Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0086223_Authorization To Construct_20010226 (2)
M State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross, Jr., Secretary Kerr T. Stevens, Director Mr. Dale Owen Route 2, Box 397 Brevard, North Carolina 28712 Dear Mr. Owen: tir• 1 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NAruRAL RESOURCES February 26, 2001 Subject: Authorization to Construct Permit Issuance ATC Number 086223 ACA D&D Catfish Resort WWTP NPDES Permit NCO086223 Transylvania County A letter of request for an Authorization to Construct (ATC) was received March 13, 2000 (with additional information submitted January 26, 2001). by the Division and final plans and specifications for this project have been reviewed and found to be satisfactory. Authorization is hereby granted for the addition of a wastewater treatment plant at D&D Catfish Resort not to exceed a design flow of 0.020 MGD with discharge into Peter Weaver Creek in the French Broad River Basin. Specifically, this ATC allows the installation of: • Splitter box to split flows between dual path facilities, Appx. 10,000 gallon total equalization with diffused air and 1 /3 hP submersible pumps, • 20,000 gallon dual aeration basins with diffused air, . 4 hopper -type clarifiers (2 per dual train) at appx. 35 ft2 each, with air lift sludge returns and skimmer boxes, Appx. 10,000 gallon total digester capacity with diffused air, 422 gallon dual chlorine contact chambers with tablet chlorination, • dual tablet dechlorination, • meter box with effluent ultrasonic flow meter, dual blowers rated at 160 cfm`, • standby power*, • all additional piping, valves, control equipment and appurtenances. " NOTE: Plans and specification must be revised to reflect dual blowers rated at 160 cfm. Additionally, standby power with enough capacity to operate main treatment units in case of power outage must be supplied prior to operation of this treatment facility. The wastewater treatment plant area must be fenced to restrict public access and a potable water source must be supplied for maintenance and sampling purposes 1617 MAR SERVICE CENTER, RAtocN, NORTH CAROLINA 27699-1617 - TELEPHONE 919-733-5083/FAX 919-733-0719 AN EQUAL OPPORTUNITY AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/ 10% POST -CONSUMER PAPER VISIT US ON THE WED AT http://h2o.enr.state.nc.us/NPDES C f Mr. Dale Owen Page 2 of 4 Once construction under this ATC has been completed and an Engineer's Certificate has been submitted (and the appropriate regional office notified), the permittee is authorized to operate the treatment units. This Authorization to Construct is issued in accordance with NPDES Permit No. NCO086223 issued November 3, 2000, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in the permit. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Asheville Regional Office, telephone number (828) 251-6208, shall be notified at least forty- eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified water pollution control treatment system operator to be in responsible charge (ORC) of the water pollution control treatment system. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the water pollution control treatment system by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8G, .0202. The ORC of the facility must visit each Class I facility at least weekly and each Class 1I, III, and IV facility at least daily, excluding weekends and holidays, and must properly manage and document daily . operation and maintenance of the facility and must comply with all other, conditions outlined in Title 15A, Chapter 8G, .0204. Once the -facility is classified, the Permittee' must submit a letter to the Certification Commission which designates the operator in responsible charge within: (A) Sixty calendar days prior to wastewater being introduced into a new system or (B) within 120 calendar days of the following, (i) after receiving notification of a change in the classification of the system requiring the designation of a new ORC and back-up ORC or (ii) a vacancy in the position of ORC or back-up ORC. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this Permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143-215.6 for violation of or failure to act in accordance with the terms and conditions of this Permit. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the NPDES Unit, Division of Water Quality, 1617 Mail Service Center, Raleigh, NC 27699-1617. Mr. Dale Owen Page 3 of 4 One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Ms. Susan A, Wilson, telephone number (919) 733-5083, extension 510. Sincerely, �eT. Stevens cc: Central Files NPDES Unit, Permit File Asheville Regional Office, Water Quality, Kerry Becker Technical Assistance and Certification, Tony Arnold Robert G. Burgin, Jr., P.E. P.O. Box 1804 Irmo, SC 29063 • • of WA rFR �02 QG � r > .� o -� Michael F. Easley Governor NCDENR William G. Ross, Secretary North Carolina Department of Environment and Natural Resources Kerr T. Stevens, Director Division of Water Quality Water Quality Section/ NPDES Unit FAX: (919) 733-0719 2/27/01 FAX TO: Robert Burgin, P.E, Re.: D&D Resort WWTP FROM: Susan A. Wilson PHONE: 733-5083, ext. 510 _NO. OF PAGES INCLUDING THIS SHEET: 4 FAX NUMBER: Ann,/761 — Here's a copy of the signed ATC. Let me know if you have (or the owner) have any questions about the requirements. Susan 4-oico 12L. -N5 I - - NC OJ e' & ZG 3 , ,, l} Ck tF/"w 45a,CT c,4 —r D� b Cp7<,sl l2�soar ,NCoo 8� Z23 PF; ©.ors M4,� boDS ; 3o is = 30 n1143-N= 5.G�6.� i t (t = 21WL � Io R0G pig/G% /N t�l�RScS O/( = 3 0/(0 0 N - 6-7 2v COO q'*JD ao 70 �s oao (Fui/i2� Cf/tC(� G¢LCS, f 2 Z, o0o �W q� � > w /44. 9.75 (401 ,rT / 7. 3 k �WL- /IFI�w 7 G (,26m TOT ; 9 9 n �:zs' (OSoZ 0a /O, 5-02, z. Z a/JJ Wy. rDi- GQ t 10 7J / 3 / /. �.7 / (YGUL NLD dOGuvA€ F62Ti¢r1k I¢¢•7.7sl )•¢SSo� 2 F7 ZD Ov B aG74,v,') 76 VoLUAt ' �(l, 5 • / Z) tit Z•s - /7�) h _ Soo • GL, " • `1 75- ZRz -7•�s4h� NCQo 96 ZZ 3 I d f aaa fV N {V "N" r.0 f'�'C/GATOnI la�lK- (�✓NTD� 2�0/ o0o y�o S.A. = (6 • s,92� = 3s. s / ����) 20, 000 -PO = 3S.S-t 14 C �AGi Fi Vooty E = 7 i99 % 7s r7 3 g 3� • �7�0 - 30) , d, 6s +� S�uv4c I lk si,Nos£/lvAy sF- Baps > Z 94 / � O.oz ( /�Lcr/Ty 06 IIoGD/nlS TMc) OIL ci - cor4Acr 00ykg6,1�- ✓oo- �./• Z-/ k h ?y o0o spo TABCci Dcato/z- S WC �IPI 4,l S /^/PJICAiC— ¢2z SAc s WOO %?23 rOON ;aa sss N lV tV " N N AOZ,gra,J A�,?"MT.5 /�iC✓a 7"19M pui p�fp2t` O�+i LE ew 1?01)I-kr= 6oaD5 oa/ ZOZ/;, 3.33NT*5 46�� /s- 3 o oz�/PAy P, y //2 �eEJE J {"/losk-SE Bu,5,9 LE DI��G 53?� R55uM E' CIF ` O. /D Grp = 57 /(0.675 • p.2 • A /44o) 2�, CFM rL Nix•Ng ZS CFM Zq ZS �; 3 - 73 cF/vl /Oo0 Fr 3 IAI Ram%i OA, j AA,L) (j if rio/� Z r-F(kS346 _ 17 crm Zo cf--M of 3 Z�j CFFt 000 %f ? 0 4- UYf 761 A L - (58 CFM- :uPP��v' l00 C PuT C/h-CS. /ND/L'Ac) SUF��IEt� Z Ar l60c)" ti Division of Water Quality MEMO F Date: To: , Subject: �5G�1 (rJs;/1-bt,tfrJ4 2. I(�G cF�` ��ov��R-s NET Z (Do cF� rn�vts !rs % r ors L A NCDENR North Carolina Department of Environment and Natural Resources PO Box 29535, Raleigh, North Carolina 27626-0535 / Phone: 733-5083 i-� 10 000 4PD W o� t—!7 H ff4 k--, To M, oat PY KK �--1& I j Area and Volume Calculation of Aeration Basin Phase One S e: 00 8189'l' I Volume and Area Calculation Area := (8.18.11.83) + (0.47.11.83) + (0.97.11.83) — (0.47.0.94) — (0.97.0.3455) Area=113.028 sq. ft. ? L, Length -of -aeration :=12 feet Volume cuft :=Area •Length_of aeration Volume cuft=1356.332 cu. ft. Volume —gallons := Volume cuft •7.481 Volume gallons=10146.72 gallons Length —of —equalization := 6 feet Volume EQ_cuft := Area •Length_of equalization Volume_EQ_cuft = 678.166 Volume EQ_gallons := Volume EQ_cuft•7.481 Volume_EQ_gallons = 5073.36 gallons. Length —of —digester := 6.5 feet Volume digester_cuft := Area•Length_of digester Volume digester cuft = 734.68 cu. ft. Volume digester gallons Volume digester tuft •7.481 Volume digester gallons = 5496.14 gallons. Aeration Calculations Phase One Equalization_ Aeration_ cfm :=1.25 •(�5073.36- ) •2 Equalization_ Aeration cfm=12.683 CFM 734.68' Digester—Aeration—CFM := 30 • � �T �.2 '91- Digester Aeration—CFM = 44.081 CFM Pressure from depth of water in aeation tank = dp 8 dp ' feet dp = 3.463 psi Pressure from depth of water in aeation tank Requirement 2050 cu. ft. of aeration per Ibs of BOD5 Population at build out = 200 people. BOD5 per person per day estimated = 0.23 Ibs BODIbs := 200.0.23 BODIbs = 46 Ibs BOD5 Ammonia in raw influent = 25 mg/l NHlbs := 25.8.P1.0.020 --;� NHlbs = 4.27 Ibs per day NOD := NHlbs •4.6 NOD=19.642 Ibs per day of nitrogen oxygen demand o Therefore calculate the cubic feet per minute of aeration required for the combined NOD and BOD5 oxygen demand CFMaeration := ( NOD + BODIbs) •(2050) 1440 CFMaeration = 93.449 cfm Digester-Aeration-CFM = 44.081 cfm CFMtotal := CFMaeration + Digester Aeratibn_CFM + Equalization—Aeration—cfm CFMtotal=150.213 cfm Note: Use 2 blowers at approximately 160 cfm each Note: 12 diffusser in extended aeration tank DIFFUSERflowaeration := CFMaeration 1 DIFFUSERflowaeration = 7.787 CFM DIFFheadloss := 0.50 psi Note: Using Davco D2 diffuser DIFFUSER_drop_flowrate := 2 •DIFFUSERflowaeration DIFFUSER drop_flowrate=15.575 CFM Note each diffuser drop is 1.5" galy. steel Note equvalent length of drop pipe =13.00 feet of 1.5 inch pipe DIFFUSER_drop_headloss :=0.05.0.13 PSI DIFFUSER drop_headloss = 0.007 PSI DISTRIBUTER headloss 3inch 150cfm 30feet :=0.30•.35 PSI DISTRIBUTER headloss 3inch 150cfm 30feet = 0.105 PSI BLOWER headloss total : = 0.5 + 0.007 + 0.105 + 3.463 BLOWER headloss total = 4.075 PSI D&D Catfish Resort WWTP Calculations Plant to be designed Dual Path G F( ��",,i5 (o � S Flow to be equalized through plant to displace peaks Aeration Volume=18,730 x 2 = 37,460 Gallons pTry Aeration Volume in cu ft = 37,460 Gallons + 7.481= 5,000.35 cu ft oppjd� Clarifier Volume = 4864 x 2 = 9,728 Gallons Daily person capacity of plant @ 100 gallons / person / day = 37460 gallons =100 gallons / person / day = 374.60 people Daily BOD5 capacity of plant @ 0.17 gallons / person / day = 374.60 x 0.17 = 63.68 lbs. BOD5 per day Hourly BOD5 capacity of plant @ 0.17 gallons / person / day = 63.68 lbs. BOD5 per day = 24 = 2.65 lbs. BOD5 per hour Aeration requirement per day extended aeration process = 63.68 lbs. BOD5 per day x 2050 Cu. Ft per lbs. of BOD5=130,544 cu. ft. per day = 90.65 cfm for both tanks Aeration requirement per day_extended aeration process for mixing = (5,000.35 cu ft . 1000 cu. ft.) x 30cfm / 1000 cu ft = 150 cfm Air requirement per diffuser =150= 24 = 6.25 cfm Head loss per diffuser = 0.25ft Aeration requirement per day equalization =150 cfm for both tanks x .25 = 37.50 cfm Digester Volume = 374.60 people x 3.0 cu. ft. per person=1123.80 cu. ft. = 8,407.15 gallons Digester Volume in Cu FT = 8,407.15 gallons - 7.481 = 1,123.80 cu. ft. Digester Air Requirement = (1,123.80 cu. ft =1000 cu. ft.) x 30cfm / 1000 cu ft = 33.71 Allowance for air lift =10 cfm Total Air requirement = 150 cfm + 37.50 cfm + 10 cfm=197.50 cfm A B C D E F G H I J 1 PUMP STATION DESIGN ONE PUMP ON 2 Submersible Pump Station 3 Robert G. Burgin, Jr. Inc. 4 1 D&D EQ Basin Pump 5 Date of Calculation 6/6/98 6 7 Average Daily Flowrate expected at Pump Station in GPD 35,000.00 8 Average Daily Flowrate at Pump Station in GPM 24.31 9 Peak Daily Flowrate at Pump Station in GPM 60.76 10 lGround Level of Pump Station in Feet MSL 2,194.00 111 Full Depth of Pump Station in Feet 11.00 12 jElevation of the bottom of the Pump Station in Feet MSL 2,183.00 13 Depth of Lowest Invert In from Ground Level in Feet 3.00 14 Elevation on Lowest Invert In of the Pump Station in Feet MSL 2,191.00 15 Low Water Cut Off Elevation in Feet MSL_ 2,185.00 16 Lead Pump Cut On Elevation in Feet MSL 2,186.50 17 Lag Pump Cut on Elevation in Feet MSL 2,188.00 18 High Water Alarm Cut On Elevation in Feet MSL 2,189.50 19 Elevation of High Point in Forcemain System in MSL 2,197.00 20 Static Head on Pumps 12.00 21 Size of Forcemain in Inches 3.00 _ 22 Minimum Flow Rate in GPM for 2 ft/sec 44.07 23 Length of Forcemain in Feet including allowance for fittings 0.00 24 1 Hazen and Williams C factor for forcemain pipe 140.00 25 IMaximum Pumping Rate in forcemain in GPM 50.00 26 Headloss in forcemain 0.00 27 Size of Pump Station Piping In Inches 2.50 28 Hazen and Williams C factor for Pump Station piping 100.00 29 Number of tees ( side outlet) in pump station line of flow 2.00 30 Number of elbows in pump station line of flow 2.00 311 Number of gate valves in pump station line of flow 2.00 32 Number of check valves in pump station line of flow 1.00 33 Length of straight pipe in pump station piping 20.00 34 Equivalent length of straight pipe in pump station piping 169.58 35 Headloss in pump station piping 5.68 36 Total Dynamic Head on Pump Station at Low Water Level 17.68 TDH P. Curve 37 0% Maximum Flowrate 0.00 12.00 18 381 20% Maximum Flowrate 10.00 12.29 17.5 391 40% Maximum Flowrate 20.00 13.04 16.5 401 60% Maximum Flowrate 30.00 14.21 15.5 411 80% Maximum Flowrate 40.00 15.76 14.5 421 100% Maximum Flowrate 50.00 17.68 13.5 43 44 45 46 47 48 49 Page 1 A B C D E F G H I --I i so 51 52 53. D&D Equalization Pump and System Curve 20.00 . ................ ..... .... . .......... ................. .... .......... ....................... . .... ..................................... ............. ....... *""'*"*'*'* . . ................. ........ .. ------ --------------- ....... oulds 2wd/3wd 1/3hp 18.00 . ..... ............ ........................................................................ ..... ...................... ........... ..................... . ........... ............................................. .. .............................. ..... . .......... ............................................ 16.00 . ............. ................................................................... ..................................................................... . ..... . ...... 14.00 . ............. .. ................... ................ ........ . ....................................................... ......................... ...................... .... ............................. ..... ............ ..................... ........ .... .............................. ......... • 12.00 a . . . .......... ...................... .. ... ................................................................................. ................................... - ------------ -- ................ .. .... ........... .. ..................... 10-00 . ............. ................................................................................................. ................................... ........... ................................................................................. ........ ........... .. ................................................ .......i System Curve ............................... . .......... .................. Operational Point One Pump 8.00 . ................................................... ............. ............... ............................. ................................................... : ................................................................... ................................. .................................... ....................... ..... ............. . ............................. 6.00 . ....................................... .. .. .. ............. .................. ............ .. ....................................................... .......................................................................... ...... .................................................................. ............... . ........................ . .......... .......... 4.00 ............ ........................................................... . ...... ............... ............. ................................................... .. .............................................................................. ............... ........................................................................................ . ........... ................. 2.00 . .......................................................................................................... . ....................... .... ......................... ......................... ........ ...................... ....................... ........................... ...................... .............................. ............................... . ............................. 54 55 56 57 58 591 601 61 62 164 63 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 821 83 0.00 0.00 10.00 20.00 30.00 40.00 Flow Rate In GPM F F s stem Pump Curve 84 85 86 87 881 891 901 91 92 93 94 95 961 97 98 991 Page 2 Splitter Box calculation V notch Weir based on Thompson Formula Angle —of —weir —in —degrees := 45 Angle_of weir Angle —of —weir —in —degrees in_degrees_divided_by_2 :_ Height —of —weir —in —inches := 6 Angle_of weir in_degrees_divided_by_2 = 22.5 Height of weir in_feet := Height —of —weir —in —inches 1 Height —of —weir —in —feet = 0.5 One —half —weir —length := tan (Angle_of weir in_degrees_divided by_2 -deg) -Height—of—weir—in—feet One—half weir length = 0.207 Weir —length —in —feet := One—half—weir—length-2 Weir length_in_feet = 0.414 Coefficient :=.57 Qfps :=Coefficient•(,, � •Weir length_in_feet•Height_of weir in feet• 2.32.174•Height of weir in_ Qfps = 0.179 Qgpm : = Qfps •7.481.60 Qgpm = 80.15 Qgpd : = Qgpm • 1440 Qgpd=115415.419 Conversion of Cubic Inches to Gallons 0562 Double "Us" Catfishing WWTP Digester Volume Conversion Tank Volume (cu. in.) = Convert to cu. Ft. (divide by 1728 cu. In. per cu. Ft.) Conversion Factor 2385447A0 1380.467 (cu. ft.) 7.481 Volume in gallons = 10327.3 (For water use 7.481 gallons/cu. Ft) f • 0962 Double "D's" Catfishing & R.V.,Resort WWTP Volume Calculations d� Digester Volume Tank 121 April,1999 ---------------- SOLIDS ---------------- Xv X 1 Mass: 793763.7842 Volume: 793763.7842 cu. in. �1 Bounding box: X:-228.0000 ---84.5000 Y:-5.9045 -- 110.8455 Z:-143.7500 ---96.0000 Centroid: X:-156.2500 Y: 52.5090 Z:-119.8750 Moments of inertia: X: 14635294465.2770 Y: 32279461715.1611 Z: 23800321710.8394 Products of inertia: XY:-6512455313.6827 YZ:-4996359099.9302 ZX: 14867563111.7106 Radii of gyration: X: 135.7860 Y: 201.6590 Z: 173.1593 Principal moments and X-Y-Z directions about centroid: I: 1040334915.3368 along [1.0000 0.0000 0.0000] J: 1494077200.1244 along [0.0000 1.0000 0.0000] K: 2232773609.0898 along [0.0000 0.0000 1.0000] Digester Volume Tank 2 21 April,1999 ---------------- SOLIDS ---------------- 01 Mass: 1591683.3997 Volume: 1591683.3997 cu. in. Bounding box: X: 0.0000 -- 143.5000 Y:-5.9045 -- 110.8455 Z:-143.7500 ---48.0000 Centroid: X:71.7500 Y: 52.5090 Z:-95.8750 Moments of inertia: X: 22019103136.4806 Y: 26734478513.8188 Z: 17059915474.4371 Products of inertia: XY: 5996709033.6721 YZ:-8013012275.8468 ZX: -1.0949E+10 Radii of gyration: X: 117.6174 Y: 129.6008 Z: 103.5285 Principal moments and X-Y-Z directions about centroid: I: 2999742881.7887 along [1.0000 0.0000 0.0000] J: 3909603065.4202 along [0.0000 1.0000 0.0000] K: 4477237132.3633 along [0.0000 0.0000 1.0000] Combined volumes: 2,385,447 cu. in. 1 GRADE LEVEL 2194' K1 INFLUENT INVERT 2191.6' 10 2�Z i� T.O.T. - 2194.5' - 2194.5' - T.O.T. - 2194.5' T.O.T. - Z194.5' WATER LEVEL WATER LEVEL _ �- GRADE WATER LEVEL - - - - - - - - 2193.5' 2193.3' WATER LEVEL. 2193.3 2193.16' WATER LEVEL WEIR NOTCH 2191.1' 2191.15' WEIR NOTCH SPUTTER BOX CHLORINE DE- 2190.5' CONTACT CHLORINATION CHAMBER METERING fl; CHAMBER I i EQUALIZATION 1 DIGESTER AERATION CLARIFIERS INVERT 2190.8' Zk ct3, 5 — EFFLUENT IMERr 2188.6' �o• Y Z• 5 LEVEL 2194'