Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout20231022 Ver 1_USACE Correspondence_20231031Homewood, Sue
From: Perez, Douglas J CIV USARMY CESAW (USA) < Doug.J.Perez@usace.army.mil >
Sent: Tuesday, October 31, 2023 2:18 PM
To: Jennifer Robertson; Homewood, Sue
Subject: [External] RE: Penny Way / USACE Action ID SAW-2022-01574 and DWR Project #
20231022 Ver 1
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Hey Jennifer,
So if all the work is being done above the OHWM and there's no fill associated with these impacts, then a 404 is not
needed for this.
Doug J. Perez
Regulatory Specialist
US Army Corps of Engineers
Wilmington District
Charlotte Field Office
Office : (704) 510-1439
Cell :(704) 578-1741
From: Jennifer Robertson <jrobertson@atlasenvi.com>
Sent: Monday, October 30, 2023 4:37 PM
To: Perez, Douglas J CIV USARMY CESAW (USA) <Doug.J.Perez@usace.army.mil>; Homewood, Sue
<sue. homewood @deq. nc.gov>
Subject: [Non-DoD Source] FW: Penny Way / USACE Action ID SAW-2022-01574 and DWR Project # 20231022 Ver 1
Doug,
Circulating this email again for the Penny Way permit application. Will you please let Sue and I know if the
USACE will be issuing a 404 for this work so Sue can get the 401 issued? Thank you!
Thank you,
Jennifer L Robertson, President
ATLAS Environmental, Inc.
338 S. Sharon Amity Road #411
Charlotte, NC 28211
(704) 512-1206 office
(828) 712-9205 mobile
www.atiasenvi.com
Offices in Asheville and Charlotte
ONMENTAL
From: Jennifer Robertson
Sent: Wednesday, October 18, 2023 6:16 AM
To: Perez, Doug J CIV SAW <Doug.J.Perez@usace.army.mil>; Homewood, Sue <sue.homewood@deg.nc.gov>
Subject: Penny Way / USACE Action ID SAW-2022-01574 and DWR Project # 20231022 Ver 1
Doug/Sue,
The civil engineer on this project has revised the culvert at the road crossing to a bridge to try to get more
volume area due to FEMA requirements through the City of Charlotte. Even with the bridge the banks of the
stream upstream of the bridge will need to be sloped back to provide enough volume not to create a rise in the
floodplain elevation upstream of the project area. Streambank impacts will total 37 linear feet.
Doug,
I talked to Sue about this project yesterday as we were discussing another project. She said that once you
decide if you need to issue a 404 she will review these new exhibits for the 401. To get through City of
Charlotte permitting my preference would be to get a 404 and 401 that the civil engineer can provide to the City
reviewer. Let me know your thoughts. Thanks!
Thank you,
Jennifer L Robertson, President
ATLAS Environmental, Inc.
338 S. Sharon Amity Road #411
Charlotte, NC 28211
(704) 512-1206 office
(828) 712-9205 mobile
www.atiasenvi.com
Offices in Asheville and Charlotte
ONMENTAL