HomeMy WebLinkAboutSW3230303_ email_20231101 Holland, Brianna
From: Holland, Brianna
Sent: Wednesday, November 1, 2023 6:08 PM
To: Peck, Kaitlin; thomas.mann@unioncountync.gov; Parker, Michael D.
Cc: Farkas, Jim J; Eplin, Jerry W
Subject: RE: SW3230303; Twelve Mile Creek WRF 9.0 MGD Expansion (Union County)
Attachments: SW3230303 LID Cover Letter & Permit.pdf
Good evening,
The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete Stormwater Management Permit
Application for the subject project on August 3, 2023. Staff review of the plans and specifications has determined that
the project, as proposed,will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000- 1062 rules.
We are forwarding Permit No. SW3230303, dated October 27, 2023,for the construction, operation and maintenance of
the built-upon areas (BUA) and vegetated conveyances or areas associated with the subject project. This permit shall be
effective from the date of issuance and shall be subject to the conditions and limitations as specified therein and does
not supersede any other agency permit that may be required.
The original signed permit package and approved plans are being mailed to the permittee,Thomas Mann, at the
following address (NOTE:An electronic version of this permit can be found in our online repository:
https://edocs.deg.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources):
Union County Water
Attn:Thomas Mann, PE
500 N. Main Street, Suite 600
Monroe, NC 28112
1 will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are noticed and
corrections need to be made) after which point,they will be kept on file at the Mooresville Regional Office. If you have
any questions, or need additional information concerning this matter, please contact Brianna Holland at
postconstruction@deq.nc.gov.
Thank you,
Brianna Holland
Post-Construction Stormwater Permitting Group
North Carolina Department of Environmental Quality
postconstruction@deq.nc.gov
From: Holland, Brianna
Sent: Friday,July 7, 2023 2:49 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>;thomas.mann@unioncountync.gov; Parker, Michael D.
<mparker@hazenandsawyer.com>
Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; Eplin,Jerry W<jerry.eplin@deq.nc.gov>
Subject: RE: SW3230303;Twelve Mile Creek WRF 9.0 MGD Expansion (Union County)
1
Good afternoon,
The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater
Management Permit Application for SW3230303 on 05/04/23. A review of that information has determined that the
application is not complete. Attached is a letter describing the items that need to be submitted. If you have any
questions, please feel free to contact me. My contact information is listed below.
Thank you,
Brianna Holland
Environmental Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-9218
brianna.holland@deg.nc.gov (email preferred)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov>
Sent: Monday,June 12, 2023 2:50 PM
To:thomas.mann@unioncountync.gov; Parker, Michael D. <mparker@hazenandsawyer.com>
Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; Eplin,Jerry W<jerry.eplin@deg.nc.gov>
Subject: SW3230303;Twelve Mile Creek WRF 9.0 MGD Expansion (Union County)
Good Afternoon,
We received your post-construction stormwater permit application for the subject project on 05/04/23. Reviews under
the Standard permitting process can take up to 90 calendar days to complete. You can see where this project stands in
the review queue by emailing Jim Farkas (He has an autoreply set up that has the review queue on it). Please upload all
documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the
Primary Contact office.
https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload
IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be
entered into the electronic form by clicking on the "Add Another Post-Construction File Upload" link directly below the
"State Stormwater Information Uploads" section of the form. YOU MUST CLICK ON THE"ADD ANOTHER POST-
CONSTRUCTION FILE UPLOAD"TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type
dropdown as you upload the various files (without adding additional file uploads)will upload all of the files as the last
file type selected,the submission will get flagged during review, and you will need to resubmit the files. Please do not
upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file
type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps
expedite the review process. NOTE:We do not require and we discourage the upload/submission of extraneous plan
sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc...) as these files are not needed for
review.
Please type in permit#: SW3230303
2
If you have any questions, please contact Kaitlin Peck at Kaitlin.peck@deg.nc.gov or at 919-707-2909 (email is
preferred).
Take care,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.Peck@deg.nc.gov
D- E
�
NORTH CAROLINA kJAj
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
3