Loading...
HomeMy WebLinkAboutDrawing HIDDEN RIVER COMMON AREA BANK STABILIZATION PROJECT, CLAY COUNTY DWR #20231078 ~ 3ft high to low water norms To Pavilion DRAWING NOT TO SCALE! Using a Bobcat or front loader and working primarily from the top side of the riverbank, install four (4) loads of Class B stone, one (1) load of surge stone and three (3) loads of fill dirt to approximately 80 liner feet of the property top down to the riverbank. Materials will be spread with the front loader from the land. Approximately twenty (20) steps of width 48 inches will be set into the bank at an angle to provide controlled access to the river for recreational purposes (e.g., fishing, kayaking, tubing, wading). No equipment will enter the river and material placement will not exceed an average of 1 cubic yard per running foot. Stabilization fabric will be set in place to assist stabilization of the bank. Work will be completed during periods when the TVA is not releasing from Lake Chatuge. After the appropriate rest time, native plantings will be added with guidance and assistance from MountainTrue. HIDDEN RIVER COMMON AREA BANK STABILIZATION PROJECT, CLAY COUJNTY (DWR #20231078) HIWASSEE RIVER