HomeMy WebLinkAboutSW6221101_Email_20231031
Peck, Kaitlin
From:Farkas, Jim J
Sent:Tuesday, October 31, 2023 4:09 PM
To:david.a.heins.civ@army.mil
Cc:Joyner, Melissa; Ward, Lee P CIV USARMY ID-READINESS (USA); Lorraine Roberts;
Kevin Sherlock; Clark, George E CIV USARMY CESAW (US);
svc_post_construction_stormwater; Moore, Daniel C CIV USARMY CESAW (USA);
Smith, Kelsey L CIV USARMY CESAW (USA); Nick Rightmyer; Paul Zinni
Subject:RE: SW6221101 Fort Bragg, North Carolina Technical Support Annex, PN79439.2
Attachments:Cover Letter & Permit10-31-23.pdf
Good A?ernoon,
The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete Stormwater Management Permit
Applica?on for the subject project on October 26, 2023. Staff review of the plans and specifica?ons has determined that
the project, as proposed, will comply with the Stormwater Regula?ons set forth in Title 15A NCAC 2H.1000 - 1062 rules.
We are forwarding Permit No. SW6221101, dated October 31, 2023, for the construc?on, opera?on and maintenance of
the subject project and the stormwater system. This permit shall be effec?ve from the date of issuance and shall be
subject to the condi?ons and limita?ons as specified therein, and does not supersede any other agency permit that may
be required.
The original signed permit package and approved plans are being mailed to the permi?ee, David Heins, at the following
address (NOTE: An electronic version of this permit can be found in our online repository:
h?ps://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources):
Fort Bragg Department of Public Works
Attn: David Heins, Environmental Division Chief
2175 Reilly Road Stop A
Fort Bragg, NC 28310-5000
We will hold onto our hard copy of this project for 30 days (in case any issues/typos with the permit are no?ced and
correc?ons need to be made) a?er which point, it will be kept on file at the Faye?eville Regional Office. If you have any
ques?ons, or need addi?onal informa?on concerning this ma?er, please contact us at postconstruc?on@deq.nc.gov.
Thanks,
Jim Farkas
Post-Construc?on Stormwater Permi?ng Group
North Carolina Department of Environmental Quality
postconstruc?on@deq.nc.gov
1
From: Farkas, Jim J
Sent: Thursday, June 1, 2023 3:29 PM
To: 'david.a.heins.civ@army.mil' <david.a.heins.civ@army.mil>; 'Ward, Lee P CIV USARMY ID-READINESS (USA)'
<lee.p.ward.civ@army.mil>; 'Lorraine Roberts' <Lorraine.Roberts@expfederal.com>; 'Kevin Sherlock'
<Kevin.Sherlock@expfederal.com>
Cc: Joyner, Melissa <melissa.joyner@deq.nc.gov>
Subject: RE: SW6221101 Fort Bragg, North Carolina Technical Support Annex, PN79439.2
Good Afternoon,
The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater
th
Management Permit Application for the subject project on March 28, 2023. A review of that information has
determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If
you have any questions, please feel free to contact me. My contact information is listed below.
Thank you,
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646
Jim.farkas@deq.nc.gov
From: Farkas, Jim J
Sent: Tuesday, February 14, 2023 5:21 PM
To: david.a.heins.civ@army.mil; Ward, Lee P CIV USARMY ID-READINESS (USA) <lee.p.ward.civ@army.mil>; Lorraine
Roberts <Lorraine.Roberts@expfederal.com>; Kevin Sherlock <Kevin.Sherlock@expfederal.com>
Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov>
Subject: RE: SW6221101 Fort Bragg, North Carolina Technical Support Annex, PN79439.2
Good Afternoon,
The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater
th
Management Permit Application for the subject project on November 17, 2022. A review of that information has
determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If
you have any questions, please feel free to contact me. My contact information is listed below.
2
Thank you,
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646
Jim.farkas@ncdenr.gov
From: DeBerry, Margie <Margie.DeBerry@ncdenr.gov>
Sent: Thursday, November 17, 2022 3:28 PM
To: david.a.heins.civ@army.mil; Ward, Lee P CIV USARMY ID-READINESS (USA) <lee.p.ward.civ@army.mil>; Lorraine
Roberts <Lorraine.Roberts@expfederal.com>; Kevin Sherlock <Kevin.Sherlock@expfederal.com>
Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Subject: SW6221101 Fort Bragg, North Carolina Technical Support Annex, PN79439.2
Good afternoon,
We received your post-construction stormwater permit application for the above mentioned project on 11/17/2022.
Reviews under the standard permitting process generally take 75 calendar days, but can take up to 90 calendar days per
statute (our other reviewer, Corey Anen, no longer works for the State, so this review may exceed 75 days). Please
upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central
Office as the Primary Contact office.
https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload
IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be
entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the
“State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form,
but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures
that the files are properly named in the electronic repository and it helps expedite the review process.
Please type in permit #: SW6221101
If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646.
Thank you,
Margie DeBerry
Environmental Specialist, Division of Energy, Mineral, and Land Resources
North Carolina Department of Environmental Quality
Office: (919) 707-9209
margie.deberry@ncdenr.gov
3
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
4