Loading...
HomeMy WebLinkAboutNCC216294_NOT Closeout Documents_20231102 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville,NC 28115 (704) 663-1699 County: Alexander Project: Harvest Ridge Subdivision River basin: Catawba Person financially responsible:WJH LLC-Dave Hodgman,Regional President Project#: ALEXA-2022-001 Address: 9325 Center Lake Drive,Suite 160,Charlotte,NC 28216 1. Project Location: Icard Ridge Road,Bethlehem Pictures: No 2. Weather and soil conditions: Sunny,Workable Soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No One Onsite Title: Inspection report: Sent Report Date given/sent: June 30,2023 9. Corrective action needed: 10. Comments: Overall the site has sufficient permanent ground cover to restrain erosion,however there are some bare areas and rills that need to be repaired and stabilized. No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT)unless permit approval date was prior to April 2019. The NOT is available at:https://edocs.deq.nc.gov/Forms/NCGO1-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Jeffrey Chandler Others present: Date of inspection: June 29,2023 Time arriving on site: 4:00 PM Time leaving site: 4:30 PM cc: