Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SWA000227_Design Calculations_20231031
s • t it • • % TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. 610 East Morehead Street, Suite 250 Charlotte, North Carolina 28202 NC License No. C-1652 WAXHAW VOLUNTEER FIRE DEPARTMENT JOB #: 54647 UNION COUNTY PROJ.#: 20223105 CALCULATIONS FOR: EROSION CONTROL STORM DRAINAGE ANALYSIS STORM DRAINAGE DENTENTION 0. DATE: 05/03/23 �.����N • R0� A ''' �tiy' �: ,' ''.• :•• • CORPORATE A)4, REV: 10/30/23 = SEAL _ = SEAL C-1652 ? v_ 48704 : E NCBELS • 2: � ' lO/3c /Z3i „ 0''• e• X" .����; ;,G.R o,;Q``,`. .,���'.,,,���RADA ►►```����`� STORM A PROJECT: WAXHAW VOL FD Designed by: AMC STORM SEWER DESIGN COMPUTATIONS LOCATION: Union County,NC COUNTY: UNION COUNTY Checked by: WBS STORM FREQUENCY 10 UNITS ENGLISH DRAIN. RUNOFF CA TOTAL RAIN RUNOFF INVERT ELEVATIONS LENGTH SLOPE SIZE SHAPE Capacity Friction VEL FLOW PIPE FROM POINT TO POINT AREA COEFF. INCRE- ADDTL ACCUM- INLET FALL Q UPPER LOWER of Pipe (Dia.Or Slope Vn TIME NO REFERENCE REFERENCE "A" "C" MENT CA ULATED TIME END END Span/Rise) REMARKS Acre Minutes In/Hr CFS Ft. Ft./Ft. In. CFS Ft./Ft. Ft/Sec Min. (1) (2) (3) (4) (5) (6) (7) (8) (9) _ (10) (11) (12) (13) (14) (15) (16) (17) (18) _ A4 A5 A3 0.520 0.800 0.416 0.000 0.416 _ 5.000 7.730 3.216 _ 579.619 578.870 124.908 0.006 15.000 Circular 5.002 0.002 4.339 0.480 _ A2 A3 Al 0.430 0.950 0.409 0.000 0.825 5.480 7.610 6.274 578.276 577.630 107.727 0.006 18.000 Circular 8.135 0.004 5.092 0.353 STORM A PROJECT: WAXHAW VOL FD DESIGNED BY: AMC HYDRAULIC GRADE LINE ANALYSIS Checked: WBS INCIDENCE PROBABILITY 10 Year OUTLET DIA. DESIGN LENGTH FRICTION FRICTION JUNCTION LOSS Inlet INLET WATER PIPE DISCH. PIPE SLOPE,Sfo LOSS 1.3 0.5 FINAL Water Rim Comments OR SURFACE Do Qo Lo Hf Vo Ho Qi Vi QiVi Vi*2/29 Hi Angle HA Ht Ht Ht H Surface Elev JUNCTION ELEV. (In) (CFS) (Ft) (FT/FT) (Ft) (Ft) (Ft) Elevation A3 579.63 18 6.27 107.73 0.0036 0.38 5.09 0.10 3.22 4.34 13.95 0.29 0.10 62.38 0.16 0.37 0.47663 FALSE 0.86 580.49 584.61 OK -4.11 A5 580.49 15 3.22 124.91 0.0025 0.31 4.34 0.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.07 0.095 FALSE 0.40 580.90 584.41 OK -3.51 STORM B PROJECT: WAXHAW VOL FD Designed by: AMC STORM SEWER DESIGN COMPUTATIONS LOCATION: Union County,NC COUNTY: UNION COUNTY Checked by: WBS STORM FREQUENCY 10 UNITS ENGLISH DRAIN. RUNOFF CA TOTAL RAIN RUNOFF INVERT ELEVATIONS LENGTH SLOPE SIZE SHAPE Capacity Friction VEL FLOW PIPE FROM POINT TO POINT AREA COEFF. INCRE- ADDTL ACCUM- INLET FALL Q UPPER LOWER of Pipe (Dia.Or Slope Vn TIME NO REFERENCE REFERENCE "A" "C" MENT CA ULATED TIME END END Span/Rise) REMARKS Acre Minutes In/Hr CFS Ft. Ft./Ft. In. CFS Ft./Ft. Ft/Sec Min. (1) (2) (3) (4) (5) (6) (7) (8) (9) _ (10) (11) (12) (13) (14) (15) (16) (17) (18) _ BIO B11 B9 0.350 0.740 0.259 0.000 0.259 _ 5.000 7.730 2.002 580.459 579.824 105.770 0.006 15.000 Circular 5.002 0.001 3.858 0.457 _ B8 B9 B7 0.040 0.850 0.034 0.000 0.293 _ 5.457 7.610 2.230 _ 579.620 579.248 62.009 0.006 15.000 Circular 5.002 0.001 3.968 0.260 _ B6 1 B7 B5 0.130 0.850 0.111 0.000 0.404 _ 5.717 7.510 3.030 _ 579.050 578.678 62.029 0.006 15.000 Circular 5.002 0.002 4.280 0.242 B12 B12 B13 0.090 0.950 0.086 0.000 0.086 _ 5.000 7.730 0.661 _ 580.320 579.240 55.260 0.020 8.000 Circular 1.829 0.003 4.828 0.191 B14 B13 B5 0.000 0.000 0.000 0.000 0.086 _ 5.191 7.700 0.658 _ 578.500 578.250 39.637 0.006 8.000 Circular 1.039 0.003 3.159 0.209 B4 B5 B3 0.090 0.950 0.086 0.000 0.575 _ 5.959 7.450 4.280 _ 578.050 577.587 77.115 0.006 18.000 Circular 8.135 0.002 4.672 0.275 B2 B3 B1 0.000 0.000 0.000 0.000 0.575 6.234 7.360 4.228 577.400 577.235 33.000 0.005 18.000 Circular 7.426 0.002 4.348 0.127 STORM B PROJECT: WAXHAW VOL FD DESIGNED BY: AMC HYDRAULIC GRADE LINE ANALYSIS Checked: WBS INCIDENCE PROBABILITY 10 Year OUTLET DIA. DESIGN LENGTH FRICTION FRICTION JUNCTION LOSS Inlet INLET WATER PIPE DISCH. PIPE SLOPE,Sfo LOSS 1.3 0.5 FINAL Water Rim Comments OR SURFACE Do Qo Lo Hf Vo Ho Qi Vi QiVi Vi*2/29 Hi Angle HA Ht Ht Ht H Surface Elev JUNCTION ELEV. (In) (CFS) (Ft) (FT/FT) (Ft) (Ft) (Ft) Elevation B3 579.63 18 4.23 33.00 0.0016 0.05 4.35 0.07 4.28 4.67 20.00 0.34 0.12 57.33 0.19 0.38 0 FALSE 0.44 580.07 584.14 OK -4.08 B5 578.79 18 4.28 77.11 0.0017 0.13 4.67 0.08 3.03 4.28 12.97 0.28 0.10 52.65 0.14 0.33 0 FALSE 0.45 579.24 582.41 OK -3.16 B7 579.68 15 3.03 62.03 0.0022 0.14 4.28 0.07 2.23 3.97 8.85 0.24 0.09 10.58 0.03 0.19 0.245 FALSE 0.38 580.06 583.24 OK -3.18 B9 580.25 15 2.23 62.01 0.0012 0.07 3.97 0.06 2.00 3.86 7.72 0.23 0.08 60.52 0.13 0.27 0 FALSE 0.35 580.59 584.21 OK -3.62 B11 580.82 15 2.00 105.77 0.0010 0.10 3.86 0.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.06 0.07512 FALSE 0.18 581.00 583.88 OK -2.88 B13 579.24 8 0.66 39.64 0.0025 0.10 3.16 0.04 0.66 4.83 3.19 0.36 0.13 84.26 0.24 0.40 0 FALSE 0.50 579.75 580.63 OK -0.89 B12 579.77 8 0.66 55.26 0.0025 0.14 4.83 0.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.09 0.11764 FALSE 0.26 580.03 581.53 OK -1.5 <12S> <13S> Predevelopment - Postdevelopment - Project Area Project Area Subcat Reach Pon Link Routing Diagram for 54647-Drainage Pre-Post Prepared by Timmons Group, Printed 10/26/2023 HydroCAD®10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC 54647 - Drainage_Pre-Post Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 2 Rainfall Events Listing (selected events) Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1-Year Type II 24-hr Default 24.00 1 2.87 2 54647 - Drainage_Pre-Post Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 3 Area Listing (selected nodes) Area CN Description (acres) (subcatchment-numbers) 0.940 61 >75% Grass cover, Good, HSG B (13S) 0.130 74 >75% Grass cover, Good, HSG C (13S) 0.540 80 >75% Grass cover, Good, HSG D (13S) 0.050 56 Brush, Fair, HSG B (12S) 0.080 70 Brush, Fair, HSG C (12S) 0.340 77 Brush, Fair, HSG D (12S) 1.010 98 Paved parking, HSG B (13S) 0.160 98 Paved parking, HSG C (13S) 4.400 60 Woods, Fair, HSG B (12S, 13S) 0.450 73 Woods, Fair, HSG C (12S, 13S) 0.200 79 Woods, Fair, HSG D (12S) 8.300 69 TOTAL AREA 54647 - Drainage_Pre-Post Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 4 Soil Listing (selected nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 6.400 HSG B 12S, 13S 0.820 HSG C 12S, 13S 1.080 HSG D 12S, 13S 0.000 Other 8.300 TOTAL AREA 54647 - Drainage_Pre-Post Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 5 Ground Covers (selected nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 0.940 0.130 0.540 0.000 1.610 >75% Grass cover, Good 13S 0.000 0.050 0.080 0.340 0.000 0.470 Brush, Fair 12S 0.000 1.010 0.160 0.000 0.000 1.170 Paved parking 13S 0.000 4.400 0.450 0.200 0.000 5.050 Woods, Fair 12S, 13S 0.000 6.400 0.820 1.080 0.000 8.300 TOTAL AREA 54647 - Drainage_Pre-Post Type 1124-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 6 Time span=0.00-120.00 hrs, dt=0.05 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment12S: Predevelopment- Runoff Area=4.150 ac 0.00% Impervious Runoff Depth=0.38" Flow Length=624' Tc=27.8 min CN=63 Runoff=0.88 cfs 0.131 af Subcatchment13S: Postdevelopment- Runoff Area=4.150 ac 28.19% Impervious Runoff Depth=0.83" Tc=5.0 min CN=74 Runoff=6.02 cfs 0.286 af Total Runoff Area = 8.300 ac Runoff Volume = 0.417 af Average Runoff Depth = 0.60" 85.90% Pervious = 7.130 ac 14.10% Impervious = 1.170 ac 54647 - Drainage_Pre-Post Type 1124-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 12S: Predevelopment - Project Area Runoff = 0.88 cfs @ 12.30 hrs, Volume= 0.131 af, Depth= 0.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.87" Area (ac) CN Description 3.160 60 Woods, Fair, HSG B 0.320 73 Woods, Fair, HSG C 0.200 79 Woods, Fair, HSG D 0.050 56 Brush, Fair, HSG B 0.080 70 Brush, Fair, HSG C 0.340 77 Brush, Fair, HSG D 4.150 63 Weighted Average 4.150 100.00°/o Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.9 100 0.0734 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" 3.9 254 0.0477 1.09 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 10.0 270 0.0391 0.45 1.34 Channel Flow, CHANNEL Area= 3.0 sf Perim= 6.3' r= 0.48' n= 0.400 Sheet flow: Woods+light brush 27.8 624 Total 54647 - Drainage_Pre-Post Type II 24-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 8 Subcatchment 12S: Predevelopment - Project Area Hydrograph /111 1 II 11 1 1 I I 1 I I 1 1 I 1 1 0.94/ 1 11 1 11 I I 1 I II I II I II I II ■Runoff 0.9 ...„ I0.88�I I 1 1 11 11 1 1 1 1 1 1 1 1 1 1 1 0.85 1 I I 1 I T pe II124 hP 0.8 1 - arirn#a11=3. 7�'- 0.75= ii 0.7 1 1 _ 1 1 1 1 1 1 Rth- ff ea=4.115O-a- 0.64, 1 1 1 1 1 11 11 1 1 1 1 1 1 1 1 1 1 1 0.6 _ I _ 1 1 1 11 1 1 Runoff VV llnle=4).131- of w 0.54' 1 ' / 1 1 1 1 1 1 1 �pI . �� f , 05� 1 / 1 1 1 1 1 1 1 1 1 'I Ullit4 " �7wIuc'"1 i? 0.45� % �2I Length 624'- 0.4 ' Z 1_ _1 _ L L 1 1 L 1 L 1 1 1 1 1 1 I�Q L [ _ 0.35� I ITQ=27�KL min- 0.34/ 1 1 1 1 1 1 11 1 II 1 1 nLc 5�0.2 ) L 1 L L- ØL _1— L _ 1_ —1— _I — 1— L —I— L —1 — L A _ 1— Y'`L6j 0.2 J_ _ 1 L L 1 1 1 L A 1 L I L I I_ A 1 L I L L 0.15, ,L _ %��' L — 1_ 1 —I— L _I — 1_ L —I— L —1 — I I _ 1_ L _I _ L L 0.1� J_ _ L L _ 1_ 1 1_ L A 1_ L _1 L _1 _ _ _ 1_ _1 _ 0.00_� i1i1i���i�����������i��� 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 9 Hydrograph for Subcatchment 12S: Predevelopment - Project Area Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.08 0.00 0.00 5.00 0.18 0.00 0.00 7.50 0.31 0.00 0.00 10.00 0.52 0.00 0.00 12.50 2.11 0.13 0.64 15.00 2.45 0.23 0.13 17.50 2.62 0.28 0.09 20.00 2.73 0.33 0.06 22.50 2.82 0.36 0.06 25.00 2.87 0.38 0.00 27.50 2.87 0.38 0.00 30.00 2.87 0.38 0.00 32.50 2.87 0.38 0.00 35.00 2.87 0.38 0.00 37.50 2.87 0.38 0.00 40.00 2.87 0.38 0.00 42.50 2.87 0.38 0.00 45.00 2.87 0.38 0.00 47.50 2.87 0.38 0.00 50.00 2.87 0.38 0.00 52.50 2.87 0.38 0.00 55.00 2.87 0.38 0.00 57.50 2.87 0.38 0.00 60.00 2.87 0.38 0.00 62.50 2.87 0.38 0.00 65.00 2.87 0.38 0.00 67.50 2.87 0.38 0.00 70.00 2.87 0.38 0.00 72.50 2.87 0.38 0.00 75.00 2.87 0.38 0.00 77.50 2.87 0.38 0.00 80.00 2.87 0.38 0.00 82.50 2.87 0.38 0.00 85.00 2.87 0.38 0.00 87.50 2.87 0.38 0.00 90.00 2.87 0.38 0.00 92.50 2.87 0.38 0.00 95.00 2.87 0.38 0.00 97.50 2.87 0.38 0.00 100.00 2.87 0.38 0.00 102.50 2.87 0.38 0.00 105.00 2.87 0.38 0.00 107.50 2.87 0.38 0.00 110.00 2.87 0.38 0.00 112.50 2.87 0.38 0.00 115.00 2.87 0.38 0.00 117.50 2.87 0.38 0.00 120.00 2.87 0.38 0.00 54647 - Drainage_Pre-Post Type II 24-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 13S: Postdevelopment - Project Area Runoff = 6.02 cfs @ 11.97 hrs, Volume= 0.286 af, Depth= 0.83" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.87" Area (ac) CN Description 1.240 60 Woods, Fair, HSG B 0.130 73 Woods, Fair, HSG C 0.940 61 >75% Grass cover, Good, HSG B 0.130 74 >75% Grass cover, Good, HSG C 0.540 80 >75% Grass cover, Good, HSG D 1.010 98 Paved parking, HSG B 0.160 98 Paved parking, HSG C 4.150 74 Weighted Average 2.980 71.81% Pervious Area 1.170 28.19% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, DIRECT Subcatchment 13S: Postdevelopment - Project Area Hydrograph I I I ' I I I I I - I I I I I I I I I ■Runoff •I , —I — I— —h — I— t —I — t —I 1 —1 — I— � —I— - 6� I I " I I I I I 1 1 Type I1124-hr - - - 7 - ; T -I - r - - 1-1-7learrRainfal 4*771'- - 5� i 1 1 1 1 1 'Runoff Area=4.150 at 1 1 1 1 1 1 1 1 1 1 1 4-' I I I 1 RunofflVolume=0:286 of - N tu;nOff 11DppthT0.031 0 3� 11 / 1 1 1 I 1 1 I 1 1 I 1 Tc5.'0 mill — I I I I I I I I I I I I I I I I I I �+I I I ' ' 1 1 1 1 1 1 IIIIIII CN74 2-' 1 1 1 1 1 1 1 I I I I I I I I I I 1 / 1 I I I I I 1 I 1 1 1- 1 1 1 ' 1 1 ci dill/ lilliil//l//iiiiiiiii�iii�iiiiiiiiiii///�/�/����/liiiiiiiiiiiiiiiii/2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 11 Hydrograph for Subcatchment 13S: Postdevelopment - Project Area Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.08 0.00 0.00 5.00 0.18 0.00 0.00 7.50 0.31 0.00 0.00 10.00 0.52 0.00 0.00 12.50 2.11 0.40 0.61 15.00 2.45 0.58 0.20 17.50 2.62 0.67 0.14 20.00 2.73 0.74 0.09 22.50 2.82 0.80 0.09 25.00 2.87 0.83 0.00 27.50 2.87 0.83 0.00 30.00 2.87 0.83 0.00 32.50 2.87 0.83 0.00 35.00 2.87 0.83 0.00 37.50 2.87 0.83 0.00 40.00 2.87 0.83 0.00 42.50 2.87 0.83 0.00 45.00 2.87 0.83 0.00 47.50 2.87 0.83 0.00 50.00 2.87 0.83 0.00 52.50 2.87 0.83 0.00 55.00 2.87 0.83 0.00 57.50 2.87 0.83 0.00 60.00 2.87 0.83 0.00 62.50 2.87 0.83 0.00 65.00 2.87 0.83 0.00 67.50 2.87 0.83 0.00 70.00 2.87 0.83 0.00 72.50 2.87 0.83 0.00 75.00 2.87 0.83 0.00 77.50 2.87 0.83 0.00 80.00 2.87 0.83 0.00 82.50 2.87 0.83 0.00 85.00 2.87 0.83 0.00 87.50 2.87 0.83 0.00 90.00 2.87 0.83 0.00 92.50 2.87 0.83 0.00 95.00 2.87 0.83 0.00 97.50 2.87 0.83 0.00 100.00 2.87 0.83 0.00 102.50 2.87 0.83 0.00 105.00 2.87 0.83 0.00 107.50 2.87 0.83 0.00 110.00 2.87 0.83 0.00 112.50 2.87 0.83 0.00 115.00 2.87 0.83 0.00 117.50 2.87 0.83 0.00 120.00 2.87 0.83 0.00 SAND FILTER WAXHAW VOLUNTEER FIRE •'����• • • DEPARTMENT TIMMONS JOB NO.: 54647.000 TIMMONS GROUP DATE: 5/3/2023 BY: AMC o THROUGH REVISED: 10/26/2023 RVW: WBS SAND FILTER BMP SUMMARY CHART Post-Routing Peak Control Storm Event Pre-dev Runoff Post-dev Runoff Runoff Elevation Top of Dam 583.00 100-yr-24hr 13.75 cfs 14.98 cfs 5.36 cfs 580.97 50-yr-24 hr 11.26 cfs 11.19 cfs 3.19 cfs 580.59 25-yr-24 hr 8.98 cfs 8.84 cfs 2.35 cfs 580.18 10-yr-24hr 6.26 cfs 6.12 cfs 1.47 cfs 579.63 2-yr-24hr 2.36 cfs 2.16 cfs 0.22 cfs 578.89 1-yr-24hr 1.22 cfs 1.22 cfs 0.15 cfs 578.45 DV= 6,752 cu-ft Maximum Ponding Depth= 6 ft Minimum Sand Filter Surface Area= 844 sf Provided Sand Filter Surface Area= 850 sf Sand Chamber Surface Area= 850 sf Water Quality Volume Sizing Sand Filter Basin Storage-Elevation Data Total Accum. Elevation Sedimentation Chamber Filtration Basin Vol.(cu ft) Notes Inc.Vol. Inc.Vol. Area(sf) Area(ac) (cu ft) Area(sf) Area(ac) (ac-ft) 575.50 0 0.000 0 850 0.020 0.000 0.00 576.50 0 0.000 0 850 0.020 850 850 577.00 0 0.000 0 850 0.020 425 1275 577.00 3579 0.082 0 0 0.000 0 1275 578.00 4438 0.102 4009 0 0.000 0 5284 579.00 5335 0.122 4887 0 0.000 0 10170 580.00 6289 0.144 5812 0 0.000 0 15982 581.00 7299 0.168 6794 0 0.000 0 22776 582.00 8366 0.192 7833 0 0.000 0 29759 Design Top of Sand Filter' 577.00 DV(Adj)= 6,752 cu-ft Elevation to hold DV(Adj)= 578.21 Water Draw Through Rate: Darcy's Equation: Q=(2.32*10^-5)*K*A*(H/L) Q= 0.0394 cfs Where: Q=Flow(Rate of Draw)through Bioretentioin Soil(cfs) K=Hydraulic Conductivity of soil(in./hr.)(2"/Hour) A=Surface Area of Sand Chamber Area(SF) H=Height of Water above Drainage Pipe(Underdrain) L=Thickness of Sand(1) Assume(H/L)—1 Source:(NCSU Rain Garden Design Worksheet,Bill Hunt) 1)Calculate Time to Drawdown water from Inundation to Saturation at Surface: Volume/Q: 79868 Seconds 22.2 Hours to Saturation 2)Calculate Time to lower Water Table to permanent pool surface: Assume 45%Porosity Volume=Area x PP Elev x 0.45 = 1417.5 Cubic Feet = 35941 Seconds = 10.0 Hours Ito Lower Water to Permanent Pool Elevation 3)Calculate Time to Drawdown Total: Ts-s+Ts-2 32.2 Hours �IZE UNDERDRAIN Pipe Size: D=16*{((Q*10)*n)/s^0.5}^(3/8) N=number of pipes Mannings Roughness Coefficients D=diameter of single pipe to carry flow(in) _ Pipe Type&Diameter n Q=Flow(cfs)*10 for factor of safety 4"Single Wall Corrugated Plastic 0.014-0.015 n=manning coefficient(see Table) 4"Smooth Wall Plastic 0.010-0.011 s=slope of pipe(typically assumed to be min.0.5%) 6"Single Wall Corrugated Plastic 0.014-0.015 (Bill Hunt Rain Garden Design Worksheet) 6"Smooth Wall Plastic 0.010-0.011 n= 0.010 8"Single Wall Corrugated Plastic 0.015-0.016 s= 0.005 (in decimal form) D= 5.4 Inches N= 2 pipes Pipe size= 6 in. diameter Recommended:Use atleast 2 pipes incase clogging occurs Source: (NCSU Rain Garden Design Worksheet,Bill Hunt) Number of pipes is based on MDC A-5 Tables 1 and 2 for Underdrains (4S) (es) ® ® Postdevelopme t Point (BS) ���Predevelopment oint 1 Predevelolpment Point 2 1 BYPAS 1 Postdevelo2ment Point lll �� A 6L ---------------1)'�� POND 1111 PRE DEV POST DEV (subcat Reach 'on• lit Routing Diagram for 54647-Drainage Pre-Post Prepared by Timmons Group, Printed 10/26/2023 0 HydroCAD®10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC 54647 - Drainage_Pre-Post Table of Contents Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC TABLE OF CONTENTS Project Reports 1 Routing Diagram 2 Project Notes 3 Rainfall Events Listing (selected events) 4 Area Listing (selected nodes) 5 Soil Listing (selected nodes) 6 Ground Covers (selected nodes) 7 Pipe Listing (selected nodes) 1-Year Event 8 Node Listing 9 Subcat 3S: Predevelopment Point 1 12 Subcat 4S: Postdevelopment Point 1 14 Subcat 7S: Predevelolpment Point 2 16 Subcat 8S: BYPASS 1 19 Subcat 9S: Postdevelopment Point 2 21 Pond 12P: POND 27 Link 6L: PRE DEV 29 Link 11 L: POST DEV 2-Year Event 31 Node Listing 32 Subcat 3S: Predevelopment Point 1 35 Subcat 4S: Postdevelopment Point 1 37 Subcat 7S: Predevelolpment Point 2 39 Subcat 8S: BYPASS 1 42 Subcat 9S: Postdevelopment Point 2 44 Pond 12P: POND 50 Link 6L: PRE DEV 52 Link 11 L: POST DEV 10-Year Event 54 Node Listing 55 Subcat 3S: Predevelopment Point 1 58 Subcat 4S: Postdevelopment Point 1 60 Subcat 7S: Predevelolpment Point 2 62 Subcat 8S: BYPASS 1 65 Subcat 9S: Postdevelopment Point 2 67 Pond 12P: POND 73 Link 6L: PRE DEV 75 Link 11 L: POST DEV 25-Year Event 77 Node Listing 78 Subcat 3S: Predevelopment Point 1 81 Subcat 4S: Postdevelopment Point 1 54647 - Drainage_Pre-Post Table of Contents Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC 83 Subcat 7S: Predevelolpment Point 2 85 Subcat 8S: BYPASS 1 88 Subcat 9S: Postdevelopment Point 2 90 Pond 12P: POND 96 Link 6L: PRE DEV 98 Link 11 L: POST DEV 50-Year Event 100 Node Listing 101 Subcat 3S: Predevelopment Point 1 104 Subcat 4S: Postdevelopment Point 1 106 Subcat 7S: Predevelolpment Point 2 108 Subcat 8S: BYPASS 1 111 Subcat 9S: Postdevelopment Point 2 113 Pond 12P: POND 119 Link 6L: PRE DEV 121 Link 11 L: POST DEV 100-Year Event 123 Node Listing 124 Subcat 3S: Predevelopment Point 1 127 Subcat 4S: Postdevelopment Point 1 129 Subcat 7S: Predevelolpment Point 2 131 Subcat 8S: BYPASS 1 134 Subcat 9S: Postdevelopment Point 2 136 Pond 12P: POND 142 Link 6L: PRE DEV 144 Link 11 L: POST DEV 54647 - Drainage_Pre-Post Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 3 Rainfall Events Listing (selected events) Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1-Year Type II 24-hr Default 24.00 1 2.87 2 2 2-Year Type II 24-hr Default 24.00 1 3.47 2 3 10-Year Type II 24-hr Default 24.00 1 5.05 2 4 25-Year Type II 24-hr Default 24.00 1 6.00 2 5 50-Year Type II 24-hr Default 24.00 1 6.75 2 6 100-Year Type II 24-hr Default 24.00 1 7.53 2 54647 - Drainage_Pre-Post Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 4 Area Listing (selected nodes) Area CN Description (acres) (subcatchment-numbers) 1.020 61 >75% Grass cover, Good, HSG B (4S, 8S) 0.130 74 >75% Grass cover, Good, HSG C (4S, 8S) 0.550 80 >75% Grass cover, Good, HSG D (4S, 8S) 0.120 56 Brush, Fair, HSG B (3S) 0.080 70 Brush, Fair, HSG C (3S) 0.350 77 Brush, Fair, HSG D (3S) 1.180 98 Paved parking, HSG B (3S, 4S, 8S) 0.280 98 Paved parking, HSG C (3S, 4S, 8S) 0.080 98 Paved parking, HSG D (3S, 8S) 6.470 60 Woods, Fair, HSG B (3S, 4S, 7S, 8S, 9S) 0.450 73 Woods, Fair, HSG C (3S, 8S) 0.200 79 Woods, Fair, HSG D (3S) 10.910 68 TOTAL AREA 54647 - Drainage_Pre-Post Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 5 Soil Listing (selected nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 8.790 HSG B 3S, 4S, 7S, 8S, 9S 0.940 HSG C 3S, 4S, 8S 1.180 HSG D 3S, 4S, 8S 0.000 Other 10.910 TOTAL AREA 54647 - Drainage_Pre-Post Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 6 Ground Covers (selected nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 1.020 0.130 0.550 0.000 1.700 >75% Grass cover, Good 4S, 8S 0.000 0.120 0.080 0.350 0.000 0.550 Brush, Fair 3S 0.000 1.180 0.280 0.080 0.000 1.540 Paved parking 3S, 4S, 8S 0.000 6.470 0.450 0.200 0.000 7.120 Woods, Fair 3S, 4S, 7S, 8S, 9S 0.000 8.790 0.940 1.180 0.000 10.910 TOTAL AREA 54647 - Drainage_Pre-Post Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 7 Pipe Listing (selected nodes) Line# Node In-Invert Out-Invert Length Slope n Width Diam/Height Inside-Fill Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) 1 12P 575.50 573.63 57.4 0.0326 0.013 0.0 15.0 0.0 54647 - Drainage_Pre-Post Type 1124-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 8 Time span=0.00-120.00 hrs, dt=0.05 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment3S: PredevelopmentPoint 1 Runoff Area=4.340 ac 4.61% Impervious Runoff Depth=0.45" Flow Length=624' Tc=27.8 min CN=65 Runoff=1.22 cfs 0.162 af Subcatchment4S: PostdevelopmentPoint Runoff Area=2.340 ac 48.29% Impervious Runoff Depth=1.21" Tc=5.0 min CN=81 Runoff=5.12 cfs 0.237 af Subcatchment7S: PredevelolpmentPoint 2 Runoff Area=1.110 ac 0.00% Impervious Runoff Depth=0.29" Flow Length=114' Tc=32.3 min CN=60 Runoff=0.13 cfs 0.027 af Subcatchment8S: BYPASS 1 Runoff Area=2.120 ac 9.91% Impervious Runoff Depth=0.56" Flow Length=627' Tc=17.8 min CN=68 Runoff=1.14 cfs 0.099 af Subcatchment9S: PostdevelopmentPoint 2 Runoff Area=1.000 ac 0.00% Impervious Runoff Depth=0.29" Flow Length=93' Slope=0.0106 '/' Tc=28.5 min CN=60 Runoff=0.13 cfs 0.024 af Pond 12P: POND Peak Elev=578.45' Storage=6,097 cf Inflow=5.12 cfs 0.237 af Primary=0.15 cfs 0.237 af Secondary=0.00 cfs 0.000 af Outflow=0.15 cfs 0.237 af Link 6L: PRE DEV Inflow=1.22 cfs 0.162 af Primary=1.22 cfs 0.162 af Link 11 L: POST DEV Inflow=1.22 cfs 0.336 af Primary=1.22 cfs 0.336 af Total Runoff Area = 10.910 ac Runoff Volume = 0.548 af Average Runoff Depth = 0.60" 85.88% Pervious = 9.370 ac 14.12% Impervious = 1.540 ac 54647 - Drainage_Pre-Post Type 1124-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 3S: Predevelopment Point 1 Runoff = 1.22 cfs @ 12.28 hrs, Volume= 0.162 af, Depth= 0.45" Routed to Link 6L : PRE DEV Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.87" Area (ac) CN Description 3.070 60 Woods, Fair, HSG B 0.320 73 Woods, Fair, HSG C 0.200 79 Woods, Fair, HSG D 0.120 56 Brush, Fair, HSG B 0.080 70 Brush, Fair, HSG C 0.350 77 Brush, Fair, HSG D 0.100 98 Paved parking, HSG B 0.060 98 Paved parking, HSG C 0.040 98 Paved parking, HSG D 4.340 65 Weighted Average 4.140 95.39% Pervious Area 0.200 4.61% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) _ 13.9 100 0.0734 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" 3.9 254 0.0477 1.09 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 10.0 270 0.0391 0.45 1.34 Channel Flow, CHANNEL Area= 3.0 sf Perim= 6.3' r= 0.48' n= 0.400 Sheet flow: Woods+light brush 27.8 624 Total 54647 - Drainage_Pre-Post Type II 24-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 10 Subcatchment 3S: Predevelopment Point 1 Hydrograph I I I I I I I I I I I I I I I I I I I I I I I I ❑Runoff 11.22 cfs I ' I I 1 I I 1 I I 1 I 1 I 1 1 11 I I 1 I I 1 I 1Type 11124-hr 11 ' - I— _, - + -11 - 1- -� - 117 r_Rlainfalhz.076' 1 / ' ' 'Runbff Awea=4.340 at 1 I I 1 1 I 1 1 I I 1 1 / 1 Runoff Volume=0.162 of 1 1nn u'n 'ff'De th 0.1Q56' 1 Q p — h 1 LL I FIOw'mi 1Length=624' I I 1 1 I ITc=27.18 min mil 1 1 1 1 1 1 1 1 l�l 6 1 1 1 1 1 1 1 1 1 1 III 1 1 ' 1 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 11 Hydrograph for Subcatchment 3S: Predevelopment Point 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.08 0.00 0.00 5.00 0.18 0.00 0.00 7.50 0.31 0.00 0.00 10.00 0.52 0.00 0.00 12.50 2.11 0.17 0.83 15.00 2.45 0.28 0.15 17.50 2.62 0.34 0.10 20.00 2.73 0.39 0.07 22.50 2.82 0.43 0.06 25.00 2.87 0.45 0.00 27.50 2.87 0.45 0.00 30.00 2.87 0.45 0.00 32.50 2.87 0.45 0.00 35.00 2.87 0.45 0.00 37.50 2.87 0.45 0.00 40.00 2.87 0.45 0.00 42.50 2.87 0.45 0.00 45.00 2.87 0.45 0.00 47.50 2.87 0.45 0.00 50.00 2.87 0.45 0.00 52.50 2.87 0.45 0.00 55.00 2.87 0.45 0.00 57.50 2.87 0.45 0.00 60.00 2.87 0.45 0.00 62.50 2.87 0.45 0.00 65.00 2.87 0.45 0.00 67.50 2.87 0.45 0.00 70.00 2.87 0.45 0.00 72.50 2.87 0.45 0.00 75.00 2.87 0.45 0.00 77.50 2.87 0.45 0.00 80.00 2.87 0.45 0.00 82.50 2.87 0.45 0.00 85.00 2.87 0.45 0.00 87.50 2.87 0.45 0.00 90.00 2.87 0.45 0.00 92.50 2.87 0.45 0.00 95.00 2.87 0.45 0.00 97.50 2.87 0.45 0.00 100.00 2.87 0.45 0.00 102.50 2.87 0.45 0.00 105.00 2.87 0.45 0.00 107.50 2.87 0.45 0.00 110.00 2.87 0.45 0.00 112.50 2.87 0.45 0.00 115.00 2.87 0.45 0.00 117.50 2.87 0.45 0.00 120.00 2.87 0.45 0.00 54647 - Drainage_Pre-Post Type II 24-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 4S: Postdevelopment Point 1 [49] Hint: Tc<2dt may require smaller dt Runoff = 5.12 cfs @ 11.96 hrs, Volume= 0.237 af, Depth= 1.21" Routed to Pond 12P : POND Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.87" Area (ac) CN Description 0.850 61 >75% Grass cover, Good, HSG B 0.010 74 >75% Grass cover, Good, HSG C 0.240 80 >75% Grass cover, Good, HSG D 1.000 98 Paved parking, HSG B 0.130 98 Paved parking, HSG C 0.110 60 Woods, Fair, HSG B 2.340 81 Weighted Average 1.210 51.71% Pervious Area 1.130 48.29% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, DIRECT Subcatchment 4S: Postdevelopment Point 1 Hydrograph I I I I I I i I I - I I I I I I I I I I I ■Runoff _ J_ ® I 1 _I_ L I 1 _ 1 _ILJILI_ _ 5- I I I I I I 1 I I I I I I1 pe I11 24-h r 1 1 1 1 ; 1�Yoarl Rainfall-2 1nfall-2.07�' 4� 1 11 I I 1 1 1Runbff Area=2.340 ad - I I I I I I 1 I I 1 1 I 1 1 11 11 1 Runoff Volume=0.237 af 3� I I 11 1 I tu;ngff1Depth 1 117 o _ 1 / 1 1 1 1 1 1 1 1 Tc 5.10 Mill " 1 1 1 1 1 1 1 1 1 I I I I I 2� 1 1 1 I 1 1 I 1 1 1 1 1 #8I- - 1 1 I I I I I I I 1-/ 1 1 1 1 1 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 13 Hydrograph for Subcatchment 4S: Postdevelopment Point 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.08 0.00 0.00 5.00 0.18 0.00 0.00 7.50 0.31 0.00 0.00 10.00 0.52 0.00 0.01 12.50 2.11 0.68 0.46 15.00 2.45 0.91 0.15 17.50 2.62 1.03 0.10 20.00 2.73 1.11 0.07 22.50 2.82 1.18 0.06 25.00 2.87 1.21 0.00 27.50 2.87 1.21 0.00 30.00 2.87 1.21 0.00 32.50 2.87 1.21 0.00 35.00 2.87 1.21 0.00 37.50 2.87 1.21 0.00 40.00 2.87 1.21 0.00 42.50 2.87 1.21 0.00 45.00 2.87 1.21 0.00 47.50 2.87 1.21 0.00 50.00 2.87 1.21 0.00 52.50 2.87 1.21 0.00 55.00 2.87 1.21 0.00 57.50 2.87 1.21 0.00 60.00 2.87 1.21 0.00 62.50 2.87 1.21 0.00 65.00 2.87 1.21 0.00 67.50 2.87 1.21 0.00 70.00 2.87 1.21 0.00 72.50 2.87 1.21 0.00 75.00 2.87 1.21 0.00 77.50 2.87 1.21 0.00 80.00 2.87 1.21 0.00 82.50 2.87 1.21 0.00 85.00 2.87 1.21 0.00 87.50 2.87 1.21 0.00 90.00 2.87 1.21 0.00 92.50 2.87 1.21 0.00 95.00 2.87 1.21 0.00 97.50 2.87 1.21 0.00 100.00 2.87 1.21 0.00 102.50 2.87 1.21 0.00 105.00 2.87 1.21 0.00 107.50 2.87 1.21 0.00 110.00 2.87 1.21 0.00 112.50 2.87 1.21 0.00 115.00 2.87 1.21 0.00 117.50 2.87 1.21 0.00 120.00 2.87 1.21 0.00 54647 - Drainage_Pre-Post Type II 24-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment 7S: Predevelolpment Point 2 Runoff = 0.13 cfs @ 12.40 hrs, Volume= 0.027 af, Depth= 0.29" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.87" Area (ac) CN Description 1.110 60 Woods, Fair, HSG B 1.110 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.9 100 0.0093 0.05 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" 0.4 14 0.0121 0.55 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 32.3 114 Total Subcatchment 7S: Predevelolpment Point 2 Hydrograph /1 I I I I I I II 0.14� I 1 1 1 I ❑Runoff 'r- II 0.13 cfs I 7 I I i I i I -r 1 1 0.13� 1_ J —/ L —I — LL — I- 1 I— LJ I— L —I L —I — I JT7'pe- 1-1124-hr 0.12 �� 11 �4- far n#a1 i1=2.07' 0.11 0.1� 1- H / - I HH - 1— 1 1— H -1 1— H —Ran-offA1-ea=1.1'fiOaac- 1_ J —/ L —I — HL — I- 1 I— HJ 1— H —I L —I — J — I— L —I — LL 0.09 11 / 1 1 1 1 1 1 1 Runoff 1Volume=10.027 af 0.08 I / 1 I 1 1u1___I� In �TI��_1=1 0. ,. fi — r — I— rt — — fi — I— rt -1- III T-w� ,�I 30 0.07= ,I— 4 J — I— 1 —1— J — — 4 —I— L Fb'W L-enOtf1— 1�14'- u` 0.06 0.05 I 1 I I 1 1 1 I 1 I I 1 I I�Q=32.3-min 1— H -r -I - H 1 - I— -1 1— fi -I 1- H -I t -1 - I rt - 1- t (e('i,kAi'is 0.04_ , 1_ -I - L J - I- 1 -1- L J - L L -I- L -1 - I- J - 1- L _ Nr6 o.oa� i %' 11 I 1 1 1 1 1 I- 11 -i I o.oz: r 7 �// r 7 — I— T —I— tI 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 15 Hydrograph for Subcatchment 7S: Predevelolpment Point 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.08 0.00 0.00 5.00 0.18 0.00 0.00 7.50 0.31 0.00 0.00 10.00 0.52 0.00 0.00 12.50 2.11 0.08 0.12 15.00 2.45 0.16 0.03 17.50 2.62 0.21 0.02 20.00 2.73 0.24 0.01 22.50 2.82 0.27 0.01 25.00 2.87 0.29 0.00 27.50 2.87 0.29 0.00 30.00 2.87 0.29 0.00 32.50 2.87 0.29 0.00 35.00 2.87 0.29 0.00 37.50 2.87 0.29 0.00 40.00 2.87 0.29 0.00 42.50 2.87 0.29 0.00 45.00 2.87 0.29 0.00 47.50 2.87 0.29 0.00 50.00 2.87 0.29 0.00 52.50 2.87 0.29 0.00 55.00 2.87 0.29 0.00 57.50 2.87 0.29 0.00 60.00 2.87 0.29 0.00 62.50 2.87 0.29 0.00 65.00 2.87 0.29 0.00 67.50 2.87 0.29 0.00 70.00 2.87 0.29 0.00 72.50 2.87 0.29 0.00 75.00 2.87 0.29 0.00 77.50 2.87 0.29 0.00 80.00 2.87 0.29 0.00 82.50 2.87 0.29 0.00 85.00 2.87 0.29 0.00 87.50 2.87 0.29 0.00 90.00 2.87 0.29 0.00 92.50 2.87 0.29 0.00 95.00 2.87 0.29 0.00 97.50 2.87 0.29 0.00 100.00 2.87 0.29 0.00 102.50 2.87 0.29 0.00 105.00 2.87 0.29 0.00 107.50 2.87 0.29 0.00 110.00 2.87 0.29 0.00 112.50 2.87 0.29 0.00 115.00 2.87 0.29 0.00 117.50 2.87 0.29 0.00 120.00 2.87 0.29 0.00 54647 - Drainage_Pre-Post Type 1124-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment 8S: BYPASS 1 Runoff = 1.14 cfs @ 12.13 hrs, Volume= 0.099 af, Depth= 0.56" Routed to Link 11 L : POST DEV Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.87" Area (ac) CN Description 1.180 60 Woods, Fair, HSG B 0.130 73 Woods, Fair, HSG C 0.170 61 >75% Grass cover, Good, HSG B 0.120 74 >75% Grass cover, Good, HSG C 0.310 80 >75% Grass cover, Good, HSG D 0.080 98 Paved parking, HSG B 0.090 98 Paved parking, HSG C 0.040 98 Paved parking, HSG D 2.120 68 Weighted Average 1.910 90.09% Pervious Area 0.210 9.91% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.9 100 0.0734 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" 3.8 249 0.0472 1.09 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.1 278 0.0398 37.88 454.62 Channel Flow, Area= 12.0 sf Perim= 7.2' r= 1.67' n= 0.011 Concrete pipe, straight & clean 17.8 627 Total 54647 - Drainage_Pre-Post Type II 24-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 17 Subcatchment 8S: BYPASS 1 Hydrograph 1 1 1 1 1 1 I 1 1 I I 1 I I 1 I I I I I I I 1 1 ❑Runoff i 1.14cfs l 1 I I 1 I I 1 I I 1 1 I 1 I 1 1 ' I I 1 I I 1 I I 1 1 I Type I1124-h r / 1 -I- + 1.Year R1,aiiifaI1-2.871'1 1 i i i 1 1 1Runbff Awes=2.120 at 1 / I I I I I 1 1 I I 1 1 Runoff Volume=0.099 of y / u;ngff',Depth 0.'156�' LL / 11 1 1 1 FIOw ltength=627' / I I 1 1 I ITc=17.18 min mil r6Ki. i2 1 1 1 1 1 1 "1 6 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 III 1 1 ' 1 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 18 Hydrograph for Subcatchment 8S: BYPASS 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.08 0.00 0.00 5.00 0.18 0.00 0.00 7.50 0.31 0.00 0.00 10.00 0.52 0.00 0.00 12.50 2.11 0.23 0.36 15.00 2.45 0.37 0.08 17.50 2.62 0.44 0.06 20.00 2.73 0.49 0.04 22.50 2.82 0.54 0.04 25.00 2.87 0.56 0.00 27.50 2.87 0.56 0.00 30.00 2.87 0.56 0.00 32.50 2.87 0.56 0.00 35.00 2.87 0.56 0.00 37.50 2.87 0.56 0.00 40.00 2.87 0.56 0.00 42.50 2.87 0.56 0.00 45.00 2.87 0.56 0.00 47.50 2.87 0.56 0.00 50.00 2.87 0.56 0.00 52.50 2.87 0.56 0.00 55.00 2.87 0.56 0.00 57.50 2.87 0.56 0.00 60.00 2.87 0.56 0.00 62.50 2.87 0.56 0.00 65.00 2.87 0.56 0.00 67.50 2.87 0.56 0.00 70.00 2.87 0.56 0.00 72.50 2.87 0.56 0.00 75.00 2.87 0.56 0.00 77.50 2.87 0.56 0.00 80.00 2.87 0.56 0.00 82.50 2.87 0.56 0.00 85.00 2.87 0.56 0.00 87.50 2.87 0.56 0.00 90.00 2.87 0.56 0.00 92.50 2.87 0.56 0.00 95.00 2.87 0.56 0.00 97.50 2.87 0.56 0.00 100.00 2.87 0.56 0.00 102.50 2.87 0.56 0.00 105.00 2.87 0.56 0.00 107.50 2.87 0.56 0.00 110.00 2.87 0.56 0.00 112.50 2.87 0.56 0.00 115.00 2.87 0.56 0.00 117.50 2.87 0.56 0.00 120.00 2.87 0.56 0.00 54647 - Drainage_Pre-Post Type II 24-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment 9S: Postdevelopment Point 2 Runoff = 0.13 cfs @ 12.34 hrs, Volume= 0.024 af, Depth= 0.29" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.87" Area (ac) CN Description 1.000 60 Woods, Fair, HSG B 1.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.5 93 0.0106 0.05 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" Subcatchment 9S: Postdevelopment Point 2 Hydrograph -1 I ± I ± H - 1- t I- H - I -1 -1 fi -1 - - - I t -I - 1- -1 - 0.14 I I I I I I I I I I I I I I I I I I I I I ■Runoff 0.13 I IX= 1 I 1 I I 1 1 I 1 I I 1 I I 1 1 Icy I 1 I ! 1 I 1 I I 1 1 I 1 I I 1 I Type Itl24 hrr 0.12 0.11 1 / 1 —11— 1— -4 — I- -I- 4 -I - - -i�- aP �lllfa�ll�2. '- Vil o.i1 1 / I I 1 1 I 1 Rinbff Area=1.000 ad -r -/ . - r7 - I- rt -1- 7 -I - I- rt -I- r —I — r7 - 1- 7 -I - r7 - 0.09 _4 _ I- -I- 1_ _l — I— _L —I— —I - 1— RunaffVol ume40!024 af_ 0.08 1 1 1 1 1 1 1 1 1 1 FIWIF _IO ^PP411 e i^I„ 0.07 / FI4�T�.J`Tr�7 I . — r - — I— t -1— -h —I - 1— —h —I— fi -fibvvterlgfh 93'- LL 0.06 1_ -1- 1_ 1 _ 1_ 1 _1_ LJ _ I_ 1 _I- L _I _ I- _ _ 1_ L _I _ 1 _ _ 0.05 1 11 I I I 1 1 I 1 I I 1 SlolTpe=0.0106 /'' 0.04 ▪ 1 -I - - I- -I- - I- - - -1 - I- 4 = 8.�11 ,�i - 0.03 % 1 1 1 1 1 1 1 1 1 QnIt6O 0.02 1 I / I I I I I 1 I I I I I I —I 1 0.01 �% 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 20 Hydrograph for Subcatchment 9S: Postdevelopment Point 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.08 0.00 0.00 5.00 0.18 0.00 0.00 7.50 0.31 0.00 0.00 10.00 0.52 0.00 0.00 12.50 2.11 0.08 0.10 15.00 2.45 0.16 0.02 17.50 2.62 0.21 0.02 20.00 2.73 0.24 0.01 22.50 2.82 0.27 0.01 25.00 2.87 0.29 0.00 27.50 2.87 0.29 0.00 30.00 2.87 0.29 0.00 32.50 2.87 0.29 0.00 35.00 2.87 0.29 0.00 37.50 2.87 0.29 0.00 40.00 2.87 0.29 0.00 42.50 2.87 0.29 0.00 45.00 2.87 0.29 0.00 47.50 2.87 0.29 0.00 50.00 2.87 0.29 0.00 52.50 2.87 0.29 0.00 55.00 2.87 0.29 0.00 57.50 2.87 0.29 0.00 60.00 2.87 0.29 0.00 62.50 2.87 0.29 0.00 65.00 2.87 0.29 0.00 67.50 2.87 0.29 0.00 70.00 2.87 0.29 0.00 72.50 2.87 0.29 0.00 75.00 2.87 0.29 0.00 77.50 2.87 0.29 0.00 80.00 2.87 0.29 0.00 82.50 2.87 0.29 0.00 85.00 2.87 0.29 0.00 87.50 2.87 0.29 0.00 90.00 2.87 0.29 0.00 92.50 2.87 0.29 0.00 95.00 2.87 0.29 0.00 97.50 2.87 0.29 0.00 100.00 2.87 0.29 0.00 102.50 2.87 0.29 0.00 105.00 2.87 0.29 0.00 107.50 2.87 0.29 0.00 110.00 2.87 0.29 0.00 112.50 2.87 0.29 0.00 115.00 2.87 0.29 0.00 117.50 2.87 0.29 0.00 120.00 2.87 0.29 0.00 54647 - Drainage_Pre-Post Type 1124-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 21 Summary for Pond 12P: POND [44] Hint: Outlet device#2 is below defined storage Inflow Area = 2.340 ac, 48.29% Impervious, Inflow Depth = 1.21" for 1-Year event Inflow = 5.12 cfs @ 11.96 hrs, Volume= 0.237 af Outflow = 0.15 cfs @ 15.01 hrs, Volume= 0.237 af, Atten= 97%, Lag= 183.1 min Primary = 0.15 cfs @ 15.01 hrs, Volume= 0.237 af Routed to Link 11 L : POST DEV Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Link 11 L : POST DEV Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 578.45'@ 15.01 hrs Surf.Area= 4,842 sf Storage= 6,097 cf Plug-Flow detention time=677.2 min calculated for 0.237 af(100% of inflow) Center-of-Mass det. time=677.5 min ( 1,518.4 - 840.9 ) Volume Invert Avail.Storage Storage Description #1 577.00' 38,262 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 577.00 3,579 0 0 578.00 4,438 4,009 4,009 579.00 5,335 4,887 8,895 580.00 6,289 5,812 14,707 581.00 7,299 6,794 21,501 582.00 8,366 7,833 29,334 583.00 9,490 8,928 38,262 Device Routing Invert Outlet Devices #1 Primary 575.50' 15.0" Round Culvert L= 57.4' RCP, rounded edge headwall, Ke= 0.100 Inlet/ Outlet Invert= 575.50'/ 573.63' S= 0.0326 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.23 sf #2 Device 1 575.50' SAND FILTER Head (feet) 0.00 1.00 1.50 2.50 3.50 4.50 5.50 6.50 Disch. (cfs) 0.000 0.052 0.060 0.077 0.095 0.112 0.129 0.146 #3 Device 1 578.21' 2.5" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 578.89' 15.0" W x 3.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 579.63' 6.0" W x 3.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Device 1 580.18' 6.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #7 Device 1 580.80' 2.0' long x 0.5' breadth Broad-Crested Rectangular Weir X 4.00 Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #8 Device 1 581.00' 3.0' long x 0.5' breadth Broad-Crested Rectangular Weir X 4.00 Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 54647 - Drainage_Pre-Post Type 1124-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 22 #9 Secondary 582.00' 20.0' long x 16.0' breadth EMERGENCY SPILLWAY Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.15 cfs @ 15.01 hrs HW=578.45' (Free Discharge) 4-1=Culvert (Passes 0.15 cfs of 11.92 cfs potential flow) 2=SAND FILTER (Custom Controls 0.09 cfs) 3=Orifice/Grate (Orifice Controls 0.06 cfs @ 1.78 fps) =Orifice/Grate ( Controls 0.00 cfs) 5=Orifice/Grate ( Controls 0.00 cfs) =Orifice/Grate ( Controls 0.00 cfs) 7=Broad-Crested Rectangular Weir( Controls 0.00 cfs) 8=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=577.00' (Free Discharge) 4-9=EMERGENCY SPILLWAY( Controls 0.00 cfs) Pond 12P: POND Hydrograph I I 1 1 1 1 1 1 1 1 ❑Inflow 5.12 cfs -h 1- fi ❑Outflow Inflow Area=2.340 ac ❑Primary i I I I I I ❑Secondary / I Peak EIev=578.45' 5 -I- '7 -t -I - 1- I- 1 I I I 1 I 1 Storage=6,097 cf I I I 1 I 1 1 1 1 1 1 4 -I- 1- fi -I - I- 1- fi -1 - I- 1- rt -I - I- firt -I- 1 I I I I I I I I I I 1 1 1 w / 1 I I I I I I I I I I 1 I 1 3 -1- 1- rt 1 1 r rt 1 1 r rt 1 t 1 1 I I 1 1 1 1 1 1 1 1 1 1 1 1 I 1 0 LL I 1 1 1 1 1 1 1 1 1 1 1 1 I 1 2 I r rt 1 1 r rt l l r rt 1 I r -r 1 I 1 I I 1 1 1 1 1 1 1 1 1 1 1 1 j% 1 1 1 1 1 1 1 1 1 1 1 0.15 cfs A 0.15 cfs .'/ 00 cfs / �/ 0. %////////////////////////////////////////////////////////////////////////////////////////// o 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type 1124-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 23 Pond 12P: POND Stage-Discharge I I I I ❑Total 583 ❑Primary ❑Secondary EMERGENCY SPILLWAY 582 1 1 / , 1 */� Broad-Crested Rectangular Weir Broad-Crested Rectangular Weir I 1 581 o / I 1 5 Orifice/Grate I 1 I c 580 �- /0 Orifice/Grate I / I I I I I Orifice/Grate w 1 579 7 1 Orifice/Grate I 1 578 O% 1 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Discharge (cfs) Pond 12P: POND Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 500 1,000 1,500 2,000 2,500 3,000 3,5004,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,000 8,500 9,000 0 Surface . . ' . . . ! . . . ' . . . . . . ! . . . I . ( . I . . . ! . . . I . . . I . . . 1 , , . I . . . ' . . . 1 . . . I . . . ' . . . ! . . . ❑Storage ::: � I 11 II 1 1 I 1 1 I 1 I I I ////' II I 1 1 _ I I I I II I I I I ��/�/ ' ,, " I I I II I I I 581 11 I I I I I II I I I a 580- 1 I I .. "/ . I II I 1 1 I II 1 I I d _ — I H + + I + I i+ r 1+ + + —II— I H r + w - I I I I I I II I I I 579-" I I II I 1 1 I II 1 I I - n - — — r — — - - r - 1- I1 tt — r1r - — + II1rtrr 578 II I I I 1 II I 1 1 / / / - Custom Stage Data / z / / 577 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 Storage(cubic-feet) 54647 - Drainage_Pre-Post Type II 24-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 24 Hydrograph for Pond 12P: POND Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 577.00 0.00 0.00 0.00 2.50 0.00 0 577.00 0.00 0.00 0.00 5.00 0.00 0 577.00 0.00 0.00 0.00 7.50 0.00 0 577.00 0.00 0.00 0.00 10.00 0.01 5 577.00 0.00 0.00 0.00 12.50 0.46 5,244 578.27 0.09 0.09 0.00 15.00 0.15 6,098 578.45 0.15 0.15 0.00 17.50 0.10 5,864 578.40 0.13 0.13 0.00 20.00 0.07 5,514 578.33 0.11 0.11 0.00 22.50 0.06 5,213 578.26 0.09 0.09 0.00 25.00 0.00 4,790 578.17 0.08 0.08 0.00 27.50 0.00 4,082 578.02 0.08 0.08 0.00 30.00 0.00 3,398 577.86 0.07 0.07 0.00 32.50 0.00 2,738 577.71 0.07 0.07 0.00 35.00 0.00 2,102 577.55 0.07 0.07 0.00 37.50 0.00 1,490 577.40 0.07 0.07 0.00 40.00 0.00 901 577.24 0.06 0.06 0.00 42.50 0.00 335 577.09 0.06 0.06 0.00 45.00 0.00 29 577.01 0.01 0.01 0.00 47.50 0.00 2 577.00 0.00 0.00 0.00 50.00 0.00 0 577.00 0.00 0.00 0.00 52.50 0.00 0 577.00 0.00 0.00 0.00 55.00 0.00 0 577.00 0.00 0.00 0.00 57.50 0.00 0 577.00 0.00 0.00 0.00 60.00 0.00 0 577.00 0.00 0.00 0.00 62.50 0.00 0 577.00 0.00 0.00 0.00 65.00 0.00 0 577.00 0.00 0.00 0.00 67.50 0.00 0 577.00 0.00 0.00 0.00 70.00 0.00 0 577.00 0.00 0.00 0.00 72.50 0.00 0 577.00 0.00 0.00 0.00 75.00 0.00 0 577.00 0.00 0.00 0.00 77.50 0.00 0 577.00 0.00 0.00 0.00 80.00 0.00 0 577.00 0.00 0.00 0.00 82.50 0.00 0 577.00 0.00 0.00 0.00 85.00 0.00 0 577.00 0.00 0.00 0.00 87.50 0.00 0 577.00 0.00 0.00 0.00 90.00 0.00 0 577.00 0.00 0.00 0.00 92.50 0.00 0 577.00 0.00 0.00 0.00 95.00 0.00 0 577.00 0.00 0.00 0.00 97.50 0.00 0 577.00 0.00 0.00 0.00 100.00 0.00 0 577.00 0.00 0.00 0.00 102.50 0.00 0 577.00 0.00 0.00 0.00 105.00 0.00 0 577.00 0.00 0.00 0.00 107.50 0.00 0 577.00 0.00 0.00 0.00 110.00 0.00 0 577.00 0.00 0.00 0.00 112.50 0.00 0 577.00 0.00 0.00 0.00 115.00 0.00 0 577.00 0.00 0.00 0.00 117.50 0.00 0 577.00 0.00 0.00 0.00 120.00 0.00 0 577.00 0.00 0.00 0.00 54647 - Drainage_Pre-Post Type 1124-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 25 Stage-Discharge for Pond 12P: POND Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 577.00 0.00 0.00 0.00 582.20 21.86 17.06 4.79 577.10 0.06 0.06 0.00 582.30 26.02 17.18 8.84 577.20 0.06 0.06 0.00 582.40 30.96 17.29 13.66 577.30 0.07 0.07 0.00 582.50 36.50 17.41 19.09 577.40 0.07 0.07 0.00 582.60 42.62 17.52 25.10 577.50 0.07 0.07 0.00 582.70 48.91 17.64 31.27 577.60 0.07 0.07 0.00 582.80 55.53 17.75 37.78 577.70 0.07 0.07 0.00 582.90 62.86 17.86 45.00 577.80 0.07 0.07 0.00 583.00 70.57 17.97 52.60 577.90 0.08 0.08 0.00 578.00 0.08 0.08 0.00 578.10 0.08 0.08 0.00 578.20 0.08 0.08 0.00 578.30 0.10 0.10 0.00 578.40 0.13 0.13 0.00 578.50 0.16 0.16 0.00 578.60 0.18 0.18 0.00 578.70 0.19 0.19 0.00 578.80 0.21 0.21 0.00 578.90 0.22 0.22 0.00 579.00 0.38 0.38 0.00 579.10 0.63 0.63 0.00 579.20 0.89 0.89 0.00 579.30 1.06 1.06 0.00 579.40 1.20 1.20 0.00 579.50 1.33 1.33 0.00 579.60 1.44 1.44 0.00 579.70 1.57 1.57 0.00 579.80 1.75 1.75 0.00 579.90 1.95 1.95 0.00 580.00 2.11 2.11 0.00 580.10 2.25 2.25 0.00 580.20 2.38 2.38 0.00 580.30 2.54 2.54 0.00 580.40 2.74 2.74 0.00 580.50 2.97 2.97 0.00 580.60 3.21 3.21 0.00 580.70 3.41 3.41 0.00 580.80 3.58 3.58 0.00 580.90 4.46 4.46 0.00 581.00 5.91 5.91 0.00 581.10 8.87 8.87 0.00 581.20 13.10 13.10 0.00 581.30 15.98 15.98 0.00 581.40 16.10 16.10 0.00 581.50 16.23 16.23 0.00 581.60 16.35 16.35 0.00 581.70 16.47 16.47 0.00 581.80 16.59 16.59 0.00 581.90 16.71 16.71 0.00 582.00 16.83 16.83 0.00 582.10 18.64 16.95 1.69 54647 - Drainage_Pre-Post Type 1124-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 26 Stage-Area-Storage for Pond 12P: POND Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 577.00 3,579 0 582.20 8,591 31,029 577.10 3,665 362 582.30 8,703 31,894 577.20 3,751 733 582.40 8,816 32,770 577.30 3,837 1,112 582.50 8,928 33,657 577.40 3,923 1,500 582.60 9,040 34,555 577.50 4,009 1,897 582.70 9,153 35,465 577.60 4,094 2,302 582.80 9,265 36,386 577.70 4,180 2,716 582.90 9,378 37,318 577.80 4,266 3,138 583.00 9,490 38,262 577.90 4,352 3,569 578.00 4,438 4,009 578.10 4,528 4,457 578.20 4,617 4,914 578.30 4,707 5,380 578.40 4,797 5,855 578.50 4,887 6,340 578.60 4,976 6,833 578.70 5,066 7,335 578.80 5,156 7,846 578.90 5,245 8,366 579.00 5,335 8,895 579.10 5,430 9,433 579.20 5,526 9,981 579.30 5,621 10,538 579.40 5,717 11,105 579.50 5,812 11,682 579.60 5,907 12,268 579.70 6,003 12,863 579.80 6,098 13,468 579.90 6,194 14,083 580.00 6,289 14,707 580.10 6,390 15,341 580.20 6,491 15,985 580.30 6,592 16,639 580.40 6,693 17,303 580.50 6,794 17,978 580.60 6,895 18,662 580.70 6,996 19,357 580.80 7,097 20,061 580.90 7,198 20,776 581.00 7,299 21,501 581.10 7,406 22,236 581.20 7,512 22,982 581.30 7,619 23,739 581.40 7,726 24,506 581.50 7,833 25,284 581.60 7,939 26,072 581.70 8,046 26,872 581.80 8,153 27,682 581.90 8,259 28,502 582.00 8,366 29,334 582.10 8,478 30,176 54647 - Drainage_Pre-Post Type 1124-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 27 Summary for Link 6L: PRE DEV Inflow Area = 4.340 ac, 4.61% Impervious, Inflow Depth = 0.45" for 1-Year event Inflow = 1.22 cfs @ 12.28 hrs, Volume= 0.162 af Primary = 1.22 cfs @ 12.28 hrs, Volume= 0.162 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 6L: PRE DEV Hydrograph / I I I I I I ❑ Inflow 122 cfs I ❑Primary 1122cfs c/ I I Inflow Area=4.340 ac 4 0 T. 0 / 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 28 Hydrograph for Link 6L: PRE DEV Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.00 0.00 0.00 10.00 0.00 0.00 0.00 12.50 0.83 0.00 0.83 15.00 0.15 0.00 0.15 17.50 0.10 0.00 0.10 20.00 0.07 0.00 0.07 22.50 0.06 0.00 0.06 25.00 0.00 0.00 0.00 27.50 0.00 0.00 0.00 30.00 0.00 0.00 0.00 32.50 0.00 0.00 0.00 35.00 0.00 0.00 0.00 37.50 0.00 0.00 0.00 40.00 0.00 0.00 0.00 42.50 0.00 0.00 0.00 45.00 0.00 0.00 0.00 47.50 0.00 0.00 0.00 50.00 0.00 0.00 0.00 52.50 0.00 0.00 0.00 55.00 0.00 0.00 0.00 57.50 0.00 0.00 0.00 60.00 0.00 0.00 0.00 62.50 0.00 0.00 0.00 65.00 0.00 0.00 0.00 67.50 0.00 0.00 0.00 70.00 0.00 0.00 0.00 72.50 0.00 0.00 0.00 75.00 0.00 0.00 0.00 77.50 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 54647 - Drainage_Pre-Post Type 1124-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 29 Summary for Link 11 L: POST DEV Inflow Area = 4.460 ac, 30.04% Impervious, Inflow Depth = 0.90" for 1-Year event Inflow = 1.22 cfs @ 12.13 hrs, Volume= 0.336 af Primary = 1.22 cfs @ 12.13 hrs, Volume= 0.336 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 11 L: POST DEV Hydrograph / I I ❑ Inflow 122 cfs I D Primary lI22c1s1 Inflow Area=4.460 ac 17 I T 1 Vl 0 T. I I L, 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 1-Year Rainfall=2.87" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 30 Hydrograph for Link 11 L: POST DEV Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.00 0.00 0.00 10.00 0.00 0.00 0.00 12.50 0.45 0.00 0.45 15.00 0.23 0.00 0.23 17.50 0.19 0.00 0.19 20.00 0.15 0.00 0.15 22.50 0.12 0.00 0.12 25.00 0.08 0.00 0.08 27.50 0.08 0.00 0.08 30.00 0.07 0.00 0.07 32.50 0.07 0.00 0.07 35.00 0.07 0.00 0.07 37.50 0.07 0.00 0.07 40.00 0.06 0.00 0.06 42.50 0.06 0.00 0.06 45.00 0.01 0.00 0.01 47.50 0.00 0.00 0.00 50.00 0.00 0.00 0.00 52.50 0.00 0.00 0.00 55.00 0.00 0.00 0.00 57.50 0.00 0.00 0.00 60.00 0.00 0.00 0.00 62.50 0.00 0.00 0.00 65.00 0.00 0.00 0.00 67.50 0.00 0.00 0.00 70.00 0.00 0.00 0.00 72.50 0.00 0.00 0.00 75.00 0.00 0.00 0.00 77.50 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 54647 - Drainage_Pre-Post Type 1124-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 31 Time span=0.00-120.00 hrs, dt=0.05 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment3S: PredevelopmentPoint 1 Runoff Area=4.340 ac 4.61% Impervious Runoff Depth=0.74" Flow Length=624' Tc=27.8 min CN=65 Runoff=2.36 cfs 0.266 af Subcatchment4S: PostdevelopmentPoint Runoff Area=2.340 ac 48.29% Impervious Runoff Depth=1.68" Tc=5.0 min CN=81 Runoff=7.10 cfs 0.328 af Subcatchment7S: PredevelolpmentPoint 2 Runoff Area=1.110 ac 0.00% Impervious Runoff Depth=0.52" Flow Length=114' Tc=32.3 min CN=60 Runoff=0.32 cfs 0.048 af Subcatchment8S: BYPASS 1 Runoff Area=2.120 ac 9.91% Impervious Runoff Depth=0.88" Flow Length=627' Tc=17.8 min CN=68 Runoff=1.99 cfs 0.156 af Subcatchment9S: PostdevelopmentPoint 2 Runoff Area=1.000 ac 0.00% Impervious Runoff Depth=0.52" Flow Length=93' Slope=0.0106 '/' Tc=28.5 min CN=60 Runoff=0.31 cfs 0.043 af Pond 12P: POND Peak Elev=578.89' Storage=8,289 cf Inflow=7.10 cfs 0.328 af Primary=0.22 cfs 0.328 af Secondary=0.00 cfs 0.000 af Outflow=0.22 cfs 0.328 af Link 6L: PRE DEV Inflow=2.36 cfs 0.266 af Primary=2.36 cfs 0.266 af Link 11 L: POST DEV Inflow=2.16 cfs 0.485 af Primary=2.16 cfs 0.485 af Total Runoff Area = 10.910 ac Runoff Volume = 0.842 af Average Runoff Depth = 0.93" 85.88% Pervious = 9.370 ac 14.12% Impervious = 1.540 ac 54647 - Drainage_Pre-Post Type 1124-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 32 Summary for Subcatchment 3S: Predevelopment Point 1 [47] Hint: Peak is 176% of capacity of segment#3 Runoff = 2.36 cfs @ 12.26 hrs, Volume= 0.266 af, Depth= 0.74" Routed to Link 6L : PRE DEV Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.47" Area (ac) CN Description 3.070 60 Woods, Fair, HSG B 0.320 73 Woods, Fair, HSG C 0.200 79 Woods, Fair, HSG D 0.120 56 Brush, Fair, HSG B 0.080 70 Brush, Fair, HSG C 0.350 77 Brush, Fair, HSG D 0.100 98 Paved parking, HSG B 0.060 98 Paved parking, HSG C 0.040 98 Paved parking, HSG D 4.340 65 Weighted Average 4.140 95.39% Pervious Area 0.200 4.61% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.9 100 0.0734 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" 3.9 254 0.0477 1.09 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 10.0 270 0.0391 0.45 1.34 Channel Flow, CHANNEL Area= 3.0 sf Perim= 6.3' r= 0.48' n= 0.400 Sheet flow: Woods+light brush 27.8 624 Total 54647 - Drainage_Pre-Post Type II 24-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 33 Subcatchment 3S: Predevelopment Point 1 Hydrograph 1 1 1 1 1 1 1 11 1 I 1 I I 1 I I 1 I 1 I 1 1 ❑Runoff 12.36 cfs I ' I I 1 I I 1 I I 1 I 1 I 1 1 11 I I 1 I I 1 I 1Type 11124-h r 1 1 1 1 1 1 r-Rl1 7`' 2 I I � I I I I I I I I I 2� ' `T`a'' 1 1ainfall rJ.� 1 1 1 ' 1 1 II 'Runbff Awea=4.340 ad 1 1 1 1 1 1 I I I I I I I I I I 1 1 1 1 1 1 Runoff Volume=0.266 of y 1 I Iu;ngff,Depth=0.741-' I I I I I ' Fldw'ILength=624' u 1 1 1 1 1 1 1 Tci;=27..1A'min / I I I I I 1 I8 N76$ 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 i 1 1 0 , .,(.,.K., 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 34 Hydrograph for Subcatchment 3S: Predevelopment Point 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.10 0.00 0.00 5.00 0.22 0.00 0.00 7.50 0.38 0.00 0.00 10.00 0.63 0.00 0.00 12.50 2.55 0.32 1.47 15.00 2.96 0.49 0.22 17.50 3.16 0.58 0.15 20.00 3.30 0.65 0.11 22.50 3.41 0.71 0.09 25.00 3.47 0.74 0.00 27.50 3.47 0.74 0.00 30.00 3.47 0.74 0.00 32.50 3.47 0.74 0.00 35.00 3.47 0.74 0.00 37.50 3.47 0.74 0.00 40.00 3.47 0.74 0.00 42.50 3.47 0.74 0.00 45.00 3.47 0.74 0.00 47.50 3.47 0.74 0.00 50.00 3.47 0.74 0.00 52.50 3.47 0.74 0.00 55.00 3.47 0.74 0.00 57.50 3.47 0.74 0.00 60.00 3.47 0.74 0.00 62.50 3.47 0.74 0.00 65.00 3.47 0.74 0.00 67.50 3.47 0.74 0.00 70.00 3.47 0.74 0.00 72.50 3.47 0.74 0.00 75.00 3.47 0.74 0.00 77.50 3.47 0.74 0.00 80.00 3.47 0.74 0.00 82.50 3.47 0.74 0.00 85.00 3.47 0.74 0.00 87.50 3.47 0.74 0.00 90.00 3.47 0.74 0.00 92.50 3.47 0.74 0.00 95.00 3.47 0.74 0.00 97.50 3.47 0.74 0.00 100.00 3.47 0.74 0.00 102.50 3.47 0.74 0.00 105.00 3.47 0.74 0.00 107.50 3.47 0.74 0.00 110.00 3.47 0.74 0.00 112.50 3.47 0.74 0.00 115.00 3.47 0.74 0.00 117.50 3.47 0.74 0.00 120.00 3.47 0.74 0.00 54647 - Drainage_Pre-Post Type 1124-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 35 Summary for Subcatchment 4S: Postdevelopment Point 1 [49] Hint: Tc<2dt may require smaller dt Runoff = 7.10 cfs @ 11.96 hrs, Volume= 0.328 af, Depth= 1.68" Routed to Pond 12P : POND Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.47" Area (ac) CN Description 0.850 61 >75% Grass cover, Good, HSG B 0.010 74 >75% Grass cover, Good, HSG C 0.240 80 >75% Grass cover, Good, HSG D 1.000 98 Paved parking, HSG B 0.130 98 Paved parking, HSG C 0.110 60 Woods, Fair, HSG B 2.340 81 Weighted Average 1.210 51.71% Pervious Area 1.130 48.29% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, DIRECT Subcatchment 4S: Postdevelopment Point 1 Hydrograph I I I I I - I I I I I I I I I ❑Runoff I- _I7.10;sI T 1 L I I T I I I- - 1 ]- 1 I I 1 I I 1 I I 1 I ITy'pe II 24-hr 6-' 1 1 1 1 1 , 27Y- a�-R1ai i fa ll 3.�47 ' : 1 I I I I I Runoff Atea=2.340 ac 1 - -h -1 - I- -1- T -1- t 1 1 5= 1 I I 1 I I 1 Runoff Volume=0.328 of w _ 1 1 1 1 1 1 4 1 1 1 1 Rulnoff Depth=1 .68" / 1 1 1 1 1 1 1 1 1 1 Tc-5.0 m i n 3_ 1 I I 1 I I 1 1 I 1 1 CN=81 1 I 1 I I 1 1 I 1 1 1 1 I I I I I I I I I I I I I I I I I I I T T I- 1 1 7 1 1 1 1 1 1 1 1 1 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 36 Hydrograph for Subcatchment 4S: Postdevelopment Point 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.10 0.00 0.00 5.00 0.22 0.00 0.00 7.50 0.38 0.00 0.00 10.00 0.63 0.01 0.04 12.50 2.55 0.98 0.61 15.00 2.96 1.28 0.19 17.50 3.16 1.44 0.12 20.00 3.30 1.55 0.09 22.50 3.41 1.64 0.08 25.00 3.47 1.68 0.00 27.50 3.47 1.68 0.00 30.00 3.47 1.68 0.00 32.50 3.47 1.68 0.00 35.00 3.47 1.68 0.00 37.50 3.47 1.68 0.00 40.00 3.47 1.68 0.00 42.50 3.47 1.68 0.00 45.00 3.47 1.68 0.00 47.50 3.47 1.68 0.00 50.00 3.47 1.68 0.00 52.50 3.47 1.68 0.00 55.00 3.47 1.68 0.00 57.50 3.47 1.68 0.00 60.00 3.47 1.68 0.00 62.50 3.47 1.68 0.00 65.00 3.47 1.68 0.00 67.50 3.47 1.68 0.00 70.00 3.47 1.68 0.00 72.50 3.47 1.68 0.00 75.00 3.47 1.68 0.00 77.50 3.47 1.68 0.00 80.00 3.47 1.68 0.00 82.50 3.47 1.68 0.00 85.00 3.47 1.68 0.00 87.50 3.47 1.68 0.00 90.00 3.47 1.68 0.00 92.50 3.47 1.68 0.00 95.00 3.47 1.68 0.00 97.50 3.47 1.68 0.00 100.00 3.47 1.68 0.00 102.50 3.47 1.68 0.00 105.00 3.47 1.68 0.00 107.50 3.47 1.68 0.00 110.00 3.47 1.68 0.00 112.50 3.47 1.68 0.00 115.00 3.47 1.68 0.00 117.50 3.47 1.68 0.00 120.00 3.47 1.68 0.00 54647 - Drainage_Pre-Post Type II 24-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 37 Summary for Subcatchment 7S: Predevelolpment Point 2 Runoff = 0.32 cfs @ 12.35 hrs, Volume= 0.048 af, Depth= 0.52" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.47" Area (ac) CN Description 1.110 60 Woods, Fair, HSG B 1.110 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.9 100 0.0093 0.05 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" 0.4 14 0.0121 0.55 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 32.3 114 Total Subcatchment 7S: Predevelolpment Point 2 Hydrograph /1 1 1 1 I 1 1 1 • 1 1 • 1 I I I I I 0.34- 1 1 1 1 I 1 1 1 I I I I I •Runoff 0.32. I II 0.32 cfs I 1 1 I I 1 1 I 1 1 I I 1 I I 1 1 I I 1 0.3y / I I I I I I I I I I I I p�Type RI24 hr '- 1 - r 7 - I- - -I- 7 -I - I- rt 1 -c "f N�fl 1 -1 r �o 0.28 ,- -I -/ - IH - I- t -I- tH - I- t -12�-{ all-- u,-faI193.4,�- - 0.26� 1_ H -/ _1 _ H H - 1- + _1_ _H H - 1- -Rti IV11 /'.t, eQ 1.�11-0-Q�.- 0.22� / -1 - 1 1- 1 Bumf lVmlume a0.048 af cli 0,8 j 11 1 II Ou1�4 PP 90•$21 LL 0.16� 1- ntl 1- �1�#' 0.14/ 1 1 1 1 1 1 1 1 I I I I I I I I I I 0.12 I I / I I I I I I 1 I I 1 I 1Ta=32.3 nnin 0.1? I I I I I I I I IIIIIIIIrlkhLait � - 1 - - -I - 77 - I- T -I- 7 -I - I- 7 -1- r —I - 1- 7 - I- 7 ' 'fl-/Ir 11- 0.08 1- 1 I -1 - I H - 1- t -1- t H - I- rt -I- t -I - I- I - I- fi -I - ]- H - 0.06� ,_ - H H - I- + -I- H H - I- H -1- f -I - I- 4 - I- + -I - 0.04- j_ �''�/// J - I- 4 -I- -I - I- -1- -k -I I- -I - I- 1 0.02 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 38 Hydrograph for Subcatchment 7S: Predevelolpment Point 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.10 0.00 0.00 5.00 0.22 0.00 0.00 7.50 0.38 0.00 0.00 10.00 0.63 0.00 0.00 12.50 2.55 0.19 0.27 15.00 2.96 0.32 0.05 17.50 3.16 0.39 0.03 20.00 3.30 0.45 0.02 22.50 3.41 0.49 0.02 25.00 3.47 0.52 0.00 27.50 3.47 0.52 0.00 30.00 3.47 0.52 0.00 32.50 3.47 0.52 0.00 35.00 3.47 0.52 0.00 37.50 3.47 0.52 0.00 40.00 3.47 0.52 0.00 42.50 3.47 0.52 0.00 45.00 3.47 0.52 0.00 47.50 3.47 0.52 0.00 50.00 3.47 0.52 0.00 52.50 3.47 0.52 0.00 55.00 3.47 0.52 0.00 57.50 3.47 0.52 0.00 60.00 3.47 0.52 0.00 62.50 3.47 0.52 0.00 65.00 3.47 0.52 0.00 67.50 3.47 0.52 0.00 70.00 3.47 0.52 0.00 72.50 3.47 0.52 0.00 75.00 3.47 0.52 0.00 77.50 3.47 0.52 0.00 80.00 3.47 0.52 0.00 82.50 3.47 0.52 0.00 85.00 3.47 0.52 0.00 87.50 3.47 0.52 0.00 90.00 3.47 0.52 0.00 92.50 3.47 0.52 0.00 95.00 3.47 0.52 0.00 97.50 3.47 0.52 0.00 100.00 3.47 0.52 0.00 102.50 3.47 0.52 0.00 105.00 3.47 0.52 0.00 107.50 3.47 0.52 0.00 110.00 3.47 0.52 0.00 112.50 3.47 0.52 0.00 115.00 3.47 0.52 0.00 117.50 3.47 0.52 0.00 120.00 3.47 0.52 0.00 54647 - Drainage_Pre-Post Type 1124-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment 8S: BYPASS 1 Runoff = 1.99 cfs @ 12.12 hrs, Volume= 0.156 af, Depth= 0.88" Routed to Link 11 L : POST DEV Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.47" Area (ac) CN Description 1.180 60 Woods, Fair, HSG B 0.130 73 Woods, Fair, HSG C 0.170 61 >75% Grass cover, Good, HSG B 0.120 74 >75% Grass cover, Good, HSG C 0.310 80 >75% Grass cover, Good, HSG D 0.080 98 Paved parking, HSG B 0.090 98 Paved parking, HSG C 0.040 98 Paved parking, HSG D 2.120 68 Weighted Average 1.910 90.09% Pervious Area 0.210 9.91% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.9 100 0.0734 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" 3.8 249 0.0472 1.09 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.1 278 0.0398 37.88 454.62 Channel Flow, Area= 12.0 sf Perim= 7.2' r= 1.67' n= 0.011 Concrete pipe, straight & clean 17.8 627 Total 54647 - Drainage_Pre-Post Type II 24-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 40 Subcatchment 8S: BYPASS 1 Hydrograph Z I I I I I I 1 I I I - I II I I I I I I I I I ' I I I ■Runoff 1.9901 T T T 1 T 7 2 I 1 I 1 1 1 1 1 (Type I1124-hr i I I 1 1 2�Yearl Rlainfall�3.47" 1 I 1 1 I I 1Rundff Awea=2.120 at I I I I I I I I I I I I I I I I I I I I I/ I I 1 I I 1 Runoff Volume=0.156 of y 1 I Ou;ngff 11Depth40.081' / 1 1 1 1 FIdwlLength=627' u_ / 1 1 1 1 1 1 1 1 1 / 1 1 I 1 1 I 1Tci;=17.18 min / 1 1 I 1 1 I 1 1 I rl id. I I I I I I I I I I I I I I I ' 1 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 41 Hydrograph for Subcatchment 8S: BYPASS 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.10 0.00 0.00 5.00 0.22 0.00 0.00 7.50 0.38 0.00 0.00 10.00 0.63 0.00 0.00 12.50 2.55 0.41 0.57 15.00 2.96 0.61 0.12 17.50 3.16 0.71 0.08 20.00 3.30 0.79 0.06 22.50 3.41 0.85 0.05 25.00 3.47 0.88 0.00 27.50 3.47 0.88 0.00 30.00 3.47 0.88 0.00 32.50 3.47 0.88 0.00 35.00 3.47 0.88 0.00 37.50 3.47 0.88 0.00 40.00 3.47 0.88 0.00 42.50 3.47 0.88 0.00 45.00 3.47 0.88 0.00 47.50 3.47 0.88 0.00 50.00 3.47 0.88 0.00 52.50 3.47 0.88 0.00 55.00 3.47 0.88 0.00 57.50 3.47 0.88 0.00 60.00 3.47 0.88 0.00 62.50 3.47 0.88 0.00 65.00 3.47 0.88 0.00 67.50 3.47 0.88 0.00 70.00 3.47 0.88 0.00 72.50 3.47 0.88 0.00 75.00 3.47 0.88 0.00 77.50 3.47 0.88 0.00 80.00 3.47 0.88 0.00 82.50 3.47 0.88 0.00 85.00 3.47 0.88 0.00 87.50 3.47 0.88 0.00 90.00 3.47 0.88 0.00 92.50 3.47 0.88 0.00 95.00 3.47 0.88 0.00 97.50 3.47 0.88 0.00 100.00 3.47 0.88 0.00 102.50 3.47 0.88 0.00 105.00 3.47 0.88 0.00 107.50 3.47 0.88 0.00 110.00 3.47 0.88 0.00 112.50 3.47 0.88 0.00 115.00 3.47 0.88 0.00 117.50 3.47 0.88 0.00 120.00 3.47 0.88 0.00 54647 - Drainage_Pre-Post Type II 24-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 42 Summary for Subcatchment 9S: Postdevelopment Point 2 Runoff = 0.31 cfs @ 12.30 hrs, Volume= 0.043 af, Depth= 0.52" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.47" Area (ac) CN Description 1.000 60 Woods, Fair, HSG B 1.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.5 93 0.0106 0.05 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" Subcatchment 9S: Postdevelopment Point 2 Hydrograph H -I- 4 -I- HH - I- 4 -I- HH - I- H -I- -1 - I- 4 -I - -I - 0.34i-/ I I 1 1 I 1 I I 1 I I I I I I I I I I ■Runoff 0.324-/ I 10.31 cfs l 1 I 1 I I 1 I I I I I I I I I I I 0.3 I 1 I 1 I I 1 I 1 I I -TYPE) 14 /p1 I �PI2 hP 0.28� I I 1 1 1 1 1 1 1 1 1A l "aI TIIn�1704.17 0.26� ,- - -1- TT - I- T -1- TT - 1 -RLinbffTA1-ea=�I.00Oa7c- 0.24� r - -1- r - I- rt -I- r - I- rt - - -r -I - r rt - I- 4 -1 - r 4 - 0.22� + -I- H H I + 1 H H I Runof'f1V -Iume=10A4�a af- • 0.• 18 L L L L I L 11 L L 11 L I 't_u1I`L"4" TP Q• €� 0 0.167- 1FI�WI to Ii'�7d�- u 0.14� I 1 I 1 1 I I 1 1 I 1 1 I I 1 I I 1 1 I 0.12 - 1 1 1 1 1 1 1 1 1 1 1 1 1 1Io1pe=0.V I V V /'- 0.1 I 1 1 1 1 1 1 ITQ -L -IT I T T I T I I T I T -I � � � 0. 1�1 0.08 1- jT 1 r T 1 I -r r rt T aN60 0.04- 4 H - I 4 - I- 4 - - - - - I- - - - 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110' 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 43 Hydrograph for Subcatchment 9S: Postdevelopment Point 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.10 0.00 0.00 5.00 0.22 0.00 0.00 7.50 0.38 0.00 0.00 10.00 0.63 0.00 0.00 12.50 2.55 0.19 0.22 15.00 2.96 0.32 0.04 17.50 3.16 0.39 0.03 20.00 3.30 0.45 0.02 22.50 3.41 0.49 0.02 25.00 3.47 0.52 0.00 27.50 3.47 0.52 0.00 30.00 3.47 0.52 0.00 32.50 3.47 0.52 0.00 35.00 3.47 0.52 0.00 37.50 3.47 0.52 0.00 40.00 3.47 0.52 0.00 42.50 3.47 0.52 0.00 45.00 3.47 0.52 0.00 47.50 3.47 0.52 0.00 50.00 3.47 0.52 0.00 52.50 3.47 0.52 0.00 55.00 3.47 0.52 0.00 57.50 3.47 0.52 0.00 60.00 3.47 0.52 0.00 62.50 3.47 0.52 0.00 65.00 3.47 0.52 0.00 67.50 3.47 0.52 0.00 70.00 3.47 0.52 0.00 72.50 3.47 0.52 0.00 75.00 3.47 0.52 0.00 77.50 3.47 0.52 0.00 80.00 3.47 0.52 0.00 82.50 3.47 0.52 0.00 85.00 3.47 0.52 0.00 87.50 3.47 0.52 0.00 90.00 3.47 0.52 0.00 92.50 3.47 0.52 0.00 95.00 3.47 0.52 0.00 97.50 3.47 0.52 0.00 100.00 3.47 0.52 0.00 102.50 3.47 0.52 0.00 105.00 3.47 0.52 0.00 107.50 3.47 0.52 0.00 110.00 3.47 0.52 0.00 112.50 3.47 0.52 0.00 115.00 3.47 0.52 0.00 117.50 3.47 0.52 0.00 120.00 3.47 0.52 0.00 54647 - Drainage_Pre-Post Type 1124-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 44 Summary for Pond 12P: POND [44] Hint: Outlet device#2 is below defined storage Inflow Area = 2.340 ac, 48.29% Impervious, Inflow Depth = 1.68" for 2-Year event Inflow = 7.10 cfs @ 11.96 hrs, Volume= 0.328 af Outflow = 0.22 cfs @ 14.36 hrs, Volume= 0.328 af, Atten= 97%, Lag= 144.2 min Primary = 0.22 cfs @ 14.36 hrs, Volume= 0.328 af Routed to Link 11 L : POST DEV Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Link 11 L : POST DEV Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 578.89'@ 14.36 hrs Surf.Area= 5,232 sf Storage= 8,289 cf Plug-Flow detention time=622.2 min calculated for 0.328 af(100% of inflow) Center-of-Mass det. time=622.6 min ( 1,454.0 - 831.4 ) Volume Invert Avail.Storage Storage Description #1 577.00' 38,262 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 577.00 3,579 0 0 578.00 4,438 4,009 4,009 579.00 5,335 4,887 8,895 580.00 6,289 5,812 14,707 581.00 7,299 6,794 21,501 582.00 8,366 7,833 29,334 583.00 9,490 8,928 38,262 Device Routing Invert Outlet Devices #1 Primary 575.50' 15.0" Round Culvert L= 57.4' RCP, rounded edge headwall, Ke= 0.100 Inlet/ Outlet Invert= 575.50'/ 573.63' S= 0.0326 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.23 sf #2 Device 1 575.50' SAND FILTER Head (feet) 0.00 1.00 1.50 2.50 3.50 4.50 5.50 6.50 Disch. (cfs) 0.000 0.052 0.060 0.077 0.095 0.112 0.129 0.146 #3 Device 1 578.21' 2.5" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 578.89' 15.0" W x 3.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 579.63' 6.0" W x 3.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Device 1 580.18' 6.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #7 Device 1 580.80' 2.0' long x 0.5' breadth Broad-Crested Rectangular Weir X 4.00 Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #8 Device 1 581.00' 3.0' long x 0.5' breadth Broad-Crested Rectangular Weir X 4.00 Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 54647 - Drainage_Pre-Post Type 1124-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 45 #9 Secondary 582.00' 20.0' long x 16.0' breadth EMERGENCY SPILLWAY Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.22 cfs @ 14.36 hrs HW=578.89' (Free Discharge) L1=Culvert (Passes 0.22 cfs of 12.62 cfs potential flow) 2=SAND FILTER (Custom Controls 0.09 cfs) 3=Orifice/Grate (Orifice Controls 0.12 cfs @ 3.64 fps) =Orifice/Grate ( Controls 0.00 cfs) 5=Orifice/Grate ( Controls 0.00 cfs) =Orifice/Grate ( Controls 0.00 cfs) 7=Broad-Crested Rectangular Weir( Controls 0.00 cfs) 8=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=577.00' (Free Discharge) L9=EMERGENCY SPILLWAY( Controls 0.00 cfs) Pond 12P: POND Hydrograph I ❑Inflow zfoofs ❑Outflow Inflow Area=2340 ac ❑Primary . I I I I I I I I I I ❑Secondary t 1 1 1 1 1 1 IPeak Elev=578.89` - 7 11 I I 1 I 1 I 1 1 I 1_i_ 4 1 I I- 4 1 1- -I 1 -SL# ora9e=8,289 cf - 6 I I I I I I I I I I I I 1 1_ L 1 _1 _ 1_ J_ 1 _1 _ 1_ L _L _ 1 1 5 I I I I I 1 1 w / i i i 3 4 0 LL 3 / 2 z 0.22 cfs //ii //// ///�/////// / / / i 1 0.22 cfs // // / / / / / 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type 1124-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 46 Pond 12P: POND Stage-Discharge I I I 1 ❑Total 583 ❑Primary ❑Secondary EMERGENCY SPILLWAY 582 I I 4 I /�// % I 1 */� Broad-Crested Rectangular Weir Broad-Crested Rectangular Weir I 581 o / I I 5 Orifice/Grate I I c 580 �- /0 Orifice/Grate I / I I I I I Orifice/Grate w 1 579 7 1 Orifice/Grate I 578 O% 1 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Discharge (cfs) Pond 12P: POND Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 500 1,000 1,500 2,000 2,500 3,000 3,5004,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,000 8,500 9,000 0 Surface . . ' . . . ! . . . ' . . . . . . ! . . . I . ( . I . . . ! . . . I . . . I . . . 1 , , . I . . . ' . . . 1 . . . I . . . ' . . . ! . . . ❑Storage ::: � I I I II 1 1 I 1 1 I 1 I I I ////' II I I I _ I I I I II I I I I ��/�/ ' ,, " 1 1 1 II 1 I I 581 11 I I I 1 I I 1 I I a 580- 1 I I .. "/ . I II I 1 1 I I 1 I I d _ — I H + + I + I i+ r I+ + + —II— I H r + w - I I I I I I II I I I 579-" I I II I I I I II I I I - n — — r — — - - r - 1- I I tt — r 11 - — + II 1 rtrr 578 II I I I I II I I I / / / - Custom Stage Data / z / / 577 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 Storage(cubic-feet) 54647 - Drainage_Pre-Post Type II 24-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 47 Hydrograph for Pond 12P: POND Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 577.00 0.00 0.00 0.00 2.50 0.00 0 577.00 0.00 0.00 0.00 5.00 0.00 0 577.00 0.00 0.00 0.00 7.50 0.00 0 577.00 0.00 0.00 0.00 10.00 0.04 51 577.01 0.01 0.01 0.00 12.50 0.61 7,472 578.73 0.20 0.20 0.00 15.00 0.19 8,260 578.88 0.22 0.22 0.00 17.50 0.12 7,714 578.77 0.20 0.20 0.00 20.00 0.09 6,940 578.62 0.18 0.18 0.00 22.50 0.08 6,189 578.47 0.15 0.15 0.00 25.00 0.00 5,440 578.31 0.10 0.10 0.00 27.50 0.00 4,673 578.15 0.08 0.08 0.00 30.00 0.00 3,969 577.99 0.08 0.08 0.00 32.50 0.00 3,289 577.84 0.07 0.07 0.00 35.00 0.00 2,633 577.68 0.07 0.07 0.00 37.50 0.00 2,001 577.53 0.07 0.07 0.00 40.00 0.00 1,392 577.37 0.07 0.07 0.00 42.50 0.00 807 577.22 0.06 0.06 0.00 45.00 0.00 245 577.07 0.06 0.06 0.00 47.50 0.00 20 577.01 0.01 0.01 0.00 50.00 0.00 2 577.00 0.00 0.00 0.00 52.50 0.00 0 577.00 0.00 0.00 0.00 55.00 0.00 0 577.00 0.00 0.00 0.00 57.50 0.00 0 577.00 0.00 0.00 0.00 60.00 0.00 0 577.00 0.00 0.00 0.00 62.50 0.00 0 577.00 0.00 0.00 0.00 65.00 0.00 0 577.00 0.00 0.00 0.00 67.50 0.00 0 577.00 0.00 0.00 0.00 70.00 0.00 0 577.00 0.00 0.00 0.00 72.50 0.00 0 577.00 0.00 0.00 0.00 75.00 0.00 0 577.00 0.00 0.00 0.00 77.50 0.00 0 577.00 0.00 0.00 0.00 80.00 0.00 0 577.00 0.00 0.00 0.00 82.50 0.00 0 577.00 0.00 0.00 0.00 85.00 0.00 0 577.00 0.00 0.00 0.00 87.50 0.00 0 577.00 0.00 0.00 0.00 90.00 0.00 0 577.00 0.00 0.00 0.00 92.50 0.00 0 577.00 0.00 0.00 0.00 95.00 0.00 0 577.00 0.00 0.00 0.00 97.50 0.00 0 577.00 0.00 0.00 0.00 100.00 0.00 0 577.00 0.00 0.00 0.00 102.50 0.00 0 577.00 0.00 0.00 0.00 105.00 0.00 0 577.00 0.00 0.00 0.00 107.50 0.00 0 577.00 0.00 0.00 0.00 110.00 0.00 0 577.00 0.00 0.00 0.00 112.50 0.00 0 577.00 0.00 0.00 0.00 115.00 0.00 0 577.00 0.00 0.00 0.00 117.50 0.00 0 577.00 0.00 0.00 0.00 120.00 0.00 0 577.00 0.00 0.00 0.00 54647 - Drainage_Pre-Post Type 1124-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 48 Stage-Discharge for Pond 12P: POND Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 577.00 0.00 0.00 0.00 582.20 21.86 17.06 4.79 577.10 0.06 0.06 0.00 582.30 26.02 17.18 8.84 577.20 0.06 0.06 0.00 582.40 30.96 17.29 13.66 577.30 0.07 0.07 0.00 582.50 36.50 17.41 19.09 577.40 0.07 0.07 0.00 582.60 42.62 17.52 25.10 577.50 0.07 0.07 0.00 582.70 48.91 17.64 31.27 577.60 0.07 0.07 0.00 582.80 55.53 17.75 37.78 577.70 0.07 0.07 0.00 582.90 62.86 17.86 45.00 577.80 0.07 0.07 0.00 583.00 70.57 17.97 52.60 577.90 0.08 0.08 0.00 578.00 0.08 0.08 0.00 578.10 0.08 0.08 0.00 578.20 0.08 0.08 0.00 578.30 0.10 0.10 0.00 578.40 0.13 0.13 0.00 578.50 0.16 0.16 0.00 578.60 0.18 0.18 0.00 578.70 0.19 0.19 0.00 578.80 0.21 0.21 0.00 578.90 0.22 0.22 0.00 579.00 0.38 0.38 0.00 579.10 0.63 0.63 0.00 579.20 0.89 0.89 0.00 579.30 1.06 1.06 0.00 579.40 1.20 1.20 0.00 579.50 1.33 1.33 0.00 579.60 1.44 1.44 0.00 579.70 1.57 1.57 0.00 579.80 1.75 1.75 0.00 579.90 1.95 1.95 0.00 580.00 2.11 2.11 0.00 580.10 2.25 2.25 0.00 580.20 2.38 2.38 0.00 580.30 2.54 2.54 0.00 580.40 2.74 2.74 0.00 580.50 2.97 2.97 0.00 580.60 3.21 3.21 0.00 580.70 3.41 3.41 0.00 580.80 3.58 3.58 0.00 580.90 4.46 4.46 0.00 581.00 5.91 5.91 0.00 581.10 8.87 8.87 0.00 581.20 13.10 13.10 0.00 581.30 15.98 15.98 0.00 581.40 16.10 16.10 0.00 581.50 16.23 16.23 0.00 581.60 16.35 16.35 0.00 581.70 16.47 16.47 0.00 581.80 16.59 16.59 0.00 581.90 16.71 16.71 0.00 582.00 16.83 16.83 0.00 582.10 18.64 16.95 1.69 54647 - Drainage_Pre-Post Type 1124-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 49 Stage-Area-Storage for Pond 12P: POND Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 577.00 3,579 0 582.20 8,591 31,029 577.10 3,665 362 582.30 8,703 31,894 577.20 3,751 733 582.40 8,816 32,770 577.30 3,837 1,112 582.50 8,928 33,657 577.40 3,923 1,500 582.60 9,040 34,555 577.50 4,009 1,897 582.70 9,153 35,465 577.60 4,094 2,302 582.80 9,265 36,386 577.70 4,180 2,716 582.90 9,378 37,318 577.80 4,266 3,138 583.00 9,490 38,262 577.90 4,352 3,569 578.00 4,438 4,009 578.10 4,528 4,457 578.20 4,617 4,914 578.30 4,707 5,380 578.40 4,797 5,855 578.50 4,887 6,340 578.60 4,976 6,833 578.70 5,066 7,335 578.80 5,156 7,846 578.90 5,245 8,366 579.00 5,335 8,895 579.10 5,430 9,433 579.20 5,526 9,981 579.30 5,621 10,538 579.40 5,717 11,105 579.50 5,812 11,682 579.60 5,907 12,268 579.70 6,003 12,863 579.80 6,098 13,468 579.90 6,194 14,083 580.00 6,289 14,707 580.10 6,390 15,341 580.20 6,491 15,985 580.30 6,592 16,639 580.40 6,693 17,303 580.50 6,794 17,978 580.60 6,895 18,662 580.70 6,996 19,357 580.80 7,097 20,061 580.90 7,198 20,776 581.00 7,299 21,501 581.10 7,406 22,236 581.20 7,512 22,982 581.30 7,619 23,739 581.40 7,726 24,506 581.50 7,833 25,284 581.60 7,939 26,072 581.70 8,046 26,872 581.80 8,153 27,682 581.90 8,259 28,502 582.00 8,366 29,334 582.10 8,478 30,176 54647 - Drainage_Pre-Post Type 1124-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 50 Summary for Link 6L: PRE DEV Inflow Area = 4.340 ac, 4.61% Impervious, Inflow Depth = 0.74" for 2-Year event Inflow = 2.36 cfs @ 12.26 hrs, Volume= 0.266 af Primary = 2.36 cfs @ 12.26 hrs, Volume= 0.266 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 6L: PRE DEV Hydrograph I I I I 1 1 1 I I 1 I 1 I 1 I 1 1 ❑ Inflow ` - 12.36 cfs I I 1 1 1 1 1 1 1 ,_El Primary I - l2.375 I I 1 1 Inflow lArea=4.3401ac L 1 _ I_ 1 _I _ L A _I_ L LI _ I_ 1 LI _ L 1 1_ L J I_ 1 / 1 1 1 1 1 1 1 1 1 I I 2—' I I I I I I I I I I I I I I I I I I I / 1 1 1 1 1 1 1 1 I I I 1 1 1 1 1 1 1 1 I 1 I I - 1 11 I I I I I 0 - / 1 1 1 3 0 T. 1 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 51 Hydrograph for Link 6L: PRE DEV Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.00 0.00 0.00 10.00 0.00 0.00 0.00 12.50 1.47 0.00 1.47 15.00 0.22 0.00 0.22 17.50 0.15 0.00 0.15 20.00 0.11 0.00 0.11 22.50 0.09 0.00 0.09 25.00 0.00 0.00 0.00 27.50 0.00 0.00 0.00 30.00 0.00 0.00 0.00 32.50 0.00 0.00 0.00 35.00 0.00 0.00 0.00 37.50 0.00 0.00 0.00 40.00 0.00 0.00 0.00 42.50 0.00 0.00 0.00 45.00 0.00 0.00 0.00 47.50 0.00 0.00 0.00 50.00 0.00 0.00 0.00 52.50 0.00 0.00 0.00 55.00 0.00 0.00 0.00 57.50 0.00 0.00 0.00 60.00 0.00 0.00 0.00 62.50 0.00 0.00 0.00 65.00 0.00 0.00 0.00 67.50 0.00 0.00 0.00 70.00 0.00 0.00 0.00 72.50 0.00 0.00 0.00 75.00 0.00 0.00 0.00 77.50 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 54647 - Drainage_Pre-Post Type 1124-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 52 Summary for Link 11 L: POST DEV Inflow Area = 4.460 ac, 30.04% Impervious, Inflow Depth = 1.30" for 2-Year event Inflow = 2.16 cfs @ 12.12 hrs, Volume= 0.485 of Primary = 2.16 cfs @ 12.12 hrs, Volume= 0.485 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 11 L: POST DEV Hydrograph I I I I I I I I ❑ Inflow 12.16 cfs ,❑Primary 2.1 cfs r Inflow 1Area=4.460 ac 2— 0 ((Sf� ,Sr rr 'Sr frrirrr5rr'Sr rr ,ir rrrTfr/Sf� , 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 2-Year Rainfall=3.47" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 53 Hydrograph for Link 11 L: POST DEV Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.00 0.00 0.00 10.00 0.01 0.00 0.01 12.50 0.76 0.00 0.76 15.00 0.34 0.00 0.34 17.50 0.28 0.00 0.28 20.00 0.24 0.00 0.24 22.50 0.20 0.00 0.20 25.00 0.10 0.00 0.10 27.50 0.08 0.00 0.08 30.00 0.08 0.00 0.08 32.50 0.07 0.00 0.07 35.00 0.07 0.00 0.07 37.50 0.07 0.00 0.07 40.00 0.07 0.00 0.07 42.50 0.06 0.00 0.06 45.00 0.06 0.00 0.06 47.50 0.01 0.00 0.01 50.00 0.00 0.00 0.00 52.50 0.00 0.00 0.00 55.00 0.00 0.00 0.00 57.50 0.00 0.00 0.00 60.00 0.00 0.00 0.00 62.50 0.00 0.00 0.00 65.00 0.00 0.00 0.00 67.50 0.00 0.00 0.00 70.00 0.00 0.00 0.00 72.50 0.00 0.00 0.00 75.00 0.00 0.00 0.00 77.50 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 54 Time span=0.00-120.00 hrs, dt=0.05 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment3S: PredevelopmentPoint 1 Runoff Area=4.340 ac 4.61% Impervious Runoff Depth=1.69" Flow Length=624' Tc=27.8 min CN=65 Runoff=6.26 cfs 0.610 af Subcatchment4S: PostdevelopmentPoint Runoff Area=2.340 ac 48.29% Impervious Runoff Depth=3.03" Tc=5.0 min CN=81 Runoff=12.57 cfs 0.591 af Subcatchment7S: PredevelolpmentPoint 2 Runoff Area=1.110 ac 0.00% Impervious Runoff Depth=1.33" Flow Length=114' Tc=32.3 min CN=60 Runoff=1.07 cfs 0.123 af Subcatchment8S: BYPASS 1 Runoff Area=2.120 ac 9.91% Impervious Runoff Depth=1.92" Flow Length=627' Tc=17.8 min CN=68 Runoff=4.68 cfs 0.338 af Subcatchment9S: PostdevelopmentPoint 2 Runoff Area=1.000 ac 0.00% Impervious Runoff Depth=1.33" Flow Length=93' Slope=0.0106 '/' Tc=28.5 min CN=60 Runoff=1.05 cfs 0.111 af Pond 12P: POND Peak Elev=579.63' Storage=12,438 cf Inflow=12.57 cfs 0.591 af Primary=1.47 cfs 0.591 af Secondary=0.00 cfs 0.000 af Outflow=1.47 cfs 0.591 af Link 6L: PRE DEV Inflow=6.26 cfs 0.610 af Primary=6.26 cfs 0.610 af Link 11 L: POST DEV Inflow=6.12 cfs 0.929 af Primary=6.12 cfs 0.929 af Total Runoff Area = 10.910 ac Runoff Volume = 1.773 af Average Runoff Depth = 1.95" 85.88% Pervious = 9.370 ac 14.12% Impervious = 1.540 ac 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 55 Summary for Subcatchment 3S: Predevelopment Point 1 [47] Hint: Peak is 466% of capacity of segment#3 Runoff = 6.26 cfs @ 12.24 hrs, Volume= 0.610 af, Depth= 1.69" Routed to Link 6L : PRE DEV Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.05" Area (ac) CN Description 3.070 60 Woods, Fair, HSG B 0.320 73 Woods, Fair, HSG C 0.200 79 Woods, Fair, HSG D 0.120 56 Brush, Fair, HSG B 0.080 70 Brush, Fair, HSG C 0.350 77 Brush, Fair, HSG D 0.100 98 Paved parking, HSG B 0.060 98 Paved parking, HSG C 0.040 98 Paved parking, HSG D 4.340 65 Weighted Average 4.140 95.39% Pervious Area 0.200 4.61% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.9 100 0.0734 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" 3.9 254 0.0477 1.09 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 10.0 270 0.0391 0.45 1.34 Channel Flow, CHANNEL Area= 3.0 sf Perim= 6.3' r= 0.48' n= 0.400 Sheet flow: Woods+light brush 27.8 624 Total 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 56 Subcatchment 3S: Predevelopment Point 1 Hydrograph I 1 7 I 1 7 I I T I 1 I I 7 1 - 7- I I I I I I I I I I 1 I I I I I I I ■Runoff 1626.fs l I I 1 I I 1 I I 1 I 1 1 I I 1 1 6L 1 I 1 I I 1 I I 1 I IType 1*I12411r - 1 1 1 10-Year, Mai Inf0=ir5.00" 5L/ ' ' 1 ' ' 1 I 'Runbff Area=4.340 ad- 1 I I 1 I I 1 I I I I I I I I I I I -+ -+ 1 1- I 1 -i + 1 1- RuneffVoI6ime0-.61-0-a' - u 4- 1 I 11 11 II iulnQff11D9P;h7-1.1,691.1 rt fi 1 rt 1 rt fi 1 r IOrtw'Le-nc1th=624+ - 3_ I / I I I 1 I I 1 I I I I I I I I 1 1 I I 1 I I 1 I I 1 1 1 I Tc=27.I8 nl i n 2� 11 1 1 1 1 11 III 1 1 %f��6ri 1� 1i I 1 6 1 1 1 1 1 1 o 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 57 Hydrograph for Subcatchment 3S: Predevelopment Point 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.14 0.00 0.00 5.00 0.32 0.00 0.00 7.50 0.55 0.00 0.00 10.00 0.91 0.00 0.00 12.50 3.71 0.87 3.51 15.00 4.31 1.21 0.44 17.50 4.60 1.40 0.28 20.00 4.81 1.53 0.20 22.50 4.96 1.63 0.17 25.00 5.05 1.69 0.00 27.50 5.05 1.69 0.00 30.00 5.05 1.69 0.00 32.50 5.05 1.69 0.00 35.00 5.05 1.69 0.00 37.50 5.05 1.69 0.00 40.00 5.05 1.69 0.00 42.50 5.05 1.69 0.00 45.00 5.05 1.69 0.00 47.50 5.05 1.69 0.00 50.00 5.05 1.69 0.00 52.50 5.05 1.69 0.00 55.00 5.05 1.69 0.00 57.50 5.05 1.69 0.00 60.00 5.05 1.69 0.00 62.50 5.05 1.69 0.00 65.00 5.05 1.69 0.00 67.50 5.05 1.69 0.00 70.00 5.05 1.69 0.00 72.50 5.05 1.69 0.00 75.00 5.05 1.69 0.00 77.50 5.05 1.69 0.00 80.00 5.05 1.69 0.00 82.50 5.05 1.69 0.00 85.00 5.05 1.69 0.00 87.50 5.05 1.69 0.00 90.00 5.05 1.69 0.00 92.50 5.05 1.69 0.00 95.00 5.05 1.69 0.00 97.50 5.05 1.69 0.00 100.00 5.05 1.69 0.00 102.50 5.05 1.69 0.00 105.00 5.05 1.69 0.00 107.50 5.05 1.69 0.00 110.00 5.05 1.69 0.00 112.50 5.05 1.69 0.00 115.00 5.05 1.69 0.00 117.50 5.05 1.69 0.00 120.00 5.05 1.69 0.00 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 58 Summary for Subcatchment 4S: Postdevelopment Point 1 [49] Hint: Tc<2dt may require smaller dt Runoff = 12.57 cfs @ 11.96 hrs, Volume= 0.591 af, Depth= 3.03" Routed to Pond 12P : POND Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.05" Area (ac) CN Description 0.850 61 >75% Grass cover, Good, HSG B 0.010 74 >75% Grass cover, Good, HSG C 0.240 80 >75% Grass cover, Good, HSG D 1.000 98 Paved parking, HSG B 0.130 98 Paved parking, HSG C 0.110 60 Woods, Fair, HSG B 2.340 81 Weighted Average 1.210 51.71% Pervious Area 1.130 48.29% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, DIRECT Subcatchment 4S: Postdevelopment Point 1 Hydrograph — I— rt I — I— rt —I— t —I— -r -I - - -r -I - 14_ I L _ L A I L I L -I- L -1 L ILI L ■Runoff 13� 112.57 cis 11 I i I I 1 1 I I 1 1 1 1 I II 1 12 1 I I 1 1 I I 1 1 I I 1Typelli 24 r 11 / + + I I 1 1u7Year 1 KainfallT5.b51 _ 11 1 I I 1 Ru nbfP Area=1.340 ad - 7 1 - I- 7 -I- T -I- T -I - I- 7 - I- T -I- T -1 - 7 - 91/ - 1 I- 4 -1 1- IRunoffNoiu-meg0.591-af 5� I I I I I I I I I I I 1 CN811 4 4 - I- - 1- 4 -1- T -1- -1 - 1 — 1— 4 —1— T —I — - 3� I 1 1 1 1 1 1 1 I 1 1 � - 2 / I I 1: 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 59 Hydrograph for Subcatchment 4S: Postdevelopment Point 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.14 0.00 0.00 5.00 0.32 0.00 0.00 7.50 0.55 0.00 0.02 10.00 0.91 0.07 0.13 12.50 3.71 1.88 1.02 15.00 4.31 2.38 0.31 17.50 4.60 2.64 0.20 20.00 4.81 2.82 0.14 22.50 4.96 2.95 0.12 25.00 5.05 3.03 0.00 27.50 5.05 3.03 0.00 30.00 5.05 3.03 0.00 32.50 5.05 3.03 0.00 35.00 5.05 3.03 0.00 37.50 5.05 3.03 0.00 40.00 5.05 3.03 0.00 42.50 5.05 3.03 0.00 45.00 5.05 3.03 0.00 47.50 5.05 3.03 0.00 50.00 5.05 3.03 0.00 52.50 5.05 3.03 0.00 55.00 5.05 3.03 0.00 57.50 5.05 3.03 0.00 60.00 5.05 3.03 0.00 62.50 5.05 3.03 0.00 65.00 5.05 3.03 0.00 67.50 5.05 3.03 0.00 70.00 5.05 3.03 0.00 72.50 5.05 3.03 0.00 75.00 5.05 3.03 0.00 77.50 5.05 3.03 0.00 80.00 5.05 3.03 0.00 82.50 5.05 3.03 0.00 85.00 5.05 3.03 0.00 87.50 5.05 3.03 0.00 90.00 5.05 3.03 0.00 92.50 5.05 3.03 0.00 95.00 5.05 3.03 0.00 97.50 5.05 3.03 0.00 100.00 5.05 3.03 0.00 102.50 5.05 3.03 0.00 105.00 5.05 3.03 0.00 107.50 5.05 3.03 0.00 110.00 5.05 3.03 0.00 112.50 5.05 3.03 0.00 115.00 5.05 3.03 0.00 117.50 5.05 3.03 0.00 120.00 5.05 3.03 0.00 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 60 Summary for Subcatchment 7S: Predevelolpment Point 2 Runoff = 1.07 cfs @ 12.31 hrs, Volume= 0.123 af, Depth= 1.33" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.05" Area (ac) CN Description 1.110 60 Woods, Fair, HSG B 1.110 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.9 100 0.0093 0.05 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" 0.4 14 0.0121 0.55 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 32.3 114 Total Subcatchment 7S: Predevelolpment Point 2 Hydrograph I I I I I I I I I I I I I I I ❑Runoff 11.07 cfs 1 1 1 1 I I I I I I 1 1 1 %I rt -1 - 1 -1 - 1I - 1 Type-III 1 ,/ 1 1 1 i 1 1 10-rlYar1 Rlainfall=5.05 ' Il 1 1 1 1 1 1 1Runbff Awea=1.110 at 1 1 1 1 1 1 1 1 1 1 1 / 1 11 I I 1 RunofflVolume=0.123 of y / 1 1 tu;nOff 11Depth=; 03" u_ I , 1 1 1 1 RIdwlLength=1114' ,// 1 1 Tc=32.3 min CN6p 1 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 61 Hydrograph for Subcatchment 7S: Predevelolpment Point 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.14 0.00 0.00 5.00 0.32 0.00 0.00 7.50 0.55 0.00 0.00 10.00 0.91 0.00 0.00 12.50 3.71 0.63 0.81 15.00 4.31 0.92 0.10 17.50 4.60 1.08 0.06 20.00 4.81 1.19 0.05 22.50 4.96 1.28 0.04 25.00 5.05 1.33 0.00 27.50 5.05 1.33 0.00 30.00 5.05 1.33 0.00 32.50 5.05 1.33 0.00 35.00 5.05 1.33 0.00 37.50 5.05 1.33 0.00 40.00 5.05 1.33 0.00 42.50 5.05 1.33 0.00 45.00 5.05 1.33 0.00 47.50 5.05 1.33 0.00 50.00 5.05 1.33 0.00 52.50 5.05 1.33 0.00 55.00 5.05 1.33 0.00 57.50 5.05 1.33 0.00 60.00 5.05 1.33 0.00 62.50 5.05 1.33 0.00 65.00 5.05 1.33 0.00 67.50 5.05 1.33 0.00 70.00 5.05 1.33 0.00 72.50 5.05 1.33 0.00 75.00 5.05 1.33 0.00 77.50 5.05 1.33 0.00 80.00 5.05 1.33 0.00 82.50 5.05 1.33 0.00 85.00 5.05 1.33 0.00 87.50 5.05 1.33 0.00 90.00 5.05 1.33 0.00 92.50 5.05 1.33 0.00 95.00 5.05 1.33 0.00 97.50 5.05 1.33 0.00 100.00 5.05 1.33 0.00 102.50 5.05 1.33 0.00 105.00 5.05 1.33 0.00 107.50 5.05 1.33 0.00 110.00 5.05 1.33 0.00 112.50 5.05 1.33 0.00 115.00 5.05 1.33 0.00 117.50 5.05 1.33 0.00 120.00 5.05 1.33 0.00 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 62 Summary for Subcatchment 8S: BYPASS 1 Runoff = 4.68 cfs @ 12.11 hrs, Volume= 0.338 af, Depth= 1.92" Routed to Link 11 L : POST DEV Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.05" Area (ac) CN Description 1.180 60 Woods, Fair, HSG B 0.130 73 Woods, Fair, HSG C 0.170 61 >75% Grass cover, Good, HSG B 0.120 74 >75% Grass cover, Good, HSG C 0.310 80 >75% Grass cover, Good, HSG D 0.080 98 Paved parking, HSG B 0.090 98 Paved parking, HSG C 0.040 98 Paved parking, HSG D 2.120 68 Weighted Average 1.910 90.09% Pervious Area 0.210 9.91% Impervious Area Tc Length Slope Velocity Capacity Description (min) _ (feet) (ft/ft) (ft/sec) (cfs) 13.9 100 0.0734 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" 3.8 249 0.0472 1.09 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.1 278 0.0398 37.88 454.62 Channel Flow, Area= 12.0 sf Perim= 7.2' r= 1.67' n= 0.011 Concrete pipe, straight & clean 17.8 627 Total 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 63 Subcatchment 8S: BYPASS 1 Hydrograph 11 1 1 1 1 1 11 1 517 I I 1 I I 1 I I 1 I I 1 I 1 1 I 1 1 ■Runoff 1 11468cfs I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Type II124-hr 1 1 1 1 1 1 I1 41 11 / 1 1 1 1 1 1 1 1 1O Y ar kalnfaII 520-5 - ' 1 I ' 1 I ' 1 1Runbff Awea=2.120 ad I I I 1 1 I 1 1 I 1 1 I 1 1 I I 1 1 T 1 1- 1 1 T 1 1- -Ru noff Yol-u meO-338-af - y 3 l I I I I I I lu;ngff,Depth 1.p2,' ' / ' 1 1 ' 1 1 ' 1 1 ' Rlbw Length=627' u 2�/ '1- — ,/ T 1 T 1 7 1 T I T I— 7 I T I T 7 I - I I I ' I I I I 1 1 I 1 1 I ITci;=17.18 min 1 1 1 1 1 1 1 ({NL6 1-, 1 1 1 1 - 1 / 1 1 1 1 i 1 1 1io ��i�����1�!!!!!!!!!!!!!!!!!!!!!!!! !/!%!!!!!!!!!!!!!!!!!!! 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 64 Hydrograph for Subcatchment 8S: BYPASS 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.14 0.00 0.00 5.00 0.32 0.00 0.00 7.50 0.55 0.00 0.00 10.00 0.91 0.00 0.00 12.50 3.71 1.03 1.17 15.00 4.31 1.41 0.23 17.50 4.60 1.60 0.15 20.00 4.81 1.74 0.10 22.50 4.96 1.85 0.09 25.00 5.05 1.92 0.00 27.50 5.05 1.92 0.00 30.00 5.05 1.92 0.00 32.50 5.05 1.92 0.00 35.00 5.05 1.92 0.00 37.50 5.05 1.92 0.00 40.00 5.05 1.92 0.00 42.50 5.05 1.92 0.00 45.00 5.05 1.92 0.00 47.50 5.05 1.92 0.00 50.00 5.05 1.92 0.00 52.50 5.05 1.92 0.00 55.00 5.05 1.92 0.00 57.50 5.05 1.92 0.00 60.00 5.05 1.92 0.00 62.50 5.05 1.92 0.00 65.00 5.05 1.92 0.00 67.50 5.05 1.92 0.00 70.00 5.05 1.92 0.00 72.50 5.05 1.92 0.00 75.00 5.05 1.92 0.00 77.50 5.05 1.92 0.00 80.00 5.05 1.92 0.00 82.50 5.05 1.92 0.00 85.00 5.05 1.92 0.00 87.50 5.05 1.92 0.00 90.00 5.05 1.92 0.00 92.50 5.05 1.92 0.00 95.00 5.05 1.92 0.00 97.50 5.05 1.92 0.00 100.00 5.05 1.92 0.00 102.50 5.05 1.92 0.00 105.00 5.05 1.92 0.00 107.50 5.05 1.92 0.00 110.00 5.05 1.92 0.00 112.50 5.05 1.92 0.00 115.00 5.05 1.92 0.00 117.50 5.05 1.92 0.00 120.00 5.05 1.92 0.00 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 65 Summary for Subcatchment 9S: Postdevelopment Point 2 Runoff = 1.05 cfs @ 12.26 hrs, Volume= 0.111 af, Depth= 1.33" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.05" Area (ac) CN Description 1.000 60 Woods, Fair, HSG B 1.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.5 93 0.0106 0.05 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" Subcatchment 9S: Postdevelopment Point 2 Hydrograph / I I 11 1 1 I I 1 I I I I I I I I I I I ■Runoff 11.o5 cfs l l I I I I I I I I I I I 1 I I 1 1 I 1Tyrpe-IIr24 1r` IO.Year, RlainfaII 5.b51 IRunbff Awea=1.000 at 1 , 1 1 , I Runoff1Volume=0.111 af 1 cu;ncpff pepth=1.,s3�' FIoW Length 93' 1 I I Slope=0.0106 Tc=28.5mii I % 1 I CN=60 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 66 Hydrograph for Subcatchment 9S: Postdevelopment Point 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.14 0.00 0.00 5.00 0.32 0.00 0.00 7.50 0.55 0.00 0.00 10.00 0.91 0.00 0.00 12.50 3.71 0.63 0.65 15.00 4.31 0.92 0.09 17.50 4.60 1.08 0.06 20.00 4.81 1.19 0.04 22.50 4.96 1.28 0.04 25.00 5.05 1.33 0.00 27.50 5.05 1.33 0.00 30.00 5.05 1.33 0.00 32.50 5.05 1.33 0.00 35.00 5.05 1.33 0.00 37.50 5.05 1.33 0.00 40.00 5.05 1.33 0.00 42.50 5.05 1.33 0.00 45.00 5.05 1.33 0.00 47.50 5.05 1.33 0.00 50.00 5.05 1.33 0.00 52.50 5.05 1.33 0.00 55.00 5.05 1.33 0.00 57.50 5.05 1.33 0.00 60.00 5.05 1.33 0.00 62.50 5.05 1.33 0.00 65.00 5.05 1.33 0.00 67.50 5.05 1.33 0.00 70.00 5.05 1.33 0.00 72.50 5.05 1.33 0.00 75.00 5.05 1.33 0.00 77.50 5.05 1.33 0.00 80.00 5.05 1.33 0.00 82.50 5.05 1.33 0.00 85.00 5.05 1.33 0.00 87.50 5.05 1.33 0.00 90.00 5.05 1.33 0.00 92.50 5.05 1.33 0.00 95.00 5.05 1.33 0.00 97.50 5.05 1.33 0.00 100.00 5.05 1.33 0.00 102.50 5.05 1.33 0.00 105.00 5.05 1.33 0.00 107.50 5.05 1.33 0.00 110.00 5.05 1.33 0.00 112.50 5.05 1.33 0.00 115.00 5.05 1.33 0.00 117.50 5.05 1.33 0.00 120.00 5.05 1.33 0.00 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 67 Summary for Pond 12P: POND [44] Hint: Outlet device#2 is below defined storage Inflow Area = 2.340 ac, 48.29% Impervious, Inflow Depth = 3.03" for 10-Year event Inflow = 12.57 cfs @ 11.96 hrs, Volume= 0.591 af Outflow = 1.47 cfs @ 12.29 hrs, Volume= 0.591 af, Atten= 88%, Lag= 20.3 min Primary = 1.47 cfs @ 12.29 hrs, Volume= 0.591 af Routed to Link 11 L : POST DEV Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Link 11 L : POST DEV Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 579.63'@ 12.29 hrs Surf.Area= 5,935 sf Storage= 12,438 cf Plug-Flow detention time=419.4 min calculated for 0.591 af(100% of inflow) Center-of-Mass det. time=419.9 min ( 1,234.6 - 814.6 ) Volume Invert Avail.Storage Storage Description #1 577.00' 38,262 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 577.00 3,579 0 0 578.00 4,438 4,009 4,009 579.00 5,335 4,887 8,895 580.00 6,289 5,812 14,707 581.00 7,299 6,794 21,501 582.00 8,366 7,833 29,334 583.00 9,490 8,928 38,262 Device Routing Invert Outlet Devices #1 Primary 575.50' 15.0" Round Culvert L= 57.4' RCP, rounded edge headwall, Ke= 0.100 Inlet/ Outlet Invert= 575.50'/ 573.63' S= 0.0326 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.23 sf #2 Device 1 575.50' SAND FILTER Head (feet) 0.00 1.00 1.50 2.50 3.50 4.50 5.50 6.50 Disch. (cfs) 0.000 0.052 0.060 0.077 0.095 0.112 0.129 0.146 #3 Device 1 578.21' 2.5" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 578.89' 15.0" W x 3.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 579.63' 6.0" W x 3.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Device 1 580.18' 6.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #7 Device 1 580.80' 2.0' long x 0.5' breadth Broad-Crested Rectangular Weir X 4.00 Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #8 Device 1 581.00' 3.0' long x 0.5' breadth Broad-Crested Rectangular Weir X 4.00 Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 68 #9 Secondary 582.00' 20.0' long x 16.0' breadth EMERGENCY SPILLWAY Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=1.47 cfs @ 12.29 hrs HW=579.63' (Free Discharge) -1=Culvert (Passes 1.47 cfs of 13.74 cfs potential flow) -2=SAND FILTER (Custom Controls 0.11 cfs) -3=Orifice/Grate (Orifice Controls 0.19 cfs @ 5.52 fps) -4=Orifice/Grate (Orifice Controls 1.18 cfs @ 3.77 fps) -5=Orifice/Grate ( Controls 0.00 cfs) -6=Orifice/Grate ( Controls 0.00 cfs) -7=Broad-Crested Rectangular Weir( Controls 0.00 cfs) -8=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=577.00' (Free Discharge) L9=EMERGENCY SPILLWAY( Controls 0.00 cfs) Pond 12P: POND Hydrograph -r -1 -1- - -I -1- 1- t -I -I- -I - I- 1- 1 -1- I- 1- - - - 1 I 44 -i 4 1 1 + -1 I 14 1 1 44 1 1 4 - ■Inflow 12.57 cfs ❑�UffIOW i i L _I - I- L _1 - -I- I 1 L 1�1 - -_ � I- L _ Primary 14_ In IrOW reaZ lac E Secondary 13 12z ' 'r r7 -1 - 1- r7 -1- i T7 1 �Q - 1- -r 1 1 fi -11 1 + -1 ISto1aUe=1-214381 cf ill- - / L I 4 -1 - 1- -k -I -1- 1- -1 -I- 1 4 1- J- 45 -1- 1- 4 - 104-z / / z /1 1 I 1 I 1 1 I 1 I 1 1 1 1 1 1 1 1 1 1 9 z , /I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 A $y "1 1 / 1111111111111111111 c - / / - + -1 1- t + 1 1 + - 1 1- 1 1 + + 1 1 + - LL 6: / z / 1 1_ _t -1 - I- _L _I -I- 1- -1 -I- 1 _t -1 - 1- L _t -I- 1- - 5 / / / /1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 4 / / "I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3y i t® 2-_ / %///' �r �i ////////////////////////////////////////////////////////////% ,� � //////%%///////////////// / o 1l�/l/ll/l/l/lll/ll/// / 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 69 Pond 12P: POND Stage-Discharge I I I 1 ❑Total 583 ❑Primary ❑Secondary EMERGENCY SPILLWAY 582 I I �� I /�// % I 1 1 */� Broad-Crested Rectangular Weir Broad-Crested Rectangular Weir I 581 / I 5 Orifice/Grate 1 f I c 580 / �0 Orifice/Grate I / I I I I I I I Orifice/Grate w 1 579 7 1 Orifice/Grate I 578 O% 1 1 i i / / i i i i / i i i i / / / / i 577 , , , , „ , , „ , , . , (, . . • (. . (. . . . 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Discharge (cfs) Pond 12P: POND Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 500 1,000 1,500 2,000 2,500 3,000 3,5004,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,000 8,500 9,000 0 Surface . . ' . . . ! . . . ' . . . . . . ! . . . I . ( . I . . . ! . . . I . . . I . . . 1 , , . I . . . ' . . . 1 . . . I . . . ' . . . ! . . . ❑Storage 583� I I I II I 11 i 1 1 7 I I I II I I I I II / 1 1 1 1 1 1 1 II I I I I I I I 582 I I I ////' II I I I _ I I I I II I I I I ��/�/ ' ,, I I I II I I I 581- 1 z,__a H I_L _L 11 I JH H 11 1 1I 1 I I1 1 I I a 580- I I I I .. "/ . 1 I II I I I I II I I I d - — I H + + I + 1 I i+ r 1+ + + II I -[ r + w - " I I I I I I II I I I 579-" I I II I I I I II I I I - n — r r 1- 1 I 1t 1 —Ill — + —1 1— 1 rt r r 578 11 I I I II I I I / / / / - Custom Stage Data / z / / 577 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 Storage(cubic-feet) 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 70 Hydrograph for Pond 12P: POND Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 577.00 0.00 0.00 0.00 2.50 0.00 0 577.00 0.00 0.00 0.00 5.00 0.00 0 577.00 0.00 0.00 0.00 7.50 0.02 15 577.00 0.00 0.00 0.00 10.00 0.13 281 577.08 0.06 0.06 0.00 12.50 1.02 12,280 579.60 1.44 1.44 0.00 15.00 0.31 8,955 579.01 0.40 0.40 0.00 17.50 0.20 8,441 578.91 0.24 0.24 0.00 20.00 0.14 7,996 578.83 0.21 0.21 0.00 22.50 0.12 7,358 578.70 0.19 0.19 0.00 25.00 0.00 6,416 578.52 0.16 0.16 0.00 27.50 0.00 5,286 578.28 0.09 0.09 0.00 30.00 0.00 4,547 578.12 0.08 0.08 0.00 32.50 0.00 3,847 577.96 0.08 0.08 0.00 35.00 0.00 3,172 577.81 0.07 0.07 0.00 37.50 0.00 2,520 577.65 0.07 0.07 0.00 40.00 0.00 1,892 577.50 0.07 0.07 0.00 42.50 0.00 1,287 577.35 0.07 0.07 0.00 45.00 0.00 706 577.19 0.06 0.06 0.00 47.50 0.00 158 577.04 0.04 0.04 0.00 50.00 0.00 12 577.00 0.00 0.00 0.00 52.50 0.00 1 577.00 0.00 0.00 0.00 55.00 0.00 0 577.00 0.00 0.00 0.00 57.50 0.00 0 577.00 0.00 0.00 0.00 60.00 0.00 0 577.00 0.00 0.00 0.00 62.50 0.00 0 577.00 0.00 0.00 0.00 65.00 0.00 0 577.00 0.00 0.00 0.00 67.50 0.00 0 577.00 0.00 0.00 0.00 70.00 0.00 0 577.00 0.00 0.00 0.00 72.50 0.00 0 577.00 0.00 0.00 0.00 75.00 0.00 0 577.00 0.00 0.00 0.00 77.50 0.00 0 577.00 0.00 0.00 0.00 80.00 0.00 0 577.00 0.00 0.00 0.00 82.50 0.00 0 577.00 0.00 0.00 0.00 85.00 0.00 0 577.00 0.00 0.00 0.00 87.50 0.00 0 577.00 0.00 0.00 0.00 90.00 0.00 0 577.00 0.00 0.00 0.00 92.50 0.00 0 577.00 0.00 0.00 0.00 95.00 0.00 0 577.00 0.00 0.00 0.00 97.50 0.00 0 577.00 0.00 0.00 0.00 100.00 0.00 0 577.00 0.00 0.00 0.00 102.50 0.00 0 577.00 0.00 0.00 0.00 105.00 0.00 0 577.00 0.00 0.00 0.00 107.50 0.00 0 577.00 0.00 0.00 0.00 110.00 0.00 0 577.00 0.00 0.00 0.00 112.50 0.00 0 577.00 0.00 0.00 0.00 115.00 0.00 0 577.00 0.00 0.00 0.00 117.50 0.00 0 577.00 0.00 0.00 0.00 120.00 0.00 0 577.00 0.00 0.00 0.00 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 71 Stage-Discharge for Pond 12P: POND Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 577.00 0.00 0.00 0.00 582.20 21.86 17.06 4.79 577.10 0.06 0.06 0.00 582.30 26.02 17.18 8.84 577.20 0.06 0.06 0.00 582.40 30.96 17.29 13.66 577.30 0.07 0.07 0.00 582.50 36.50 17.41 19.09 577.40 0.07 0.07 0.00 582.60 42.62 17.52 25.10 577.50 0.07 0.07 0.00 582.70 48.91 17.64 31.27 577.60 0.07 0.07 0.00 582.80 55.53 17.75 37.78 577.70 0.07 0.07 0.00 582.90 62.86 17.86 45.00 577.80 0.07 0.07 0.00 583.00 70.57 17.97 52.60 577.90 0.08 0.08 0.00 578.00 0.08 0.08 0.00 578.10 0.08 0.08 0.00 578.20 0.08 0.08 0.00 578.30 0.10 0.10 0.00 578.40 0.13 0.13 0.00 578.50 0.16 0.16 0.00 578.60 0.18 0.18 0.00 578.70 0.19 0.19 0.00 578.80 0.21 0.21 0.00 578.90 0.22 0.22 0.00 579.00 0.38 0.38 0.00 579.10 0.63 0.63 0.00 579.20 0.89 0.89 0.00 579.30 1.06 1.06 0.00 579.40 1.20 1.20 0.00 579.50 1.33 1.33 0.00 579.60 1.44 1.44 0.00 579.70 1.57 1.57 0.00 579.80 1.75 1.75 0.00 579.90 1.95 1.95 0.00 580.00 2.11 2.11 0.00 580.10 2.25 2.25 0.00 580.20 2.38 2.38 0.00 580.30 2.54 2.54 0.00 580.40 2.74 2.74 0.00 580.50 2.97 2.97 0.00 580.60 3.21 3.21 0.00 580.70 3.41 3.41 0.00 580.80 3.58 3.58 0.00 580.90 4.46 4.46 0.00 581.00 5.91 5.91 0.00 581.10 8.87 8.87 0.00 581.20 13.10 13.10 0.00 581.30 15.98 15.98 0.00 581.40 16.10 16.10 0.00 581.50 16.23 16.23 0.00 581.60 16.35 16.35 0.00 581.70 16.47 16.47 0.00 581.80 16.59 16.59 0.00 581.90 16.71 16.71 0.00 582.00 16.83 16.83 0.00 582.10 18.64 16.95 1.69 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 72 Stage-Area-Storage for Pond 12P: POND Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 577.00 3,579 0 582.20 8,591 31,029 577.10 3,665 362 582.30 8,703 31,894 577.20 3,751 733 582.40 8,816 32,770 577.30 3,837 1,112 582.50 8,928 33,657 577.40 3,923 1,500 582.60 9,040 34,555 577.50 4,009 1,897 582.70 9,153 35,465 577.60 4,094 2,302 582.80 9,265 36,386 577.70 4,180 2,716 582.90 9,378 37,318 577.80 4,266 3,138 583.00 9,490 38,262 577.90 4,352 3,569 578.00 4,438 4,009 578.10 4,528 4,457 578.20 4,617 4,914 578.30 4,707 5,380 578.40 4,797 5,855 578.50 4,887 6,340 578.60 4,976 6,833 578.70 5,066 7,335 578.80 5,156 7,846 578.90 5,245 8,366 579.00 5,335 8,895 579.10 5,430 9,433 579.20 5,526 9,981 579.30 5,621 10,538 579.40 5,717 11,105 579.50 5,812 11,682 579.60 5,907 12,268 579.70 6,003 12,863 579.80 6,098 13,468 579.90 6,194 14,083 580.00 6,289 14,707 580.10 6,390 15,341 580.20 6,491 15,985 580.30 6,592 16,639 580.40 6,693 17,303 580.50 6,794 17,978 580.60 6,895 18,662 580.70 6,996 19,357 580.80 7,097 20,061 580.90 7,198 20,776 581.00 7,299 21,501 581.10 7,406 22,236 581.20 7,512 22,982 581.30 7,619 23,739 581.40 7,726 24,506 581.50 7,833 25,284 581.60 7,939 26,072 581.70 8,046 26,872 581.80 8,153 27,682 581.90 8,259 28,502 582.00 8,366 29,334 582.10 8,478 30,176 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 73 Summary for Link 6L: PRE DEV Inflow Area = 4.340 ac, 4.61% Impervious, Inflow Depth = 1.69" for 10-Year event Inflow = 6.26 cfs @ 12.24 hrs, Volume= 0.610 af Primary = 6.26 cfs @ 12.24 hrs, Volume= 0.610 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 6L: PRE DEV Hydrograph 7-/-71 I 1 1 1 1 1 1 1 1 1 I ❑Inflow ` - 1626 cfs I I _0 Primary 1 '62 j 1 I IlnflowlArea=4.340lac 6 / 1 1 1 1 1 1 1 1 1 1 / 1 1 i 1 1 1 1 1 1 1 1 1 I I I I1 1 / T T — 1— T —I — T T —1— T 1 T 1 — T I 1— 1- —11— T —1 I 1 11 11 I I I I I I I I 1 I 4 / 1 1 1 1 1 1 I I I 1 1 33 / 1 1 1 1 1 1 I I1 11 1 1 1 1 1 1 11 11 -I -1- 4 —I — I— -1 — HI -1— -1 - 1— -L1 1 1 I I I I 2 1 1 1 1 1 1 1 1 I I I I 7 717 T 717 1 7 —1— r 1— T —' — 1 7 717 T 7171 1 1 1 1 1 0 � 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 74 Hydrograph for Link 6L: PRE DEV Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.00 0.00 0.00 10.00 0.00 0.00 0.00 12.50 3.51 0.00 3.51 15.00 0.44 0.00 0.44 17.50 0.28 0.00 0.28 20.00 0.20 0.00 0.20 22.50 0.17 0.00 0.17 25.00 0.00 0.00 0.00 27.50 0.00 0.00 0.00 30.00 0.00 0.00 0.00 32.50 0.00 0.00 0.00 35.00 0.00 0.00 0.00 37.50 0.00 0.00 0.00 40.00 0.00 0.00 0.00 42.50 0.00 0.00 0.00 45.00 0.00 0.00 0.00 47.50 0.00 0.00 0.00 50.00 0.00 0.00 0.00 52.50 0.00 0.00 0.00 55.00 0.00 0.00 0.00 57.50 0.00 0.00 0.00 60.00 0.00 0.00 0.00 62.50 0.00 0.00 0.00 65.00 0.00 0.00 0.00 67.50 0.00 0.00 0.00 70.00 0.00 0.00 0.00 72.50 0.00 0.00 0.00 75.00 0.00 0.00 0.00 77.50 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 75 Summary for Link 11 L: POST DEV Inflow Area = 4.460 ac, 30.04% Impervious, Inflow Depth = 2.50" for 10-Year event Inflow = 6.12 cfs @ 12.11 hrs, Volume= 0.929 of Primary = 6.12 cfs @ 12.11 hrs, Volume= 0.929 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 11 L: POST DEV Hydrograph I I I I 1 1 1 1 1 I I 1 I 1 I 1 I 1 I I I ❑Inflow ` J 6.12 cfs I L _ T I I— I I - I— 4 —I -0 Primary 16.,/fs r/ I 1 I 1 1 Inflow 1Area=4.46O lac 6 1 1 1 1 1 " 1 " I I I I 1 1 T T — I— T —1 — T -1 —1— T I I— T - I— T —1 5 1 1 1 1 1 I I I I 1 1 1 1 1 I I I I I I 1 1 1 1 1 1 I I I I 1 1 N 4 1 1 1 1 I I I I 1 1 L L _ I_ 1 _I _ L _ 1 _1_ L _I _ 1_ 1 _I _ o 9 1 1 1 1 1 1 1 1 LL 3 ' 1 I 1 1 I I T — 2 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 10-Year Rainfall=5.05" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 76 Hydrograph for Link 11 L: POST DEV Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.00 0.00 0.00 10.00 0.06 0.00 0.06 12.50 2.61 0.00 2.61 15.00 0.63 0.00 0.63 17.50 0.38 0.00 0.38 20.00 0.31 0.00 0.31 22.50 0.28 0.00 0.28 25.00 0.16 0.00 0.16 27.50 0.09 0.00 0.09 30.00 0.08 0.00 0.08 32.50 0.08 0.00 0.08 35.00 0.07 0.00 0.07 37.50 0.07 0.00 0.07 40.00 0.07 0.00 0.07 42.50 0.07 0.00 0.07 45.00 0.06 0.00 0.06 47.50 0.04 0.00 0.04 50.00 0.00 0.00 0.00 52.50 0.00 0.00 0.00 55.00 0.00 0.00 0.00 57.50 0.00 0.00 0.00 60.00 0.00 0.00 0.00 62.50 0.00 0.00 0.00 65.00 0.00 0.00 0.00 67.50 0.00 0.00 0.00 70.00 0.00 0.00 0.00 72.50 0.00 0.00 0.00 75.00 0.00 0.00 0.00 77.50 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 77 Time span=0.00-120.00 hrs, dt=0.05 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment3S: PredevelopmentPoint 1 Runoff Area=4.340 ac 4.61% Impervious Runoff Depth=2.35" Flow Length=624' Tc=27.8 min CN=65 Runoff=8.98 cfs 0.850 af Subcatchment4S: PostdevelopmentPoint Runoff Area=2.340 ac 48.29% Impervious Runoff Depth=3.88" Tc=5.0 min CN=81 Runoff=15.94 cfs 0.757 af Subcatchment7S: PredevelolpmentPoint 2 Runoff Area=1.110 ac 0.00% Impervious Runoff Depth=1.92" Flow Length=114' Tc=32.3 min CN=60 Runoff=1.63 cfs 0.178 af Subcatchment8S: BYPASS 1 Runoff Area=2.120 ac 9.91% Impervious Runoff Depth=2.62" Flow Length=627' Tc=17.8 min CN=68 Runoff=6.50 cfs 0.463 af Subcatchment9S: PostdevelopmentPoint 2 Runoff Area=1.000 ac 0.00% Impervious Runoff Depth=1.92" Flow Length=93' Slope=0.0106 '/' Tc=28.5 min CN=60 Runoff=1.60 cfs 0.160 af Pond 12P: POND Peak Elev=580.18' Storage=15,852 cf Inflow=15.94 cfs 0.757 af Primary=2.35 cfs 0.757 af Secondary=0.00 cfs 0.000 af Outflow=2.35 cfs 0.757 af Link 6L: PRE DEV Inflow=8.98 cfs 0.850 af Primary=8.98 cfs 0.850 af Link 11 L: POST DEV Inflow=8.84 cfs 1.220 af Primary=8.84 cfs 1.220 af Total Runoff Area = 10.910 ac Runoff Volume = 2.409 af Average Runoff Depth = 2.65" 85.88% Pervious = 9.370 ac 14.12% Impervious = 1.540 ac 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 78 Summary for Subcatchment 3S: Predevelopment Point 1 [47] Hint: Peak is 668% of capacity of segment#3 Runoff = 8.98 cfs @ 12.23 hrs, Volume= 0.850 af, Depth= 2.35" Routed to Link 6L : PRE DEV Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.00" Area (ac) CN Description 3.070 60 Woods, Fair, HSG B 0.320 73 Woods, Fair, HSG C 0.200 79 Woods, Fair, HSG D 0.120 56 Brush, Fair, HSG B 0.080 70 Brush, Fair, HSG C 0.350 77 Brush, Fair, HSG D 0.100 98 Paved parking, HSG B 0.060 98 Paved parking, HSG C 0.040 98 Paved parking, HSG D 4.340 65 Weighted Average 4.140 95.39% Pervious Area 0.200 4.61% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.9 100 0.0734 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" 3.9 254 0.0477 1.09 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 10.0 270 0.0391 0.45 1.34 Channel Flow, CHANNEL Area= 3.0 sf Perim= 6.3' r= 0.48' n= 0.400 Sheet flow: Woods+light brush 27.8 624 Total 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 79 Subcatchment 3S: Predevelopment Point 1 Hydrograph A- -r - 1- rt -1- , 1 - 1- -I 1 1 , - r -1 - 1 rt - 1- 1 - -r -1 - I- - 10 1 1 1 I I 1 I I 1 1 I I 1 1 1 1 1 I 1 1 ■Runoff /— i 8.98 cfs -r 1- 1 7 T T 1 7 I- - T I- - 9� I I I I I I I I I I I I ITyrpe lli 24-hr 81/ i I I I --1 -.ear RainfaIIT6.b0l 7- 1 I I I Ru nbf Awes=4.340 ad - / 1 1 1 1 1 1 1 1 1 },1 11 1 1 1 1 1 1 1 1 IRuTno flrVolunlle-0.850 a# - w 6_ / *tin 1 Depth ` 5�" - 51 '/ I I I I I io : 4- / 1 1 I I I 1 F_IOw'Length=-624' - 41-' / 1 I I I I I I 1 1 T I / 1 1 1 1 'Tc=27.88 min - 31 �/ NL6 21/ 1 1 I I I 1 1 11/ 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 80 Hydrograph for Subcatchment 3S: Predevelopment Point 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.17 0.00 0.00 5.00 0.38 0.00 0.00 7.50 0.66 0.00 0.00 10.00 1.09 0.00 0.00 12.50 4.41 1.27 4.89 15.00 5.12 1.73 0.58 17.50 5.47 1.97 0.37 20.00 5.71 2.14 0.26 22.50 5.90 2.28 0.23 25.00 6.00 2.35 0.00 27.50 6.00 2.35 0.00 30.00 6.00 2.35 0.00 32.50 6.00 2.35 0.00 35.00 6.00 2.35 0.00 37.50 6.00 2.35 0.00 40.00 6.00 2.35 0.00 42.50 6.00 2.35 0.00 45.00 6.00 2.35 0.00 47.50 6.00 2.35 0.00 50.00 6.00 2.35 0.00 52.50 6.00 2.35 0.00 55.00 6.00 2.35 0.00 57.50 6.00 2.35 0.00 60.00 6.00 2.35 0.00 62.50 6.00 2.35 0.00 65.00 6.00 2.35 0.00 67.50 6.00 2.35 0.00 70.00 6.00 2.35 0.00 72.50 6.00 2.35 0.00 75.00 6.00 2.35 0.00 77.50 6.00 2.35 0.00 80.00 6.00 2.35 0.00 82.50 6.00 2.35 0.00 85.00 6.00 2.35 0.00 87.50 6.00 2.35 0.00 90.00 6.00 2.35 0.00 92.50 6.00 2.35 0.00 95.00 6.00 2.35 0.00 97.50 6.00 2.35 0.00 100.00 6.00 2.35 0.00 102.50 6.00 2.35 0.00 105.00 6.00 2.35 0.00 107.50 6.00 2.35 0.00 110.00 6.00 2.35 0.00 112.50 6.00 2.35 0.00 115.00 6.00 2.35 0.00 117.50 6.00 2.35 0.00 120.00 6.00 2.35 0.00 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 81 Summary for Subcatchment 4S: Postdevelopment Point 1 [49] Hint: Tc<2dt may require smaller dt Runoff = 15.94 cfs @ 11.95 hrs, Volume= 0.757 af, Depth= 3.88" Routed to Pond 12P : POND Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.00" Area (ac) CN Description 0.850 61 >75% Grass cover, Good, HSG B 0.010 74 >75% Grass cover, Good, HSG C 0.240 80 >75% Grass cover, Good, HSG D 1.000 98 Paved parking, HSG B 0.130 98 Paved parking, HSG C 0.110 60 Woods, Fair, HSG B 2.340 81 Weighted Average 1.210 51.71% Pervious Area 1.130 48.29% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, DIRECT Subcatchment 4S: Postdevelopment Point 1 Hydrograph 1 1 1 1 I I I I I I I I I 11 1 I 1 I I I I I I I I I I I I I I I I I I ■Runoff 171-/ EMI T —I— T -1 — T7 — I— T —I— T —I— T -1 — T — IT —II— Tn-11 — T 16� — -I — —I — I— rt —I— fi —I— 1— —I — rt — 17T y1""-1 EL F 15� H -1 — H — I— —1— T —I— 1 — H — 1— -I- t -b- — 14 � / •I — � � — I— —I— —I— 4u-7 Lear ��inf�ll 6 �� _ 134-/ H 1 — — I— _L —I— T —I— Rim off Area.1 4, 124-/ 1 — L J — I— L —I— L _I L _I — L II—...,�1',�—I— L C—I'— L — 11� -1 I I 1 1 I IRu�ff_V_o rneQ.Z5�7_af y 10 _ D pI h 3 _ I 1 I 1 1 I I 1 T '1mY 1 1"°1 Ek 7y 1 1 1 I I I I I I I I I I I I I 6� I I 1 I 1 1 I I 1 1 I I 1 1 I Cl�l 81 — T — T I — I— 7 I— T —I T I T T T I T I T 5 r r 1— r T 1 r r rt T 1— r 4 — � t 1 r I t -1 T I T -1 1— T 1— r — 3 — + I r 7 1— 4 —I T 1 T —1 — I— I— T —1 — 2 1 1— I— 4 —1 T —1— T —1 — — I— — T —1 — 1 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 82 Hydrograph for Subcatchment 4S: Postdevelopment Point 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.17 0.00 0.00 5.00 0.38 0.00 0.00 7.50 0.66 0.01 0.04 10.00 1.09 0.13 0.20 12.50 4.41 2.47 1.27 15.00 5.12 3.09 0.38 17.50 5.47 3.40 0.25 20.00 5.71 3.62 0.17 22.50 5.90 3.79 0.15 25.00 6.00 3.88 0.00 27.50 6.00 3.88 0.00 30.00 6.00 3.88 0.00 32.50 6.00 3.88 0.00 35.00 6.00 3.88 0.00 37.50 6.00 3.88 0.00 40.00 6.00 3.88 0.00 42.50 6.00 3.88 0.00 45.00 6.00 3.88 0.00 47.50 6.00 3.88 0.00 50.00 6.00 3.88 0.00 52.50 6.00 3.88 0.00 55.00 6.00 3.88 0.00 57.50 6.00 3.88 0.00 60.00 6.00 3.88 0.00 62.50 6.00 3.88 0.00 65.00 6.00 3.88 0.00 67.50 6.00 3.88 0.00 70.00 6.00 3.88 0.00 72.50 6.00 3.88 0.00 75.00 6.00 3.88 0.00 77.50 6.00 3.88 0.00 80.00 6.00 3.88 0.00 82.50 6.00 3.88 0.00 85.00 6.00 3.88 0.00 87.50 6.00 3.88 0.00 90.00 6.00 3.88 0.00 92.50 6.00 3.88 0.00 95.00 6.00 3.88 0.00 97.50 6.00 3.88 0.00 100.00 6.00 3.88 0.00 102.50 6.00 3.88 0.00 105.00 6.00 3.88 0.00 107.50 6.00 3.88 0.00 110.00 6.00 3.88 0.00 112.50 6.00 3.88 0.00 115.00 6.00 3.88 0.00 117.50 6.00 3.88 0.00 120.00 6.00 3.88 0.00 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 83 Summary for Subcatchment 7S: Predevelolpment Point 2 Runoff = 1.63 cfs @ 12.30 hrs, Volume= 0.178 af, Depth= 1.92" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.00" Area (ac) CN Description 1.110 60 Woods, Fair, HSG B 1.110 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.9 100 0.0093 0.05 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" 0.4 14 0.0121 0.55 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 32.3 114 Total Subcatchment 7S: Predevelolpment Point 2 Hydrograph I I I I I I 1 I I I I 1 I I ❑Runoff 1 1 s3 cfs 1 1 i 1 1 I I I I I I I I I I I 1 I 1 1 I I 1 1 I IType Ili 24-hr / 1 i 1 i I 1 I 45-Year, Rlainfall=6.b0�' / I I - 1 ' I 1 ' 'Runbff Awea=1.110 at / I 1 I I 1 I IIIII I 1 1 1 I I 1 Runoff Volume=0.178 of 1 / 11 Itu;nCff 11Depth=1.p2l' / ' 1 I FIdwlLength=1114' / Tc=32.3 min / CN6p ,%iiiiz ,, ii , 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 84 Hydrograph for Subcatchment 7S: Predevelolpment Point 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.17 0.00 0.00 5.00 0.38 0.00 0.00 7.50 0.66 0.00 0.00 10.00 1.09 0.00 0.00 12.50 4.41 0.97 1.19 15.00 5.12 1.37 0.13 17.50 5.47 1.58 0.08 20.00 5.71 1.74 0.06 22.50 5.90 1.85 0.05 25.00 6.00 1.92 0.00 27.50 6.00 1.92 0.00 30.00 6.00 1.92 0.00 32.50 6.00 1.92 0.00 35.00 6.00 1.92 0.00 37.50 6.00 1.92 0.00 40.00 6.00 1.92 0.00 42.50 6.00 1.92 0.00 45.00 6.00 1.92 0.00 47.50 6.00 1.92 0.00 50.00 6.00 1.92 0.00 52.50 6.00 1.92 0.00 55.00 6.00 1.92 0.00 57.50 6.00 1.92 0.00 60.00 6.00 1.92 0.00 62.50 6.00 1.92 0.00 65.00 6.00 1.92 0.00 67.50 6.00 1.92 0.00 70.00 6.00 1.92 0.00 72.50 6.00 1.92 0.00 75.00 6.00 1.92 0.00 77.50 6.00 1.92 0.00 80.00 6.00 1.92 0.00 82.50 6.00 1.92 0.00 85.00 6.00 1.92 0.00 87.50 6.00 1.92 0.00 90.00 6.00 1.92 0.00 92.50 6.00 1.92 0.00 95.00 6.00 1.92 0.00 97.50 6.00 1.92 0.00 100.00 6.00 1.92 0.00 102.50 6.00 1.92 0.00 105.00 6.00 1.92 0.00 107.50 6.00 1.92 0.00 110.00 6.00 1.92 0.00 112.50 6.00 1.92 0.00 115.00 6.00 1.92 0.00 117.50 6.00 1.92 0.00 120.00 6.00 1.92 0.00 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 85 Summary for Subcatchment 8S: BYPASS 1 Runoff = 6.50 cfs @ 12.11 hrs, Volume= 0.463 af, Depth= 2.62" Routed to Link 11 L : POST DEV Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.00" Area (ac) CN Description 1.180 60 Woods, Fair, HSG B 0.130 73 Woods, Fair, HSG C 0.170 61 >75% Grass cover, Good, HSG B 0.120 74 >75% Grass cover, Good, HSG C 0.310 80 >75% Grass cover, Good, HSG D 0.080 98 Paved parking, HSG B 0.090 98 Paved parking, HSG C 0.040 98 Paved parking, HSG D 2.120 68 Weighted Average 1.910 90.09% Pervious Area 0.210 9.91% Impervious Area Tc Length Slope Velocity Capacity Description (min) _ (feet) (ft/ft) (ft/sec) (cfs) 13.9 100 0.0734 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" 3.8 249 0.0472 1.09 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.1 278 0.0398 37.88 454.62 Channel Flow, Area= 12.0 sf Perim= 7.2' r= 1.67' n= 0.011 Concrete pipe, straight & clean 17.8 627 Total 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 86 Subcatchment 8S: BYPASS 1 Hydrograph /f I I I I I 1 I I I - 7:./ I I I 1 I I 1 I I 1 1 ' I 1 1 ■Runoff II 6.50 cfs 11 I I 1 I I 1 ' I 1 1 I 1 1 J 2 L -1 - 1— _i -1- 1 -1— L Type-I1-24-iK - 6- 1 1 1 1 1 1 1 5.Year1I��ainfallT6.p0�' I I I I I I I I I I � 1 rt 1 fi 1 1 I I T 1 fi 1 'Runbff�Awea=2 1-20 arc - 5- 1 I I I 1 I I 1 1 I 1 1 I 1 1 I I 1 1 1 I 1 I I 1 Runoff Volumle0.463 of 4� 1 / 1 I Ou;ngff 11Depih42.1,62�' 1 o - J— _ ,/ L —1 — 1_ _i _1_ 1 —1— L —I — 1_ _i _Rdw ten t�1=6271 - LL 3� 1 1 1 1 1 1 1 1 1 g 1 1 1 ' 1 1 1 1 1 1 1 1 ' Tc=17.18 min 1 -1 - 1- -r -1- T —1— T —1 — 1 —i — 1— [�A'�— 2- 1 1 1 1 1 1 1 1 1 �f'Y 16 1 1 1 1 1 1 1 1 I I I I I I 1 1 ' ' 1 ' 1 1 1 1_ 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 87 Hydrograph for Subcatchment 8S: BYPASS 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.17 0.00 0.00 5.00 0.38 0.00 0.00 7.50 0.66 0.00 0.00 10.00 1.09 0.00 0.02 12.50 4.41 1.47 1.56 15.00 5.12 1.97 0.29 17.50 5.47 2.22 0.19 20.00 5.71 2.40 0.13 22.50 5.90 2.54 0.12 25.00 6.00 2.62 0.00 27.50 6.00 2.62 0.00 30.00 6.00 2.62 0.00 32.50 6.00 2.62 0.00 35.00 6.00 2.62 0.00 37.50 6.00 2.62 0.00 40.00 6.00 2.62 0.00 42.50 6.00 2.62 0.00 45.00 6.00 2.62 0.00 47.50 6.00 2.62 0.00 50.00 6.00 2.62 0.00 52.50 6.00 2.62 0.00 55.00 6.00 2.62 0.00 57.50 6.00 2.62 0.00 60.00 6.00 2.62 0.00 62.50 6.00 2.62 0.00 65.00 6.00 2.62 0.00 67.50 6.00 2.62 0.00 70.00 6.00 2.62 0.00 72.50 6.00 2.62 0.00 75.00 6.00 2.62 0.00 77.50 6.00 2.62 0.00 80.00 6.00 2.62 0.00 82.50 6.00 2.62 0.00 85.00 6.00 2.62 0.00 87.50 6.00 2.62 0.00 90.00 6.00 2.62 0.00 92.50 6.00 2.62 0.00 95.00 6.00 2.62 0.00 97.50 6.00 2.62 0.00 100.00 6.00 2.62 0.00 102.50 6.00 2.62 0.00 105.00 6.00 2.62 0.00 107.50 6.00 2.62 0.00 110.00 6.00 2.62 0.00 112.50 6.00 2.62 0.00 115.00 6.00 2.62 0.00 117.50 6.00 2.62 0.00 120.00 6.00 2.62 0.00 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 88 Summary for Subcatchment 9S: Postdevelopment Point 2 Runoff = 1.60 cfs @ 12.25 hrs, Volume= 0.160 af, Depth= 1.92" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.00" Area (ac) CN Description 1.000 60 Woods, Fair, HSG B 1.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.5 93 0.0106 0.05 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" Subcatchment 9S: Postdevelopment Point 2 Hydrograph / II I I I I I I I I I I I I I I I I I ❑Runoff 11.6o cfsl I I I I I I I I I I 1 I I I I I I I 1 Type II 24-hr 1 I 1 i I 1 I 5-rlYear1 R1lainfalIT6.00 ' 1 I I 1 I I 1 I IRunbff Area=1.000 at , 1 1 1 1 1 1 1 1 1 1 L ✓ 1 1 Runoff 1 Vo l u mle=0.169_af ,11 / 1I u;ngff,Depth=1.021' LL 1 Im IFlow Length=93' 1 I 1 1 Slope=0.0106 '/' 11 1 1 Tc=28.5 mi 1n 1 1 1 1' 1 1 1 CN=60 1 1 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 89 Hydrograph for Subcatchment 9S: Postdevelopment Point 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.17 0.00 0.00 5.00 0.38 0.00 0.00 7.50 0.66 0.00 0.00 10.00 1.09 0.00 0.00 12.50 4.41 0.97 0.95 15.00 5.12 1.37 0.12 17.50 5.47 1.58 0.08 20.00 5.71 1.74 0.05 22.50 5.90 1.85 0.05 25.00 6.00 1.92 0.00 27.50 6.00 1.92 0.00 30.00 6.00 1.92 0.00 32.50 6.00 1.92 0.00 35.00 6.00 1.92 0.00 37.50 6.00 1.92 0.00 40.00 6.00 1.92 0.00 42.50 6.00 1.92 0.00 45.00 6.00 1.92 0.00 47.50 6.00 1.92 0.00 50.00 6.00 1.92 0.00 52.50 6.00 1.92 0.00 55.00 6.00 1.92 0.00 57.50 6.00 1.92 0.00 60.00 6.00 1.92 0.00 62.50 6.00 1.92 0.00 65.00 6.00 1.92 0.00 67.50 6.00 1.92 0.00 70.00 6.00 1.92 0.00 72.50 6.00 1.92 0.00 75.00 6.00 1.92 0.00 77.50 6.00 1.92 0.00 80.00 6.00 1.92 0.00 82.50 6.00 1.92 0.00 85.00 6.00 1.92 0.00 87.50 6.00 1.92 0.00 90.00 6.00 1.92 0.00 92.50 6.00 1.92 0.00 95.00 6.00 1.92 0.00 97.50 6.00 1.92 0.00 100.00 6.00 1.92 0.00 102.50 6.00 1.92 0.00 105.00 6.00 1.92 0.00 107.50 6.00 1.92 0.00 110.00 6.00 1.92 0.00 112.50 6.00 1.92 0.00 115.00 6.00 1.92 0.00 117.50 6.00 1.92 0.00 120.00 6.00 1.92 0.00 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 90 Summary for Pond 12P: POND [44] Hint: Outlet device#2 is below defined storage Inflow Area = 2.340 ac, 48.29% Impervious, Inflow Depth = 3.88" for 25-Year event Inflow = 15.94 cfs @ 11.95 hrs, Volume= 0.757 af Outflow = 2.35 cfs @ 12.17 hrs, Volume= 0.757 af, Atten= 85%, Lag= 13.0 min Primary = 2.35 cfs @ 12.17 hrs, Volume= 0.757 af Routed to Link 11 L : POST DEV Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Link 11 L : POST DEV Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 580.18'@ 12.17 hrs Surf.Area= 6,470 sf Storage= 15,852 cf Plug-Flow detention time=355.3 min calculated for 0.757 af(100% of inflow) Center-of-Mass det. time= 355.9 min ( 1,163.4 - 807.6 ) Volume Invert Avail.Storage Storage Description #1 577.00' 38,262 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 577.00 3,579 0 0 578.00 4,438 4,009 4,009 579.00 5,335 4,887 8,895 580.00 6,289 5,812 14,707 581.00 7,299 6,794 21,501 582.00 8,366 7,833 29,334 583.00 9,490 8,928 38,262 Device Routing Invert Outlet Devices #1 Primary 575.50' 15.0" Round Culvert L= 57.4' RCP, rounded edge headwall, Ke= 0.100 Inlet/ Outlet Invert= 575.50'/ 573.63' S= 0.0326 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.23 sf #2 Device 1 575.50' SAND FILTER Head (feet) 0.00 1.00 1.50 2.50 3.50 4.50 5.50 6.50 Disch. (cfs) 0.000 0.052 0.060 0.077 0.095 0.112 0.129 0.146 #3 Device 1 578.21' 2.5" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 578.89' 15.0" W x 3.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 579.63' 6.0" W x 3.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Device 1 580.18' 6.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #7 Device 1 580.80' 2.0' long x 0.5' breadth Broad-Crested Rectangular Weir X 4.00 Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #8 Device 1 581.00' 3.0' long x 0.5' breadth Broad-Crested Rectangular Weir X 4.00 Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 91 #9 Secondary 582.00' 20.0' long x 16.0' breadth EMERGENCY SPILLWAY Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=2.35 cfs @ 12.17 hrs HW=580.18' (Free Discharge) -1=Culvert (Passes 2.35 cfs of 14.51 cfs potential flow) -2=SAND FILTER (Custom Controls 0.12 cfs) -3=Orifice/Grate (Orifice Controls 0.22 cfs @ 6.57 fps) -4=Orifice/Grate (Orifice Controls 1.62 cfs @ 5.19 fps) -5=Orifice/Grate (Orifice Controls 0.39 cfs @ 3.12 fps) -6=Orifice/Grate ( Controls 0.00 cfs) -7=Broad-Crested Rectangular Weir( Controls 0.00 cfs) -8=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=577.00' (Free Discharge) 4-9=EMERGENCY SPILLWAY( Controls 0.00 cfs) Pond 12P: POND Hydrograph I IIII I III I II I III I III I I I I I I I I I I •Inflow /I I resa cfs(I /�.I. OutflowD _ / /• / /1 I I 1 1 1 1 1 i I Area 2 34O ac ❑Secondary 174-"' , I POQ 0Is080 J� - G T 16 ' i z• ,I I I I I I I I I I In I I I 15 , 1 1 1 1 1 1 1 IS T"��-�-1-5 8�-If - 14 , I 1 1 1 1 1 1 1 1 1 1 I I� 1 h 1 1 1 134-/ i 1 -I - I- LI -I- I- 1 _I -1- I- 1 -I - I- 1L -I- I- L - , 11� / _f - 1_ _1 1 1 L _I 1 1 LH _1 1 H 1 1 1 1 _1 1 1 L - - 4 I- 1- -1 -1 - I- L -1 -1- 1- -H -1 -1- H L -1 - 1- 1- -1 -I- 1- -H - w 10 ' , ' / 3 $� / - + I- 1- 4 -I - I- -h H -1- I- + -1 -I- H 4 -I - I- '4 4 -1- I- ± - LL 7 / , , - H 1 HI - 6 , / / /- t 1- HH -1 - 1- tH -1- 1- + -1 -1- Ht -1 - 1- ' -1 -1- 1- t - 5� / / / r.3e as 1 r -r 1 1 fi - 1 1 t - 1 1 fi 1 1 r- -r 1 1 fi - 4=' / • / 2.35 cfs !�//• 1 3� / %//////%//////////////////////////////////////////////////////////////////////% ? / %///i %/%//////////////////////////////////////////////////////////////////////////////% I o° ' // / / ,/ 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 92 Pond 12P: POND Stage-Discharge I I I I ❑Total 583 ❑Primary ❑Secondary EMERGENCY SPILLWAY 582 I I 4 I /�// % I 1 */� Broad-Crested Rectangular Weir Broad-Crested Rectangular Weir I 581 o / I I 5 Orifice/Grate I I c 580 �- /0 Orifice/Grate I / I I I I I Orifice/Grate w 1 579 7 1 Orifice/Grate I 578 O% 1 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Discharge (cfs) Pond 12P: POND Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 500 1,000 1,500 2,000 2,500 3,000 3,5004,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,000 8,500 9,000 0 Surface . . ' . . . ! . . . ' . . . . . . ! . . . I . ( . I . . . ! . . . I . . . I . . . 1 , , . I . . . ' . . . 1 . . . I . . . ' . . . ! . . . ❑Storage ::: � I I I II 1 1 I 1 1 I 1 I I I ////' II I I I _ I I I I II I I I I ��/�/ ' ,, " 1 1 1 II 1 I I 581 11 I I I 1 I I 1 I I a 580- 1 I I .. "/ . I II I 1 1 I I I 1 I I d _ — I H + + I + I i+ r 1+ + + —II— 1 H r + w - I I I I I I II I I I 579-" I I II I I I II I I I - n — — r — — - - r - 1- I I tt — r 11 - — + II 1 rtrr 578 II I I I I II I I I / / / - Custom Stage Data / z / / 577 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 Storage(cubic-feet) 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 93 Hydrograph for Pond 12P: POND Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 577.00 0.00 0.00 0.00 2.50 0.00 0 577.00 0.00 0.00 0.00 5.00 0.00 0 577.00 0.00 0.00 0.00 7.50 0.04 67 577.02 0.02 0.02 0.00 10.00 0.20 563 577.15 0.06 0.06 0.00 12.50 1.27 15,168 580.07 2.21 2.21 0.00 15.00 0.38 9,292 579.07 0.56 0.56 0.00 17.50 0.25 8,613 578.95 0.28 0.28 0.00 20.00 0.17 8,285 578.88 0.22 0.22 0.00 22.50 0.15 7,819 578.79 0.21 0.21 0.00 25.00 0.00 6,890 578.61 0.18 0.18 0.00 27.50 0.00 5,569 578.34 0.11 0.11 0.00 30.00 0.00 4,771 578.17 0.08 0.08 0.00 32.50 0.00 4,063 578.01 0.08 0.08 0.00 35.00 0.00 3,380 577.86 0.07 0.07 0.00 37.50 0.00 2,721 577.70 0.07 0.07 0.00 40.00 0.00 2,086 577.55 0.07 0.07 0.00 42.50 0.00 1,474 577.39 0.07 0.07 0.00 45.00 0.00 885 577.24 0.06 0.06 0.00 47.50 0.00 320 577.09 0.06 0.06 0.00 50.00 0.00 28 577.01 0.01 0.01 0.00 52.50 0.00 2 577.00 0.00 0.00 0.00 55.00 0.00 0 577.00 0.00 0.00 0.00 57.50 0.00 0 577.00 0.00 0.00 0.00 60.00 0.00 0 577.00 0.00 0.00 0.00 62.50 0.00 0 577.00 0.00 0.00 0.00 65.00 0.00 0 577.00 0.00 0.00 0.00 67.50 0.00 0 577.00 0.00 0.00 0.00 70.00 0.00 0 577.00 0.00 0.00 0.00 72.50 0.00 0 577.00 0.00 0.00 0.00 75.00 0.00 0 577.00 0.00 0.00 0.00 77.50 0.00 0 577.00 0.00 0.00 0.00 80.00 0.00 0 577.00 0.00 0.00 0.00 82.50 0.00 0 577.00 0.00 0.00 0.00 85.00 0.00 0 577.00 0.00 0.00 0.00 87.50 0.00 0 577.00 0.00 0.00 0.00 90.00 0.00 0 577.00 0.00 0.00 0.00 92.50 0.00 0 577.00 0.00 0.00 0.00 95.00 0.00 0 577.00 0.00 0.00 0.00 97.50 0.00 0 577.00 0.00 0.00 0.00 100.00 0.00 0 577.00 0.00 0.00 0.00 102.50 0.00 0 577.00 0.00 0.00 0.00 105.00 0.00 0 577.00 0.00 0.00 0.00 107.50 0.00 0 577.00 0.00 0.00 0.00 110.00 0.00 0 577.00 0.00 0.00 0.00 112.50 0.00 0 577.00 0.00 0.00 0.00 115.00 0.00 0 577.00 0.00 0.00 0.00 117.50 0.00 0 577.00 0.00 0.00 0.00 120.00 0.00 0 577.00 0.00 0.00 0.00 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 94 Stage-Discharge for Pond 12P: POND Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 577.00 0.00 0.00 0.00 582.20 21.86 17.06 4.79 577.10 0.06 0.06 0.00 582.30 26.02 17.18 8.84 577.20 0.06 0.06 0.00 582.40 30.96 17.29 13.66 577.30 0.07 0.07 0.00 582.50 36.50 17.41 19.09 577.40 0.07 0.07 0.00 582.60 42.62 17.52 25.10 577.50 0.07 0.07 0.00 582.70 48.91 17.64 31.27 577.60 0.07 0.07 0.00 582.80 55.53 17.75 37.78 577.70 0.07 0.07 0.00 582.90 62.86 17.86 45.00 577.80 0.07 0.07 0.00 583.00 70.57 17.97 52.60 577.90 0.08 0.08 0.00 578.00 0.08 0.08 0.00 578.10 0.08 0.08 0.00 578.20 0.08 0.08 0.00 578.30 0.10 0.10 0.00 578.40 0.13 0.13 0.00 578.50 0.16 0.16 0.00 578.60 0.18 0.18 0.00 578.70 0.19 0.19 0.00 578.80 0.21 0.21 0.00 578.90 0.22 0.22 0.00 579.00 0.38 0.38 0.00 579.10 0.63 0.63 0.00 579.20 0.89 0.89 0.00 579.30 1.06 1.06 0.00 579.40 1.20 1.20 0.00 579.50 1.33 1.33 0.00 579.60 1.44 1.44 0.00 579.70 1.57 1.57 0.00 579.80 1.75 1.75 0.00 579.90 1.95 1.95 0.00 580.00 2.11 2.11 0.00 580.10 2.25 2.25 0.00 580.20 2.38 2.38 0.00 580.30 2.54 2.54 0.00 580.40 2.74 2.74 0.00 580.50 2.97 2.97 0.00 580.60 3.21 3.21 0.00 580.70 3.41 3.41 0.00 580.80 3.58 3.58 0.00 580.90 4.46 4.46 0.00 581.00 5.91 5.91 0.00 581.10 8.87 8.87 0.00 581.20 13.10 13.10 0.00 581.30 15.98 15.98 0.00 581.40 16.10 16.10 0.00 581.50 16.23 16.23 0.00 581.60 16.35 16.35 0.00 581.70 16.47 16.47 0.00 581.80 16.59 16.59 0.00 581.90 16.71 16.71 0.00 582.00 16.83 16.83 0.00 582.10 18.64 16.95 1.69 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 95 Stage-Area-Storage for Pond 12P: POND Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 577.00 3,579 0 582.20 8,591 31,029 577.10 3,665 362 582.30 8,703 31,894 577.20 3,751 733 582.40 8,816 32,770 577.30 3,837 1,112 582.50 8,928 33,657 577.40 3,923 1,500 582.60 9,040 34,555 577.50 4,009 1,897 582.70 9,153 35,465 577.60 4,094 2,302 582.80 9,265 36,386 577.70 4,180 2,716 582.90 9,378 37,318 577.80 4,266 3,138 583.00 9,490 38,262 577.90 4,352 3,569 578.00 4,438 4,009 578.10 4,528 4,457 578.20 4,617 4,914 578.30 4,707 5,380 578.40 4,797 5,855 578.50 4,887 6,340 578.60 4,976 6,833 578.70 5,066 7,335 578.80 5,156 7,846 578.90 5,245 8,366 579.00 5,335 8,895 579.10 5,430 9,433 579.20 5,526 9,981 579.30 5,621 10,538 579.40 5,717 11,105 579.50 5,812 11,682 579.60 5,907 12,268 579.70 6,003 12,863 579.80 6,098 13,468 579.90 6,194 14,083 580.00 6,289 14,707 580.10 6,390 15,341 580.20 6,491 15,985 580.30 6,592 16,639 580.40 6,693 17,303 580.50 6,794 17,978 580.60 6,895 18,662 580.70 6,996 19,357 580.80 7,097 20,061 580.90 7,198 20,776 581.00 7,299 21,501 581.10 7,406 22,236 581.20 7,512 22,982 581.30 7,619 23,739 581.40 7,726 24,506 581.50 7,833 25,284 581.60 7,939 26,072 581.70 8,046 26,872 581.80 8,153 27,682 581.90 8,259 28,502 582.00 8,366 29,334 582.10 8,478 30,176 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 96 Summary for Link 6L: PRE DEV Inflow Area = 4.340 ac, 4.61% Impervious, Inflow Depth = 2.35" for 25-Year event Inflow = 8.98 cfs @ 12.23 hrs, Volume= 0.850 af Primary = 8.98 cfs @ 12.23 hrs, Volume= 0.850 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 6L: PRE DEV Hydrograph rt -I- r -1 - I- rt -1- r rt -1- t —I — I— rt —I— fi —I — I— rt —I— r -I - io-/- 1 I I I I I 1 I 1 I 1 1 I 1 1 I 11 ■Inflow 1 ` - /- 1 ass cfs I I I I I I I I I I I I I I I I I I I I El Primary 9� i �I89� 1 I 1 I 1 inflow lArea=4.1340lac , ' I I 1 I 1 I 1 I 1 I 1 1 I 8� 1/ I I I 1 I 1 I 1 I 1 I 1 fi - _ , 1 I I 11 11 11 11 11 7� 1/ I 1 I 1 I 1 I 1 I 1 = , I I 11 11 11 11 11 6 -/ ,_ — / —I — I— 4 —I— i— 4 — I— + 1 — I— 4 1— 4 1— 4 —1 I— —I — - • 5L/ IV LL / 1 I 1 I 1 I 1 I 1 I 1 4_ fi / rt r + rt I � '2 I 1 I 1 I 1 I 1 I 1 I 2 1 1 1 1 1 1 1 1 1 1- 1 1 1 1 1 1 1 1 1 7 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 97 Hydrograph for Link 6L: PRE DEV Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.00 0.00 0.00 10.00 0.00 0.00 0.00 12.50 4.89 0.00 4.89 15.00 0.58 0.00 0.58 17.50 0.37 0.00 0.37 20.00 0.26 0.00 0.26 22.50 0.23 0.00 0.23 25.00 0.00 0.00 0.00 27.50 0.00 0.00 0.00 30.00 0.00 0.00 0.00 32.50 0.00 0.00 0.00 35.00 0.00 0.00 0.00 37.50 0.00 0.00 0.00 40.00 0.00 0.00 0.00 42.50 0.00 0.00 0.00 45.00 0.00 0.00 0.00 47.50 0.00 0.00 0.00 50.00 0.00 0.00 0.00 52.50 0.00 0.00 0.00 55.00 0.00 0.00 0.00 57.50 0.00 0.00 0.00 60.00 0.00 0.00 0.00 62.50 0.00 0.00 0.00 65.00 0.00 0.00 0.00 67.50 0.00 0.00 0.00 70.00 0.00 0.00 0.00 72.50 0.00 0.00 0.00 75.00 0.00 0.00 0.00 77.50 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 98 Summary for Link 11 L: POST DEV Inflow Area = 4.460 ac, 30.04% Impervious, Inflow Depth = 3.28" for 25-Year event Inflow = 8.84 cfs @ 12.11 hrs, Volume= 1.220 of Primary = 8.84 cfs @ 12.11 hrs, Volume= 1.220 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 11 L: POST DEV Hydrograph / 1 I I I I I 1 I 1 1 I I I ❑Inflow 1 8.84 cfs I 1 1 0 Primary 9- I8.8 cf51/ 1 1 1 I1lnflow 1Area=4�460 I�ac- 1 1 1 1 I I I I 1 1 1 1 1 1 1 1 8 / LL — — T —I — LJ —I— LI — I— TI — LII— LJI— L —I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 7 / L - — I— T —1 — 1 4 —1— L 1 — I— T 1 — 1 4 I— L -1 I— T —I 6 ✓ 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1— H — I— + —1 — H —1 —1— 1— —1 — I— + —1 — H —1 —1— H H — I— + —1 — 33 5 t —1 — 1 1 —1— fi -I - I- rt -1 - o LL 4 / — T 1 — T TI I— T —I I— T —1 3 I I I I I I I I I I I I I I 2 I I I I I I I 1 1 I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 25-Year Rainfall=6.00" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 99 Hydrograph for Link 11 L: POST DEV Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.02 0.00 0.02 10.00 0.08 0.00 0.08 12.50 3.78 0.00 3.78 15.00 0.85 0.00 0.85 17.50 0.47 0.00 0.47 20.00 0.35 0.00 0.35 22.50 0.32 0.00 0.32 25.00 0.18 0.00 0.18 27.50 0.11 0.00 0.11 30.00 0.08 0.00 0.08 32.50 0.08 0.00 0.08 35.00 0.07 0.00 0.07 37.50 0.07 0.00 0.07 40.00 0.07 0.00 0.07 42.50 0.07 0.00 0.07 45.00 0.06 0.00 0.06 47.50 0.06 0.00 0.06 50.00 0.01 0.00 0.01 52.50 0.00 0.00 0.00 55.00 0.00 0.00 0.00 57.50 0.00 0.00 0.00 60.00 0.00 0.00 0.00 62.50 0.00 0.00 0.00 65.00 0.00 0.00 0.00 67.50 0.00 0.00 0.00 70.00 0.00 0.00 0.00 72.50 0.00 0.00 0.00 75.00 0.00 0.00 0.00 77.50 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 100 Time span=0.00-120.00 hrs, dt=0.05 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment3S: PredevelopmentPoint 1 Runoff Area=4.340 ac 4.61% Impervious Runoff Depth=2.91" Flow Length=624' Tc=27.8 min CN=65 Runoff=11.26 cfs 1.053 af Subcatchment4S: PostdevelopmentPoint Runoff Area=2.340 ac 48.29% Impervious Runoff Depth=4.57" Tc=5.0 min CN=81 Runoff=18.62 cfs 0.892 af Subcatchment7S: PredevelolpmentPoint 2 Runoff Area=1.110 ac 0.00% Impervious Runoff Depth=2.43" Flow Length=114' Tc=32.3 min CN=60 Runoff=2.11 cfs 0.225 af Subcatchment8S: BYPASS 1 Runoff Area=2.120 ac 9.91% Impervious Runoff Depth=3.21" Flow Length=627' Tc=17.8 min CN=68 Runoff=8.01 cfs 0.567 af Subcatchment9S: PostdevelopmentPoint 2 Runoff Area=1.000 ac 0.00% Impervious Runoff Depth=2.43" Flow Length=93' Slope=0.0106 '/' Tc=28.5 min CN=60 Runoff=2.07 cfs 0.202 af Pond 12P: POND Peak Elev=580.59' Storage=18,615 cf Inflow=18.62 cfs 0.892 af Primary=3.19 cfs 0.892 af Secondary=0.00 cfs 0.000 af Outflow=3.19 cfs 0.892 af Link 6L: PRE DEV Inflow=11.26 cfs 1.053 af Primary=11.26 cfs 1.053 af Link 11 L: POST DEV Inflow=11.19 cfs 1.459 af Primary=11.19 cfs 1.459 af Total Runoff Area = 10.910 ac Runoff Volume = 2.938 af Average Runoff Depth = 3.23" 85.88% Pervious = 9.370 ac 14.12% Impervious = 1.540 ac 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 101 Summary for Subcatchment 3S: Predevelopment Point 1 [47] Hint: Peak is 838% of capacity of segment#3 Runoff = 11.26 cfs @ 12.23 hrs, Volume= 1.053 af, Depth= 2.91" Routed to Link 6L : PRE DEV Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=6.75" Area (ac) CN Description 3.070 60 Woods, Fair, HSG B 0.320 73 Woods, Fair, HSG C 0.200 79 Woods, Fair, HSG D 0.120 56 Brush, Fair, HSG B 0.080 70 Brush, Fair, HSG C 0.350 77 Brush, Fair, HSG D 0.100 98 Paved parking, HSG B 0.060 98 Paved parking, HSG C 0.040 98 Paved parking, HSG D 4.340 65 Weighted Average 4.140 95.39% Pervious Area 0.200 4.61% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.9 100 0.0734 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" 3.9 254 0.0477 1.09 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 10.0 270 0.0391 0.45 1.34 Channel Flow, CHANNEL Area= 3.0 sf Perim= 6.3' r= 0.48' n= 0.400 Sheet flow: Woods+light brush 27.8 624 Total 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 102 Subcatchment 3S: Predevelopment Point 1 Hydrograph 1 1 1 1 1 1 1 1 1 1 11 1 12� 1 1 I I I I I I I I I I I I I 1 1 ■Runoff I1126cfsIL LL _ I_ 1 _I_ L _I_ L _I _ L _L _ I_ I _ L _I - L _ I I I 1 1 I I 1 1 I I Type 11124-hr 10� � / OrYeai IilainfaIIT6.`l51 _ 9 I 1 I I I Ru nbff Area=4.340 ad 4 / r -I - r I I -I- fi -1 - 1- rt - I- -r -1- r -1 - r - 8� 1 I 1 1 I 1Runoffl Volumle�1.053 of U 7_ T ,/ I I I I I I I I pI I .. �� 4- - / � - H - 1 -1- -1- Q'` 1D {� h 1�, _c 6� / I I I I I I 1 El Len�h=624 u 5L-' I 4- - % + + -II + I + I + I + + II-C=27A-rain - 4� (6 3_ �f'�I 3- - I- -1 1 4 1 + 1 1 I- 4 I- -k 1 L 1 I - 2.-/ ' I I I I I I 1 1 1 1:-' I I I I I 1 1 0 , �7������� ������ �������������������������� 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 103 Hydrograph for Subcatchment 3S: Predevelopment Point 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.19 0.00 0.00 5.00 0.43 0.00 0.00 7.50 0.74 0.00 0.00 10.00 1.22 0.00 0.02 12.50 4.96 1.63 6.03 15.00 5.76 2.18 0.69 17.50 6.15 2.46 0.44 20.00 6.43 2.67 0.31 22.50 6.63 2.82 0.27 25.00 6.75 2.91 0.00 27.50 6.75 2.91 0.00 30.00 6.75 2.91 0.00 32.50 6.75 2.91 0.00 35.00 6.75 2.91 0.00 37.50 6.75 2.91 0.00 40.00 6.75 2.91 0.00 42.50 6.75 2.91 0.00 45.00 6.75 2.91 0.00 47.50 6.75 2.91 0.00 50.00 6.75 2.91 0.00 52.50 6.75 2.91 0.00 55.00 6.75 2.91 0.00 57.50 6.75 2.91 0.00 60.00 6.75 2.91 0.00 62.50 6.75 2.91 0.00 65.00 6.75 2.91 0.00 67.50 6.75 2.91 0.00 70.00 6.75 2.91 0.00 72.50 6.75 2.91 0.00 75.00 6.75 2.91 0.00 77.50 6.75 2.91 0.00 80.00 6.75 2.91 0.00 82.50 6.75 2.91 0.00 85.00 6.75 2.91 0.00 87.50 6.75 2.91 0.00 90.00 6.75 2.91 0.00 92.50 6.75 2.91 0.00 95.00 6.75 2.91 0.00 97.50 6.75 2.91 0.00 100.00 6.75 2.91 0.00 102.50 6.75 2.91 0.00 105.00 6.75 2.91 0.00 107.50 6.75 2.91 0.00 110.00 6.75 2.91 0.00 112.50 6.75 2.91 0.00 115.00 6.75 2.91 0.00 117.50 6.75 2.91 0.00 120.00 6.75 2.91 0.00 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 104 Summary for Subcatchment 4S: Postdevelopment Point 1 [49] Hint: Tc<2dt may require smaller dt Runoff = 18.62 cfs @ 11.95 hrs, Volume= 0.892 af, Depth= 4.57" Routed to Pond 12P : POND Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=6.75" Area (ac) CN Description 0.850 61 >75% Grass cover, Good, HSG B 0.010 74 >75% Grass cover, Good, HSG C 0.240 80 >75% Grass cover, Good, HSG D 1.000 98 Paved parking, HSG B 0.130 98 Paved parking, HSG C 0.110 60 Woods, Fair, HSG B 2.340 81 Weighted Average 1.210 51.71% Pervious Area 1.130 48.29% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, DIRECT Subcatchment 4S: Postdevelopment Point 1 Hydrograph 20 I I I I I I I I I I I I I I I I I I ■Runoff 118.627 I 1 I I 1 1 I I 1 1 I I 1 1 I I 1 1 18 T �$1�1 124 - 17 - - L 1 L 1 I L I L I �I— ah' -Ial11f I11 �' 16=' ,_ / L -1 - L 1 - I- L -1- L -I- ,T�_`y�� t e }1. aZ 1 - L - 15� - -1 - - I- - -I- -1- RUnbff AV e� =2.34O-a 14 I - I - - 1 - I I - 1- I 1 I -I- I -1 - I - 1- I - I -1 - I - 13 ' ,- - -I - - H - I- 4 -I- + -IRun-off1-Volume=4.892-af - 12 -I- t 1 - -I - I- -F -1- t -1- ii1Dp1 „ 11 ,r 1 -I- ` -I - - -1 - I- rt -I- T -1- fi - 10 77 - I 7 17 71 7 T 1 T Tc±-5 in-"n1 LL 9; I - T T - I- T -I- T -I- T -1 - T T - I- T -I-/+I ���-�.�1 -.p1 7 8 i I I I I I I 1 1 1 CW81 6 / I 1 I I I I I I 4= ✓ 1 1 I I I I I I I I I I I I I I I 3=' 1 ! 1 1 1 1 1 1 1 I 1 1 1 2=' 1 1 1 1 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 105 Hydrograph for Subcatchment 4S: Postdevelopment Point 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.19 0.00 0.00 5.00 0.43 0.00 0.00 7.50 0.74 0.03 0.06 10.00 1.22 0.18 0.26 12.50 4.96 2.95 1.47 15.00 5.76 3.67 0.44 17.50 6.15 4.02 0.28 20.00 6.43 4.27 0.19 22.50 6.63 4.47 0.17 25.00 6.75 4.57 0.00 27.50 6.75 4.57 0.00 30.00 6.75 4.57 0.00 32.50 6.75 4.57 0.00 35.00 6.75 4.57 0.00 37.50 6.75 4.57 0.00 40.00 6.75 4.57 0.00 42.50 6.75 4.57 0.00 45.00 6.75 4.57 0.00 47.50 6.75 4.57 0.00 50.00 6.75 4.57 0.00 52.50 6.75 4.57 0.00 55.00 6.75 4.57 0.00 57.50 6.75 4.57 0.00 60.00 6.75 4.57 0.00 62.50 6.75 4.57 0.00 65.00 6.75 4.57 0.00 67.50 6.75 4.57 0.00 70.00 6.75 4.57 0.00 72.50 6.75 4.57 0.00 75.00 6.75 4.57 0.00 77.50 6.75 4.57 0.00 80.00 6.75 4.57 0.00 82.50 6.75 4.57 0.00 85.00 6.75 4.57 0.00 87.50 6.75 4.57 0.00 90.00 6.75 4.57 0.00 92.50 6.75 4.57 0.00 95.00 6.75 4.57 0.00 97.50 6.75 4.57 0.00 100.00 6.75 4.57 0.00 102.50 6.75 4.57 0.00 105.00 6.75 4.57 0.00 107.50 6.75 4.57 0.00 110.00 6.75 4.57 0.00 112.50 6.75 4.57 0.00 115.00 6.75 4.57 0.00 117.50 6.75 4.57 0.00 120.00 6.75 4.57 0.00 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 106 Summary for Subcatchment 7S: Predevelolpment Point 2 Runoff = 2.11 cfs @ 12.29 hrs, Volume= 0.225 af, Depth= 2.43" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=6.75" Area (ac) CN Description 1.110 60 Woods, Fair, HSG B 1.110 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.9 100 0.0093 0.05 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" 0.4 14 0.0121 0.55 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 32.3 114 Total Subcatchment 7S: Predevelolpment Point 2 Hydrograph I I I I I I I I I I I I I I I 1 I I e Runoff - 1 1l2.11cfsI 1 I 1 I I 1 I I I I I I I 1 1 'T T 1 1 T I T 1 T 1 1 T 1 T Type tl'241ir 2 - I / I 1 I � / 1 1 1 1 1 1 so-Yearl Rlainfall=6.`751. I 1 I I 1 I 1Runbff Awea=1.110 at / 1 I 1 I I 1 1 IIIII I 1 1 1 1 I I 1 Runoff Volume=0.225 af y 11 I I 1 / I I Dun 1ff 1De th 2.43�' / Q p 1 o / + 1 + + I + H + —Ficiw'tellti �l't11-4� fL 1 1/ 1 1 I 1 I 1 1 1 1 1 1 1 I 1 1 I 1 1 Tc=32.3 m i n / CN6p 1 1 1 1 1 ' 1 1 1 1 1 1 1 1 1 1 1 1 o rz z ,, iiiiiii�i���liiiiiiiiiiJiiiJiiiiiiiiiiiJiii�iiiiiiiiiiiiiiiiiiiiiiiiiiiii�, 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 107 Hydrograph for Subcatchment 7S: Predevelolpment Point 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.19 0.00 0.00 5.00 0.43 0.00 0.00 7.50 0.74 0.00 0.00 10.00 1.22 0.00 0.00 12.50 4.96 1.28 1.52 15.00 5.76 1.77 0.16 17.50 6.15 2.02 0.10 20.00 6.43 2.21 0.07 22.50 6.63 2.35 0.06 25.00 6.75 2.43 0.00 27.50 6.75 2.43 0.00 30.00 6.75 2.43 0.00 32.50 6.75 2.43 0.00 35.00 6.75 2.43 0.00 37.50 6.75 2.43 0.00 40.00 6.75 2.43 0.00 42.50 6.75 2.43 0.00 45.00 6.75 2.43 0.00 47.50 6.75 2.43 0.00 50.00 6.75 2.43 0.00 52.50 6.75 2.43 0.00 55.00 6.75 2.43 0.00 57.50 6.75 2.43 0.00 60.00 6.75 2.43 0.00 62.50 6.75 2.43 0.00 65.00 6.75 2.43 0.00 67.50 6.75 2.43 0.00 70.00 6.75 2.43 0.00 72.50 6.75 2.43 0.00 75.00 6.75 2.43 0.00 77.50 6.75 2.43 0.00 80.00 6.75 2.43 0.00 82.50 6.75 2.43 0.00 85.00 6.75 2.43 0.00 87.50 6.75 2.43 0.00 90.00 6.75 2.43 0.00 92.50 6.75 2.43 0.00 95.00 6.75 2.43 0.00 97.50 6.75 2.43 0.00 100.00 6.75 2.43 0.00 102.50 6.75 2.43 0.00 105.00 6.75 2.43 0.00 107.50 6.75 2.43 0.00 110.00 6.75 2.43 0.00 112.50 6.75 2.43 0.00 115.00 6.75 2.43 0.00 117.50 6.75 2.43 0.00 120.00 6.75 2.43 0.00 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 108 Summary for Subcatchment 8S: BYPASS 1 Runoff = 8.01 cfs @ 12.11 hrs, Volume= 0.567 af, Depth= 3.21" Routed to Link 11 L : POST DEV Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=6.75" Area (ac) CN Description 1.180 60 Woods, Fair, HSG B 0.130 73 Woods, Fair, HSG C 0.170 61 >75% Grass cover, Good, HSG B 0.120 74 >75% Grass cover, Good, HSG C 0.310 80 >75% Grass cover, Good, HSG D 0.080 98 Paved parking, HSG B 0.090 98 Paved parking, HSG C 0.040 98 Paved parking, HSG D 2.120 68 Weighted Average 1.910 90.09% Pervious Area 0.210 9.91% Impervious Area Tc Length Slope Velocity Capacity Description (min) _ (feet) (ft/ft) (ft/sec) (cfs) 13.9 100 0.0734 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" 3.8 249 0.0472 1.09 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.1 278 0.0398 37.88 454.62 Channel Flow, Area= 12.0 sf Perim= 7.2' r= 1.67' n= 0.011 Concrete pipe, straight & clean 17.8 627 Total 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 109 Subcatchment 8S: BYPASS 1 Hydrograph 1 1 1 I I I I I I I I I I 1 1 I I 1 I I 1 I I 1 1 I 1 1 I 1 1 ■Runoff fi 18.olds l -r —I— fi —1 — I— rt —1— -r —1— fi —I — 1— rt — 1— -r —1 — — rt —1— - 8� 1 j I I 1 I I 1 I I 1 1 I Type 11124-hr 71/ I —I — — —i— —1— —i - �Y r Iinfl ' rI OaaalT6l5 L -1 — — _L -1- 1 -1— L — — Rtinb-ff-Ares-2A20 ad- - 61/ 1 1 1 1 1 1 I I I I I I I I I I I 1 1 1 1 I 1 I Runoff VQIIJrne O 567saf _ y 5� / 11 1 Ou;ngff 11Dppth73.4116' `0 4� 1 / 1 1 1 1 1 1 1 1 FIOw(Length=627' 1 I 1 1 1 1 1 1 1 1 1 1 7 1 1 1 3 1 / 1 1 1 1 1 1 1 1 1 1 I Tc=17.18 rrri n- - , 1 1 1 1 1 1 1 1 1 1 1 1 1 ''7L60- - 1 1 — 1- -I 2� 1 1 1 1 1 1 1 I 1 1 1L/ 1 1 1 1 1 1 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100' 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 110 Hydrograph for Subcatchment 8S: BYPASS 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.19 0.00 0.00 5.00 0.43 0.00 0.00 7.50 0.74 0.00 0.00 10.00 1.22 0.02 0.04 12.50 4.96 1.85 1.88 15.00 5.76 2.44 0.35 17.50 6.15 2.74 0.22 20.00 6.43 2.95 0.16 22.50 6.63 3.12 0.14 25.00 6.75 3.21 0.00 27.50 6.75 3.21 0.00 30.00 6.75 3.21 0.00 32.50 6.75 3.21 0.00 35.00 6.75 3.21 0.00 37.50 6.75 3.21 0.00 40.00 6.75 3.21 0.00 42.50 6.75 3.21 0.00 45.00 6.75 3.21 0.00 47.50 6.75 3.21 0.00 50.00 6.75 3.21 0.00 52.50 6.75 3.21 0.00 55.00 6.75 3.21 0.00 57.50 6.75 3.21 0.00 60.00 6.75 3.21 0.00 62.50 6.75 3.21 0.00 65.00 6.75 3.21 0.00 67.50 6.75 3.21 0.00 70.00 6.75 3.21 0.00 72.50 6.75 3.21 0.00 75.00 6.75 3.21 0.00 77.50 6.75 3.21 0.00 80.00 6.75 3.21 0.00 82.50 6.75 3.21 0.00 85.00 6.75 3.21 0.00 87.50 6.75 3.21 0.00 90.00 6.75 3.21 0.00 92.50 6.75 3.21 0.00 95.00 6.75 3.21 0.00 97.50 6.75 3.21 0.00 100.00 6.75 3.21 0.00 102.50 6.75 3.21 0.00 105.00 6.75 3.21 0.00 107.50 6.75 3.21 0.00 110.00 6.75 3.21 0.00 112.50 6.75 3.21 0.00 115.00 6.75 3.21 0.00 117.50 6.75 3.21 0.00 120.00 6.75 3.21 0.00 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 111 Summary for Subcatchment 9S: Postdevelopment Point 2 Runoff = 2.07 cfs @ 12.24 hrs, Volume= 0.202 af, Depth= 2.43" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=6.75" Area (ac) CN Description 1.000 60 Woods, Fair, HSG B 1.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.5 93 0.0106 0.05 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" Subcatchment 9S: Postdevelopment Point 2 Hydrograph / I I I I I I I I I I I I 1 I I 1 I I I I I ■Runoff 12.07 cfs 11 I I I 1 I I 1 1 I I 1 pe 1 2 . 2 I I I 1 I I 1 Ty7 I24 4 = / 1 1 I 1 $0-Year, R1lainfalIT6.`75 ' / 1 I IRunbff Awea=1.000 at Runoff Volume=0.202 af / 1 I I I I I Ou;ngff,Depth=2.43" o / T 7 T T 1 1FFoW I-1-e4gth 931- - u_ 1 / 1 1 1 1 I I I I I 1 1 1 j1 11 11 1 11 1 1 Slope=0.0106 '/' / 1 1 1 1 1 1 Tc=28.5 mi In 1 1 1 1 1 1 1' 1 1 1 1 1 1 CN=60 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 112 Hydrograph for Subcatchment 9S: Postdevelopment Point 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.19 0.00 0.00 5.00 0.43 0.00 0.00 7.50 0.74 0.00 0.00 10.00 1.22 0.00 0.00 12.50 4.96 1.28 1.20 15.00 5.76 1.77 0.14 17.50 6.15 2.02 0.09 20.00 6.43 2.21 0.06 22.50 6.63 2.35 0.06 25.00 6.75 2.43 0.00 27.50 6.75 2.43 0.00 30.00 6.75 2.43 0.00 32.50 6.75 2.43 0.00 35.00 6.75 2.43 0.00 37.50 6.75 2.43 0.00 40.00 6.75 2.43 0.00 42.50 6.75 2.43 0.00 45.00 6.75 2.43 0.00 47.50 6.75 2.43 0.00 50.00 6.75 2.43 0.00 52.50 6.75 2.43 0.00 55.00 6.75 2.43 0.00 57.50 6.75 2.43 0.00 60.00 6.75 2.43 0.00 62.50 6.75 2.43 0.00 65.00 6.75 2.43 0.00 67.50 6.75 2.43 0.00 70.00 6.75 2.43 0.00 72.50 6.75 2.43 0.00 75.00 6.75 2.43 0.00 77.50 6.75 2.43 0.00 80.00 6.75 2.43 0.00 82.50 6.75 2.43 0.00 85.00 6.75 2.43 0.00 87.50 6.75 2.43 0.00 90.00 6.75 2.43 0.00 92.50 6.75 2.43 0.00 95.00 6.75 2.43 0.00 97.50 6.75 2.43 0.00 100.00 6.75 2.43 0.00 102.50 6.75 2.43 0.00 105.00 6.75 2.43 0.00 107.50 6.75 2.43 0.00 110.00 6.75 2.43 0.00 112.50 6.75 2.43 0.00 115.00 6.75 2.43 0.00 117.50 6.75 2.43 0.00 120.00 6.75 2.43 0.00 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 113 Summary for Pond 12P: POND [44] Hint: Outlet device#2 is below defined storage Inflow Area = 2.340 ac, 48.29% Impervious, Inflow Depth = 4.57" for 50-Year event Inflow = 18.62 cfs @ 11.95 hrs, Volume= 0.892 af Outflow = 3.19 cfs @ 12.14 hrs, Volume= 0.892 af, Atten= 83%, Lag= 11.4 min Primary = 3.19 cfs @ 12.14 hrs, Volume= 0.892 af Routed to Link 11 L : POST DEV Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Link 11 L : POST DEV Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 580.59'@ 12.14 hrs Surf.Area= 6,888 sf Storage= 18,615 cf Plug-Flow detention time=320.1 min calculated for 0.892 af(100% of inflow) Center-of-Mass det. time= 319.9 min ( 1,122.8 - 802.9 ) Volume Invert Avail.Storage Storage Description #1 577.00' 38,262 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 577.00 3,579 0 0 578.00 4,438 4,009 4,009 579.00 5,335 4,887 8,895 580.00 6,289 5,812 14,707 581.00 7,299 6,794 21,501 582.00 8,366 7,833 29,334 583.00 9,490 8,928 38,262 Device Routing Invert Outlet Devices #1 Primary 575.50' 15.0" Round Culvert L= 57.4' RCP, rounded edge headwall, Ke= 0.100 Inlet/ Outlet Invert= 575.50'/ 573.63' S= 0.0326 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.23 sf #2 Device 1 575.50' SAND FILTER Head (feet) 0.00 1.00 1.50 2.50 3.50 4.50 5.50 6.50 Disch. (cfs) 0.000 0.052 0.060 0.077 0.095 0.112 0.129 0.146 #3 Device 1 578.21' 2.5" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 578.89' 15.0" W x 3.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 579.63' 6.0" W x 3.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Device 1 580.18' 6.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #7 Device 1 580.80' 2.0' long x 0.5' breadth Broad-Crested Rectangular Weir X 4.00 Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #8 Device 1 581.00' 3.0' long x 0.5' breadth Broad-Crested Rectangular Weir X 4.00 Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a sin 08663 ©2021 HydroCAD Software Solutions LLC Page 114 #9 Secondary 582.00' 20.0' long x 16.0' breadth EMERGENCY SPILLWAY Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=3.19 cfs @ 12.14 hrs HW=580.59' (Free Discharge) -1=Culvert (Passes 3.19 cfs of 15.07 cfs potential flow) -2=SAND FILTER (Custom Controls 0.12 cfs) -3=Orifice/Grate (Orifice Controls 0.25 cfs @ 7.27 fps) -4=Orifice/Grate (Orifice Controls 1.89 cfs @ 6.05 fps) -5=Orifice/Grate (Orifice Controls 0.55 cfs @ 4.40 fps) -6=Orifice/Grate (Orifice Controls 0.38 cfs @ 2.19 fps) -7=Broad-Crested Rectangular Weir( Controls 0.00 cfs) -8=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=577.00' (Free Discharge) L9=EMERGENCY SPILLWAY( Controls 0.00 cfs) Pond 12P: POND Hydrograph I I /111111 1 1 I 1 I 1 I 1 I I 1 I 1 I 1 ■Inflow 18.62 cfs I D Outflow / • 1 , 1 4 - 1- r -1 -1- 1- -1 1- 4 - 1-_� 1- - Primar El ' / / /• ' rt -1 - 1- 1- H -1- 1- -h �w Imired--'r2• o lac - 0 Secondary 204-/ , z / /i T T T T T ,�T�� Ip 18 / / ' /1 1 1 1 1 1 1 1 1 1 1� "'I" ��I" �I�' 17� / / / I _ H -1 - 1_ L J -1- 1- 1 J -1St 1-8"6�1� - 16� / / / / HHIIHHIIHHIHHIHIIHH - 15=' / / /1_ - L T T T 1 T T 1 L T 71717 L H 1 T 14� , i /I 124 / / / /1 w 12= / / , L 1 L L 1 1 L L 1 1 T J 1 L L 1 1 L H 1 1 L - � 11 ,=' / / / L 4 1 I- -1 -1 - 1 H - 1- 1- T - -1 1 T -1 - 1 I- -I 1- 1- H - a 10=' / / / //- rt I- I- -1 I I t i I 1 T H I L fi I I L rt I I t - 8� / / /1 1 1 I III I III 1 III 1 III I III 6 -/ / / / /LI3.19cfs 1LHI1HJITHIH4J11- HI 1- -H 5 / / /I3.19cfs I- L 4 1 1 t H 1 1 + H -I- H T 1 1 L -+ 1 1 H - 44-' / / iirAosir /.. 3' / � ///////////////////////////////////////////////////////////�////�///////� o o r////// / / ,i 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 115 Pond 12P: POND Stage-Discharge I I I I ❑Total 583 ❑Primary ❑Secondary EMERGENCY SPILLWAY 582 I I �� I /�// % I I */� Broad-Crested Rectangular Weir Broad-Crested Rectangular Weir I I 581 / I I 5 Orifice/Grate I I I c 580 �- /0 Orifice/Grate I / I I I I I Orifice/Grate w I 579 7 I Orifice/Grate I I 578 O% I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Discharge (cfs) Pond 12P: POND Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 500 1,000 1,500 2,000 2,500 3,000 3,5004,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,000 8,500 9,000 0 Surface . . ' . . . ! . . . ' . . . . . . ! . . . I . ( . I . . . ! . . . I . . . I . . . 1 , , . I . . . ' . . . 1 . . . I . . . ' . . . ! . . . ❑Storage ::: � I I I II 1 1 I 1 1 I I I I ////' II I I I _ I I I I II I I I ��/�/ ' ,, " I I I II I I I 581 I , I I I I I II I I I a 580- 1 I I .. "/ . I II I I I I II I I I d _ — I H + + I + 1 I 1+ r I+ + + II I -1r + w - I I I II I II I II 579-" I I II I I I I II I I I - n — — r — — - - r - 1- I I tt — r 111 — + II 1 rtrr 578 II I I I I II 1 II / / / - Custom Stage Data / z / / 577 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 Storage(cubic-feet) 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 116 Hydrograph for Pond 12P: POND Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 577.00 0.00 0.00 0.00 2.50 0.00 0 577.00 0.00 0.00 0.00 5.00 0.00 0 577.00 0.00 0.00 0.00 7.50 0.06 123 577.03 0.03 0.03 0.00 10.00 0.26 871 577.24 0.06 0.06 0.00 12.50 1.47 17,397 580.41 2.77 2.77 0.00 15.00 0.44 9,647 579.14 0.74 0.74 0.00 17.50 0.28 8,736 578.97 0.32 0.32 0.00 20.00 0.19 8,416 578.91 0.23 0.23 0.00 22.50 0.17 8,094 578.85 0.21 0.21 0.00 25.00 0.00 7,205 578.67 0.19 0.19 0.00 27.50 0.00 5,774 578.38 0.13 0.13 0.00 30.00 0.00 4,909 578.20 0.08 0.08 0.00 32.50 0.00 4,197 578.04 0.08 0.08 0.00 35.00 0.00 3,509 577.89 0.08 0.08 0.00 37.50 0.00 2,845 577.73 0.07 0.07 0.00 40.00 0.00 2,205 577.58 0.07 0.07 0.00 42.50 0.00 1,589 577.42 0.07 0.07 0.00 45.00 0.00 996 577.27 0.06 0.06 0.00 47.50 0.00 427 577.12 0.06 0.06 0.00 50.00 0.00 45 577.01 0.01 0.01 0.00 52.50 0.00 4 577.00 0.00 0.00 0.00 55.00 0.00 0 577.00 0.00 0.00 0.00 57.50 0.00 0 577.00 0.00 0.00 0.00 60.00 0.00 0 577.00 0.00 0.00 0.00 62.50 0.00 0 577.00 0.00 0.00 0.00 65.00 0.00 0 577.00 0.00 0.00 0.00 67.50 0.00 0 577.00 0.00 0.00 0.00 70.00 0.00 0 577.00 0.00 0.00 0.00 72.50 0.00 0 577.00 0.00 0.00 0.00 75.00 0.00 0 577.00 0.00 0.00 0.00 77.50 0.00 0 577.00 0.00 0.00 0.00 80.00 0.00 0 577.00 0.00 0.00 0.00 82.50 0.00 0 577.00 0.00 0.00 0.00 85.00 0.00 0 577.00 0.00 0.00 0.00 87.50 0.00 0 577.00 0.00 0.00 0.00 90.00 0.00 0 577.00 0.00 0.00 0.00 92.50 0.00 0 577.00 0.00 0.00 0.00 95.00 0.00 0 577.00 0.00 0.00 0.00 97.50 0.00 0 577.00 0.00 0.00 0.00 100.00 0.00 0 577.00 0.00 0.00 0.00 102.50 0.00 0 577.00 0.00 0.00 0.00 105.00 0.00 0 577.00 0.00 0.00 0.00 107.50 0.00 0 577.00 0.00 0.00 0.00 110.00 0.00 0 577.00 0.00 0.00 0.00 112.50 0.00 0 577.00 0.00 0.00 0.00 115.00 0.00 0 577.00 0.00 0.00 0.00 117.50 0.00 0 577.00 0.00 0.00 0.00 120.00 0.00 0 577.00 0.00 0.00 0.00 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 117 Stage-Discharge for Pond 12P: POND Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 577.00 0.00 0.00 0.00 582.20 21.86 17.06 4.79 577.10 0.06 0.06 0.00 582.30 26.02 17.18 8.84 577.20 0.06 0.06 0.00 582.40 30.96 17.29 13.66 577.30 0.07 0.07 0.00 582.50 36.50 17.41 19.09 577.40 0.07 0.07 0.00 582.60 42.62 17.52 25.10 577.50 0.07 0.07 0.00 582.70 48.91 17.64 31.27 577.60 0.07 0.07 0.00 582.80 55.53 17.75 37.78 577.70 0.07 0.07 0.00 582.90 62.86 17.86 45.00 577.80 0.07 0.07 0.00 583.00 70.57 17.97 52.60 577.90 0.08 0.08 0.00 578.00 0.08 0.08 0.00 578.10 0.08 0.08 0.00 578.20 0.08 0.08 0.00 578.30 0.10 0.10 0.00 578.40 0.13 0.13 0.00 578.50 0.16 0.16 0.00 578.60 0.18 0.18 0.00 578.70 0.19 0.19 0.00 578.80 0.21 0.21 0.00 578.90 0.22 0.22 0.00 579.00 0.38 0.38 0.00 579.10 0.63 0.63 0.00 579.20 0.89 0.89 0.00 579.30 1.06 1.06 0.00 579.40 1.20 1.20 0.00 579.50 1.33 1.33 0.00 579.60 1.44 1.44 0.00 579.70 1.57 1.57 0.00 579.80 1.75 1.75 0.00 579.90 1.95 1.95 0.00 580.00 2.11 2.11 0.00 580.10 2.25 2.25 0.00 580.20 2.38 2.38 0.00 580.30 2.54 2.54 0.00 580.40 2.74 2.74 0.00 580.50 2.97 2.97 0.00 580.60 3.21 3.21 0.00 580.70 3.41 3.41 0.00 580.80 3.58 3.58 0.00 580.90 4.46 4.46 0.00 581.00 5.91 5.91 0.00 581.10 8.87 8.87 0.00 581.20 13.10 13.10 0.00 581.30 15.98 15.98 0.00 581.40 16.10 16.10 0.00 581.50 16.23 16.23 0.00 581.60 16.35 16.35 0.00 581.70 16.47 16.47 0.00 581.80 16.59 16.59 0.00 581.90 16.71 16.71 0.00 582.00 16.83 16.83 0.00 582.10 18.64 16.95 1.69 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 118 Stage-Area-Storage for Pond 12P: POND Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 577.00 3,579 0 582.20 8,591 31,029 577.10 3,665 362 582.30 8,703 31,894 577.20 3,751 733 582.40 8,816 32,770 577.30 3,837 1,112 582.50 8,928 33,657 577.40 3,923 1,500 582.60 9,040 34,555 577.50 4,009 1,897 582.70 9,153 35,465 577.60 4,094 2,302 582.80 9,265 36,386 577.70 4,180 2,716 582.90 9,378 37,318 577.80 4,266 3,138 583.00 9,490 38,262 577.90 4,352 3,569 578.00 4,438 4,009 578.10 4,528 4,457 578.20 4,617 4,914 578.30 4,707 5,380 578.40 4,797 5,855 578.50 4,887 6,340 578.60 4,976 6,833 578.70 5,066 7,335 578.80 5,156 7,846 578.90 5,245 8,366 579.00 5,335 8,895 579.10 5,430 9,433 579.20 5,526 9,981 579.30 5,621 10,538 579.40 5,717 11,105 579.50 5,812 11,682 579.60 5,907 12,268 579.70 6,003 12,863 579.80 6,098 13,468 579.90 6,194 14,083 580.00 6,289 14,707 580.10 6,390 15,341 580.20 6,491 15,985 580.30 6,592 16,639 580.40 6,693 17,303 580.50 6,794 17,978 580.60 6,895 18,662 580.70 6,996 19,357 580.80 7,097 20,061 580.90 7,198 20,776 581.00 7,299 21,501 581.10 7,406 22,236 581.20 7,512 22,982 581.30 7,619 23,739 581.40 7,726 24,506 581.50 7,833 25,284 581.60 7,939 26,072 581.70 8,046 26,872 581.80 8,153 27,682 581.90 8,259 28,502 582.00 8,366 29,334 582.10 8,478 30,176 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 119 Summary for Link 6L: PRE DEV Inflow Area = 4.340 ac, 4.61% Impervious, Inflow Depth = 2.91" for 50-Year event Inflow = 11.26 cfs @ 12.23 hrs, Volume= 1.053 af Primary = 11.26 cfs @ 12.23 hrs, Volume= 1.053 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 6L: PRE DEV Hydrograph I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ■Inflow ` ❑Prima 1 12� J 11.26 cfs I L 1— J _1_ i— _1 _ 1_ + 1 H 4 1 H _1 1 _L 1 i— _1 _ 1_ ry : / i 11.26cfs V 1 1 1 1 1 1 InflowlArea=4.13401ac 10 i 111111 11 II III II - / 101! -1 1— -1 — I— -k -1 — I— -1 -1- 4- -1 - 1- 4- -1 - 1— - - 1- - / 11 1 1 1 1 1 1 11 11 III 11 9� 1 1 1 1 1 1 1 11 II III - / 8� 4 4 —I — I- 4 —I— t- 4 - 1— + 1 — I- 4 -1- 4 - - 1— + —I - 1 - — — - - 7- z 1/ H 1 1 1 1 1 1 H 11 1 1 1 1a 6 ' 40 — — - 4 -1— {- 4 - 1— + 1 — - 1— H41- 4 -1HH — - LL - I 5 -/- i I I I I I I I I I 11 I II III 4� ! 1— -h —1— i— -h — 1— + —1 — I— -h —1— t H — 1— t —1 — I /3 0 1 1 1 1 1 1 1 1 1 1 1 I I 1,/ I I I I I 1 1 1 1 1 1 2 I P 1 1 1 1 1 1 I I 1 '�% // % % o % ////////////////////////////////////////////////////////////////////////////% 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 120 Hydrograph for Link 6L: PRE DEV Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.00 0.00 0.00 10.00 0.02 0.00 0.02 12.50 6.03 0.00 6.03 15.00 0.69 0.00 0.69 17.50 0.44 0.00 0.44 20.00 0.31 0.00 0.31 22.50 0.27 0.00 0.27 25.00 0.00 0.00 0.00 27.50 0.00 0.00 0.00 30.00 0.00 0.00 0.00 32.50 0.00 0.00 0.00 35.00 0.00 0.00 0.00 37.50 0.00 0.00 0.00 40.00 0.00 0.00 0.00 42.50 0.00 0.00 0.00 45.00 0.00 0.00 0.00 47.50 0.00 0.00 0.00 50.00 0.00 0.00 0.00 52.50 0.00 0.00 0.00 55.00 0.00 0.00 0.00 57.50 0.00 0.00 0.00 60.00 0.00 0.00 0.00 62.50 0.00 0.00 0.00 65.00 0.00 0.00 0.00 67.50 0.00 0.00 0.00 70.00 0.00 0.00 0.00 72.50 0.00 0.00 0.00 75.00 0.00 0.00 0.00 77.50 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 121 Summary for Link 11 L: POST DEV Inflow Area = 4.460 ac, 30.04% Impervious, Inflow Depth = 3.92" for 50-Year event Inflow = 11.19 cfs @ 12.11 hrs, Volume= 1.459 af Primary = 11.19 cfs @ 12.11 hrs, Volume= 1.459 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 11 L: POST DEV Hydrograph / 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ■Inflow 1 121/ A_12 4 11.19 cfs I i— + -I- 1- - I- + -I - I- 4 -I- -I - I- 4 -I- 1- -I - I- CI Primary l 11.19cfs 1/ 111111 InflowlArea=4.146O lac 11� T 10 -/ k -/ -1 - I- 4 —I— {— - — 1— + I — I— -+ I— I— 4 I 1— - — - 1 I I I I I I I I I 1 I I 1 9 -/ / 1 1 I I I I I I 1 1 1 1 1 i 8 -/ k —/ —1 — 1— 1 -1— 1— H — 1— + 1 — I— A 1— H H I— H 1 1— H — - _ I I I I I I 1 I I 1 Zul 7� / 3 61/ k — — H -1- 1— H - 1— + 1 — — A1— HH — H —IHH LL =5 ,/ A_ 1, 1 1 1 1 1 1 1 1 1 1 1 I I I I I I I I I I I I I I I I I 4� / k I— H —1— 1— - h — 1— + —1 — I— -h —1— t H — I— t —' - / 3y - z 1 I I I 1 2 -/ fi — 1— H 1 t 1 1 H fi f— H — - I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 50-Year Rainfall=6.75" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 122 Hydrograph for Link 11 L: POST DEV Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.03 0.00 0.03 10.00 0.11 0.00 0.11 12.50 4.66 0.00 4.66 15.00 1.09 0.00 1.09 17.50 0.54 0.00 0.54 20.00 0.39 0.00 0.39 22.50 0.35 0.00 0.35 25.00 0.19 0.00 0.19 27.50 0.13 0.00 0.13 30.00 0.08 0.00 0.08 32.50 0.08 0.00 0.08 35.00 0.08 0.00 0.08 37.50 0.07 0.00 0.07 40.00 0.07 0.00 0.07 42.50 0.07 0.00 0.07 45.00 0.06 0.00 0.06 47.50 0.06 0.00 0.06 50.00 0.01 0.00 0.01 52.50 0.00 0.00 0.00 55.00 0.00 0.00 0.00 57.50 0.00 0.00 0.00 60.00 0.00 0.00 0.00 62.50 0.00 0.00 0.00 65.00 0.00 0.00 0.00 67.50 0.00 0.00 0.00 70.00 0.00 0.00 0.00 72.50 0.00 0.00 0.00 75.00 0.00 0.00 0.00 77.50 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 123 Time span=0.00-120.00 hrs, dt=0.05 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment3S: PredevelopmentPoint 1 Runoff Area=4.340 ac 4.61% Impervious Runoff Depth=3.52" Flow Length=624' Tc=27.8 min CN=65 Runoff=13.75 cfs 1.272 af Subcatchment4S: PostdevelopmentPoint Runoff Area=2.340 ac 48.29% Impervious Runoff Depth=5.30" Tc=5.0 min CN=81 Runoff=21.41 cfs 1.034 af Subcatchment7S: PredevelolpmentPoint 2 Runoff Area=1.110 ac 0.00% Impervious Runoff Depth=2.99" Flow Length=114' Tc=32.3 min CN=60 Runoff=2.64 cfs 0.276 af Subcatchment8S: BYPASS 1 Runoff Area=2.120 ac 9.91% Impervious Runoff Depth=3.84" Flow Length=627' Tc=17.8 min CN=68 Runoff=9.62 cfs 0.679 af Subcatchment9S: PostdevelopmentPoint 2 Runoff Area=1.000 ac 0.00% Impervious Runoff Depth=2.99" Flow Length=93' Slope=0.0106 '/' Tc=28.5 min CN=60 Runoff=2.59 cfs 0.249 af Pond 12P: POND Peak Elev=580.97' Storage=21,252 cf Inflow=21.41 cfs 1.034 af Primary=5.36 cfs 1.034 af Secondary=0.00 cfs 0.000 af Outflow=5.36 cfs 1.034 af Link 6L: PRE DEV Inflow=13.75 cfs 1.272 of Primary=13.75 cfs 1.272 af Link 11 L: POST DEV Inflow=14.98 cfs 1.713 af Primary=14.98 cfs 1.713 af Total Runoff Area = 10.910 ac Runoff Volume = 3.510 af Average Runoff Depth = 3.86" 85.88% Pervious = 9.370 ac 14.12% Impervious = 1.540 ac 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 124 Summary for Subcatchment 3S: Predevelopment Point 1 [47] Hint: Peak is 1023% of capacity of segment#3 Runoff = 13.75 cfs @ 12.22 hrs, Volume= 1.272 af, Depth= 3.52" Routed to Link 6L : PRE DEV Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.53" Area (ac) CN Description 3.070 60 Woods, Fair, HSG B 0.320 73 Woods, Fair, HSG C 0.200 79 Woods, Fair, HSG D 0.120 56 Brush, Fair, HSG B 0.080 70 Brush, Fair, HSG C 0.350 77 Brush, Fair, HSG D 0.100 98 Paved parking, HSG B 0.060 98 Paved parking, HSG C 0.040 98 Paved parking, HSG D 4.340 65 Weighted Average 4.140 95.39% Pervious Area 0.200 4.61% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.9 100 0.0734 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" 3.9 254 0.0477 1.09 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 10.0 270 0.0391 0.45 1.34 Channel Flow, CHANNEL Area= 3.0 sf Perim= 6.3' r= 0.48' n= 0.400 Sheet flow: Woods+light brush 27.8 624 Total 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 125 Subcatchment 3S: Predevelopment Point 1 Hydrograph /_ A 11 L _1 L I B L I LA 11 I L I L _ 15� I 1 1 I I I I I I I I I I I I I I I I ■Runoff 14 -/ 113.75 cfs I I I I 1 1 I I 1 1 I I 1 1 I I 1 1 - i I F -I - TT - 1- 7 -1- T -1- T -1 - TT 1Type-1IT2441r 13� k 1 —I — — I— — — + — — — — I— — —I 12 1 I 1 1 1*OTYVail Fain aii-r f - 3, 11 1 1 I 1 1 I I 1 1 nbff Area=4..34D ad — 10� ✓ 1 1 I I I I I I I - -r 1- -1 - 1- rt 1- T -Runoff -2-a# - w 9� ,_ — — 4 4 —I 1 4 1 T 1 L L- — ,, 8� un4 1��1-; 1 I I- 7� / 1 i 1 1 I I I I I F]Ow',LengtlL Q24 6 -/ —/ -r — — fi 1 1— -1 1 rt 1 fi -1- fi 1 1rt 1Tc=2218-min - 5- —/ 4 - - L I I- -1 1 4 1 T 1 L I I— 4 1 -k 1 r6 Kii k 4;' 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 'f"I�l' 3 / / 1 1 I I I I I I I I I 1 1 1 1 I I � 1 1 1 1 1 1 1 1 1 1 1 I 1 1 2� 4 '% 1- H - 1— fi —I— t -1— H -1 — HH - 1 1 — H - 1- 4,.... //��������� IIIIII/ 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 126 Hydrograph for Subcatchment 3S: Predevelopment Point 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.21 0.00 0.00 5.00 0.47 0.00 0.00 7.50 0.82 0.00 0.00 10.00 1.36 0.01 0.07 12.50 5.53 2.02 7.25 15.00 6.43 2.67 0.81 17.50 6.87 3.00 0.51 20.00 7.17 3.23 0.36 22.50 7.40 3.42 0.31 25.00 7.53 3.52 0.01 27.50 7.53 3.52 0.00 30.00 7.53 3.52 0.00 32.50 7.53 3.52 0.00 35.00 7.53 3.52 0.00 37.50 7.53 3.52 0.00 40.00 7.53 3.52 0.00 42.50 7.53 3.52 0.00 45.00 7.53 3.52 0.00 47.50 7.53 3.52 0.00 50.00 7.53 3.52 0.00 52.50 7.53 3.52 0.00 55.00 7.53 3.52 0.00 57.50 7.53 3.52 0.00 60.00 7.53 3.52 0.00 62.50 7.53 3.52 0.00 65.00 7.53 3.52 0.00 67.50 7.53 3.52 0.00 70.00 7.53 3.52 0.00 72.50 7.53 3.52 0.00 75.00 7.53 3.52 0.00 77.50 7.53 3.52 0.00 80.00 7.53 3.52 0.00 82.50 7.53 3.52 0.00 85.00 7.53 3.52 0.00 87.50 7.53 3.52 0.00 90.00 7.53 3.52 0.00 92.50 7.53 3.52 0.00 95.00 7.53 3.52 0.00 97.50 7.53 3.52 0.00 100.00 7.53 3.52 0.00 102.50 7.53 3.52 0.00 105.00 7.53 3.52 0.00 107.50 7.53 3.52 0.00 110.00 7.53 3.52 0.00 112.50 7.53 3.52 0.00 115.00 7.53 3.52 0.00 117.50 7.53 3.52 0.00 120.00 7.53 3.52 0.00 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 127 Summary for Subcatchment 4S: Postdevelopment Point 1 [49] Hint: Tc<2dt may require smaller dt Runoff = 21.41 cfs @ 11.95 hrs, Volume= 1.034 af, Depth= 5.30" Routed to Pond 12P : POND Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.53" Area (ac) CN Description 0.850 61 >75% Grass cover, Good, HSG B 0.010 74 >75% Grass cover, Good, HSG C 0.240 80 >75% Grass cover, Good, HSG D 1.000 98 Paved parking, HSG B 0.130 98 Paved parking, HSG C 0.110 60 Woods, Fair, HSG B 2.340 81 Weighted Average 1.210 51.71% Pervious Area 1.130 48.29% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, DIRECT Subcatchment 4S: Postdevelopment Point 1 Hydrograph 11 1 I I I I I I I 11 1 23 ,_ I 1 1 I I _ i I 1 1 I I 1 1 I 1 1 I I 1 1 — ■Runoff 22 1 21 41 cfs 14 I t 1 — 4 4 I L 1 H 1 H 4 IT 4 1 t wI2-4 H - 21 — t -1— t —I - 1- -4 — I- 4 -1 + -1— t I — — # — (Type-I � 19 / I�O r a gaipfZaH�75 1— 18 -/ — 17 — L —1 L I — 1 L —I_ L _1_ RUiibff A!a=234O_ad 164-/ - 4 — 4 -1— t 1 - 44 — I- 4 -1 H —I-- 4 1 - 44 — I 1— t 1 — — 154 r -1- 7 -I - 4 - I- H -1- 14 �wQff � �u I I I I I I I I I I I I IIM" 1F 1 1 011 - —I — — 1- 4 —I— —1— —I — 4 — I—TC—5.40it]h LL 10� 1 t I t 1 t1 I -L —I— t I t 1 74 1 t —I—//++t�H�.�. H - 9; 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I CF4 8r I I I I I I I I I I I I I I I I I I I I — 64' — — t —1— t 1 H 4 I_ 4 I t 1 H 1 H 4 I t 1 t 1 H - 54-/ 4 t 1 I— —I —1 t I 1 1 t I t 1 — 3 � -I 7 T T 7 7 T T 7 _ 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 128 Hydrograph for Subcatchment 4S: Postdevelopment Point 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.21 0.00 0.00 5.00 0.47 0.00 0.00 7.50 0.82 0.05 0.09 10.00 1.36 0.25 0.32 12.50 5.53 3.46 1.67 15.00 6.43 4.27 0.50 17.50 6.87 4.68 0.32 20.00 7.17 4.96 0.22 22.50 7.40 5.18 0.20 25.00 7.53 5.30 0.00 27.50 7.53 5.30 0.00 30.00 7.53 5.30 0.00 32.50 7.53 5.30 0.00 35.00 7.53 5.30 0.00 37.50 7.53 5.30 0.00 40.00 7.53 5.30 0.00 42.50 7.53 5.30 0.00 45.00 7.53 5.30 0.00 47.50 7.53 5.30 0.00 50.00 7.53 5.30 0.00 52.50 7.53 5.30 0.00 55.00 7.53 5.30 0.00 57.50 7.53 5.30 0.00 60.00 7.53 5.30 0.00 62.50 7.53 5.30 0.00 65.00 7.53 5.30 0.00 67.50 7.53 5.30 0.00 70.00 7.53 5.30 0.00 72.50 7.53 5.30 0.00 75.00 7.53 5.30 0.00 77.50 7.53 5.30 0.00 80.00 7.53 5.30 0.00 82.50 7.53 5.30 0.00 85.00 7.53 5.30 0.00 87.50 7.53 5.30 0.00 90.00 7.53 5.30 0.00 92.50 7.53 5.30 0.00 95.00 7.53 5.30 0.00 97.50 7.53 5.30 0.00 100.00 7.53 5.30 0.00 102.50 7.53 5.30 0.00 105.00 7.53 5.30 0.00 107.50 7.53 5.30 0.00 110.00 7.53 5.30 0.00 112.50 7.53 5.30 0.00 115.00 7.53 5.30 0.00 117.50 7.53 5.30 0.00 120.00 7.53 5.30 0.00 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 129 Summary for Subcatchment 7S: Predevelolpment Point 2 Runoff = 2.64 cfs @ 12.29 hrs, Volume= 0.276 af, Depth= 2.99" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.53" Area (ac) CN Description 1.110 60 Woods, Fair, HSG B 1.110 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.9 100 0.0093 0.05 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" 0.4 14 0.0121 0.55 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 32.3 114 Total Subcatchment 7S: Predevelolpment Point 2 Hydrograph ' I I I I I I 1 I I I 1 I I ❑Runoff l 2s4 cfs 1 I i 1 1 I I I I I I I I I I I • 1 I 1 1 I I 1 1 I IType Ili 24-hr 1 1 1 ; 100-Year, kainfall=7.03 ' 1 1 R inbffAwea=1:110 at- 2 / 1 1 1 1 I I I I I 1 1 1 1 11 11 1 Runoff Volume=0.276 af w / tu'n off 1Depth=;2.$9,' 1 1 1 1 Q u_ ✓ I I 1 I 1 RIdwlLength=114' • 1 Tc=32.i3 m1n 1 11 0 N 61 /Milli ,, iiiiiiiii���liiiiiiiiiiJiii�iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii�, 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 130 Hydrograph for Subcatchment 7S: Predevelolpment Point 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.21 0.00 0.00 5.00 0.47 0.00 0.00 7.50 0.82 0.00 0.00 10.00 1.36 0.00 0.00 12.50 5.53 1.62 1.87 15.00 6.43 2.21 0.19 17.50 6.87 2.51 0.12 20.00 7.17 2.72 0.09 22.50 7.40 2.89 0.07 25.00 7.53 2.99 0.00 27.50 7.53 2.99 0.00 30.00 7.53 2.99 0.00 32.50 7.53 2.99 0.00 35.00 7.53 2.99 0.00 37.50 7.53 2.99 0.00 40.00 7.53 2.99 0.00 42.50 7.53 2.99 0.00 45.00 7.53 2.99 0.00 47.50 7.53 2.99 0.00 50.00 7.53 2.99 0.00 52.50 7.53 2.99 0.00 55.00 7.53 2.99 0.00 57.50 7.53 2.99 0.00 60.00 7.53 2.99 0.00 62.50 7.53 2.99 0.00 65.00 7.53 2.99 0.00 67.50 7.53 2.99 0.00 70.00 7.53 2.99 0.00 72.50 7.53 2.99 0.00 75.00 7.53 2.99 0.00 77.50 7.53 2.99 0.00 80.00 7.53 2.99 0.00 82.50 7.53 2.99 0.00 85.00 7.53 2.99 0.00 87.50 7.53 2.99 0.00 90.00 7.53 2.99 0.00 92.50 7.53 2.99 0.00 95.00 7.53 2.99 0.00 97.50 7.53 2.99 0.00 100.00 7.53 2.99 0.00 102.50 7.53 2.99 0.00 105.00 7.53 2.99 0.00 107.50 7.53 2.99 0.00 110.00 7.53 2.99 0.00 112.50 7.53 2.99 0.00 115.00 7.53 2.99 0.00 117.50 7.53 2.99 0.00 120.00 7.53 2.99 0.00 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 131 Summary for Subcatchment 8S: BYPASS 1 Runoff = 9.62 cfs @ 12.10 hrs, Volume= 0.679 af, Depth= 3.84" Routed to Link 11 L : POST DEV Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.53" Area (ac) CN Description 1.180 60 Woods, Fair, HSG B 0.130 73 Woods, Fair, HSG C 0.170 61 >75% Grass cover, Good, HSG B 0.120 74 >75% Grass cover, Good, HSG C 0.310 80 >75% Grass cover, Good, HSG D 0.080 98 Paved parking, HSG B 0.090 98 Paved parking, HSG C 0.040 98 Paved parking, HSG D 2.120 68 Weighted Average 1.910 90.09% Pervious Area 0.210 9.91% Impervious Area Tc Length Slope Velocity Capacity Description (min) _ (feet) (ft/ft) (ft/sec) (cfs) 13.9 100 0.0734 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" 3.8 249 0.0472 1.09 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.1 278 0.0398 37.88 454.62 Channel Flow, Area= 12.0 sf Perim= 7.2' r= 1.67' n= 0.011 Concrete pipe, straight & clean 17.8 627 Total 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 132 Subcatchment 8S: BYPASS 1 Hydrograph 11 1 1 1 1 1 1 1 1 1 1 1 -I 14 I 4 -I 17 I 1 I - - 1- -I- T -I 4 - ■Runoff 10 -/ 1 9.62 cts 1 1 1 1 1 1 1 1 1 1 1 1 1 1 4- H -i - I- H - 1- -1- -1- Type-II�24-hr� - - - - 7 7 -I I- 7 -I T -1 a 11 I `I"'.•I I ai� ' 117 'al- - 8- / 1 I 1 1 I I Runoffmea=2.1-20_ad 71-' 1 I I I I I I I I I I I I I I I - J _I 1 1 I 1 1 I Runoff VoIum1eQ.679af — 6� OLLngf 1DgpthT3.,04H" o 5� / 1 1 1 I I 1 1 I FIbw Length=627' 4� I 1 1 I I I I I I I ITci;=17.18 min y - -1 1 1- -1 - 1- 7 -I- T -I- 7 - - I- 7 - I- T —1—[.A'L 3- 1 1 1 1 1 1 1 1 1 �r'Y 16 2:-/ I 1 I 1 1 1 ' 1 1 1 1 1 : i o 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 133 Hydrograph for Subcatchment 8S: BYPASS 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.21 0.00 0.00 5.00 0.47 0.00 0.00 7.50 0.82 0.00 0.00 10.00 1.36 0.03 0.08 12.50 5.53 2.27 2.22 15.00 6.43 2.95 0.40 17.50 6.87 3.30 0.26 20.00 7.17 3.55 0.18 22.50 7.40 3.74 0.16 25.00 7.53 3.84 0.00 27.50 7.53 3.84 0.00 30.00 7.53 3.84 0.00 32.50 7.53 3.84 0.00 35.00 7.53 3.84 0.00 37.50 7.53 3.84 0.00 40.00 7.53 3.84 0.00 42.50 7.53 3.84 0.00 45.00 7.53 3.84 0.00 47.50 7.53 3.84 0.00 50.00 7.53 3.84 0.00 52.50 7.53 3.84 0.00 55.00 7.53 3.84 0.00 57.50 7.53 3.84 0.00 60.00 7.53 3.84 0.00 62.50 7.53 3.84 0.00 65.00 7.53 3.84 0.00 67.50 7.53 3.84 0.00 70.00 7.53 3.84 0.00 72.50 7.53 3.84 0.00 75.00 7.53 3.84 0.00 77.50 7.53 3.84 0.00 80.00 7.53 3.84 0.00 82.50 7.53 3.84 0.00 85.00 7.53 3.84 0.00 87.50 7.53 3.84 0.00 90.00 7.53 3.84 0.00 92.50 7.53 3.84 0.00 95.00 7.53 3.84 0.00 97.50 7.53 3.84 0.00 100.00 7.53 3.84 0.00 102.50 7.53 3.84 0.00 105.00 7.53 3.84 0.00 107.50 7.53 3.84 0.00 110.00 7.53 3.84 0.00 112.50 7.53 3.84 0.00 115.00 7.53 3.84 0.00 117.50 7.53 3.84 0.00 120.00 7.53 3.84 0.00 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 134 Summary for Subcatchment 9S: Postdevelopment Point 2 Runoff = 2.59 cfs @ 12.24 hrs, Volume= 0.249 af, Depth= 2.99" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.53" Area (ac) CN Description 1.000 60 Woods, Fair, HSG B 1.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.5 93 0.0106 0.05 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.68" Subcatchment 9S: Postdevelopment Point 2 Hydrograph / II I I I I I I I I I I I I I I I I I I I ❑Runoff 12.59 cfs l l I I I I I I I I I I 2 1 I I I I I I I I 1 Type II 24-hr / 11 I 1 i I 1 ; 10O-rlYear, klainfaII71r7.153 ' 2-- / — I- 7 T —I — r — RunbfiAtea=l-VVOarc / 11 1 1 Runoff Volume=0.249 af / 1 1 1 I I Ou;ngff,Depth=2.$911' I / 11 I 1 FIovV Length=93' LL * �r 11 II 1 I 1 I I 1 I I 1 1� Slope=0.0 106- 1 Tc285 mi l / = . 1 ri CN=60 o /, „....,.,15 20 25 30 35,/ ���,/����45 40 ��������55 0 ����60����65����70����������75 80 ���,/����������������������� 0 5 10 5 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 135 Hydrograph for Subcatchment 9S: Postdevelopment Point 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.21 0.00 0.00 5.00 0.47 0.00 0.00 7.50 0.82 0.00 0.00 10.00 1.36 0.00 0.00 12.50 5.53 1.62 1.47 15.00 6.43 2.21 0.17 17.50 6.87 2.51 0.11 20.00 7.17 2.72 0.08 22.50 7.40 2.89 0.07 25.00 7.53 2.99 0.00 27.50 7.53 2.99 0.00 30.00 7.53 2.99 0.00 32.50 7.53 2.99 0.00 35.00 7.53 2.99 0.00 37.50 7.53 2.99 0.00 40.00 7.53 2.99 0.00 42.50 7.53 2.99 0.00 45.00 7.53 2.99 0.00 47.50 7.53 2.99 0.00 50.00 7.53 2.99 0.00 52.50 7.53 2.99 0.00 55.00 7.53 2.99 0.00 57.50 7.53 2.99 0.00 60.00 7.53 2.99 0.00 62.50 7.53 2.99 0.00 65.00 7.53 2.99 0.00 67.50 7.53 2.99 0.00 70.00 7.53 2.99 0.00 72.50 7.53 2.99 0.00 75.00 7.53 2.99 0.00 77.50 7.53 2.99 0.00 80.00 7.53 2.99 0.00 82.50 7.53 2.99 0.00 85.00 7.53 2.99 0.00 87.50 7.53 2.99 0.00 90.00 7.53 2.99 0.00 92.50 7.53 2.99 0.00 95.00 7.53 2.99 0.00 97.50 7.53 2.99 0.00 100.00 7.53 2.99 0.00 102.50 7.53 2.99 0.00 105.00 7.53 2.99 0.00 107.50 7.53 2.99 0.00 110.00 7.53 2.99 0.00 112.50 7.53 2.99 0.00 115.00 7.53 2.99 0.00 117.50 7.53 2.99 0.00 120.00 7.53 2.99 0.00 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 136 Summary for Pond 12P: POND [44] Hint: Outlet device#2 is below defined storage Inflow Area = 2.340 ac, 48.29% Impervious, Inflow Depth = 5.30" for 100-Year event Inflow = 21.41 cfs @ 11.95 hrs, Volume= 1.034 af Outflow = 5.36 cfs @ 12.11 hrs, Volume= 1.034 af, Atten= 75%, Lag= 9.3 min Primary = 5.36 cfs @ 12.11 hrs, Volume= 1.034 of Routed to Link 11 L : POST DEV Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Link 11 L : POST DEV Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 580.97'@ 12.11 hrs Surf.Area= 7,264 sf Storage= 21,252 cf Plug-Flow detention time=289.9 min calculated for 1.034 af(100% of inflow) Center-of-Mass det. time=289.6 min ( 1,088.3 - 798.7 ) Volume Invert Avail.Storage Storage Description #1 577.00' 38,262 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 577.00 3,579 0 0 578.00 4,438 4,009 4,009 579.00 5,335 4,887 8,895 580.00 6,289 5,812 14,707 581.00 7,299 6,794 21,501 582.00 8,366 7,833 29,334 583.00 9,490 8,928 38,262 Device Routing Invert Outlet Devices #1 Primary 575.50' 15.0" Round Culvert L= 57.4' RCP, rounded edge headwall, Ke= 0.100 Inlet/ Outlet Invert= 575.50'/ 573.63' S= 0.0326 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.23 sf #2 Device 1 575.50' SAND FILTER Head (feet) 0.00 1.00 1.50 2.50 3.50 4.50 5.50 6.50 Disch. (cfs) 0.000 0.052 0.060 0.077 0.095 0.112 0.129 0.146 #3 Device 1 578.21' 2.5" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 578.89' 15.0" W x 3.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 579.63' 6.0" W x 3.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Device 1 580.18' 6.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #7 Device 1 580.80' 2.0' long x 0.5' breadth Broad-Crested Rectangular Weir X 4.00 Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #8 Device 1 581.00' 3.0' long x 0.5' breadth Broad-Crested Rectangular Weir X 4.00 Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 137 #9 Secondary 582.00' 20.0' long x 16.0' breadth EMERGENCY SPILLWAY Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=5.27 cfs @ 12.11 hrs HW=580.96' (Free Discharge) -1=Culvert (Passes 5.27 cfs of 15.55 cfs potential flow) -2=SAND FILTER (Custom Controls 0.13 cfs) -3=Orifice/Grate (Orifice Controls 0.27 cfs @ 7.83 fps) -4=Orifice/Grate (Orifice Controls 2.10 cfs @ 6.71 fps) -5=Orifice/Grate (Orifice Controls 0.66 cfs @ 5.28 fps) -6=Orifice/Grate (Orifice Controls 0.69 cfs @ 3.50 fps) -7=Broad-Crested Rectangular Weir(Weir Controls 1.43 cfs @ 1.12 fps) -8=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=577.00' (Free Discharge) 4-9=EMERGENCY SPILLWAY( Controls 0.00 cfs) Pond 12P: POND Hydrograph 1 1 1 1 I1 -1 -1_ - - - 1 _I _I_ � 1 - - - � � -I- I- L _ ❑Inflow / 121.41 cfs I Outflow /�_,. ❑Primary 1 1 Iow IAr eaZ2 i3- O lac ❑Secondary 22� / /' 1 - I- + -1- I- + -1 -1 p6nit 01" -48 1"'47 - / , 1 1 1 1 1 I 2°� 1 1 Stoi-ae=211252' c'f 18 - / / I -1 -1- - r -1 -1- r r 1- r �' -1- 1- r - / - 1 L _I I _L A I L 1 _1 _ 1_ L _L I 1 L - 161-/ / /I N 141-' / /1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 =- - / / -I - I- L -I -1- 1- LA -I- 14 -1 - 1- LH -1- 1- L - c 12 / / : / I I I I I I I I I I I I I I I I I I LL 10 -/ / /1 I I I I I I I I I I I 1 1 1 1 1 1 1 - / / 8- / 5.36cfs -I/ /15.36 cfs� 67-/ / /I / 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 / / '% 2� //.� ���%//////////////////////////////////////////////////////////////////////////// o /l�l/ll/l/l// / 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 138 Pond 12P: POND Stage-Discharge I I I I ❑Total 583 ❑Primary ❑Secondary EMERGENCY SPILLWAY 582 I I �� I /�// % I I */� Broad-Crested Rectangular Weir Broad-Crested Rectangular Weir I I 581 / I 5 Orifice/Grate I f I c 580 / �0 Orifice/Grate I / I I I I I I I Orifice/Grate w I 579 7 I Orifice/Grate I I 578 O% I I i i / / i i i i / i i i i / / / / i 577 , , , , „ , , „ , , . , (, . . • (. . (. . . . 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Discharge (cfs) Pond 12P: POND Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 500 1,000 1,500 2,000 2,500 3,000 3,5004,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,000 8,500 9,000 0 Surface . . ' . . . ! . . . ' . . . . . . ! . . . I . ( . I . . . ! . . . I . . . I . . . 1 , , . I . . . ' . . . 1 . . . I . . . ' . . . ! . . . ❑Storage 583� I I I II I I I . .I I 7 I I I II I I I I II / I 1 1 I I I I II I I I I I I I 582 I I I ////' II I I I 1 I I I �� I I 1 ////��� I I I I I ' ,, I I I II I I I 581- 1 z,__a H I_L _L 11 I JH H I , I II I I II I I I a 580- I I I I .. "/ . 1 I II I I I I II I I I d - — I H + + I -11 I i+ r 1+ + + II 1 -[ r + w - I I I I II I II I II 579-" I I II I 1 1 I II I I I - n — r r 1- I tt 1 —Ill — + II 1 rt r r 578 11 I I I II I I I / / / / - Custom Stage Data / z / / 577 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 Storage(cubic-feet) 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 139 Hydrograph for Pond 12P: POND Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 577.00 0.00 0.00 0.00 2.50 0.00 0 577.00 0.00 0.00 0.00 5.00 0.00 0 577.00 0.00 0.00 0.00 7.50 0.09 190 577.05 0.05 0.05 0.00 10.00 0.32 1,265 577.34 0.07 0.07 0.00 12.50 1.67 19,151 580.67 3.35 3.35 0.00 15.00 0.50 10,058 579.21 0.91 0.91 0.00 17.50 0.32 8,845 578.99 0.36 0.36 0.00 20.00 0.22 8,518 578.93 0.26 0.26 0.00 22.50 0.20 8,295 578.89 0.22 0.22 0.00 25.00 0.00 7,469 578.73 0.20 0.20 0.00 27.50 0.00 5,956 578.42 0.14 0.14 0.00 30.00 0.00 5,021 578.22 0.08 0.08 0.00 32.50 0.00 4,304 578.07 0.08 0.08 0.00 35.00 0.00 3,613 577.91 0.08 0.08 0.00 37.50 0.00 2,946 577.75 0.07 0.07 0.00 40.00 0.00 2,302 577.60 0.07 0.07 0.00 42.50 0.00 1,682 577.45 0.07 0.07 0.00 45.00 0.00 1,086 577.29 0.06 0.06 0.00 47.50 0.00 512 577.14 0.06 0.06 0.00 50.00 0.00 66 577.02 0.02 0.02 0.00 52.50 0.00 5 577.00 0.00 0.00 0.00 55.00 0.00 0 577.00 0.00 0.00 0.00 57.50 0.00 0 577.00 0.00 0.00 0.00 60.00 0.00 0 577.00 0.00 0.00 0.00 62.50 0.00 0 577.00 0.00 0.00 0.00 65.00 0.00 0 577.00 0.00 0.00 0.00 67.50 0.00 0 577.00 0.00 0.00 0.00 70.00 0.00 0 577.00 0.00 0.00 0.00 72.50 0.00 0 577.00 0.00 0.00 0.00 75.00 0.00 0 577.00 0.00 0.00 0.00 77.50 0.00 0 577.00 0.00 0.00 0.00 80.00 0.00 0 577.00 0.00 0.00 0.00 82.50 0.00 0 577.00 0.00 0.00 0.00 85.00 0.00 0 577.00 0.00 0.00 0.00 87.50 0.00 0 577.00 0.00 0.00 0.00 90.00 0.00 0 577.00 0.00 0.00 0.00 92.50 0.00 0 577.00 0.00 0.00 0.00 95.00 0.00 0 577.00 0.00 0.00 0.00 97.50 0.00 0 577.00 0.00 0.00 0.00 100.00 0.00 0 577.00 0.00 0.00 0.00 102.50 0.00 0 577.00 0.00 0.00 0.00 105.00 0.00 0 577.00 0.00 0.00 0.00 107.50 0.00 0 577.00 0.00 0.00 0.00 110.00 0.00 0 577.00 0.00 0.00 0.00 112.50 0.00 0 577.00 0.00 0.00 0.00 115.00 0.00 0 577.00 0.00 0.00 0.00 117.50 0.00 0 577.00 0.00 0.00 0.00 120.00 0.00 0 577.00 0.00 0.00 0.00 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 140 Stage-Discharge for Pond 12P: POND Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 577.00 0.00 0.00 0.00 582.20 21.86 17.06 4.79 577.10 0.06 0.06 0.00 582.30 26.02 17.18 8.84 577.20 0.06 0.06 0.00 582.40 30.96 17.29 13.66 577.30 0.07 0.07 0.00 582.50 36.50 17.41 19.09 577.40 0.07 0.07 0.00 582.60 42.62 17.52 25.10 577.50 0.07 0.07 0.00 582.70 48.91 17.64 31.27 577.60 0.07 0.07 0.00 582.80 55.53 17.75 37.78 577.70 0.07 0.07 0.00 582.90 62.86 17.86 45.00 577.80 0.07 0.07 0.00 583.00 70.57 17.97 52.60 577.90 0.08 0.08 0.00 578.00 0.08 0.08 0.00 578.10 0.08 0.08 0.00 578.20 0.08 0.08 0.00 578.30 0.10 0.10 0.00 578.40 0.13 0.13 0.00 578.50 0.16 0.16 0.00 578.60 0.18 0.18 0.00 578.70 0.19 0.19 0.00 578.80 0.21 0.21 0.00 578.90 0.22 0.22 0.00 579.00 0.38 0.38 0.00 579.10 0.63 0.63 0.00 579.20 0.89 0.89 0.00 579.30 1.06 1.06 0.00 579.40 1.20 1.20 0.00 579.50 1.33 1.33 0.00 579.60 1.44 1.44 0.00 579.70 1.57 1.57 0.00 579.80 1.75 1.75 0.00 579.90 1.95 1.95 0.00 580.00 2.11 2.11 0.00 580.10 2.25 2.25 0.00 580.20 2.38 2.38 0.00 580.30 2.54 2.54 0.00 580.40 2.74 2.74 0.00 580.50 2.97 2.97 0.00 580.60 3.21 3.21 0.00 580.70 3.41 3.41 0.00 580.80 3.58 3.58 0.00 580.90 4.46 4.46 0.00 581.00 5.91 5.91 0.00 581.10 8.87 8.87 0.00 581.20 13.10 13.10 0.00 581.30 15.98 15.98 0.00 581.40 16.10 16.10 0.00 581.50 16.23 16.23 0.00 581.60 16.35 16.35 0.00 581.70 16.47 16.47 0.00 581.80 16.59 16.59 0.00 581.90 16.71 16.71 0.00 582.00 16.83 16.83 0.00 582.10 18.64 16.95 1.69 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 141 Stage-Area-Storage for Pond 12P: POND Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 577.00 3,579 0 582.20 8,591 31,029 577.10 3,665 362 582.30 8,703 31,894 577.20 3,751 733 582.40 8,816 32,770 577.30 3,837 1,112 582.50 8,928 33,657 577.40 3,923 1,500 582.60 9,040 34,555 577.50 4,009 1,897 582.70 9,153 35,465 577.60 4,094 2,302 582.80 9,265 36,386 577.70 4,180 2,716 582.90 9,378 37,318 577.80 4,266 3,138 583.00 9,490 38,262 577.90 4,352 3,569 578.00 4,438 4,009 578.10 4,528 4,457 578.20 4,617 4,914 578.30 4,707 5,380 578.40 4,797 5,855 578.50 4,887 6,340 578.60 4,976 6,833 578.70 5,066 7,335 578.80 5,156 7,846 578.90 5,245 8,366 579.00 5,335 8,895 579.10 5,430 9,433 579.20 5,526 9,981 579.30 5,621 10,538 579.40 5,717 11,105 579.50 5,812 11,682 579.60 5,907 12,268 579.70 6,003 12,863 579.80 6,098 13,468 579.90 6,194 14,083 580.00 6,289 14,707 580.10 6,390 15,341 580.20 6,491 15,985 580.30 6,592 16,639 580.40 6,693 17,303 580.50 6,794 17,978 580.60 6,895 18,662 580.70 6,996 19,357 580.80 7,097 20,061 580.90 7,198 20,776 581.00 7,299 21,501 581.10 7,406 22,236 581.20 7,512 22,982 581.30 7,619 23,739 581.40 7,726 24,506 581.50 7,833 25,284 581.60 7,939 26,072 581.70 8,046 26,872 581.80 8,153 27,682 581.90 8,259 28,502 582.00 8,366 29,334 582.10 8,478 30,176 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 142 Summary for Link 6L: PRE DEV Inflow Area = 4.340 ac, 4.61% Impervious, Inflow Depth = 3.52" for 100-Year event Inflow = 13.75 cfs @ 12.22 hrs, Volume= 1.272 af Primary = 13.75 cfs @ 12.22 hrs, Volume= 1.272 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 6L: PRE DEV Hydrograph L I L I I 1 1 r L 1 1 I L J 1 L J I L I L L I - I I I I I I I I I I I I I I I I I I I I I I ■Inflow 15i-/ / Ar 113.75 cfs 1 I I I I I I I I I I I I I I I I I I I I ❑Primary 14 -/ 13 i s I I I I I In fflolw Ared=4.I3407aC 13 -z z z- + -1 - '- + -I- r1 - 1 T 1 1- 1 1 -r1 1 T 1 1- 1 1 124 � � - - + - - - - - � � - - - - HH - I- I 1 1 I 1 I 1 I 1 1 I 1 1 1 11 -/ / 10 -/ / 1 I I I I I 1 1 I I I I 8y fi - - 1- -1- 1- -1 - 1- T 1 - - -1 1- fiH 1- T -1 r - - - 33 7y _L -1- 1- _1 - 1- 1 -1 - I- _1 -1- _1 - 1- _L -1 - 1 Li- - / 1 I I I I I I I I 1 1 I 6' / I I I I I I I I I I I 1 I 1 1 1 54z / ^ I I I I I I I I I I I 1 I I I I 4y ' - T 1 I- J -1- r T - 1- T 1 - I -1 1- T -I1- T -I T T 3� / k - 1 -1 - '- 4 —1— I— H — 1— + 1 — I— H —I— H H — 1— H -I - H H - - - 2� z � I J - 1- 1 -1 - I_ J -1- LJ - 1- 1 _ I _� 1 I 1 1 I 1 1 I I I 1 0- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 143 Hydrograph for Link 6L: PRE DEV Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.00 0.00 0.00 10.00 0.07 0.00 0.07 12.50 7.25 0.00 7.25 15.00 0.81 0.00 0.81 17.50 0.51 0.00 0.51 20.00 0.36 0.00 0.36 22.50 0.31 0.00 0.31 25.00 0.01 0.00 0.01 27.50 0.00 0.00 0.00 30.00 0.00 0.00 0.00 32.50 0.00 0.00 0.00 35.00 0.00 0.00 0.00 37.50 0.00 0.00 0.00 40.00 0.00 0.00 0.00 42.50 0.00 0.00 0.00 45.00 0.00 0.00 0.00 47.50 0.00 0.00 0.00 50.00 0.00 0.00 0.00 52.50 0.00 0.00 0.00 55.00 0.00 0.00 0.00 57.50 0.00 0.00 0.00 60.00 0.00 0.00 0.00 62.50 0.00 0.00 0.00 65.00 0.00 0.00 0.00 67.50 0.00 0.00 0.00 70.00 0.00 0.00 0.00 72.50 0.00 0.00 0.00 75.00 0.00 0.00 0.00 77.50 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 144 Summary for Link 11 L: POST DEV Inflow Area = 4.460 ac, 30.04% Impervious, Inflow Depth = 4.61" for 100-Year event Inflow = 14.98 cfs @ 12.11 hrs, Volume= 1.713 of Primary = 14.98 cfs @ 12.11 hrs, Volume= 1.713 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 11 L: POST DEV Hydrograph I I I 1 1 1 1 1 � I I I I I I I I I I I I I I ❑ Inflow 14.98 cfs I ❑Primary 16� � I I 7 I � � I � I I I T I T e d�+�/��, J,a.98crs j —I — 1 rt 1— r rt —1 T 1 —In f Iowi-Area=4.46V la�i - 15� , v 14� � 1- -h -1- i- -h -I- + -1 1 1 1 1 1 13 , /— I- 4 -1— I— —I -1- 4 -1 - 1- —I -1— H -1 - 1- 4 -1- 1 - - 1— 1 —1— L J — 1— 1 —1 — I— J —1— L J — 1— 1 —1 — L J - 12' "/ 1 1 1 1 1 1 1 1 1 1 1 I I I I 11� / III I I I 1 I 1 I 1 I 1 I I I I 101 /— 1 1 1 1 1 1 1 1 1 1 I I I I u 94 z /— 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 84' /— I I I I 1 I 1 I 1 I 1 1 1 1 1 T. 7 J I L H 1 T I I H I T 1 1 T I F H I 64 r 1— rt -1— rrt -1- -r -1 - 1— rt -1— r - - 1- 1 1 1 k 1— H —I— H H —I— + —1 — H H —I— t H — I— t —I — H H — I— - 5 -/ , 4 —1— I— —I —1— 4 —1 — 1— —I —1— - - 1- 4 -1- 1— - - 1 4 1 —1— L J —1— 1 —1 — 1— _I —1— J J — 1— 1 —1 — L J - hill! 1- , ��� ZZZZ��������������/ / �Sf is r( 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 54647 - Drainage_Pre-Post Type II 24-hr 100-Year Rainfall=7.53" Prepared by Timmons Group Printed 10/26/2023 HydroCAD® 10.10-7a s/n 08663 ©2021 HydroCAD Software Solutions LLC Page 145 Hydrograph for Link 11 L: POST DEV Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.05 0.00 0.05 10.00 0.14 0.00 0.14 12.50 5.57 0.00 5.57 15.00 1.32 0.00 1.32 17.50 0.62 0.00 0.62 20.00 0.44 0.00 0.44 22.50 0.37 0.00 0.37 25.00 0.20 0.00 0.20 27.50 0.14 0.00 0.14 30.00 0.08 0.00 0.08 32.50 0.08 0.00 0.08 35.00 0.08 0.00 0.08 37.50 0.07 0.00 0.07 40.00 0.07 0.00 0.07 42.50 0.07 0.00 0.07 45.00 0.06 0.00 0.06 47.50 0.06 0.00 0.06 50.00 0.02 0.00 0.02 52.50 0.00 0.00 0.00 55.00 0.00 0.00 0.00 57.50 0.00 0.00 0.00 60.00 0.00 0.00 0.00 62.50 0.00 0.00 0.00 65.00 0.00 0.00 0.00 67.50 0.00 0.00 0.00 70.00 0.00 0.00 0.00 72.50 0.00 0.00 0.00 75.00 0.00 0.00 0.00 77.50 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00