HomeMy WebLinkAboutSite Inspection 9.22.22 I-40 Bridge over J CreekSite Inspection Report
Site Number:
Site Name:
Site Address:
County:
Directions:
Region:
WT003362
I-40 Bridge over Jonathan Creek
Haywood Asheville
Inspection Date:
Latitude:
Site Owner Name:
Reason for Inspection:
Inspection Type:
Longitude:
09/22/22
NCDOT Division 14
Routine
Site Inspection (DOT)
Inspection Contact Person:Phone:
On-Site Representative(s)
Primary Inspector:Phone:Robert K Mitchell
Secondary Inspector(s):
Facility Compliance Status:Compliant Not Compliant
Program Areas:NPDES SW - Roadway (DOT)
Question Areas:
Operation and Maintenance
Inspection Summary:
Site inspection was conducted on September 22, 2022 by Kevin Mitchell with the Asheville Regional Office. I spoke
with an inspector (Thomas) with TGS during the inspection. Measures looked well maintained.
- Recommend addtional ground cover in idle areas.
- Recommend additional gravel in ditch line draining drilling area.
page:1
Inspection Date:
Site Number:Owner:
Inspection Type:Reason for Visit:
WT003362
09/22/22 Site Inspection (DOT)
NCDOT Division 14
Routine
Operation and Maintenance Yes No NA
Are the SW measures being maintained and operated as per the permit requirements?
Are the inspection and maintenance records complete and available for review?
Comment:
page:2