Loading...
HomeMy WebLinkAbout20231022 Ver 1_USACE Correspondence_20231031Homewood, Sue From: Perez, Douglas J CIV USARMY CESAW (USA) < Doug.J.Perez@usace.army.mil > Sent: Tuesday, October 31, 2023 2:18 PM To: Jennifer Robertson; Homewood, Sue Subject: [External] RE: Penny Way / USACE Action ID SAW-2022-01574 and DWR Project # 20231022 Ver 1 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hey Jennifer, So if all the work is being done above the OHWM and there's no fill associated with these impacts, then a 404 is not needed for this. Doug J. Perez Regulatory Specialist US Army Corps of Engineers Wilmington District Charlotte Field Office Office : (704) 510-1439 Cell :(704) 578-1741 From: Jennifer Robertson <jrobertson@atlasenvi.com> Sent: Monday, October 30, 2023 4:37 PM To: Perez, Douglas J CIV USARMY CESAW (USA) <Doug.J.Perez@usace.army.mil>; Homewood, Sue <sue. homewood @deq. nc.gov> Subject: [Non-DoD Source] FW: Penny Way / USACE Action ID SAW-2022-01574 and DWR Project # 20231022 Ver 1 Doug, Circulating this email again for the Penny Way permit application. Will you please let Sue and I know if the USACE will be issuing a 404 for this work so Sue can get the 401 issued? Thank you! Thank you, Jennifer L Robertson, President ATLAS Environmental, Inc. 338 S. Sharon Amity Road #411 Charlotte, NC 28211 (704) 512-1206 office (828) 712-9205 mobile www.atiasenvi.com Offices in Asheville and Charlotte ONMENTAL From: Jennifer Robertson Sent: Wednesday, October 18, 2023 6:16 AM To: Perez, Doug J CIV SAW <Doug.J.Perez@usace.army.mil>; Homewood, Sue <sue.homewood@deg.nc.gov> Subject: Penny Way / USACE Action ID SAW-2022-01574 and DWR Project # 20231022 Ver 1 Doug/Sue, The civil engineer on this project has revised the culvert at the road crossing to a bridge to try to get more volume area due to FEMA requirements through the City of Charlotte. Even with the bridge the banks of the stream upstream of the bridge will need to be sloped back to provide enough volume not to create a rise in the floodplain elevation upstream of the project area. Streambank impacts will total 37 linear feet. Doug, I talked to Sue about this project yesterday as we were discussing another project. She said that once you decide if you need to issue a 404 she will review these new exhibits for the 401. To get through City of Charlotte permitting my preference would be to get a 404 and 401 that the civil engineer can provide to the City reviewer. Let me know your thoughts. Thanks! Thank you, Jennifer L Robertson, President ATLAS Environmental, Inc. 338 S. Sharon Amity Road #411 Charlotte, NC 28211 (704) 512-1206 office (828) 712-9205 mobile www.atiasenvi.com Offices in Asheville and Charlotte ONMENTAL