HomeMy WebLinkAboutWQ0044259_Additional Information Request_20231103ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
RICH DEMING — CEO
CAROLINA POULTRY POWER RG2, LLC
3730 NORTH MAIN STREET
FARMVILLE, NORTH CAROLINA 27828
Dear Mr. Deming:
NORTH CAROLINA
Environmental Quality
November 3, 2023
Subject: Application No. WQ0044259
Additional Information Request 2
Carolina Poultry Power —
Wilson CUS
Reclaimed Water System
Wilson County
Division of Water Resources' Central and Regional staff have reviewed the application package
received March 27, 2023, and additional information received August 7, 2023. However, additional
information is required before the review may be completed. Please address the items on the attached pages
no later than the close of business on December 4, 2023.
Please be aware that you are responsible for meeting all requirements set forth in North Carolina
rules and regulations. Any oversights that occurred in the review of the subject application package are
still the Applicant's responsibility. In addition, any omissions made in responding to the outstanding items
in Sections A through J, or failure to provide the additional information on or before the above requested
date may result in your application being returned as incomplete pursuant to 15A NCAC 02T .0107(e)(2).
Please reference the subject application number when providing the requested information. All
revised and/or additional documentation shall be signed, sealed and dated (where needed), with an
electronic response submitted to my attention at: hitps://edocs.deq.nc.gov/Fonns/NonDischarize-Branch-
Submittal-Form-Ver2.
If you have any questions regarding this request, please contact Erick Saunders at (919) 707-3659
or Erickson.Saunders@deq.nc.gov. Thank you for your cooperation.
Sincerely,
Erick Saunders, Engineer III
Division of Water Resources
cc: Raleigh Regional Office, Water Quality Regional Operations Section (Electronic Copy)
Kim Melvin, PE — Project Integration, Inc. (Electronic Copy)
Laserfiche File (Electronic Copy)
E Q�� North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617
NORTH CAROLINA -
OepaMlent at EnulmnmeMal Duality 919.707.9000
Mr. Rich Deming
November 3, 2023
Page 2 of 3
A. Cover Letter/Introduction:
1. The response to Comment A.4. of the previous additional information request mentioned the
Alliance One facility as a process being considered for distribution. It does not appear that this is
included in this application package. Please clarify whether this side stream is being proposed in
this application.
2. The response to Comment A.6. indicates the system is designed to minimize drift under typical
wind flow speeds below 25 mph which is the typical design operation conditions. How will
operations be handled if the wind flow speed exceeds these design conditions.
B. Application Fee:
1. No comments.
C. Application (Form RWPI 06-16):
1. No comments.
D. Application (Form RWCU 06-16):
1. Item V.5. indicates the impoundment is designed to receive surface water runoff, but the drainage
area provided matches the top of dam water surface area in Item V.11. Item V.5. refers to any
additional drainage areas contributing runoff into the basins other than the berm surface area. Please
clarify if any additional drainage areas contribute to the stormwater into the system.
2. The mean seasonal high water table (SHWT) in Table in V.I I is higher than the impoundment
bottom elevation. In accordance with Item V.8., an explanation shall be provided for how the liner
will be protected from bubbling and groundwater infiltration.
Item V.9. was not completed. This section shall be updated with the specification page for liner
installation and testing requirements.
4. The impoundment design elements still appear to be incorrect based on the engineering plans. The
impoundment bottom elevation is given as 85 ft. in the table but is 88.4 ft in the plans and the
calculations. Likewise, the top of embankment elevation is given a 94 ft, implying a depth of 9 ft,
while the depth in the calculations is only 5.3 feet. Please revise this section with the correct design
elements and dimensions.
The Waterbody/Stream Index column in the table in VII.2. includes the name of the water body,
not the stream index number. Additionally, the values in the Classification column does not
correspond to any water planning classifications listed. This section shall be updated with the
correct stream index under and associated classification.
E. Property Ownership Documentation:
1. No comments.
Mr. Rich Deming
November 3, 2023
Page 3 of 3
F. Engineering Plans:
1. Please indicate the elevations for the top of the embankment, 2 ft freeboard level, and pump suction
at the foot valve basket in Detail 2 of Sheet 1966.
2. Comment F.1. of the previous additional information letter requested the piping configuration from
the tie-in to the City of Wilson's reclaimed water pipe. The updated piping plan on Sheet #1964
references the reclaimed water line and the new reclaimed water makeup valve, but the site plan
and topography and plan / profile views on Sheets 1963 and 1970 do not show the location of the
tie in. All reclaimed water piping connecting the existing City of Wilson's distribution line to the
proposed thermal loop will be included under the scope of this permit and shall be included in this
application. The piping plans shall show the locations of all reclaimed water piping from the tie-in
City of Wilson reclaimed water distribution pipe.
3. The P&I diagram on Sheet 5080 indicates that reclaimed water entering the system bypasses the
holding pond entirely, entering the thermal loop through lines labeled `RW-8-WRA-2"' and `RW-
9-WRA-2". This contradicts schematic plans on Sheets 1964 and 1967. Please clarify the
configuration of the piping. If reclaimed water lines can bypass the holding pond, these lines shall
be shown in updated plans.
4. Pipe sizes for the east clarifier, boiler building, and sludge building side streams appear on the P&I
diagram on Sheet 5080 appear to differ from the diameters shown on Sheets 1963, 1973 and 1974,
which indicate 8" diameter pipe for the entire loop. The P&I piping schedule has a 2" line to the
east clarifier, and two 6" lines to the boiler and sludge side streams. Please clarify the actual pipe
dimensions and update the plans as needed.
5. The August 3, 2023 email attached as a response to Comment F.S. of the previous additional
information letter stated that the 8" main was cut and capped as part of the "new reclaimed water
tie-in". Please clarify whether this reclaimed water tie-in is to be used as a part of this project.
G. Specifications:
1. Please provide a copy of the construction schedule as mentioned in the response to Comment G.1.
2. Please provide the manufacturer's information for the proposed spray nozzles.
H. Engineering Calculations:
1. In accordance with 02U .0201(c)(3), engineering calculations shall include a total dynamic head
and system curve analysis for each pump. These calculations shall be prepared by a professional
engineer for the specified cooling water pumps and submitted for review.
I. Site Map
1. No comments.
J. Operation & Maintenance Plan:
1. No comments.