Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCC233289_ESC Approval Submitted_20231103
ROY COOPER Governor • } ELIZABETH S. BISER tti 1 Secretary WILLIAM E. TOBY VINSON,JR. Interim Director NORTH CAROLINA Environmental Quality November 1, 2023 LETTER OF APPROVAL True Homes, LLC Attention: Keith Fenn, Market Partner-Land 309 Post Office Drive Indian Trail,North Carolina 28079 RE: Project Name: The Glenns II Acres Approved: 44.27 Project ID: UNION-2023-062 County: Union, City: Indian Trail Address: Ansonville Road River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Vincent Keene, PE, Yarbrough-Williams & Houle, Inc. Date Received by LQS: October 16, 2023 Plan Type: Revised Dear Mr. Fenn: The subject erosion and sedimentation control plan has been approved by default. The Sedimentation Pollution Control Act (hereinafter "Act") states that this plan must be filed a minimum of 30 days (15 days for revised plans) prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days (15 days for revised plans) of receipt of G.S. 113A-54.1. The Act further states that if the approving authority fails to approve or disapprove the submitted plan within the 30-day(15 days for revised plans)period, the plan will be deemed approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3)years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,the new responsible party must obtain a new COC. North Carolina Department of Environmental Quality I Division of Energy,Minerarand Land Resources 1 I Mooresville Regional Office(610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 704-663-1699 Letter of Approval True Homes,LLC November 1,2023 Page 2 of 2 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining properties. If,following the commencement of this project,it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land- disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land-disturbance,as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notified this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Shannon Leonard Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCG01 Fact Sheet c: Inspection Department ec: Vincent Keene, PE 4 2,0 04 wl ,..., opz E ,..cy, • ,44 6 ,4 = , pc ..Z ...44 cif) c �� °�, 0 °1.8 •F 48) i . a_ ° a co) ° °- III tti) CA itwa N t ' ; i �' �. ,: h --j _ era i - / t,, x 3' 4.� CV W "- !,I n ,_ ; 44 1- ' 61 41 co ° 6 °w ® CI et © o ° ° °..4 0 b,A 0 0 = 0 - 4 ct on 0 e..4