Loading...
HomeMy WebLinkAbout20090266 Ver 10_DWR Cover letter_PCN 2023_20231031Hazen October 31, 2023 Mr. Robert Tankard Hazen and Sawyer 4011 WestChase Boulevard, Suite 500 Raleigh, NC 27607 • 919.833.7152 Assistant Regional Supervisor Division of Water Resources, NCDEQ Washington Regional Office 943 Washington Square Mall Washington, NC, 27889 Re: 20090266 v9 — Modification Request for Individual 401 Water Quality Certification Dear Mr. Tankard: Greenville Utilities Commission (GUC) requests the modification of the authorized Individual 401 Water Quality Certification for the Raw Water Intake Screen Replacement and Maintenance Dredging project, issued on October 4, 2022. The project scope and extents have expanded due to additional sedimentation around the intake screens. The original certification authorized the impacts specified as impact site OW-1 in the current electronic Pre -Construction Notification (ePCN), submitted electronically on today's date. The impacts listed for OW-1 are unchanged from the original approval. The impacts associated with OW-2 and OW-3 are new impacts and are the areas for which the modification is requested. Please note that OW-1 is included in the ePCN for the purpose of requesting authorization by the U.S. Army Corps of Engineers under Section 404 of the Clean Water Act. GUC appreciates your expedited review of the modification request provided in the ePCN. The construction window for the proposed dredging is limited due to the moratorium on in -water work for the protection of the federally endangered Atlantic sturgeon (Acipenser oxyrinchus oxyrinchus), which begins February 1 of each year. If any questions, concerns, comments, or other needs arise during your review and consideration of the proposed activity, please contact me as soon as possible in order to resolve the concern quickly and provide adequate time for the activity to be performed prior to February 1. Very respectfully, Ms. Keven Duerr Associate hazenandsawyer.com