Loading...
HomeMy WebLinkAboutNCC214564_NOT Closeout Documents_20231103 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center,Raleigh,NC 27699 (919) 791-4200 County: Nash Project: Duck Thru at Spring Hope River basin: Tar-Pamlico Person financially responsible:Jernigan Oil Company,Inc.-J M Harrell,President Project#: NASH-2021-029 Address: PO Box 688,Ahoskie,NC 27910 1. Project Location: Hwy 581,Spring Hope Pictures: No 2. Weather and soil conditions: Warm Dry Workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): no one Title: Inspection report: Sent Report Date given/sent: October 23,2023 9. Corrective action needed: 10. Comments: This project is complete and stable and will be closed in this office Permanent ground cover sufficient to restrain erosion has been established.No additional self monitoring or self inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Thaddeus Valentine Others present: Isaac Allen&Tyler Hufnal Date of inspection: October 20,2023 Time arriving on site: 10:25 AM Time leaving site: 11:00 AM CC: