HomeMy WebLinkAboutSite Inspection Non-Compliant 8.30.23 B-6054C Br 171 over J Creek Site Inspection Report
Site Number: WT003362
Site Name: I-40 Bridge over Jonathan Creek
Site Address:
County: Havwood Region: Asheville
Directions:
Latitude: Longitude:
Site Owner Name: NCDOT Division 14
Inspection Date: 08/30/23
Reason for Inspection: Routine
Inspection Type: Site Inspection(DOT)
Inspection Contact Person: Phone:
On-Site Representative(s)
Primary Inspector: Robert K Mitchell Phone:
Secondary Inspector(s):
Facility Compliance Status: ❑ Compliant 0 Not Compliant
Program Areas: Standards/Sediment
Question Areas:
Unpermittable Activities
Inspection Summary:
Site inspection was conducted on August 30,2023 by Kevin Mitchell with the Asheville Regional Office. The
inspection was in response to a self reported sediment loss reported on August 29,2023. Jeff Stockton was present
during the inspection. The following are items that require attention:
- Sediment and 57 stone in Jonathan Creek need to be removed and stabilized on-site.
-Basin on the east side of Jonathan Creek needs maintenance/repair.
-Eroded ditchline and rills need repair.
-Ensure NPDES records are up to date.
page 1
Site Number: WT003362 Owner:NCDOT Division 14
Inspection Date: 08/30/23 Inspection Type: Site Inspection(DOT) Reason for Visit:Routine
Unpermittable Activities Yes No NA
#Note: This section should be completed only if the impact is unpermittable(eg. Sediment,draining
wetlands, etc.).
Is stream(s) free of unpermittable impacts? ❑ 0 ❑ ❑
Is wetland(s) free of unpermittable impacts? ❑ ❑ 0 ❑
Is open water(s) free of unpermittable impacts? ❑ ❑ 0 ❑
Are other standards being met(turbidity,pH, etc.)in all surface waters onsite? ❑ ❑ 0 ❑
Are surface waters on the site free of illegal discharges? ❑ ❑ 0 ❑
Comment: Sediment and 57 stone from the site were observed in Jonathan Creek.
page 2