Loading...
HomeMy WebLinkAboutSite Inspection 9.1.23 B-6054C I-40 over JCreek Site Inspection Report Site Number: WT003362 Site Name: I-40 Bridge over Jonathan Creek Site Address: County: Haywood Region: Asheville Directions: Latitude: Longitude: Site Owner Name: NCDOT Division 14 Inspection Date: 09/01/23 Reason for Inspection: Follow-Up Inspection Type: Site Inspection(DOT) Inspection Contact Person: Phone: On-Site Representative(s) Primary Inspector: Robert K Mitchell Phone: Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: Standards/Sediment Question Areas: Unpermittable Activities Inspection Summary: Follow up inspection was conducted on September 1,2023 by Kevin Mitchell with the Asheville Regional Office. DOT and contractor personnel were present during the inspection. Sediment was removed from Jonathan Creek. Erosion control measures have been maintained and efforts are much appreciated. The base ditch above the sediment basin still needs attention. Please coordinate these efforts with Roadside Environmental. NPDES records were up to date. page 1 Site Number: WT003362 Owner:NCDOT Division 14 Inspection Date: 09/01/23 Inspection Type: Site Inspection(DOT) Reason for Visit:Follow-Up Unpermittable Activities Yes No NA #Note: This section should be completed only if the impact is unpermittable(eg. Sediment,draining wetlands, etc.). Is stream(s) free of unpermittable impacts? 0 ❑ ❑ ❑ Is wetland(s) free of unpermittable impacts? ❑ ❑ 0 ❑ Is open water(s) free of unpermittable impacts? ❑ ❑ 0 ❑ Are other standards being met(turbidity,pH, etc.)in all surface waters onsite? 0 ❑ ❑ ❑ Are surface waters on the site free of illegal discharges? 0 ❑ ❑ ❑ Comment: page 2