Loading...
HomeMy WebLinkAboutNCC204722_NOT Close Out Document_20231030 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall,Washington,NC 27889 (252) 946-6481 County: Beaufort Project: Keech's Kampground,LLC River basin: Tar-Pamlico Person financially responsible:Keech's Kampground,LLC-Stacy AKeech, Project#: BEAUF-2021-004 Manager Address: 389 Old New Bern Road,Chocowinity,NC 27817 1. Project Location: SR 1134,Chocowinity Pictures: No 2. Weather and soil conditions: SunnyAVarm/Dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No One Title: Inspection report: Sent Report Date given/sent: October 30,2023 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established.No additional self- monitoring or self-inspections are required.Project is in compliance and released under the SPCA. 10. Comments: Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at:https://edocs.deg.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process Reported by: Amber Rights Others present: Date of inspection: October 30,2023 Time arriving on site: 10:45 AM Time leaving site: 11:00 AM cc: