, including specific vegetation counts, vigor and heights showing that the  trees or tree and shrub species planted are meeting performance standards and updated  photographs; and  5. A copy of the most recent Bank credit/debit lodgers; and  6. Corresponding verification letters from designated local governments upon request; and  7. Corresponding Mitigation Transfer Certificates upon request; and  8. Proof of performance bond renewal to cover the next monitoring year (when applicable).   9 Contingency Plans/Remedial Actions    M. In the event a Bank Parcel fails to achieve the performance criteria described in this Instrument  and in the approved Nutrient Offset Plan, the Bank Sponsor shall develop necessary contingency  plans in coordination with the DWR and implement appropriate remedial actions for the Bank  Parcels and the Bank. Depending on the degree of remedial actions required, the DWR may  modify the monitoring period.    VII. CALCULATION OF CREDITS    Nutrient Offset Credits    A. The square footage of Nutrient Offset Credits on the Bank Parcel will be determined by applying  the applicable ratio as provided in 15A NCAC 02B .0295(m) for a Restoration Site following the  guidance provided in the Clarified Procedures for Calculating Buffer Mitigation Credits and  Nutrient Offset Credits issued by the DWR see reference #5, including the most recent Project  Credit Table Template provided online.  All riparian areas proposed for Nutrient Offset Credits  must be a minimum of 50 feet from the top of the stream or ditch banks on land noted in a Site  Viability Letter as agriculture.    B. Nutrient Abatement of Restored Riparian Area/Buffers on agricultural land: The Sponsor and DWR  agree to the following:    1. The pounds of nitrogen offset per acre of restored riparian areas/buffers on agricultural  land shall be 2,273.02 pounds per acre or 19.16394 square feet per pound.    C. The Sponsor and DWR agree that the methodology and calculations for determining nitrogen  reductions, associated with restoration of riparian areas on these Bank Parcels as described in  Section IV of this Instrument, shall be fixed as part of the approval of this Instrument, with the  fixed amount not changing during the Bank Parcel Development or credit release schedule for the  Bank Parcel unless the viability letter for that Bank Parcel has expired.  For further details on the  approved method and calculations for determining nutrient reductions associated with the  riparian restoration on this Bank Parcel refer to the NCDWR ‐ Methodology & Calculations for  Nutrient Reductions document found in reference number 6.         10   This space left blank intentionally, do not add text to this space.     11 VIII. CREDIT RELEASE SCHEDULE  A. Upon submittal of all appropriate documentation by the Sponsor, and subsequent approval by  DWR, it is agreed that the Nutrient Offset Credits associated with the Georgianna Bank Parcel will  become available for sale to a third party in accordance with the Credit Release Schedule in Table  3.0 below:      Table 3.0 ‐ Credit Release Schedule for Nutrient Offset Credits   Task Project Milestone  % Credit  Available for  Sale  1 Instrument and Nutrient Offset PlanApproved by DWR,  Conservation Easement Recorded*, and Financial Assurance Posted 20  2  All Riparian Earthwork & Mitigation Activities, Planting and  Installation of Monitoring Devices completed, easement boundaries  adequately marked, all applicable permits obtained, site visit  performed by DWR   20  3 Monitoring Financial Assurance Posted and Approval of As‐Built  Report 10  4 Monitoring Report #1: Approved by the DWR** & financial  assurance renewed 10  5 Monitoring Report #2: Approved by the DWR** & financial  assurance renewed 10  6 Monitoring Report #3: Approved by the DWR** & financial  assurance renewed 10  7  Item B (I) of Section X in this Instrument has been completed and  approved by DWR 5  No remaining credits will be released until Task 7 has been satisfied, assigning the  conversation easement to an approved land trust or long‐term steward.   8  Monitoring Report #4: Approved by the DWR** & financial  assurance renewed 5  9  Monitoring Report #5: Approved by the DWR** and final site visit  by DWR has been conducted 10    Total 100%  * For specification, please see Section V in this Instrument  ** DWR Approval provided upon a determination that the site is meeting performance  standards contained within the approved Nutrient Offset Plan    B. DWR may modify Credit Release Schedules based on the information submitted or the order in  which required information is received. DWR will notify the Sponsor of any modification to the  credit release schedule.    C. Any major deviations to the Bank Parcel that were not authorized in writing by DWR prior to  implementation may affect the amount of riparian buffer credits and nutrient offset credits that  will be generated by the Bank Parcel.      12 IX. PROCEDURE FOR DEBITING AND CREDITING     Credit Ledgers    A. The Bank Sponsor shall maintain one credit ledger for each mitigation type for the Bank Parcel  under this Instrument unless otherwise instructed by DWR in the approved Nutrient Offset Plan:   Credit ledgers shall provide the accounting for  Nutrient Offset Credits in pounds and square feet.    B. Each credit ledger shall be submitted on a separate 8 ½ in. x 11in. spreadsheet with legible font  style and font size. All ledgers shall be submitted using the templates provided in Attachment B  of this Instrument or any updated versions to these templates as provided by DWR.    Credit Processing    C. Nutrient Offset Credits generated on these Bank Parcels will be used to offset nitrogen nutrient  loads within the 03020201 HUC of the Neuse River Basin, excluding the Falls Lake Watershed, in  accordance with 15A NCAC 02B .0703.    D. Any Credit conversions must be calculated using the guidance provided in the Clarified Procedures  for Calculating Buffer Mitigation Credits and Nutrient Offset Credits letter issued by the DWR, see  reference #5.    E. The Bank Sponsor shall obtain written verification of nutrient offset need from a designated local  government in the 03020201 HUC of the Neuse River Basin outside of the Falls Lake Watershed,  or from DWR through an approved NPDES permit for wastewater nutrient sources prior to  debiting Nutrient Offset Credits from the Bank Parcel.      F. All credit and debit transactions for each Bank Parcel under this Instrument shall be accurately  depicted in the credit ledgers.  The Sponsor shall submit accurate and up‐to‐date credit ledgers  for each Bank Parcel by the 10th of each month.  At a minimum and only upon request, DWR shall  receive a hard copy of updated credit ledgers along with corresponding Mitigation Credit Transfer  Certificates and all corresponding letters from the designated local governments or DWR where  applicable once a year.  Notification of all credit sales shall be provided to DWR until all credits  that have been released have been sold.    Mitigation Credit Transfer Certificates    G. All credit sales will include a Mitigation Credit Transfer Certificate (“Certificate") that is required  to be provided to the buyer of Riparian Buffer and/or Nutrient Offset Credits, that will include, at  a minimum, the following information;    1. Bank Details: (1) Sponsor Name, (2) Bank Parcel name as it appears in this Instrument and,  (3) DWR project number for the BPDP as it appears in Table 1.0.     2. Credit Details: (1) date of receipt, (2) identify if full or partial payment, and (3‐ when  applicable) amount of nitrogen Nutrient Offset Credits purchased in pounds and  confirmation from the designated local government or DWR of the amount required.    13 3. Permitted Project Details: (1) project name and project number as it appears on DWR or  local government permits and/or certifications, (2) 8‐digit HUC, (3) river basin, (4) nutrient  strategy applicable to the project with impacts, (5 – when applicable) designated local  government requiring Nutrient Offset Credits, and (6) credit type and amount required  for project.    H. If the DWR determines the Bank is operating at a deficit (e.g. the Sponsor is selling and/or  transferring credit that is not available), or the Bank is selling or transferring credits out of  compliance with statutes, rules or this Agreement, the sale/transfer of credits will immediately  cease, and the DWR, in consultation with the Sponsor, will determine what remedial actions are  necessary.    X. BANK PARCEL CLOSURE    A. Bank Parcel Closure for each Bank Parcel under this Instrument shall be identified as the event  when the Sponsor is relieved of all its responsibilities to the Bank Parcel and there are no Nutrient  Offset Credits left to sell.     B. Bank Parcel Closure shall commence only after all following events have occurred;     1. Transfer or assign the conservation easement and all its interests, in perpetuity, to a land  trust or stewardship program as described in Section V of this instrument.    2. All five years of monitoring completed, and all monitoring reports submitted and  approved by DWR.    3. All credits have been released and debited and updated ledgers showing zero credit  balances have been submitted and approved by DWR.    XI. GENERAL PROVISIONS    A. Upon the presentation of proper credentials, and during normal business hours, the Sponsor and  the landowner shall grant permission to the Director of DWR, or an authorized representative of  the Director of DWR to enter the property containing the Bank Parcel(s).     B. Amendments: This Banking Instrument may be amended or modified only with written approval  of all signatory parties.    C. Any transfer of the Sponsor’s rights or obligations outlined in this Instrument or any other  agreement referenced in this Instrument to a third party must be approved by DWR prior to the  transfer.    D. Force Majeure: After 100% of all the credits have been released in accordance with the credit  release schedule in Section VIII and confirmation has been received by the DWR that the  Conservation Easement has been successfully assigned in compliance with Item H of Section V,  the Sponsor will not be responsible for Bank failure that is attributed to natural catastrophes  including but not limited to flood, drought, disease, regional pest infestation, etc. that are beyond  the control of the Sponsor.   14   E. However, if an event occurs before 100% of all the credits have been released in accordance with  the credit release schedule in Section VIII, the Sponsor shall take remedial action to restore the  property to its condition prior to the event, in a manner sufficient to provide adequate mitigation  to cover credits that were sold prior to the occurrence of the event. Such remedial action shall be  taken by the Sponsor only to the extent necessary and appropriate, as determined by DWR and  the Sponsor.     DWR must concur in writing that a force majeure event has occurred for this provision to apply.    F. Oversight: Actions taken by DWR may include, but are not limited to, the following:  1. Site visits,  2. Issuance of Site Viability Letters,  3. Nutrient Offset Planreview and approval of items listed in Section V of this Instrument,   4. As‐Built report review and approval of items listed in Section VI of this Instrument,   5. Monitoring Report review and approval of items listen in Section VI of this Instrument,   6. Credit Ledger review and approval of items listen in Section IX of this Instrument,   7. Certificate review of items listed in Section IX of this Instrument and cross analysis to  credit ledgers and,   8. Information requests, file reviews and audits.     Reports, ledgers, files and other information shall be made available to DWR upon request, unless  otherwise specified in this or any other document.     G. Validity of this Instrument: This Instrument will become valid on the date of the last party’s  signature.     H. Specific Language of this Instrument Shall Be Controlling: To the extent that specific language in  this document changes, modifies, or deletes terms and conditions contained in those documents  that are incorporated into the Instrument by reference, and that are not legally binding, the  specific language within the Instrument shall be controlling.    I. Any disputes over decisions regarding this Instrument, shall be referred to the Director of DWR  for a decision. The Director’s decision is subject to review as provided in Articles 3 and 4 of G.S.  150B.    J. This Agreement shall be binding upon the parties and is entered into knowingly, intelligently and  voluntarily.     K. Notices: All Notices and other communication which may be or are required to be given or made  by any party to the other shall be in writing and shall be deemed to have been properly given and  received on the date delivered in person, received via email with a delivery receipt requested, or  deposited in the United States mail, registered or certified, return receipt requested, to the  addresses set out below or at such other addresses as specified by written notice delivered in  accordance herewith.            15 If to Bank Sponsor: 1430 South Mint Street, Suite 104    Charlotte, NC  28203    Attn: John Hutton    jhutton@wildlandseng.com    If to DWR: NC Division of Water Resources – 401 & Buffer Permitting Branch  Attn:  Nutrient Offset and Buffer Banking Coordinator    1617 Mail Service Center    Raleigh, NC  27699‐1617    Applicable Law: This Agreement shall be construed under the laws of the State of North Carolina.      Wildlands Holdings X, LLC    By: John Hutton (Print)          (Signature)  Title:  Vice President of Wildlands Engineering,  Member of Wildlands Holdings X, LLC      Date:              NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY‐DIVISION OF WATER RESOURCES    By:  (Print)       (Signature)  Title:       Date:         Sa l e / Re l e a s e D a t e Pu r c h a s e r o r % C r e d i t R e l e a s e Pr o j e c t N a m e Go v ' t R e q u i r i n g Po u n d s o f Ni t r o g e n Ac r e s Po u n d s o f Ni t r o g e n Ac r e s Po u n d s o f Ni t r o g e n Ac r e s To t a l s - - - - - - Ge o r g i a n n a N u t r i e n t O f f s e t B a n k i n g I n s t r u m e n t : Ge o r g i a n n a M i t i g a t i o n B a n k P a r c e l Ne u s e R i v e r B a s i n H U C 0 3 0 2 0 2 0 1 (o u t s i d e o f t h e F a l l s B a s i n ) Ni t r o g e n C r e d i t L e d g e r Da t e L a s t U p d a t e d : 1 0 - 3 - 2 0 2 3 DW R P r o j e c t # : 2 0 2 3 0 2 4 5 v 1 C r e d i t s R e l e a s e d / A v a i l a b l e to B a n k Cr e d i t s D e b i t e d / S o l d F r o m Ba n k Nu t r i e n t C r e d i t B a l a n c e Attachment B Ta b l e  1.  [I N S E R T  PR O J E C T  NA M E ] ,  [I N S E R T  PR O J E C T  NU M B E R ] ,  Pr o j e c t  Cr e d i t s Pr o j e c t  Ar e a N Cr e d i t  Co n v e r s i o n  Ra t i o  (f t 2/p o u n d ) P Cr e d i t  Co n v e r s i o n  Ra t i o  (f t 2/p o u n d ) Cr e d i t  Ty p e L o c a t i o n Su b j e c t ?  (e n t e r   NO  if   ep h e m e r a l  or   di t c h  1) Fe a t u r e  Ty p e M i t i g a t i o n  Ac t i v i t y Mi n ‐Ma x  Bu f f e r   Wi d t h  (f t ) Fe a t u r e  Na m e To t a l  Ar e a  (f t 2) To t a l  (C r e d i t a b l e )   Ar e a  of  Bu f f e r   Mi t i g a t i o n  (f t 2) In i t i a l  Cr e d i t   Ra t i o  (x : 1 ) % Fu l l  Cr e d i t  Fi n a l  Cr e d i t   Ra t i o  (x : 1 )    Co n v e r t i b l e  to   Ri p a r i a n   Bu f f e r ?    Ri p a r i a n  Bu f f e r   Cr e d i t s    Co n v e r t i b l e  to   Nu t r i e n t  Of f s e t ?    De l i v e r e d   Nu t r i e n t   Of f s e t :  N (l b s )    De l i v e r e d   Nu t r i e n t   Of f s e t :  P (l b s )   —— — —— — —— — —— — —— — —— — —— — —— — —— — —— — —— — —— — —— — —— — —— — —— — —— — —— — —— — To t a l s  (f t 2 ) : 0 0 0. 0 0 0 0. 0 0 0 0 . 0 0 0 To t a l  Bu f f e r  (f t 2 ) : 00 To t a l  Nu t r i e n t  Of f s e t  (f t 2 ) : 0 N/ A To t a l  Ep h e m e r a l  Ar e a  (f t 2) fo r  Cr e d i t : 00 To t a l  El i g i b l e  Ep h e m e r a l  Ar e a  (f t 2): 0 0. 0 % Ep h e m e r a l  Re a c h e s  as  % TA B M En t e r  Pr e s e r v a t i o n  Cr e d i t s  Be l o w To t a l  El i g i b l e  fo r  Pr e s e r v a t i o n  (f t 2): 0 0. 0 % Pr e s e r v a t i o n  as  % TA B M Cr e d i t  Ty p e L o c a t i o n S u b j e c t ? F e a t u r e  Ty p e M i t i g a t i o n  Ac t i v i t y Mi n ‐Ma x  Bu f f e r   Wi d t h  (f t ) Fe a t u r e  Na m e  To t a l  Ar e a  (s f )   To t a l  (C r e d i t a b l e )   Ar e a  fo r  Bu f f e r   Mi t i g a t i o n  (f t 2) In i t i a l  Cr e d i t   Ra t i o  (x : 1 ) % Fu l l  Cr e d i t  Fi n a l  Cr e d i t   Ra t i o  (x : 1 )    Ri p a r i a n   Bu f f e r  Cr e d i t s   Bu f f e r ————— Pr e s e r v a t i o n  Ar e a  Su b t o t a l s  (f t 2): 00 Sq u a r e  Fe e t C r e d i t s 0 0. 0 0 0 0 0. 0 0 0 0 0. 0 0 0 0 0. 0 0 0 Sq u a r e  Fe e t C r e d i t s Ni t r o g e n : 0. 0 0 0 Ph o s p h o r u s : 0. 0 0 0 0 TO T A L  AR E A  OF  BU F F E R  MI T I G A T I O N  (T A B M ) TO T A L  NU T R I E N T  OF F S E T  MI T I G A T I O N Mi t i g a t i o n  To t a l s Nu t r i e n t  Of f s e t : Pr e s e r v a t i o n : To t a l  Ri p a r i a n  Bu f f e r : Ne u s e  03 0 2 0 2 0 1  ‐   Ou t s i d e  Fa l l s  La k e 19 . 1 6 3 9 4 N/ A Re s t o r a t i o n : En h a n c e m e n t : Mi t i g a t i o n  To t a l s 1. T h e  Ra n d l e m a n  La k e  bu f f e r  ru l e s  al l o w  so m e  di t c h e s  to  be  cl a s s i f i e d  as  su b j e c t  ac c o r d i n g  to  15 A  NC A C  02 B  .0 2 5 0  (5 ) ( a ) . la s t  up d a t e d  08 / 0 3 / 2 0 2 0 Attachment C