HomeMy WebLinkAboutNCC204722_NOT Close Out Document_20231030 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall,Washington,NC 27889 (252) 946-6481
County: Beaufort Project: Keech's Kampground,LLC River basin: Tar-Pamlico
Person financially responsible:Keech's Kampground,LLC-Stacy AKeech, Project#: BEAUF-2021-004
Manager
Address: 389 Old New Bern Road,Chocowinity,NC 27817
1. Project Location: SR 1134,Chocowinity
Pictures: No
2. Weather and soil conditions: SunnyAVarm/Dry Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): No One Title:
Inspection report: Sent Report Date given/sent: October 30,2023
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established.No additional self-
monitoring or self-inspections are required.Project is in compliance and released under the SPCA.
10. Comments: Termination of coverage under the NPDES General Stormwater Permit for Construction Activities
(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is
available at:https://edocs.deg.nc.gov/Forms/NCG01-Termination.Please note that this
correspondence must be uploaded as part of completing the NOT process
Reported by: Amber Rights Others present:
Date of inspection: October 30,2023 Time arriving on site: 10:45 AM Time leaving site: 11:00 AM
cc: