Loading...
HomeMy WebLinkAboutSite Inspection 9.22.22 I-40 Bridge over J CreekSite Inspection Report Site Number: Site Name: Site Address: County: Directions: Region: WT003362 I-40 Bridge over Jonathan Creek Haywood Asheville Inspection Date: Latitude: Site Owner Name: Reason for Inspection: Inspection Type: Longitude: 09/22/22 NCDOT Division 14 Routine Site Inspection (DOT) Inspection Contact Person:Phone: On-Site Representative(s) Primary Inspector:Phone:Robert K Mitchell Secondary Inspector(s): Facility Compliance Status:Compliant Not Compliant Program Areas:NPDES SW - Roadway (DOT) Question Areas: Operation and Maintenance Inspection Summary: Site inspection was conducted on September 22, 2022 by Kevin Mitchell with the Asheville Regional Office. I spoke with an inspector (Thomas) with TGS during the inspection. Measures looked well maintained. - Recommend addtional ground cover in idle areas. - Recommend additional gravel in ditch line draining drilling area. page:1 Inspection Date: Site Number:Owner: Inspection Type:Reason for Visit: WT003362 09/22/22 Site Inspection (DOT) NCDOT Division 14 Routine Operation and Maintenance Yes No NA Are the SW measures being maintained and operated as per the permit requirements? Are the inspection and maintenance records complete and available for review? Comment: page:2