Loading...
HomeMy WebLinkAboutGW1--06973_Well Construction - GW1_20231027 WELL CONSTRUCTION RECORD(GW-1') For Internal Use Only: 1.Well Contractor Information: .3ePi"r7 Li-304k I wS _14:WATER7.ONES`. :_=',;_____,_.�.._—____........._____:::::-,.1...- c='='' Well Contractor Name FROM , TO DESCRIPTION a Os- A ft. ft I ft. ft NC Well Contractor Certification Number :�157OIITER CASING"(for.mn]ti wedwellit)OR•LINER{ifls"'livable)==�" ' Yadkin Well Company, Inc. FROM TO DIAMETER THICKNESS 1 MATERIAL. - !•• ft. ft in. ‘,11).. Company Name I:16c'INN R.CASING'OR TUBING'(geothermal aisle-1=Ioop)7"-'�-'7--------7,..------ c• 2.Well Construction Permit#: 3 B 5 SAY FROM TO DIAMETER -THICKNESS _ MATERIAL c'" List all applicable well construction permits 7.e.UIC,County,State,Variance,etc.) 4 1 R• G 3 it L SW rn. . '1?I? 601 v r. 3.Well Use(check well use): ft ft in. Water Supply Well: `, PP Y P FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL I/Agricultural [q {,-• e-JMuaicipaUPublic ft ft. in. (Geothermal(Heating/Cooling Supply) ❑Residential Water Supply(single) ft ft in, ❑lndustrial/Commercial ❑Residential Water Supply(shared) EI8` Otil..--------- —--- --- - _ --- - ------_-._ ❑Irrigation ❑Wells>100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply 0 ft Li ft PP Y Well: 1 Pick 1i4 _re wed J[p 3 `°o ❑Monitoring ❑Recovery ft. ft J (v Injection Well: ft. ft. ❑Aquifer Recharge El Groundwater Remediation LI9PSAND/GRAVEL PACK"(f sPp71cib7e)L _- - ; ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ft. ft. e` 0 ❑Experimental Technology ❑Subsidence Control ft. ft. OGeothermal(Closed Loop) ❑Tracer :;Zp2;DRII;YBPIG'>±O:Gi(atriaeliadditiiinnhsheeti;ifae"cissarq)i=FROM TO DESCRIPTION(color,hardness,soillrook llpc,kratn she,etc.) ❑Geothermal(Heating/Coolipng Return) ❑Other(explain under#21 Remarks) o it ' 7 ft. �, Date Well Started gr/4l'!7.3 4.Date Well(s)Completed: Yrei/)3 Well ID# I 5?9 •�I ft. .�o ft. 8C6s fpl Rock Phone#:Ji 47'7 -A.109 st) ft. 6U.ft GC'5a Well Location: � 4 n1't'! S et 11 l : PAP let vb. 3 3G-ate-43 y.3 ft. ft T. - T, rc",' a 4..,v � 1 Is-w Facili /O Name FacilityID#(if applicable) ft. it -':'"' 9 ,, te^L) h PP ) ��. .�'I vr. L 3 44( itiwy 8 g' �� e, Way fi 1 ft. ft OCT 2 7 2023 Physical Address,City,and p _11 RF.M'ATrKR i..—_..-----------------_-..------ `2-----gr.-,._.:J::v-7- .;;;IZi i_r1 .S County Parcel Identification No.(PIN) Sb.Latitude and longitude in degrees/minutes/seconds or decimal degrees: /M't) "AA C gl,4-- 22/r (dwell field,one lat/long is sufficient) 22.Certification' . • t' a 1..S N '/t 49 - 2- W 6.Is(are)the well(s):/Permanent or ❑Temporary Sign e'ofCe ifiedWellContractor Date By signing this form,I hereby cern),that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or ro ISA NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair,fill out,Grown well construction information and explain the nature of the of this record has been provided to the well owner. repair under#21 remanla section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same ' You may use the back of this page to provide additional well construction info construction,only 1 GW-1 ig needed. Indicate TOTAL_NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: G 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: 6t o (ft) Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths if different(example-3Q200'and 2@100) 10.Static water level below top of casing: /4 kit) ) 24a. For All Wells: Original form to Division of Water Resources (DWR), ft. Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 If water level is above casing,use"+" 11.Borehole diameter: Co (in.) G, 01 S 24b.For Injection Wells:Copy to DWR,Underground Injection Control(IUC) 1.4 Program,1636 MSC,Raleigh,NC 27699-1636 .67 12.Well construction method: (i e.auger,rotary,cable direct push etc.) 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the county environmental health department of the county where installed il FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD:Copy to DWR,CCPCUA 0 13a.Yield(gpm) NIA Method of test: *vile Permit Program,1611 MSC,Raleigh,NC 27699-1611 70% hth `� Oz Date Site Visited:.a,..2.,e— 0 � 13b.Disinfection type: Amount: Site Visited By: Ve Ferns GW-1 w North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018 Price:'