HomeMy WebLinkAbout20210829 Ver 2_More Info Received_20231102Notes: x Y CL d O• 0 N r) N O N N 1. Work to reroute the existing drainage shall be done during periods of dry weather. In the event that a rainfall should ' occur during construction, the contractor shall pump around site drainage to a sediment trap or basin to prevent any additional impacts to the stream. 2. Wetland crossings: initial disturbance of these areas shall be limited to only that area minimally needed to allow passage of construction equipment to prepare for the installation of the crossing and to execute upland construction on the opposing side of the crossing. Grubbing or land disturbance of the subject area shall not be performed until the culverts, backf ill material, erosion and sediment control materials or devices sufficient to substantially complete the construction and stabilization of the crossing are staged or stockpiled at the location. Due consideration shall be _ given to impending inclement weather conditions that may adversely affect the completion of the crossing in the shortest time practicable. 3. Drainage work shall be completed in the minimum time necessary. 4. Stream and Wetlands information taken from JD (SAW-2012-01392) 7 Construction Sequence: ' 4. No construction of the drainage for the wetland impact shall commence until all materials needed for the impact are staged on site, and the temporary dams are installed to impede flows. 5. Establish clearing limits per approved plans. Clear and grub impact area as needed. Immediately install the temporary dams upslope of the headwall. Temporary seed and mulch disturbed area. Do not clear or disturb any unpermitted areas. 6. Install drainage. Fill, compact and finish grade area. 7. Install permanent ground cover (sod) on slopes near the headwall and pipe outlet. f ` B. Install silt fence at toe of fill slope and as needed to prevent erosion. 9. Seethe construction plans for additional details. 10. See wetlands permit for additional requirements. (SAW-2012-01392) Stream and Wetlands Impact Notes:_ 1. Stream crossing: initial disturbance of this area shall be limited to only that area minimally needed to allow passage - of construction equipment to prepare for the installation of the crossing and to execute upland construction on the opposing side of the crossing. Clearing, grubbing or land disturbance of the subject area shall not be performed until all equipment, water, sewer, storm drain and erosion and sediment control materials or devices sufficient to substantially complete the construction and stabilization of the crossing are staged or stockpiled at the location. Due consideration shall be given to impending inclement weather conditions that may adversely affect the completion of the crossing in the shortest time practicable. 2. Establish clearing limits per approved plans. Clear and grub area as needed. Immediately install silt fence at the wetlands line, and along existing creek top of bank. Install erosion control fabric along ditch banks. Do not clear or disturb any unpermitted areas. 3. No construction of the crossing shall commence in the wetlands until all materials needed for the crossing are staged on site. 4. When possible, work in the wetlands shall be done during periods of dry weather. 5. Work in the wetlands shall be completed in the minimum time necessary. 6. Contractor shall install temporary sand bags and/or sheet pilings in the stream prior to construction and bypass water as needed via a pump around. Pump around shall discharge into a rip rap lined basin or a sediment bag to keep sediment out of stream. 7. During excavation, stockpile the top 12"± of topsoil, and reuse topsoil as the top layer of soil when backfilling. 8. Install silt fence at top of ditch bank and at wetlands line to prevent erosion. 9. If wetland or stream areas are disturbed, outside of the impact areas, they shall be regraded to / original contours using topsoil for the top layer, and the stream banks shall be seeded, with annual seed, then lined with high velocity excelsior matting then staked with live willow stakes at 3' on center to stabilize the banks to 5' beyond the top of bank. / 10. See rest of design plans for additional detail. 11. See wetlands permit for additional requirements. Rev. 11/02/2023 KHW - Add Stream Impact #2 Rev. 09/05/2023 KHW - Revise road at pump station Rev. 08/02/2023 KHW - Revise notes and wetlands impact #1 Rev. 06/28/2023 KHW - Revise impacts Rev. 10/25/2022 KHW - Add proposed pond Rev. 10/13/2022 KHW - Add additional wetlands and boundary area Rev. 09/2712022 KHW - Revise impact numbers, eliminate impact at Gum Branch Road, chg. sheet numbers Project: Owners: A. S`/des THE VINEYARDS Construction, Inc. Jacksonville Twp., Onslow Co., North Carolina at tl-w V :7 V 71 Wetlands Impact #1 (Temporary) ( _` Stream Impact #1 (Temporary) See Sheet 2 of 3 : �( �1 t erall 404 Impacts Map - Sheet 100 Carolina Plantations Boulevard Jacksonville, North Carolina 28546 Date: 04/21/2021 Scale: 1"=600' Field Book: N/A File Name: Vineyards Wetlands Impact.dwg Disk Name: Acad #2422 Drawn: KHW Job No.: S200818-7454 Wetlands Impact #2 (Temporary) Stream Impact #2 (Temporary) See Sheet 3 of 3 1of3 J 5ITE NF�--- kp4R Jacksonville Legend: Ac. - Acre 0 CMF - Concrete Monument Found O Comp. - Computed Point D.B. - Deed Book ex. - Existing O IPF - Iron Pipe Found O ISF - Iron Stake Found M.B. - Map Book Pg. - Page R/W - Right-of-way SF - Square Feet x Wetlands Flag - Wetlands tit GRAPHIC SCALE: 1"=600' 0 300 600 1200 1500 FEET TIDEWATER ASSOCIATES, INC. Consulting Engineers - Land Surveyors - Land Planners Jacksonville, North Carolina P.O. Box 976 - 306 New Bridge Street - 28540 Phone (910) 455-2414 - www.TidewaterENC.com Firm License Number: F-0108 Plan View Scale: 1"=40' GRAPHIC SCALE: 1"=40' 40 80 ev. 09/05/2023 KHW - Add ex. dirt road and labels i— I-- ev. 08/02/2023 KHW - Add clearing limits / silt fence ev. 06/28/2023 KHW - Revise impact to be temporary sewer impact ev. 10/25/2022 KHW - Revise impact ev. 10/13/2022 KHW - Revise impact ev. 09/27/2022 KHW - Revise impact numbers, chg. sheet numbers THE VINEYARDS Jacksonville Twp., Onslow Co., North Carolina 41 f1 t O Z� �m z� mo mz Le'� end: Ac. - Acre 5 CMF - Concrete Monument Found 0 Comp. - Computed Point D.B. - Deed Book ex. - Existing IPF - Iron Pipe Found 0 ISF - Iron Stake Found M.B. - Map Book Pg. - Page R/W - Right-of-way SF - Square Feet x - Wetlands Flag t/ -Wetlands Temoorary Utility Imvact Notes: 1. Purpose of 70 L.F. Temporary Stream Impact is to install a sewer crossing. Once crossing is installed, stream is to be built back following standards set forth in GC 4256. 2. Contractor to ensure mixing of topsoil and subsoils shall be minimized to the greatest extent possible. 3. Impact area shall be re-covered with topsoil layed back on top. Existing ground elevations shot be matched. 4. Excess material to be removed to a high ground disposal area 5. Wetland seed mix to be used over impact area once finished. 6. Work to be done in periods of dry weather. / � 1 6 o' � F mo.R h H �- 268 LF 8" 5DR-35 55 @ 0.4 76 _ N cqq. H H 1 / 8+00 9+00 Profile View Scale: P=40' Horiz. Wetlands Impact # 1 and Stream Impact # 1 - Sheet 2 of 3 1"=4' Vert. Date: 04/21/2021 Scale: 1"= 40' Field Book: N/A File Name: Vineyards Wetlands Impact.dwg Disk Name: Acad #2422 Drawn: KHW Job No.: S200818-7454 TIDEWATER ASSOCIATES, INC. Consulting Engineers - Land Surveyors - Land Planners Jacksonville, North Carolina P.O. Box 976 - 306 New Bridge Street - 28540 Phone (910) 455-2414 - www.TidewaterENC.com Firm License Number: F-0108 Rol 35 30 10+00 k / Remove Existing Dirt / Road Crossing. Regrade / Area to Establish Ditch / • Bottom �47 ----- �-,6—'Co. — — _ 46Remove Existing 71 — -44- — — Pipe Crossing Stream Impact #2 = 40 L.F. \\ \ — �j ��/�►� \ / (Temporary) Ilk M2 / In Out Wetlands Impact #2 = 0.02 Ac. (Temporary) = Outl Storm A. Sydes Const ction, Inc. nt Pool <1/ D.B. 48. P 208 f —.� JB#80 j� //� g it / / 1 M1 Inv.3800 �0 ;h et Structure water ands / /i /� / / ,�• 20 GRAPHIC SCALE: 1"=40' 0 40 60 120 FEET Rev. 10/31/2023 KHW - Revise Pipe M2 and Wetlands Impact Rev. 09/05/2023 KHW - Add contour labels, wetlands hatch Rev. 08/02/2023 KHW - Add clearing limits / silt fence Rev. 06/28/2023 KHW - Revise impact to be Temporary Pipe Impact at Pond Rev. 0912712022 KHW - Revise impact numbers, chg. sheet numbers Project: THE VINEYARDS Jacksonville Twp., Onslow Co., North Carolina t� os Z N Legend: Ac. - Acre 0 CMF - Concrete Monument Found O Comp. - Computed Point D.B. - Deed Book ex. - Existing IPF - Iron Pipe Found O I5F - Iron Stake Found M.B. - Map Book Pg. - Page R/W - Right-of-way SF - Square Feet x Wetlands Flag [J - Wetlands Temoorary Utilitv Impact Notes: 50 45 M 35 30 0+00 1+00 Profile View Scale: 1"=40' Horiz. Wetlands Impact #2 - Sheet 3 of 3 1"=4' Vert. Owners: A. Sydes Date: 04/21/2021 TIDEWATER ASSOCIATES, INC. Scale: Book: N Consulting Engineers - Land Surveyors - Land Planners Construction Inc. Field Book: N/A 9 9 Y File Name: Vineyards Wetlands Impact.dwg Jacksonville, North Carolina Disk Name: Acad #2422 P.O. Box 976 - 306 New Bridge Street - 28540 100 Carolina Plantations Boulevard Drawn: KHW Phone (910) 455-2414 - www.TidewaterENC.com Jacksonville, North Carolina 28546 Job No.: S200818-7454 Firm License Number: F-0108 1. Contractor to ensure mixing of topsoil and subsoils shall be minimized to the greatest extent possible. 2. Impact area shall be re-covered with topsoil layed back on top. Existing ground elevations shall be matched. 3. Excess material to be removed to a high ground disposal area 4. Wetland seed mix to be used over impact area once finished. 5. Work to be done in periods of dry weather 2+00 Est. 1961 50 45 M 35 all