Loading...
HomeMy WebLinkAboutSW6231101_Stormwater Narrative_20231102 Stormwater Narrative & Modeling for Forest Ridge Commons - Phase 1 Cameron, NC Developer: Forest Ridge Subdivision , Inc. •i, • ��,�:OFESSIo,..q % � SEAL 9��� T. 045277 4cA>W/t October 26th, 2023 Prepared By: Kenneth W. Smith Jr., PE PLS ASmithSite ACONSULTANTS , PLLC Table of Contents 1. Stormwater Narrative 2. NCRS Soils Report for Site and Site's SHWT Bores with Native Soil Investigation. 3. Pre-Developed Runoff, Post-Developed Runoff& Both Ponds' Routed Runoff Calculations 4. Ponds' 1 &2 Water Quality Volume, Stage Storage, Drawdown Time, Riser Buoyancy&Avg. Depth 5. Subdivision's Storm Network 10-year storm event&Gutter Spread calculations 6. Rip Rap Apron Sizing STORMWATER NARRATIVE Forest Ridge Commons—Phase 1 will consist of seven (7)commercial lots and two(2)streets with sidewalks, Harnett Regional Water's water and sewer utilities as well as implementing proposed storm drainage networks that will direct the post construction runoff into two(2)wet detention ponds in order to treat the site's runoff.At full build out of the project, Pond#1 will receive runoff from lots C6 and C7,while Pond#2 will receive runoff from lots C8,C9,C10,C11 and C12 after the site's final grading.The site is currently bounded by residential parcels and wetlands on the western and southern edges, Melody Lane and NC24/87 on the western and northern sides and wooded property to the east and south.To reiterate,this site will be mass-graded in such a manner that helps better facilitate the grading of the streets,the proposed commercial lots and their utilities.This proposed mass grading will help to direct runoff in various directions which,coupled with the proposed storm drainage infrastructure within the streets,will help to facilitate the site's post development runoff in a more controlled manner after full development. Ponds will be designed to treat and slowly release this runoff via the proposed stormwater management facilities as shown,along with the water quality volumes as well as the required. Pre-Developed Site Info • or • • GaB •N 1 `\4;16. • • r r 71:\ The existing site's pre-developed drainage area of 11.43 acres is a mostly barren and rough-graded area that was recently timbered a few years back.Thereafter,the land was backfilled with stockpiles of select fill material that is a loamy sand and a hydrologic soils group B, and now this area of the site awaits development.The remaining acreage is comprised of wooded area and smaller wetlands fingers (outside of the project limits)which are not to be disturbed.This site's topography has always directed its runoff to the southwest corner of the parcel where there is a natural, lower-lying drainage conveyance via the wetlands.The native soil series for this area to be graded is predominantly Blaney Loamy Sand (BnB)and Gilead Loamy Sand (GaB)which are types B and C Hydrologic Soils Groups.This has been confirmed with site visits via a North Carolina Licensed Soil Scientist. Post-Developed Site Info "-,w.a.�,Pd ...._, _ R®......zga...,,q I.. T T.... . _ cwu.aum,a e„n.v•.„®,.y,.,,...,,.. m. ,v..7 ._,..Wp.=l.,,,,....e,2..o,�, -,naro,_. ems. 1 � .. I l 11 1 iI - !x ' Is a , . , ` }•. ill ' --- — — r _.�•==..ea ,. --- . 'I I I . ��, I�,It 2 1 i ::a I I — 4 ;'• 1 \, .1 I 1 Lr . t ;jr jl III{{ Unor I �. ..,., 7 /Mit —, rT ° r n. 1'M ram. — i To see more information on the post-developed site's drainage layout,the proposed patterns,the drainage areas tributary to each inlet,see the grading&drainage plan for more detailed information.The Rational Method has been utilized to help analyze the site's post construction storm network's characteristics. Composite"C"values were computed for the inlets based upon the proposed impervious&pervious areas tributary to them as well as the future,allocated built upon/impervious areas for each commercial lot. Rational Method "C"values were derived using those listed in NCDEQ's Table 8.03E while NOAA's Precipitation Frequency estimates were imported and utilized for the site's rational method calculations for the pond hydrograph and storm network calculations. Storm network calculations were based upon the 10 year storm event for this site and profiles of the storm network are attached to show the hydraulic grade line of the system.The pre-developed, post-developed and routed ponds' hydrographs reflect the anticipated runoff and water surface elevations during the 1, 10, 25 and 100 year storm events for both Pond#1 and Pond#2. Gutter spread calculations were also computed and results from the 10 year storm event were used,which is above and beyond the typical Rational Method "I" intensity of 4.0 inches/hour, per section 10.2.2 of NCDOT's Guidelines for Drainage Studies&Hydraulic Design.These drainage criteria are also in accordance with Harnett's Unified Development Ordinance as well as NCDEQ's Post Construction Stormwater Criteria. Both Pond#1 and Pond#2,the wet detention ponds for Forest Ridge Commons-Phase 1, have been designed to treat the required water quality volumes for the site's proposed runoff, as well as to control the release of the post development storm events,such that they do not exceed the pre-developed storm events' runoff. Information on the wet pond's sizing, drawdown time, riser buoyancy and average depth calculations can also be found herein. Soils on site at the ponds' locations have been analyzed by Mike Eaker(NC Licensed Soil Scientist#1030)of Southeastern Soil & Environmental Associates. Seasonal high water table bores were conducted at the stormwater control measure's location to determine the in-situ properties. Further information about the elevations of the Seasonal High Water Tables(SHWT)as well as the observed groundwater tables at each of these bores is also included within this narrative. Soil Map—Harnett County,North Carolina a (Forest Ridge Commons) o 679250 679320 679390 679460 679530 679600 679670 35°15'6"N —n -". , --xs, a. 35°15'6"N 4 ,1 !, _N u 4'H T .s 46. 1 . \,.. -- -- '.'' '414:1 Nl*/.\ : / if.1 i: . / M C 4 • ` A( .' y. 111—o .1 4 ., -2 I. I-- \ `,r GaB �, -, •r. Y-r ' —, \ u, t, , r''-i,i s'r l , o N— ., P I M f Jy r M ` •Jr • Ro\' •F 0 5 M v,,,N 5,1ap Eii,a,,,,00© bQ eaUc7 as 11M0�,.gaOQ° 35°14'48"N 1 35°14'48"N 679320 679390 679460 679530 679600 679670 3 3 0 a Map Scale:1:2,770 if printed on A portrait(8.5"x 11")sheet. Meters m N 0 40 80 160 240 Feet 0 100 200 400 600 Map projedion:Web Mercator Corner coordinates:WGS84 Edge tics:UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 6/27/2023 -011-01 Conservation Service National Cooperative Soil Survey Page 1 of 3 Soil Map—Harnett County,North Carolina (Forest Ridge Commons) MAP LEGEND MAP INFORMATION Area of Interest(AOI) Spoil Area The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. Q Stony Spot Soils Very Stony Spot Warning:Soil Map may not be valid at this scale. 0 Soil Map Unit Polygons Wet Spot Enlargement of maps beyond the scale of mapping can cause .�� Soil Map Unit Lines misunderstanding of the detail of mapping and accuracy of soil Other line placement.The maps do not show the small areas of p Soil Map Unit Points contrasting soils that could have been shown at a more detailed Special Line Features Special Point Features scale. (9 Blowout Water Features Streams and Canals Please rely on the bar scale on each map sheet for map cs Borrow Pit measurements. Transportation X Clay Spot Rails Source of Map: Natural Resources Conservation Service 0 Closed Depression Web Soil Survey URL: ti Interstate Highways Coordinate System: Web Mercator(EPSG:3857) X Gravel Pit US Routes Maps from the Web Soil Survey are based on the Web Mercator ,. Gravelly Spot Major Roads projection,which preserves direction and shape but distorts distance and area.A projection that preserves area,such as the 0 Landfill Local Roads Albers equal-area conic projection,should be used if more Lava Flow accurate calculations of distance or area are required. Background 46 Marsh or swamp Aerial Photography This product is generated from the USDA-NRCS certified data as of the version date(s)listed below. iRk Mine or Quarry Soil Survey Area: Harnett County,North Carolina O Miscellaneous Water Survey Area Data: Version 20,Sep 8,2022 Q Perennial Water Soil map units are labeled(as space allows)for map scales v Rock Outcrop 1:50,000 or larger. ▪ Saline Spot Date(s)aerial images were photographed: Apr 23,2022—Apr 27,2022 Sandy Spot The orthophoto or other base map on which the soil lines were Severely Eroded Spot compiled and digitized probably differs from the background imagery displayed on these maps.As a result,some minor • Sinkhole shifting of map unit boundaries may be evident. 3) Slide or Slip oa Sodic Spot i\ Natural Resources Web Soil Survey 6/27/2023 Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map—Harnett County,North Carolina Forest Ridge Commons Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BnB Blaney loamy sand,2 to 8 6.0 37.8% percent slopes GaB Gilead loamy sand,2 to 8 9.6 60.1% percent slopes Ro Roanoke loam,occasionally 0.3 2.1% flooded Totals for Area of Interest 15.9 100.0% USDA Natural Resources Web Soil Survey 6/27/2023 Conservation Service National Cooperative Soil Survey Page 3 of 3 Southeastern Soil & Environmental Associates, Inc. P.O. Box 9321 Fayetteville, NC 28311 Phone/Fax (910)822-4540 Email mike@southeasternsoil.com May 31, 2023 Mr. Ken Smith, Jr. Smith Site Consultants, PLLC 121 Bulittle Drive Linden,NC 28356 Re: Seasonal High-Water table (SHWT) evaluation for potential stormwater retention areas, Forest Ridge Commercial (Southern parcel), NC Hwy. 87, Harnett County,North Carolina Dear Mr. Smith, An evaluation of soil properties on a portion of the aforementioned property has been conducted at your request. The purpose of the investigation was to determine soil water table depths for use in stormwater retention design. Soils at the proposed basin sites are most similar to the Gilead soil series (see attached boring logs). 4 soil borings were advanced to a depth of at least 5.0 feet below the soil surface. Seasonal High-Water table (SHWT) as determined by evidence of colors of chroma 2 or less was encountered at depths ranging from 0 to 44 inches below the ground surface. The attached map shows the approximate location of the sample points (as requested by the design engineer). I trust this is the information you require at this time. Sincerely, :d. tf. Mike Eaker Q1` a %,.‘.s,'.i.,.,t;;/1,S:: :,e,,',,i.f.'.:-/-.. fib' "....:), President lrr� ','' ., .i.:i--t.-..41/4-i 4t-is S(1iiL.i iiai,.A;,„Dv_.10.. .0-.. Nk ,,f i r `r \<4'ivorr- 140' _________.i SOIL/SITE EVALUATION • SOIL PHYSICAL ANALYSIS•LAND USE/SUBDIVISION PLANNING GROUNDWATER DRAINAGE/MOUNDING •SURFACE/SUBSURFACE WASTE TREATMENT SYSTEMS. EVALUATION& DESIGN Southeastern Soil & Environmental Associates, Inc. P.O. Box 9321 Fayetteville, NC 28311 Phone/Fax (910) 822-4540 Email mike@southeasternsoil.com SHWT and Observed Water Depths, Forest Ridge Commercial, NC Hwy. 87, Harnett County, NC BORING SHWT DEPT SHWT DEPT GROUND ELEVATION OBSERVED WATER Inches (msl-feet) (msl-feet) (msl-feet) 1 44 273.63 277.30 275.22 2 44 273.31 276.98 270.73 3 15 255.33 256.58 None 4 0 255.16 255.16 None SOIL/SITE EVALUATION • SOIL PHYSICAL ANALYSIS•LAND USE/SUBDIVISION PLANNING GROUNDWATER DRAINAGE/MOUNDING•SURFACE/SUBSURFACE WASTE TREATMENT SYSTEMS. EVALUATION& DESIGN Southeastern Soil & Environmental Associates, Inc. P.O. Box 9321 Fayetteville, NC 28311 Phone/Fax (910)822-4540 Email mike@southeasternsoil.com Soil Boring Log (Bore 1), Forest Ridge Commercial, NC Hwy. 87, Harnett County, NC This map unit consists of moderately well drained to somewhat poorly drained soils on uplands. These soils formed in clayey sediment. Slope ranged from 0 to 3 percent. A - 0 to 15 inches; black (10YR 2/1) loam; weak fine granular structure; very friable; many fine and medium roots; clear wavy boundary. Btl - 15 to 32 inches; brownish yellow(10YR 6/8) sandy loam; weak fine subangular blocky structure; friable; many fine and medium roots; clear wavy boundary. Bt2 - 32 to 40 inches; light yellowish brown (2.5Y 6/4) sandy clay loam; many medium prominent yellowish red (5YR 5/8)mottles; weak medium subangular blocky structure; firm; gradual wavy boundary. BC - 40 to 44 inches; strong brown(7.5YR 5/6) sandy clay loam; weak fine subangular blocky structure; firm; slightly brittle; gradual wavy boundary. Cl -44 to 50 inches; strong brown (7.5YR 5/6) sandy clay loam; many medium prominent light brownish gray (2.5Y 6/2)mottles; firm; massive structure; gradual wavy boundary. C2 - 50 to 60 inches; light yellowish brown(2.5Y 6/4) sandy clay loam; many medium prominent gray (10YR 6/1) mottles; firm; massive structure. SHWT @ 44 inches (2.5Y 6/2) SOIL/SITE EVALUATION •SOIL PHYSICAL ANALYSIS •LAND USE/SUBDIVISION PLANNING GROUNDWATER DRAINAGE/MOUNDING •SURFACE/SUBSURFACE WASTE TREATMENT SYSTEMS, EVALUATION& DESIGN Southeastern Soil & Environmental Associates, Inc. P.O. Box 9321 Fayetteville, NC 28311 Phone/Fax (910)822-4540 Email mike@southeasternsoil.com Soil Boring Log (Bore 2), Forest Ridge Commercial, NC Hwy. 87, Harnett County, NC This map unit consists of moderately well drained to somewhat poorly drained soils on uplands. These soils formed in clayey sediment. Slope ranged from 0 to 3 percent. 0 to 24 inches; sand and clay fill material A—24 to 32 inches; black(10YR 2/1) loam; weak fine granular structure; very friable; many fine and medium roots; clear wavy boundary. Bt- 32 to 44 inches; brownish yellow(10YR 6/8) sandy loam to sandy clay loam; weak fine subangular blocky structure; friable to firm; many fine and medium roots; clear wavy boundary. BC - 44 to 48 inches; strong brown(7.5YR 5/8) sandy clay loam; many medium prominent gray (10YR 6/1)mottles; weak fine subangular blocky structure; firm; slightly brittle; gradual wavy boundary. Cl -48 to 71 inches; red (2.5YR 4/8) sandy clay; many medium prominent brownish yellow(10YR 6/8) and gray (10YR 6/1) mottles; massive structure; firm. SHWT @ 44 inches (10YR 6/1) SOIL/SITE EVALUATION • SOIL PHYSICAL ANALYSIS•LAND USE/SUBDIVISION PLANNING GROUNDWATER DRAINAGE/MOUNDING • SURFACE/SUBSURFACE WASTE TREATMENT SYSTEMS. EVALUATION& DESIGN Southeastern Soil & Environmental Associates, Inc. P.O. Box 9321 Fayetteville, NC 28311 Phone/Fax (910)822-4540 Email mike@southeasternsoil.com Soil Boring Log (Bore 3), Forest Ridge Commercial, NC Hwy. 87, Harnett County, NC This map unit consists of moderately well drained to somewhat poorly drained soils on uplands. These soils formed in clayey sediment. Slope ranged from 0 to 3 percent. A- 0 to 7 inches; black(10YR 2/1) loam; weak fine granular structure; very friable; many fine and medium roots; clear wavy boundary. Btl - 7 to 15 inches; light olive brown(2.5Y 5/3) clay; many medium prominent yellowish red (5YR 5/8) mottles; weak fine subangular blocky structure; firm; few fine and medium roots; gradual diffuse boundary. Bt2 - 15 to 40 inches; grayish brown (2.5Y 5/2) silty clay; many medium prominent olive yellow(2.5Y 6/8) and yellowish red (5YR 5/8)mottles;massive parting to angular blocky structure; very firm; gradual wavy boundary. BC - 40 to 60 inches; grayish brown (2.5Y 5/2) sandy clay loam; many medium prominent olive yellow(2.5Y 6/8) and yellowish red (5YR 5/8)mottles; massive structure; firm. SHWT @ 15 inches (2.5Y 5/2) SOIL/SITE EVALUATION • SOIL PHYSICAL ANALYSIS • LAND USE/SUBDIVISION PLANNING GROUNDWATER DRAINAGE/MOUNDING • SURFACE/SUBSURFACE WASTE TREATMENT SYSTEMS. EVALUATION& DESIGN Southeastern Soil & Environmental Associates, Inc. P.O. Box 9321 Fayetteville, NC 28311 Phone/Fax (910)822-4540 Email mike@southeasternsoil.com Soil Boring Log (Bore 4), Forest Ridge Commercial, NC Hwy. 87, Harnett County, NC This map unit consists of moderately well drained to somewhat poorly drained soils on uplands. These soils formed in clayey sediment. Slope ranged from 0 to 3 percent. Btl - 0 to 30 inches; white (10YR 8/1) silty clay; many medium prominent yellowish red (5YR 5/8) mottles; massive structure; firm to very firm; gradual diffuse boundary. Bt2 - 30 to 51 inches; grayish brown (2.5Y 5/2) silty clay loam; massive parting to angular blocky structure; very firm; gradual wavy boundary. BC - 51 to 60 inches; red (2.5Y 4/6) silty clay; many medium prominent olive yellow (2.5Y 6/8) and yellowish red(5YR 5/8) mottles; massive structure; very firm. SHWT @ 0 inches (10YR 8/1) SOIL/SITE EVALUATION • SOIL PHYSICAL ANALYSIS •LAND USE/SUBDIVISION PLANNING GROUNDWATER DRAINAGE/MOUNDING - SURFACE/SUBSURFACE WASTE TREATMENT SYSTEMS. EVALUATION& DESIGN 1 i . /iliffq , _____-_ __-- qp s $3bbmdw l ® Yaai a 1 v --.. / J te lig §4n 1-s i\ $C j y e66 \ �iZ 9 r 3,5 1 iG gamin - +h,yYy C « .. '+ >r . 8i` - - .-'4 s 1 H1 ° r tra -47 ` ® Al, r x A 1' K, `�Y Rmcm gq 1s p€ y 1 _ 1 1 _ "s sv.x uY g I«««J \� I 1 1 __, �l w° _ y L. or g8 6 1 1 1 "L a \\ 1.-169---, ' ) ob ill, t '...4:6''4 .. I- f� as a 1 1 - ......----,,1"." + `r •\ \ :4•I nal i k sBB BE 1 itx 1 h., t1 gin` -,a 11 3• - Sa 4 - - ® na A Y , -S. - --_ ; Si I\ T ex Pypg y - ` Y i ;.11. , 4 tt r +i�‘ _ ti -1 - -.0 {has § e 'i t, a a-A. $A as Ea t�l 1 111!I � , L aj,_ � 1 11 ax ct A y 1 ® . A ►^ 'P� U AA \ Amo 1 t 1�1 _ qqt 10 11 1 YA - / VO'� « -5'. - -. 1 1( '1 1 ,.: ' F:- _4, L,_10 I ®igT gi , - �_ PP-.y ., .1. `a l;> illg11ggag ,a *-i FFE` g4215§Ag§i7.6 _ -s— - `I- - - — Ilggi !A ® � €coma B - - / /' ' o ^s. — ! OFF il 0 a' p- g”. �F9 S; 31 zA 5 SMITH SITE CONSULTANTS,PLLC. In �' -- • e� ^ ry FOREST RIDGE COMMERICAL-SOUTHERN PARCEL NC FIRM 8 P-2144 ¢ ED' 14 LAND DEVELOPMENT a ENGINEERING 3 SURVEYING i"$ b T FtrN- RIDGE SUBDIVISION.BORE INC. w a 6 121 BULf LED E LINDEN,NC 28356 910-391.5923 ' • 1 3 $ SITE PLAN-POND BORE LOCATIONS 5M111ESfTECONSULTAN3 GMAILCOM o overt e.:FOREST M.Su9om4IXt Nt. 57.vm.wef RON NC MIN ,uw.er.cOW, 1 Watershed Model Schematic HydraflowHydrographsExtensionforAutodesk®Civil3D®byAutodesk, Inc.v2020 1 -Pre Development _2-Post Dev.-Pond 1 4-Post Dev.-Pond 2 3-Post Routed Pond 1VW ' 5-Post Routed-Pond 2 Iv Project: Southern Commercial Ponds.gpw Thursday, 10/26/2023 Hydraflow Table of Contents Southern Commercial Ponds.gpw Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1 - Year Summary Report 3 Hydrograph Reports 4 Hydrograph No. 1, Rational, Pre Development 4 TR-55 Tc Worksheet 5 Hydrograph No. 2, Rational, Post Dev. - Pond 1 6 Hydrograph No. 3, Reservoir, Post Routed Pond 1 7 Pond Report - Pond 1 8 Hydrograph No. 4, Rational, Post Dev. - Pond 2 9 Hydrograph No. 5, Reservoir, Post Routed - Pond 2 10 Pond Report - Pond #2 11 10 - Year Summary Report 12 Hydrograph Reports 13 Hydrograph No. 1, Rational, Pre Development 13 Hydrograph No. 2, Rational, Post Dev. - Pond 1 14 Hydrograph No. 3, Reservoir, Post Routed Pond 1 15 Hydrograph No. 4, Rational, Post Dev. - Pond 2 16 Hydrograph No. 5, Reservoir, Post Routed - Pond 2 17 25 - Year Summary Report 18 Hydrograph Reports 19 Hydrograph No. 1, Rational, Pre Development 19 Hydrograph No. 2, Rational, Post Dev. - Pond 1 20 Hydrograph No. 3, Reservoir, Post Routed Pond 1 21 Hydrograph No. 4, Rational, Post Dev. - Pond 2 22 Hydrograph No. 5, Reservoir, Post Routed - Pond 2 23 50 - Year Summary Report 24 Hydrograph Reports 25 Hydrograph No. 1, Rational, Pre Development 25 Hydrograph No. 2, Rational, Post Dev. - Pond 1 26 Hydrograph No. 3, Reservoir, Post Routed Pond 1 27 Hydrograph No. 4, Rational, Post Dev. - Pond 2 28 Hydrograph No. 5, Reservoir, Post Routed - Pond 2 29 100 - Year Summary Report 30 Hydrograph Reports 31 Hydrograph No. 1, Rational, Pre Development 31 Hydrograph No. 2, Rational, Post Dev. - Pond 1 32 Contents continued... Southern Commercial Ponds.gpw Hydrograph No. 3, Reservoir, Post Routed Pond 1 33 Hydrograph No. 4, Rational, Post Dev. - Pond 2 34 Hydrograph No. 5, Reservoir, Post Routed - Pond 2 35 2 Hydrograph Return Period Recap Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 Rational 23.62 36.36 40.87 43.89 47.66 Pre Development 2 Rational 11.23 17.29 19.44 20.87 22.67 Post Dev.-Pond 1 3 Reservoir 2 0.040 0.048 0.375 0.965 1.865 Post Routed Pond 1 4 Rational 33.89 52.16 58.64 62.97 68.38 Post Dev.-Pond 2 5 Reservoir 4 0.049 0.060 0.153 0.488 1.689 Post Routed-Pond 2 Proj. file: Southern Commercial Ponds.gpw Thursday, 10/26/2023 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 23.62 1 5 7,086 Pre Development 2 Rational 11.23 1 8 5,055 Post Dev.-Pond 1 3 Reservoir 0.040 1 15 4,295 2 279.99 4,697 Post Routed Pond 1 4 Rational 33.89 1 8 15,249 Post Dev.-Pond 2 5 Reservoir 0.049 1 15 7,145 4 256.74 14,209 Post Routed-Pond 2 Southern Commercial Ponds.gpw Return Period: 1 Year Thursday, 10/26/2023 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 1 Pre Development Hydrograph type = Rational Peak discharge = 23.62 cfs Storm frequency = 1 yrs Time to peak = 0.08 hrs Time interval = 1 min Hyd. volume = 7,086 cuft Drainage area = 11.430 ac Runoff coeff. = 0.4 Intensity = 5.166 in/hr Tc by TR55 = 5.00 min IDF Curve = Fayetteville NC.IDF Asc/Rec limb fact = 1/1 Pre Development Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 Hyd No. 1 Time (hrs) 5 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Hyd. No. 1 Pre Development Description A B C Totals Sheet Flow Manning's n-value = 0.050 0.011 0.011 Flow length (ft) = 200.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.69 0.00 0.00 Land slope (%) = 8.00 0.00 0.00 Travel Time (min) = 3.79 + 0.00 + 0.00 = 3.79 Shallow Concentrated Flow Flow length (ft) = 400.00 0.00 0.00 Watercourse slope (%) = 8.00 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =4.56 0.00 0.00 Travel Time (min) = 1.46 + 0.00 + 0.00 = 1.46 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter(ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc 5.00 min 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 2 Post Dev. - Pond 1 Hydrograph type = Rational Peak discharge = 11.23 cfs Storm frequency = 1 yrs Time to peak = 0.13 hrs Time interval = 1 min Hyd. volume = 5,055 cuft Drainage area = 3.020 ac Runoff coeff. = 0.72* Intensity = 5.166 in/hr Tc by User = 5.00 min IDF Curve = Fayetteville NC.IDF Asc/Rec limb fact = 1.5/1.5 *Composite(Area/C)=[(2.010 x 0.95)+(1.010 x 0.25)]/3.020 Post Dev. - Pond 1 Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 12.00 - 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 - 4.00 2.00 2.00 0.00 0.00 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.3 Hyd No. 2 Time (hrs) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 3 Post Routed Pond 1 Hydrograph type = Reservoir Peak discharge = 0.040 cfs Storm frequency = 1 yrs Time to peak = 0.25 hrs Time interval = 1 min Hyd. volume = 4,295 cuft Inflow hyd. No. = 2 - Post Dev. - Pond 1 Max. Elevation = 279.99 ft Reservoir name = Pond 1 Max. Storage = 4,697 cuft Storage Indication method used. Post Routed Pond 1 Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 12.00 12.00 • 10.00 - • 10.00 8.00 • 8.00 6.00 • 6.00 4.00 • 4.00 • 2.00 • 2.00 0.00 -1 0.00 0 5 10 15 20 25 30 35 40 45 50 Time (hrs) Hyd No. 3 Hyd No. 2 I Total storage used =4,697 cuft Pond Report 8 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Pond No. 1 - Pond 1 Pond Data Contours-User-defined contour areas.Conic method used for volume calculation. Begining Elevation=279.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 279.00 3,841 0 0 0.50 279.50 4,867 2,172 2,172 1.00 280.00 5,346 2,552 4,724 2.00 281.00 6,386 5,858 10,582 3.00 282.00 7,541 6,955 17,536 4.00 283.00 8,813 8,168 25,704 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 24.00 1.25 0.00 0.00 Crest Len(ft) = 20.00 4.00 12.00 0.00 Span(in) = 24.00 1.25 0.00 0.00 Crest El.(ft) = 281.00 280.50 281.50 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 275.50 279.00 0.00 0.00 Weir Type = 1 Rect Ciplti --- Length(ft) = 32.00 0.50 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 1.55 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 4.00 283.00 3.00 282.00 2.00 281.00 1.00 280.00 0.00 279.00 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 Total Q Discharge(cfs) 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 4 Post Dev. - Pond 2 Hydrograph type = Rational Peak discharge = 33.89 cfs Storm frequency = 1 yrs Time to peak = 0.13 hrs Time interval = 1 min Hyd. volume = 15,249 cuft Drainage area = 8.410 ac Runoff coeff. = 0.78* Intensity = 5.166 in/hr Tc by User = 5.00 min IDF Curve = Fayetteville NC.IDF Asc/Rec limb fact = 1.5/1.5 *Composite(Area/C)=[(6.310 x 0.95)+(2.100 x 0.25)]/8.410 Post Dev. - Pond 2 Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 V 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.3 Hyd No. 4 Time (hrs) 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 5 Post Routed - Pond 2 Hydrograph type = Reservoir Peak discharge = 0.049 cfs Storm frequency = 1 yrs Time to peak = 0.25 hrs Time interval = 1 min Hyd. volume = 7,145 cuft Inflow hyd. No. = 4 - Post Dev. - Pond 2 Max. Elevation = 256.74 ft Reservoir name = Pond #2 Max. Storage = 14,209 cuft Storage Indication method used. Post Routed - Pond 2 Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 - 0.00 0 5 10 15 20 25 30 35 40 45 50 Time (hrs) Hyd No. 5 Hyd No. 4 I Total storage used = 14,209 cuft Pond Report 11 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Pond No. 2 - Pond #2 Pond Data Contours-User-defined contour areas.Conic method used for volume calculation. Begining Elevation=256.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 256.00 16,608 0 0 0.50 256.50 20,090 9,160 9,160 1.00 257.00 21,167 10,312 19,472 2.00 258.00 23,373 22,259 41,731 3.00 259.00 25,635 24,493 66,223 4.00 260.00 27,965 26,789 93,012 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 30.00 1.50 0.00 0.00 Crest Len(ft) = 20.00 8.00 12.00 0.00 Span(in) = 30.00 1.50 0.00 0.00 Crest El.(ft) = 257.50 257.25 258.50 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 251.00 256.00 0.00 0.00 Weir Type = 1 Rect Ciplti --- Length(ft) = 40.00 0.50 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 7.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 4.00 260.00 3.00 259.00 2.00 258.00 1.00 257.00 0.00 ' � 256.00 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 130.0 140.0 Total Q Discharge(cfs) 12 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 36.36 1 5 10,907 Pre Development 2 Rational 17.29 1 8 7,781 Post Dev.-Pond 1 3 Reservoir 0.048 1 15 6,016 2 280.43 7,237 Post Routed Pond 1 4 Rational 52.16 1 8 23,473 Post Dev.-Pond 2 5 Reservoir 0.060 1 15 9,204 4 257.11 21,877 Post Routed-Pond 2 Southern Commercial Ponds.gpw Return Period: 10 Year Thursday, 10/26/2023 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 1 Pre Development Hydrograph type = Rational Peak discharge = 36.36 cfs Storm frequency = 10 yrs Time to peak = 0.08 hrs Time interval = 1 min Hyd. volume = 10,907 cuft Drainage area = 11.430 ac Runoff coeff. = 0.4 Intensity = 7.952 in/hr Tc by TR55 = 5.00 min IDF Curve = Fayetteville NC.IDF Asc/Rec limb fact = 1/1 Pre Development Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 40.00 - 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 Hyd No. 1 Time (hrs) 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 2 Post Dev. - Pond 1 Hydrograph type = Rational Peak discharge = 17.29 cfs Storm frequency = 10 yrs Time to peak = 0.13 hrs Time interval = 1 min Hyd. volume = 7,781 cuft Drainage area = 3.020 ac Runoff coeff. = 0.72* Intensity = 7.952 in/hr Tc by User = 5.00 min IDF Curve = Fayetteville NC.IDF Asc/Rec limb fact = 1.5/1.5 *Composite(Area/C)=[(2.010 x 0.95)+(1.010 x 0.25)]/3.020 Post Dev. - Pond 1 Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.3 Hyd No. 2 Time (hrs) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 3 Post Routed Pond 1 Hydrograph type = Reservoir Peak discharge = 0.048 cfs Storm frequency = 10 yrs Time to peak = 0.25 hrs Time interval = 1 min Hyd. volume = 6,016 cuft Inflow hyd. No. = 2 - Post Dev. - Pond 1 Max. Elevation = 280.43 ft Reservoir name = Pond 1 Max. Storage = 7,237 cuft Storage Indication method used. Post Routed Pond 1 Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 18.00 � 18.00 15.00 15.00 12.00 - 12.00 9.00 - 9.00 6.00 6.00 3.00 3.00 0.00 - 0.00 0 5 10 15 20 25 30 35 40 45 50 Time (hrs) Hyd No. 3 Hyd No. 2 I I Total storage used = 7,237 cuft 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 4 Post Dev. - Pond 2 Hydrograph type = Rational Peak discharge = 52.16 cfs Storm frequency = 10 yrs Time to peak = 0.13 hrs Time interval = 1 min Hyd. volume = 23,473 cuft Drainage area = 8.410 ac Runoff coeff. = 0.78* Intensity = 7.952 in/hr Tc by User = 5.00 min IDF Curve = Fayetteville NC.IDF Asc/Rec limb fact = 1.5/1.5 *Composite(Area/C)=[(6.310 x 0.95)+(2.100 x 0.25)]/8.410 Post Dev. - Pond 2 Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 - 10.00 0.00 0.00 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.3 Hyd No. 4 Time (hrs) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 5 Post Routed - Pond 2 Hydrograph type = Reservoir Peak discharge = 0.060 cfs Storm frequency = 10 yrs Time to peak = 0.25 hrs Time interval = 1 min Hyd. volume = 9,204 cuft Inflow hyd. No. = 4 - Post Dev. - Pond 2 Max. Elevation = 257.11 ft Reservoir name = Pond #2 Max. Storage = 21,877 cuft Storage Indication method used. Post Routed - Pond 2 Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 60.00 60.00 • 50.00 • 50.00 40.00 - • 40.00 • 30.00 • 30.00 • 20.00 • 20.00 • 10.00 • 10.00 • 0.00 0.00 0 5 10 15 20 25 30 35 40 45 50 Time (hrs) Hyd No. 5 Hyd No. 4 I Total storage used = 21,877 cuft 18 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 40.87 1 5 12,260 Pre Development 2 Rational 19.44 1 8 8,746 Post Dev.-Pond 1 3 Reservoir 0.375 1 15 6,680 2 280.58 8,103 Post Routed Pond 1 4 Rational 58.64 1 8 26,386 Post Dev.-Pond 2 5 Reservoir 0.153 1 15 10,025 4 257.23 24,589 Post Routed-Pond 2 Southern Commercial Ponds.gpw Return Period: 25 Year Thursday, 10/26/2023 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 1 Pre Development Hydrograph type = Rational Peak discharge = 40.87 cfs Storm frequency = 25 yrs Time to peak = 0.08 hrs Time interval = 1 min Hyd. volume = 12,260 cuft Drainage area = 11.430 ac Runoff coeff. = 0.4 Intensity = 8.939 in/hr Tc by TR55 = 5.00 min IDF Curve = Fayetteville NC.IDF Asc/Rec limb fact = 1/1 Pre Development Q (cfs) Hyd. No. 1 -- 25 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 Hyd No. 1 Time (hrs) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 2 Post Dev. - Pond 1 Hydrograph type = Rational Peak discharge = 19.44 cfs Storm frequency = 25 yrs Time to peak = 0.13 hrs Time interval = 1 min Hyd. volume = 8,746 cuft Drainage area = 3.020 ac Runoff coeff. = 0.72* Intensity = 8.939 in/hr Tc by User = 5.00 min IDF Curve = Fayetteville NC.IDF Asc/Rec limb fact = 1.5/1.5 *Composite(Area/C)=[(2.010 x 0.95)+(1.010 x 0.25)]/3.020 Post Dev. - Pond 1 Q (cfs) Hyd. No. 2 -- 25 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.3 Hyd No. 2 Time (hrs) 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 3 Post Routed Pond 1 Hydrograph type = Reservoir Peak discharge = 0.375 cfs Storm frequency = 25 yrs Time to peak = 0.25 hrs Time interval = 1 min Hyd. volume = 6,680 cuft Inflow hyd. No. = 2 - Post Dev. - Pond 1 Max. Elevation = 280.58 ft Reservoir name = Pond 1 Max. Storage = 8,103 cuft Storage Indication method used. Post Routed Pond 1 Q (cfs) Hyd. No. 3 -- 25 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 _L- - - 0.00 0 5 10 15 20 25 30 35 40 45 50 Time (hrs) Hyd No. 3 Hyd No. 2 I Total storage used = 8,103 cuft 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 4 Post Dev. - Pond 2 Hydrograph type = Rational Peak discharge = 58.64 cfs Storm frequency = 25 yrs Time to peak = 0.13 hrs Time interval = 1 min Hyd. volume = 26,386 cuft Drainage area = 8.410 ac Runoff coeff. = 0.78* Intensity = 8.939 in/hr Tc by User = 5.00 min IDF Curve = Fayetteville NC.IDF Asc/Rec limb fact = 1.5/1.5 *Composite(Area/C)=[(6.310 x 0.95)+(2.100 x 0.25)]/8.410 Post Dev. - Pond 2 Q (cfs) Hyd. No. 4 -- 25 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.3 Hyd No. 4 Time (hrs) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 5 Post Routed - Pond 2 Hydrograph type = Reservoir Peak discharge = 0.153 cfs Storm frequency = 25 yrs Time to peak = 0.25 hrs Time interval = 1 min Hyd. volume = 10,025 cuft Inflow hyd. No. = 4 - Post Dev. - Pond 2 Max. Elevation = 257.23 ft Reservoir name = Pond #2 Max. Storage = 24,589 cuft Storage Indication method used. Post Routed - Pond 2 Q (cfs) Hyd. No. 5 -- 25 Year Q (cfs) 60.00 i 60.00 • 50.00 • 50.00 40.00 - • 40.00 • 30.00 • 30.00 • 20.00 • 20.00 • 10.00 • 10.00 • 0.00 0.00 0 5 10 15 20 25 30 35 40 45 50 Time (hrs) Hyd No. 5 Hyd No. 4 I Total storage used = 24,589 cuft 24 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 43.89 1 5 13,166 Pre Development 2 Rational 20.87 1 8 9,393 Post Dev.-Pond 1 3 Reservoir 0.965 1 15 7,264 2 280.66 8,612 Post Routed Pond 1 4 Rational 62.97 1 8 28,336 Post Dev.-Pond 2 5 Reservoir 0.488 1 15 11,499 4 257.31 26,371 Post Routed-Pond 2 Southern Commercial Ponds.gpw Return Period: 50 Year Thursday, 10/26/2023 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 1 Pre Development Hydrograph type = Rational Peak discharge = 43.89 cfs Storm frequency = 50 yrs Time to peak = 0.08 hrs Time interval = 1 min Hyd. volume = 13,166 cuft Drainage area = 11.430 ac Runoff coeff. = 0.4 Intensity = 9.599 in/hr Tc by TR55 = 5.00 min IDF Curve = Fayetteville NC.IDF Asc/Rec limb fact = 1/1 Pre Development Q (cfs) Hyd. No. 1 -- 50 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 Hyd No. 1 Time (hrs) 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 2 Post Dev. - Pond 1 Hydrograph type = Rational Peak discharge = 20.87 cfs Storm frequency = 50 yrs Time to peak = 0.13 hrs Time interval = 1 min Hyd. volume = 9,393 cuft Drainage area = 3.020 ac Runoff coeff. = 0.72* Intensity = 9.599 in/hr Tc by User = 5.00 min IDF Curve = Fayetteville NC.IDF Asc/Rec limb fact = 1.5/1.5 *Composite(Area/C)=[(2.010 x 0.95)+(1.010 x 0.25)]/3.020 Post Dev. - Pond 1 Q (cfs) Hyd. No. 2 -- 50 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.3 Hyd No. 2 Time (hrs) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 3 Post Routed Pond 1 Hydrograph type = Reservoir Peak discharge = 0.965 cfs Storm frequency = 50 yrs Time to peak = 0.25 hrs Time interval = 1 min Hyd. volume = 7,264 cuft Inflow hyd. No. = 2 - Post Dev. - Pond 1 Max. Elevation = 280.66 ft Reservoir name = Pond 1 Max. Storage = 8,612 cuft Storage Indication method used. Post Routed Pond 1 Q (cfs) Hyd. No. 3 -- 50 Year Q (cfs) 21.00 -' 21.00 18.00 • 18.00 15.00 • 15.00 • 12.00 • 12.00 • 9.00 • 9.00 6.00 • 6.00 3.00 3.00 0.00 —L._ - - 0.00 0 5 10 15 20 25 30 35 40 45 50 Time (hrs) Hyd No. 3 Hyd No. 2 I Total storage used = 8,612 cuft 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 4 Post Dev. - Pond 2 Hydrograph type = Rational Peak discharge = 62.97 cfs Storm frequency = 50 yrs Time to peak = 0.13 hrs Time interval = 1 min Hyd. volume = 28,336 cuft Drainage area = 8.410 ac Runoff coeff. = 0.78* Intensity = 9.599 in/hr Tc by User = 5.00 min IDF Curve = Fayetteville NC.IDF Asc/Rec limb fact = 1.5/1.5 *Composite(Area/C)=[(6.310 x 0.95)+(2.100 x 0.25)]/8.410 Post Dev. - Pond 2 Q (cfs) Hyd. No. 4 -- 50 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.3 Hyd No. 4 Time (hrs) 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 5 Post Routed - Pond 2 Hydrograph type = Reservoir Peak discharge = 0.488 cfs Storm frequency = 50 yrs Time to peak = 0.25 hrs Time interval = 1 min Hyd. volume = 11,499 cuft Inflow hyd. No. = 4 - Post Dev. - Pond 2 Max. Elevation = 257.31 ft Reservoir name = Pond #2 Max. Storage = 26,371 cuft Storage Indication method used. Post Routed - Pond 2 Q (cfs) Hyd. No. 5 -- 50 Year Q (cfs) 70.00 - 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 5 10 15 20 25 30 35 40 45 50 Time (hrs) Hyd No. 5 Hyd No. 4 I I Total storage used = 26,371 cuft 30 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 47.66 1 5 14,298 Pre Development 2 Rational 22.67 1 8 10,200 Post Dev.-Pond 1 3 Reservoir 1.865 1 14 8,008 2 280.76 9,188 Post Routed Pond 1 4 Rational 68.38 1 8 30,771 Post Dev.-Pond 2 5 Reservoir 1.689 1 15 13,663 4 257.40 28,466 Post Routed-Pond 2 Southern Commercial Ponds.gpw Return Period: 100 Year Thursday, 10/26/2023 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 1 Pre Development Hydrograph type = Rational Peak discharge = 47.66 cfs Storm frequency = 100 yrs Time to peak = 0.08 hrs Time interval = 1 min Hyd. volume = 14,298 cuft Drainage area = 11.430 ac Runoff coeff. = 0.4 Intensity = 10.424 in/hr Tc by TR55 = 5.00 min IDF Curve = Fayetteville NC.IDF Asc/Rec limb fact = 1/1 Pre Development Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 Hyd No. 1 Time (hrs) 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 2 Post Dev. - Pond 1 Hydrograph type = Rational Peak discharge = 22.67 cfs Storm frequency = 100 yrs Time to peak = 0.13 hrs Time interval = 1 min Hyd. volume = 10,200 cuft Drainage area = 3.020 ac Runoff coeff. = 0.72* Intensity = 10.424 in/hr Tc by User = 5.00 min IDF Curve = Fayetteville NC.IDF Asc/Rec limb fact = 1.5/1.5 *Composite(Area/C)=[(2.010 x 0.95)+(1.010 x 0.25)]/3.020 Post Dev. - Pond 1 Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.3 Hyd No. 2 Time (hrs) 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 3 Post Routed Pond 1 Hydrograph type = Reservoir Peak discharge = 1.865 cfs Storm frequency = 100 yrs Time to peak = 0.23 hrs Time interval = 1 min Hyd. volume = 8,008 cuft Inflow hyd. No. = 2 - Post Dev. - Pond 1 Max. Elevation = 280.76 ft Reservoir name = Pond 1 Max. Storage = 9,188 cuft Storage Indication method used. Post Routed Pond 1 Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 24.00 24.00 • 20.00 - • 20.00 16.00 - • 16.00 • 12.00 • 12.00 8.00 • 8.00 • • 4.00 • 4.00 0.00 — 0.00 0 5 10 15 20 25 30 35 40 45 50 Time (hrs) Hyd No. 3 Hyd No. 2 I Total storage used = 9,188 cuft 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 4 Post Dev. - Pond 2 Hydrograph type = Rational Peak discharge = 68.38 cfs Storm frequency = 100 yrs Time to peak = 0.13 hrs Time interval = 1 min Hyd. volume = 30,771 cuft Drainage area = 8.410 ac Runoff coeff. = 0.78* Intensity = 10.424 in/hr Tc by User = 5.00 min IDF Curve = Fayetteville NC.IDF Asc/Rec limb fact = 1.5/1.5 *Composite(Area/C)=[(6.310 x 0.95)+(2.100 x 0.25)]/8.410 Post Dev. - Pond 2 Q (cfs) Hyd. No. 4 -- 100 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 V 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.3 Hyd No. 4 Time (hrs) 35 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday, 10/26/2023 Hyd. No. 5 Post Routed - Pond 2 Hydrograph type = Reservoir Peak discharge = 1.689 cfs Storm frequency = 100 yrs Time to peak = 0.25 hrs Time interval = 1 min Hyd. volume = 13,663 cuft Inflow hyd. No. = 4 - Post Dev. - Pond 2 Max. Elevation = 257.40 ft Reservoir name = Pond #2 Max. Storage = 28,466 cuft Storage Indication method used. Post Routed - Pond 2 Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 70.00 I 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 5 10 15 20 25 30 35 40 45 50 Time (hrs) Hyd No. 5 Hyd No. 4 I I Total storage used = 28,466 cuft Stormwater Wet Pond Design Criteria Project Name: Forest Ridge Commons - Ph. 1 SCM: Wet Pond 1 Calculate Runoff Coefficient A= 3.02 acres 131,734 sf Watershed area Ai= 2.01 acres 87,463 sf Impervious area la= 0.66 Impervious fraction Rv=0.05+0.9*la Rv= 0.65 Runoff Coefficient Calculate Runoff Volume Required to be Controlled Rd= 1 in Design storm rainfall depth (typically 1" or 1.5") V=3630*Rd*Rv*A WQV= 7,109 cf Volume of runoff that must be 1.96 Ac in controlled for specified design storm Calculate Required Pond Surface Area for Permanent Pool Elevation SA/DA= 2.34 Based 3 Avg. Perm. Pool Depth **See Table 10-1,10-2,10-3 for SA/DA SA= 0.071 Ac 3,079 sf Required Surface Area @ Perm Pool SC-3 Pond Volume Calculations Project Name: Forest Ridge Commons - Ph. 1 Outlet: Wet Pond 1 Permanent Pool Volume (Main Pool Only) Elev. Contour Accum. Stage Diff Area Incr. Vol. Vol. (ft) _(ft) (sf) (cf) (cf) 273.5 0.0 398 0 0 275 1.5 1,406 1,353 1,353 276 1.0 1,708 1,557 2,910 277 1.0 2,028 1,868 2,910 278 1.0 2,364 2,196 5,106 278.5 0.5 2,537 1,225 6,331 279 0.5 3,087 1,406 7,737 Perm Pool Elev. Forebay Only Volume Elev. Contour Accum. Stage Diff Area Incr. Vol. Vol. (ft) (ft) (sf) (cf) (cf) 274.5 0.0 50 0 0 275 0.5 77.3 32 32 276 1.0 151.3 114 146 277 1.0 252 202 348 278 1.0 379.7 316 664 278.5 0.5 452.3 208 872 279 0.5 761 303 1,175 15.2% Forebay To Main Volumes Check Temporary Pool Volume Elev. Contour Accum. Stage Diff Area Incr. Vol. Vol. (ft) (ft) (sf) (cf) (cf) 279 0.0 3,848 0 0 Perm Pool Elev. 279.5 0.5 4,867 2,179 2,179 280 0.5 5,346 2,553 4,732 280.5 0.5 5,836 2,796 ,52. Actual WQV 7,109 Min. Required WQV SC-7 Drawdown Orifice Sizing Calculations Project Name: Forest Ridge Commons - Ph. 1 Outlet: Wet Pond 1 Pond Storage= 7,528 cf Water Quality Volume Pond Depth(h)= 0.5 ft HO=H/3 Drawdown Time= 2.5 days 2-5 days Cd= 0.6 Coefficient of Discharge (typical 0.6) g= 32.2 ft/secA2 Gravity The Orifice Equation Q= Cd A Sqrt(2 g h) Rearrange to solve for A, the minimum orifice area needed to meet drawdown requirements Q= 0.03 cfs Based on pond volume and desired drawdown time A= 0.01024 sf 1.47 si Number of Orifices= 1 Minimum diameter to meet area d= 1.37 inch diameter orifice Use: 1.25 "diameter orifice 0.0085 sf Check Outflow time Q= Cd A Sqrt(2 g h) Q= 0.03 cfs Drawdown time= 3.00 days OK SC-5 Anti-Flotation Sizing Calculations Project Name: Forest Ridge Commons - Ph. 1 Outlet: Wet Pond 1 Riser Diameter= 0 in (circular) Dimensions of Riser= 5.5 5.5 ft Depth of pond = 6 ft Required Factor of Safety= 1.5 Cross Sectional Area of Riser Circular= 0.00 sf Rectangular= 30.25 sf Volume of Water Displaced Depth of pond * Cross-sectional area 181.5 cf Weight of Water Displaced (assuming weight of water= 62.4 lb/cf) 62.4 *Volume of water Displaced 11325.60 lb Minimum Weight of Anti-Flotaton Device FS *WoW Displaced 16988.40 lb Riser Base Provided 8 ft x 8 ft x 2 ft(depth) c-c-c-c-c-c- Weight of concrete assumed 150 lb/cf Weight of Base Provided = 19200.00 lb FS Provided = 1.70 OK SC-6 AVERAGE DEPTH CALCULATIONS Project Name: Forest Ridge Commons - Ph. 1 SCM: Wet Pond 1 Average Depth Equation 3 Vpp= 7,737 cf VSheIf= 153.3 cf ABottom of Shelf— 2,537 sf Davg= 3.0 ft Dmax Over Shelf= 0.5 ft Pperm PooI= 204.4 ft Wsubmerged part of shelf— 3 ft Vshelf= 153.3 cf Equation 3. Average depth when the shelf is partially or fully submerged and the shelf is being excluded from the average depth calculation VPP—Vshelf Davg= Abottom of shelf Where: Davg = Average depth(feet) Vpp = Main pool volume at permanent pool elevation(feet') Vshelf = Volume over the shelf only(feet3)—see below Abottom of shelf = Area of main pool at the bottom of the shelf(feet2) Vshelf= 0.5* Depthma,,over shelf*Perimeterparm pool•W Idthst6merged part of shelf Where: Depthmax over shelf = Depth of water at the deep side of the shelf as measured from the permanent pool(feet) Perimeterpem,pool = Perimeter of main pool at the bottom of the shelf(feet) Wdthsubmerged part of shelf = Width from the deep side to the dry side of the shelf as measured at permanent pool(feet) SC-8 Stormwater Wet Pond Design Criteria Project Name: Forest Ridge Commons - Ph. 1 SCM: Wet Pond 2 Calculate Runoff Coefficient A= 8.41 acres 366,362 sf Watershed area Ai= 6.31 acres 274,772 sf Impervious area la= 0.75 Impervious fraction Rv=0.05+0.9*la Rv= 0.73 Runoff Coefficient Calculate Runoff Volume Required to be Controlled Rd= 1 in Design storm rainfall depth (typically 1" or 1.5") V=3630*Rd*Rv*A WQV= 22,134 cf Volume of runoff that must be 6.10 Ac in controlled for specified design storm Calculate Required Pond Surface Area for Permanent Pool Elevation SA/DA= 2.72 Based 3 Avg. Perm. Pool Depth **See Table 10-1,10-2,10-3 for SA/DA SA= 0.228 Ac 9,947 sf Required Surface Area @ Perm Pool SC-3 Pond Volume Calculations Project Name: Forest Ridge Commons -Ph. 1 Outlet: Wet Pond 2 Permanent Pool Volume (Main Pool Only) Elev. Contour Accum. Stage Diff Area Incr.Vol. Vol. (ft) (ft) (sf) (cf) (cf) 251.25 0.0 7,764 0 0 252 0.8 8,390 6,058 6,058 253 1.0 9,238 8,814 14,872 254 1.0 10,104 9,671 14,872 255 1.0 10,986 10,545 25,417 255.5 0.5 11,434 5,605 31,022 256 0.5 13,726 6,290 37,312 Perm Pool Elev. 9,947 Min. Req'd SA Forebay Only Volume Elev. Contour Accum. Stage Diff Area Incr.Vol. Vol. (ft) (ft) (sf) (cf) (cf) 252 0.0 783 0 0 253 1.0 1054 919 919 254 1.0 1363 1,209 2,127 255 1.0 1710 1,537 3,664 255.5 0.5 1898 902 4,566 256 0.5 2876 1,194 5,759 15.4% Forebay To Main Volumes Check Temporary Pool Volume Elev. Contour Accum. Stage Diff Area Incr.Vol. Vol. (ft) (ft) (sf) (cf) (cf) 256 0.0 16,602 0 0 Perm Pool Elev. 256.5 _ 0.5 20,090 9,173 9,173 257.25 0.8 21,722 15,680 24,853 Actual WQV 22,134 Min. Required WQV SC-7 Drawdown Orifice Sizing Calculations Project Name: Forest Ridge Commons - Ph. 1 Outlet: Wet Pond 2 Pond Storage= 24,853 cf Water Quality Volume Pond Depth(h)= 0.416667 ft HO=H/3 Drawdown Time= 2.5 days 2-5 days Cd= 0.6 Coefficient of Discharge (typical 0.6) g= 32.2 ft/secA2 Gravity The Orifice Equation Q= Cd A Sqrt(2 g h) Rearrange to solve for A, the minimum orifice area needed to meet drawdown requirements Q= 0.12 cfs Based on pond volume and desired drawdown time A= 0.03702 sf 5.33 si Number of Orifices= 1 Minimum diameter to meet area d= 2.61 inch diameter orifice Use: 2.5 " diameter orifice 0.0341 sf Check Outflow time Q= Cd A Sqrt(2 g h) Q= 0.11 cfs Drawdown time= 2.72 days OK SC-5 Anti-Flotation Sizing Calculations Project Name: Forest Ridge Commons - Ph. 1 Outlet: Wet Pond 2 Riser Diameter= 0 in (circular) Dimensions of Riser= 5.5 5.5 ft Depth of pond = 6.5 ft Required Factor of Safety = 1.5 Cross Sectional Area of Riser Circular= 0.00 sf Rectangular= 30.25 sf Volume of Water Displaced Depth of pond * Cross-sectional area 196.625 cf Weight of Water Displaced (assuming weight of water= 62.4 lb/cf) 62.4 *Volume of water Displaced 12269.40 lb Minimum Weight of Anti-Flotaton Device FS *WoW Displaced 18404.10 lb Riser Base Provided 8.5 ft x 8.5 ft x 2 ft (depth) c-c-c-c-c-c- Weight of concrete assumed 150 lb/cf Weight of Base Provided = 21675.00 lb FS Provided = 1.77 OK SC-6 AVERAGE DEPTH CALCULATIONS Project Name: Forest Ridge Commons - Ph. 1 SCM: Wet Pond 2 Average Depth Equation 3 VPP= 37,312 cf VShelf— 647.75 cf ABottom of Shelf= 11,434 sf Dag= 3.2 ft Amax over Shelf= 0.5 ft Pperm Pool= 518.2 ft Wsubmerged part of shelf— 5 ft VShelf= 647.75 cf Equation 3. Average depth when the shelf is partially or fully submerged and the shelf is being excluded from the average depth calculation VPP—Vshelf Davg= A bottom of shelf Where: Dav = Average depth(feet) VPP = Main pool volume at permanent pool elevation(feet3) Vshelf = Volume over the shelf only(feet3)—see below Abottom of shelf = Area of main pool at the bottom of the shelf(feet2) Vshelf= 0.5*Depthmax over shelf*Perim eterperm pool*W ldthsubmerged part of shelf Where: Depths, over shelf = Depth of water at the deep side of the shelf as measured from the permanent pool(feet) Perimeter pool = Perimeter of main pool at the bottom of the shelf(feet) Wdthsubmerged part of shelf = Width from the deep side to the dry side of the shelf as measured at permanent pool(feet) SC-8 Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan 5 6 4 1 2 3 Outfall Project File: pond 1.stm Number of lines:6 Date:6/26/2023 Storm Sewers v2020.00 Storm Rpt Page 1 Line Inlet Drng Byp Capac Inlet Tc i i Runoff Total J-Loss Minor Q Q Gutter Line Line Line Total No. ID Area Ln No Full Time Inlet Sys Coeff Runoff Coeff Loss Capt Byp Spread Size Slope Length Area (ac) (cfs) (min) (min) (in/hr) (in/hr) (C) (cfs) (ft) (cfs) (cfs) (ft) (in) (%) (ft) (ac) 6 1.30 n/a 26.42 5.0 5.0 7.87 7.87 0.81 8.29 1.00 z n/a 8.29 0.00 .... 18 6.33 7.9 1.30 5 1.18 n/a 26.42 5.0 5.0 7.87 7.87 0.81 7.52 1.00 z 0.49 7.52 0.00 .... 18 6.33 7.9 1.18 4 0.03 Offsite 37.77 5.0 5.0 7.87 7.86 0.75 15.96 1.13 z 0.76 0.17 0.01 2.82 24 2.79 26.9 2.51 3 0.11 Offsite 28.29 5.0 5.1 7.87 7.83 0.75 16.54 0.50 z n/a 0.62 0.03 3.72 24 1.56 26.2 2.62 2 0.03 Offsite 27.67 5.0 5.2 7.87 7.80 0.75 16.66 1.50 z 1.06 0.20 0.00 2.01 24 1.50 52.1 2.65 1 0.10 2 29.12 5.0 5.4 7.87 7.74 0.75 17.11 1.50 z 1.08 0.57 0.02 3.55 24 1.66 36.2 2.75 Project File: pond 1.stm Number of lines:6 Date: 6/26/2023 NOTES: Intensity=75.89/(Inlet time+ 12.20)^0.80--Return period= 10 Yrs. ; **Critical depth Storm Sewers Storm Rpt Page 1 Line Inlet Drng Byp Capac Inlet Tc i i Runoff Total J-Loss Minor Q Q Gutter Line Line Line Total No. ID Area Ln No Full Time Inlet Sys Coeff Runoff Coeff Loss Capt Byp Spread Size Slope Length Area (ac) (cfs) (min) (min) (in/hr) (in/hr) (C) (cfs) (ft) (cfs) (cfs) (ft) (in) (%) (ft) (ac) 6 1.30 n/a 26.42 5.0 5.0 7.87 7.87 0.81 8.29 1.00 z n/a 8.29 0.00 .... 18 6.33 7.9 1.30 5 1.18 n/a 26.42 5.0 5.0 7.87 7.87 0.81 7.52 1.00 z 0.49 7.52 0.00 .... 18 6.33 7.9 1.18 4 0.03 Offsite 37.77 5.0 5.0 7.87 7.86 0.75 15.96 1.13 z 0.76 0.17 0.01 2.82 24 2.79 26.9 2.51 3 0.11 Offsite 28.29 5.0 5.1 7.87 7.83 0.75 16.54 0.50 z n/a 0.62 0.03 3.72 24 1.56 26.2 2.62 2 0.03 Offsite 27.67 5.0 5.2 7.87 7.80 0.75 16.66 1.50 z 1.06 0.20 0.00 2.01 24 1.50 52.1 2.65 1 0.10 2 29.12 5.0 5.4 7.87 7.74 0.75 17.11 1.50 z 1.08 0.57 0.02 3.55 24 1.66 36.2 2.75 Project File: pond 1.stm Number of lines:6 Date: 6/26/2023 NOTES: Intensity=75.89/(Inlet time+ 12.20)^0.80--Return period=10 Yrs. ; **Critical depth Storm Sewers Storm Sewer Profile Proj. file: pond 1.stm U N coCo O � J O� J O� J 08� J O� J OO O °gyp t[)• O ��O) O O�CO• O ONN• O �OI� O NC\I O N W N °OR co W�lc) to 09000 �I � co (NI co •Elev. (ft) p w Ps-1M NNN NNN v NNN „Tr NNN v co co W-. o -6w o www o Wwcu Www WwLu -ciW— m E > ca E» as E55 as E55 ca E55 as E> u)0E u) iEcc co EEcc co E c c co Q E in 0E 305.00 305.00 299.00 299.00 293.00 — 293.00 287.00 p!.........,-------- _----- - , -287.00 52.1 L1-14 CcfT 750% 7.9Lf-18"@6.33% 281.00 t- --- — 26.9Lf-24" re 2.73%281.00 26 2Lf-24"a 1 56% 36.2Lf-94"© 1.66% 275.00 275.00 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: pond 1.stm o E 5 oO 0 0. o^ ' N N o� hl- Nc0 Elev. (ft) p N N N O W 0Www o w m E > > m E cnEcE co OE 300.00 300.00 297.00 • . 297.00 294.00 294.00 I ------------ 291.00 291.00 J 288.00 m..........-------- . 288.00 — 7.9Lf-18" c@ 6.33% 285.00 285.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan 1QIS C8 DBL CB 5A 16 DBL CB 4A 4 DI 3 21 FES C10 7 3 DI 2 18 FES C9 20 15�-.: CB p 1I2913 DBL CB 12A FES C11 CB 8 1 11[2 DBL CB 11A 10 11 DBL CB 11 2 CB 10 19 DI 'FES C12 27 DBL CB 20A 1 WEINI1Z 21A DI 22 Outfall 22 DBL CB 21 Outfall 25 23 CB 18 24 29 CB 19 DBL CB 17 30 DBL CB 17A Project File: pond 2.stm Number of lines:30 Date:6/26/2023 Storm Sewers v2020.00 Storm Rpt Page 1 Line Inlet Drng Byp Capac Inlet Tc i i Runoff Total J-Loss Minor Q Q Gutter Line Line Line Total No. ID Area Ln No Full Time Inlet Sys Coeff Runoff Coeff Loss Capt Byp Spread Size Slope Length Area (ac) (cfs) (min) (min) (in/hr) (in/hr) (C) (cfs) (ft) (cfs) (cfs) (ft) (in) (%) (ft) (ac) 1 DI 1 0.01 Sag 88.71 5.0 8.9 7.87 6.68 0.81 38.45 1.49 z n/a 0.06 0.00 3.27 36 1.77 52.0 7.17 2 DI 2 0.01 Sag 46.16 5.0 8.5 7.87 6.79 0.81 34.02 1.48 z n/a 0.06 0.00 3.27 30 1.27 172.1 6.25 3 DI 3 0.01 Sag 95.50 5.0 8.0 7.87 6.93 0.81 28.13 1.42 z n/a 0.06 0.00 3.27 30 5.42 171.5 5.08 4 DBL CB 4 0.13 Sag 94.87 5.0 7.3 7.87 7.13 0.75 21.26 2.22 z n/a 0.77 0.00 2.24 30 5.35 185.0 3.75 5 DBL DB 5 0.13 Sag 13.25 5.0 5.2 7.87 7.81 0.75 10.38 1.50 z 1.03 0.77 0.00 2.24 18 1.59 26.4 1.65 6 DBL CB 4A 0.12 Sag 4.57 5.0 5.0 7.87 7.87 0.75 0.71 1.00 0.11 0.71 0.00 2.20 15 0.50 6.0 0.12 7 CB 7 0.02 4 14.55 5.0 6.6 7.87 7.33 0.75 10.74 1.50 z 1.08 0.12 0.00 1.42 18 1.92 248.1 1.85 8 DBL CB 5A 0.12 Sag 4.57 5.0 5.0 7.87 7.87 0.81 0.76 1.00 0.09 0.76 0.00 2.23 15 0.50 6.0 0.12 9 CB 8 0.05 5 10.01 5.0 5.1 7.87 7.82 0.75 8.53 0.50 z n/a 0.30 0.00 2.02 18 0.91 26.4 1.35 10 CB 10 0.04 28 9.13 5.0 6.1 7.87 7.48 0.75 2.69 1.50 z n/a 0.24 0.00 1.94 15 2.00 65.1 0.48 11 DBL CB 11 0.11 10 9.27 5.0 5.6 7.87 7.66 0.75 2.53 1.50 z n/a 0.65 0.01 2.88 15 2.06 65.5 0.44 12 DBL CB 12 0.11 9 4.53 5.0 5.2 7.87 7.80 0.75 1.29 1.50 0.24 0.65 0.01 2.88 15 0.49 26.4 0.22 13 DBL CB 12A 0.11 12 4.57 5.0 5.0 7.87 7.87 0.75 0.65 1.00 0.02 0.64 0.01 2.87 15 0.50 6.0 0.11 14 DBL CB 11A 0.11 11 4.57 5.0 5.0 7.87 7.87 0.75 0.65 1.00 0.08 0.64 0.01 2.87 15 0.50 6.0 0.11 15 DI 9 0.05 Sag 14.88 5.0 5.0 7.87 7.86 0.81 8.27 0.50 z n/a 0.32 0.00 5.33 18 2.01 26.9 1.30 16 DI 6 0.05 Sag 14.74 5.0 5.0 7.87 7.86 0.81 8.91 0.83 z n/a 0.32 0.00 5.33 18 1.97 26.9 1.40 17 FES C8 1.35 n/a 27.58 5.0 5.0 7.87 7.87 0.81 8.61 1.00 z 0.56 8.61 0.00 .... 18 6.90 10.0 1.35 18 FES C9 1.25 n/a 19.93 5.0 5.0 7.87 7.87 0.81 7.97 1.00 z 0.52 7.97 0.00 .... 18 3.60 10.0 1.25 19 FES C12 0.91 n/a 42.73 5.0 5.0 7.87 7.87 0.81 5.80 1.00 z 0.40 5.80 0.00 .... 18 16.56 18.0 0.91 20 FES C11 1.16 n/a 24.75 5.0 5.0 7.87 7.87 0.81 7.39 1.00 z n/a 7.39 0.00 .... 18 5.56 18.0 1.16 21 FES C10 1.32 n/a 40.10 5.0 5.0 7.87 7.87 0.81 8.41 1.00 z 0.55 8.41 0.00 .... 18 14.58 24.0 1.32 22 DI 22 0.02 Sag 46.39 5.0 12.6 7.87 5.88 0.81 3.22 1.50 z 0.34 0.13 0.00 3.90 24 4.21 30.9 0.73 23 DBL CB 17 0.11 Sag 22.37 5.0 10.3 7.87 6.35 0.75 3.38 1.49 z 0.35 0.66 0.00 2.20 24 0.98 168.7 0.71 Project File: pond 2.stm Number of lines:30 Date: 6/26/2023 NOTES: Intensity=75.89/(Inlet time+ 12.20)^0.80--Return period=10 Yrs. ; **Critical depth Storm Sewers Storm Rpt Page 2 Line Inlet Drng Byp Capac Inlet Tc i i Runoff Total J-Loss Minor Q Q Gutter Line Line Line Total No. ID Area Ln No Full Time Inlet Sys Coeff Runoff Coeff Loss Copt Byp Spread Size Slope Length Area (ac) (cfs) (min) (min) (in/hr) (in/hr) (C) (cfs) (ft) (cfs) (cfs) (ft) (in) (%) (ft) (ac) 24 CB 18 0.12 23 18.60 5.0 9.1 7.87 6.64 0.75 2.44 1.49 z n/a 0.70 0.01 2.84 18 3.14 111.6 0.49 25 DBL CB 20 0.07 24 18.28 5.0 6.2 7.87 7.46 0.75 1.40 1.50 z 0.26 0.41 0.00 1.82 15 8.02 209.6 0.25 26 DBL CB 21 0.05 29 4.53 5.0 5.3 7.87 7.75 0.75 0.64 1.50 0.16 0.30 0.00 1.61 15 0.49 26.4 0.11 27 DBL CB 20A 0.07 25 4.57 5.0 5.0 7.87 7.87 0.75 0.41 1.00 0.03 0.41 0.00 1.82 15 0.50 6.0 0.07 28 DBL CB 21A 0.06 26 4.57 5.0 5.0 7.87 7.87 0.75 0.35 1.00 0.02 0.35 0.00 1.72 15 0.50 6.0 0.06 29 CB 19 0.12 30 4.53 5.0 5.0 7.87 7.87 0.75 0.71 1.00 0.11 0.70 0.01 2.84 15 0.49 26.4 0.12 30 DBL CB 17A 0.11 Sag 4.57 5.0 5.0 7.87 7.87 0.75 0.65 1.00 0.11 0.66 0.00 2.20 15 0.50 6.0 0.11 Project File: pond 2.stm Number of lines:30 Date: 6/26/2023 NOTES: Intensity=75.89/(Inlet time+ 12.20)^0.80--Return period=10 Yrs. ; **Critical depth Storm Sewers Storm Sewer Profile Proj. file: pond 2.stm N M V O O - J 0E J O C J 'C J 0 f- N M 40 O CMo O O N0� O M Co. O 00� O 00 ONO O NCO I� • co.co. CO in • Co �O Elev. (ft) 00 w N NNN Lc)in N NNN M NNN NN p -p W O W W W N W W W M W W W (0 W W CD E j m E > j m E » m E > ; ° E � tnt� Cl) o EE (� E�� co EEE to EE 312.00 312.00 299.00 299.00 • 286.00 —286.00 o 273.00 R5 0`1_ 5 3 273.00 @5. 260.00 _- _— Alt 1i2.1L(-30" a 1.27°/ 260.00 — 52.0Lt-36"L 1.77% 247.00 i 1 1 1 I I 247.00 0 50 100 150 200 250 300 350 400 450 500 550 600 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: pond 2.stm O E c p E c O. c 00 J J J C° 0 In coto _ O OON O CO N- , ONM 00 O°0 � OO NN�� M LOIn C• O Elev. (ft) •NO NNNN c NNN wN oWww o www o Www o -aw asE > > }s E co E > > m c cn 0_ c c co 0_E c co ii E E co 5 E 301.00 301.00 297.00 297.00 293.00 293.00 289.00 / —289.00 • --------------------------- 285.00 1 R.'�il 1.97% • 285.00 rw 1 59% 26.9Lf . r . . _ 1nnif-1R„©Rany. 281.00 1 • 281.00 8 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: pond 2.stm CD = 5 0 2 o 0 o� • o� o)in o coui Elev. (ft) p N N N N N oW LT;w o ww co > > co E > co'a-. c c co E c 298.00 298.00 295.00 • . 295.00 292.00 292.00 289.00 / 289.00 286.00 286.00 — 6.0Lf-19'@0.50% 283.00 283.00 0' 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: pond 2.stm 0E 5 0 O co N-Q co o„,, NI-ui o �m Elev. (ft) o N c?c.9 p N N oWwLT; o ww co E > > µo E > NiE cc U) Ec 298.00 298.00 295.00 • • 295.00 292.00 292.00 289.00 / / 289.00 286.00 \ - - 286.00 — 6.0Lf-19'@0.50% 283.00 283.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: pond 2.stm O O E E O E E OE 5 O Oco WN ' MCN ' O�� ' OD • 0� �� c. �00 N BOO • r, ON Elev. (ft) g N N N v NNN M N N N CO NN o W W W N W W W M W W W M W W co > > ccs E» as E » m E > coEi5 c to Esc co E c c u) i .E 310.00 310.00 304.00 — - 304.00 298.00 —298.00 I 292.00 _ 0 292.00 0 • 286.00 — _ — 1.92 0 286.00 280.00 280.00 0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 400 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: pond 2.stm Lo op OE OE J 0E o Oc c _M Q� N � O • 7M0) �6) d'CO OM A d1 A 6) .M gO co NO • CO CO Elev. (ft) ON NN N NNN NNN CD �N 0Www o www a, Www o aw mE > > ccs E» ;o E > > CO E > co c c co Ecc co EEc u> 55 306.00 • 306.00 302.00 302.00 • 298.00 298.00 • 294.00 —294.00 - — 290.00 — — - 290.00 z6.4Lf- 18"@ 0.914. 96.9 -TS� 9 _ • 10.0Lf 18"@ 3.60% 286.00 286.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: pond 2.stm N M 7 7 7 O E E OE = 0 00 0.,-. o ' ONN • NN 03 O CO O CN CD O)O d. 01 0)CNI CS) 0)W Elev. (ft) p N N N CO NNN CO n!N oWww o www o L.T. co E > > m E» ;s E> U)R5 E fA ricc co .c2 E 305.00 305.00 302.00 - . 302.00 299.00 299.00 N 296.00 296.00 293.00 _ % 293.00 _ 2ti.4Lf-1 5-L 0.49% 6.0Lf-15'•@ 0.50% 290.00 290.00 0 10 20 30 40 50 60 70 80 90 100 • HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: pond 2.stm Tr o= o el O N NON O c•iO N Elev. (ft) g- gN 00 N N oWwLT; o ww m E > > as E > coa cc co 2c 305.00 305.00 302.00 • • 302.00 299.00 299.00 296.00 296.00 293.00 293.00 mfl: — 6.0Lf-19'@0.50% 290.00 290.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: pond 2.stm 0= 500 0 o' coN O' co . pZ; co co p (NJ N- Elev. (ft) 6 N. N N W N owww o w coE c c cn 0 275.00 275.00 271.00 - 271.00 267.00 267.00 263.00 263.00 / -<\ 259.00 - 259.00 — f 8 0Lf-18"Q 1 6 c6w- 255.00 255.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: pond 2.stm 0 N 7 7 O E • 00 O OM ow C �O OCO 66 O NCO CO to co Elev. (ft) 00 N. N N co �N oWww o -air, 277.00 277.00 274.00 • . 274.00 271.00 271.00 268.00 268.00 ------ -------'""----\\ 265.00 265.00 i f ii 18.0Lf-18"@ 5.56% 262.00 262.00 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: pond 2.stm N 7 7 0E c OD O 0) O u.) O' a)O Lo O O)N O N GO Elev. (ft) p N. N N N W N oW Ww o -aw as E > > @ E coi2 c c u) 0E 289.00 289.00 285.00 285.00 281.00 281.00 277.00 277.00 oho 1�5a 273.00 - • 273.00 269.00 269.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: pond 2.stm U N N N N N 00 c - OE E OE c 0E 5 0E E 0 OM OO �Oooco in ��� �O0 pOj�� �� O O ti 601 NCO aO O �� O OLc) O 0 . O N O• NOS 6) NOO NOO O NOO O NC Elev. (ft) O W N CO NN O NN NN N (Ni(N N N o -OW o Www www co Www Lc) WwEi 0 III w co E > ;° E » co E » as E » co E» co E (ACC E ca 62c= co E2=5 co 12cc cn RE ci EE 308.00 308.00 • 296.00 • 296.00 IK 284.00 284.00 • @ice O21° 272.00 —272.0Q 2�q6\ — 6.0Lf-15" 0.50/0 _� _ 260.00 — — — — —— FLf.18 _• — - ok —260.00 �ga7lf-24" an0.9 — 30.9Lt-24"1 4.21% 248.00 248.00 0 50 100 150 200 250 300 350 400 450 500 550 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: pond 2.stm co co N N 7 7 7 O OE E 0 ( coLC) ' C)C)O ' no Elev. (ft) gC`! NN CDLo • N•NN CO NN 0WwW o wwlll o Ww mE > > m E» co E > co. c c u) E E E cn E E 294.00 294.00 291.00 - . 291.00 288.00 288.00 285.00 285.00 282.00 282.00 279.00 — 6.0Lf-15"@ 0.50% 279.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: pond 2.stm N 7 7 0 E c 0 —I m8� �N Elev. (ft) gN (NI N N CV(NI 0Www o L.T. mE > > m E> coi2 c c Ec 278.00 278.00 275.00 - • • 275.00 272.00 272.00 . • . 269.00 269.00 • 266.00 _ 266.00 az,.'+Lf- I5"@ 0.49 0 - ' 263.00 263.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: pond 2.stm 0 M 7 7 O c • 0 • -O • .O c\I co O Tr ci coo coo co O coo Cfl Elev. (ft) 0 N N N g N N +0 W W L1 o ww mE > > ;o E > co R c c co 2 c 274.00 274.00 271.00 • . 271.00 268.00 268.00 265.00 / / 265.00 262.00 262.00 6.0Lf-19'@0.50% 259.00 259.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers • Forest Ridge Commons — Ph. 1 - Riprap Apron Outlet Protection Sizing 24"Pipe Outlet Aprons: L= 16' W = 22' Class B rip rap with 18"Thickness &fabric underlayment 3a Outlet :::: f =Do•La PIPa / eiameter(Do) I 0.5% I A'\r\ 7 �` 701 11. cc O ct9 60- i ., tc�'ec9 00�o at 11 I I e a�'` I� yr,�p irOlrf ®III mein —16�d0"' Ip�l�@ lam"�h 13 - Ii I I�fl r 1114vIro0 aCIP 1,0A.d '�arre�C �Egi il'lld oii 1; > ;rib _ilk IlialF : n-- ~ 11'H 1 50 Discharge(h3,c 30"Pipe Outlet Aprons: L = 16' W = 24' Class B rip rap with 18"Thickness &fabric underlayment 3. Outlet y=Do•La 4 �•</i� fi ' Ie 1emeter(Do) 80 I 10 I e.dn La_.4 toP �7gitittt r<0.50p c 70 • � cVz� I Y � \P'Qt60 / ec�c0 I ,.q zr ° l4J \'50 I I I f� ^ti A, ? � • m r' 4 r III � , I` 0 .p0 R� a ��I 1 50 100 200 600 1000 l schar ell.9src 9 1 36"Pipe Outlet Aprons: L = 20' W = 30' Class B rip rap with 18"Thickness &fabric underlayment 3a Outlet Y•Oe•La 90 Pipe ammeter(Do) 1 iud � Tatirer<0.52to I �tOcvr 70 I I • i c9�r I I /VO m w, 4 e I IIjlilr.