Loading...
HomeMy WebLinkAboutSW3230303_ email_20231101 Holland, Brianna From: Holland, Brianna Sent: Wednesday, November 1, 2023 6:08 PM To: Peck, Kaitlin; thomas.mann@unioncountync.gov; Parker, Michael D. Cc: Farkas, Jim J; Eplin, Jerry W Subject: RE: SW3230303; Twelve Mile Creek WRF 9.0 MGD Expansion (Union County) Attachments: SW3230303 LID Cover Letter & Permit.pdf Good evening, The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete Stormwater Management Permit Application for the subject project on August 3, 2023. Staff review of the plans and specifications has determined that the project, as proposed,will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000- 1062 rules. We are forwarding Permit No. SW3230303, dated October 27, 2023,for the construction, operation and maintenance of the built-upon areas (BUA) and vegetated conveyances or areas associated with the subject project. This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein and does not supersede any other agency permit that may be required. The original signed permit package and approved plans are being mailed to the permittee,Thomas Mann, at the following address (NOTE:An electronic version of this permit can be found in our online repository: https://edocs.deg.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): Union County Water Attn:Thomas Mann, PE 500 N. Main Street, Suite 600 Monroe, NC 28112 1 will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made) after which point,they will be kept on file at the Mooresville Regional Office. If you have any questions, or need additional information concerning this matter, please contact Brianna Holland at postconstruction@deq.nc.gov. Thank you, Brianna Holland Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deq.nc.gov From: Holland, Brianna Sent: Friday,July 7, 2023 2:49 PM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>;thomas.mann@unioncountync.gov; Parker, Michael D. <mparker@hazenandsawyer.com> Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; Eplin,Jerry W<jerry.eplin@deq.nc.gov> Subject: RE: SW3230303;Twelve Mile Creek WRF 9.0 MGD Expansion (Union County) 1 Good afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater Management Permit Application for SW3230303 on 05/04/23. A review of that information has determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Thank you, Brianna Holland Environmental Engineer North Carolina Department of Environmental Quality Office: (919) 707-9218 brianna.holland@deg.nc.gov (email preferred) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address: 512 North Salisbury Street, Raleigh, NC 27604 From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent: Monday,June 12, 2023 2:50 PM To:thomas.mann@unioncountync.gov; Parker, Michael D. <mparker@hazenandsawyer.com> Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; Eplin,Jerry W<jerry.eplin@deg.nc.gov> Subject: SW3230303;Twelve Mile Creek WRF 9.0 MGD Expansion (Union County) Good Afternoon, We received your post-construction stormwater permit application for the subject project on 05/04/23. Reviews under the Standard permitting process can take up to 90 calendar days to complete. You can see where this project stands in the review queue by emailing Jim Farkas (He has an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the "Add Another Post-Construction File Upload" link directly below the "State Stormwater Information Uploads" section of the form. YOU MUST CLICK ON THE"ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD"TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding additional file uploads)will upload all of the files as the last file type selected,the submission will get flagged during review, and you will need to resubmit the files. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE:We do not require and we discourage the upload/submission of extraneous plan sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc...) as these files are not needed for review. Please type in permit#: SW3230303 2 If you have any questions, please contact Kaitlin Peck at Kaitlin.peck@deg.nc.gov or at 919-707-2909 (email is preferred). Take care, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.Peck@deg.nc.gov D- E � NORTH CAROLINA kJAj Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 3