Loading...
HomeMy WebLinkAboutNCC233310_ESC Approval Submitted_20231106 TE ROY COOPER a Governor ELIZABETH BISER Secretary 4 WILLIAM E.TOBY VINSON,JR. Interim Director NORTH CAROLINA Environmental Quality October 26, 2023 LETTER OF APPROVAL WITH MODIFICATIONS Phil Strupe Builders Inc. Attention: Phil M Strupe, President 217 Riverwood Dr • Lewisville,NC 27023 RE: Project Name: Meadowlands 109, 121, 83, 767 Project ID: DAVID-2024-023 County: Davidson Acres Approved: 1.32 Acres City: Wallburg Address: 411 Wentworth Drive River Basin: Yadkin Pee-Dee Stream Classification: WS-III Submitted By: Phil M Strupe, President 'Date Received by LQS: October 13, 2023 Plan Type: New Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The modifications required for approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG010000 permit require that the following documentation be kept on file at the job site: E /� North Carolinm Department of Environmental Quality I Division of Energy,Mineral,and Land Resources +/ Winston-Salem Regional Office 1450 West Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27105 ... 336-776-9800 P. Letter of Approval with Modifications Phil Strupe Builders Inc. October 26, 2023 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 peuuit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the infoiluation provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any Change in the infoiination included on the form. In addition, it would be helpful if you notify this pffice of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, &PP --- Nicole Chiles, EI Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval