HomeMy WebLinkAboutSite Inspection 11.22.22 Br 171 I-40 over Jonathan CreekSite Inspection Report
Site Number:
Site Name:
Site Address:
County:
Directions:
Region:
WT003362
I-40 Bridge over Jonathan Creek
Haywood Asheville
Inspection Date:
Latitude:
Site Owner Name:
Reason for Inspection:
Inspection Type:
Longitude:
11/22/22
NCDOT Division 14
Follow-Up
Site Inspection (DOT)
Inspection Contact Person:Phone:
On-Site Representative(s)
Primary Inspector:Phone:Robert K Mitchell
Secondary Inspector(s):
Facility Compliance Status:Compliant Not Compliant
Program Areas:NPDES SW - Roadway (DOT)
Question Areas:
Operation and Maintenance
Inspection Summary:
Site Inspection was conducted on November 22, 2022 by Kevin Mitchell with the Asheville Regional Office. The
inspection was a follow up to a self reported material release in Jonathan Creek. Jeff Stockton was present during the
inspection.
-Material in JS has been removed. Measures are currently in place.
-Maintain SDOs. Add gravel at silt fence outlet on Left Bank Descending.
-Contractor is dewatering drill shaft through silt bag. Efforts to add PAM and additional fabric to stone under silt bag
are planned to minimize turbidity to receiving waters.
page:1
Inspection Date:
Site Number:Owner:
Inspection Type:Reason for Visit:
WT003362
11/22/22 Site Inspection (DOT)
NCDOT Division 14
Follow-Up
Operation and Maintenance Yes No NA
Are the SW measures being maintained and operated as per the permit requirements?
Are the inspection and maintenance records complete and available for review?
Comment:
page:2