Loading...
HomeMy WebLinkAbout20231466 Ver 1_1_20231027I-85 EXIT 17-A US 321 TO CHARLOTTE SITE EROSION & SEDIMENTATION CONTROL PLANS FOR SIMS LEGION PARK LANDFILL GASTONIA, GASTON COUNTY , NORTH CAROLINA VICINITY MAP SCALE: 1" = 400' VICINITY MAP N.T.S. NORTH CAROLINA CONTACT INFORMATION OWNER/DEVELOPER NCDEQ - DIVISION OF WASTE MANAGEMENT 217 WEST JONES STREET RALEIGH, NORTH CAROLINA (919) 707-8331 SURVEYOR ---- ---- ---- ---- ENGINEER SHIELD ENGINEERING, INC. 4301 TAGGERT CREEK ROAD CHARLOTTE, NC 28208 (704) 394-6913 CLIENT CONTACT MR. THOMAS SLUSSER (919) 707-8331 C:\U s e r s \ d a v e . w e i k l e \ C D G , I n c \ C h a r l o t t e P r o j e c t s - 1 2 2 0 1 2 1 - S i m ' s L e g i o n P a r k \ P r o j e c t D e t a i l s \ D r a w i n g s \ 1 2 2 0 1 2 1 - 0 1 C O V E R . d w g , 10 / 2 7 / 2 0 2 3 9 : 2 2 A M , Da v e W e i k l e DR A W I N G N O : SH E E T T I T L E : PR O J E C T # DA T E : DE S I G N B Y : DR A W N B Y : AP P R O V E D : SC A L E : RE V I S I O N S RE V . DA T E CO M M E N T S 1 2 3 4 12 2 0 1 2 1 - 0 1 JU L Y , 2 0 2 3 AS S H O W N DWDW RL G 1 NC D E Q - D I V I S I O N O F W A S T E MA N A G E M E N T 21 7 W E S T J O N E S S T R E E T RA L E I G H , N O R T H C A R O L I N A (9 1 9 ) 7 0 7 - 8 3 3 1 CO V E R NC D E Q S U B M I T T A L 09 - 1 2 - 2 3 RE V 2 RE V 2 D A T E RE V 3 RE V 3 D A T E RE V 4 RE V 4 D A T E SI M S L E G I O N P A R K L A N D F I L L 10 0 1 D R . M A R T I N L U T H E R K I N G J R . H W Y . GA S T O N I A , GA S T O N C O U N T Y , NO R T H C A R O L I N A EN G I N E E R ' S S E A L : 43 0 1 T A G G A R T C R E E K R O A D CH A R L O T T E , N C 2 8 2 0 8 Ph o n e : 7 0 4 - 3 9 4 - 6 9 1 3 ww w . c d g e . c o m Li c e n s e N o . C - 4 9 7 3 GASTON COUNTY SEE BELOWSheet List Table Sheet Number Sheet Title 1 COVER 2 EXISTING CONDITIONS PLAN 3 EROSION & SEDIMENTATION CONTROL PLAN - OVERVIEW 4 EROSION & SEDIMENTATION CONTROL PLAN - 1 5 EROSION & SEDIMENTATION CONTROL PLAN - 2 6 EROSION & SEDIMENTATION CONTROL PLAN - 3 7 EROSION & SEDIMENTATION CONTROL DETAILS - 1 8 EROSION & SEDIMENTATION CONTROL DETAILS - 2 9 STORM PLAN & PROFILE 10 RAVINE PLAN & DETAILS 11 STOCKPILE PLAN 12 TREE SAVE PLAN 13 MISCELLANEOUS NOTES 14 NC DEQ SELF INSPECTIONS 15 NC DEQ STABILIZATION NOTES TOTAL DISTURBED AREA = 19.20 AC. 720 700 710 70 0 710 71 0 X X X X 0+00 1+00 2+00 3+00 700 700 705 705 710 7 1 0 715 FES 1 MH 1 680 690 700 710 720 680 690 700 710 720 0+00 +1+00 +2+00 +3+00 2+ 5 8 = E X . 4 8 " C M P EX . I N V = 6 9 9 . 1 5 FES 1 STA:2+03.29 RIM:702.26 INV IN:698.30 48" RCP 73.49' of 48" RCP @ 1.35% MH 1 STA:2+76.81 RIM:717.35 INV OUT:699.29 48" RCP EX. GRADE @ C/L DITCH 1.17% PROP. GRADE @ C/L DITCH 2+ 7 8 = P R O P . 7 2 " Ø M A N H O L E IN V = 6 9 9 . 5 4 ( E X . 4 8 " C M P ) IN V = 6 9 9 . 2 9 ( P R O P 4 8 " R C P ) REMOVE 20' OF EX. 48" RUSTED CMP 1+ 8 5 = P R O P . C L A S S B R I P R A P IN V = 6 9 8 . 1 0 ( P R O P G R A D E ) PROP. 18" THICK CLASS 1 RIP RAP OUTFALL CHANNEL w/ GEOTEXTILE FABRIC NCDOT DETAIL 840.52 EX . 5 4 9 ' - 4 8 " RC P @ 1 . 9 4 % RIPRAP APRON AT PIPE OUTFALL 1) FILL MATERIAL SHALL BE COMPACTED TO 95% PROCTOR DENSITY IN LIFTS NO MORE THAN 6" THICK. SPECIAL CARE SHOULD BE TAKEN TO MAKE SURE FILL MATERIAL UNDER PIPES IS THOROUGHLY COMPACTED. 2) ALL TRENCHING OPERATIONS SHALL MEET OSHA STANDARDS 3) A MINIMUM OF 24" FROM OUTSIDE DIAMETER OF PIPE TO SIDE OF TRENCH MUST BE ALLOWED FOR COMPACTION OF FILL MATERIAL. BACKFILLING OF TRENCHES SHALL BE ACCOMPLISHED IMMEDIATELY AFTER THE PIPE IS LAID. THE FILL AROUND THE PIPE SHALL BE PLACED IN LAYERS NOT TO EXCEED 6". UNDER NO CIRCUMSTANCES SHALL WATER BE PERMITTED TO RISE IN UNBACKFILLED TRENCHES AFTER THE PIPE HAS BEEN PLACED. COMPACTION REQUIREMENTS SHALL BE ATTAINED BY THE USE OF MECHANICAL TAMPS ONLY. EACH AND EVERY LAYER OF BACKFILL SHALL BE PLACED LOOSE AND THOROUGHLY COMPACTED INTO PLACE. NOTES: 48" RCP DR A W I N G N O : SH E E T T I T L E : PR O J E C T # DA T E : DE S I G N B Y : DR A W N B Y : AP P R O V E D : SC A L E : RE V I S I O N S RE V . DA T E CO M M E N T S 1 2 3 4 12 2 0 1 2 1 - 0 1 JU L Y , 2 0 2 3 AS S H O W N DWDW RL G 10 NC D E Q - D I V I S I O N O F W A S T E MA N A G E M E N T 21 7 W E S T J O N E S S T R E E T RA L E I G H , N O R T H C A R O L I N A (9 1 9 ) 7 0 7 - 8 3 3 1 ST O R M P L A N & P R O F I L E NC D E Q S U B M I T T A L 09 - 1 2 - 2 3 RE V 2 RE V 2 D A T E RE V 3 RE V 3 D A T E RE V 4 RE V 4 D A T E C:\U s e r s \ d a v e . w e i k l e \ C D G , I n c \ C h a r l o t t e P r o j e c t s - 1 2 2 0 1 2 1 - S i m ' s L e g i o n P a r k \ P r o j e c t D e t a i l s \ D r a w i n g s \ 1 2 2 0 1 2 1 S T O R M . d w g , 10 / 2 7 / 2 0 2 3 9 : 2 0 A M , Da v e W e i k l e SI M S L E G I O N P A R K L A N D F I L L 10 0 1 D R . M A R T I N L U T H E R K I N G J R . H W Y . GA S T O N I A , GA S T O N C O U N T Y , NO R T H C A R O L I N A 1"=30' 0 12030153060 (IN FEET) GRAPHIC SCALE EN G I N E E R ' S S E A L : 43 0 1 T A G G A R T C R E E K R O A D CH A R L O T T E , N C 2 8 2 0 8 Ph o n e : 7 0 4 - 3 9 4 - 6 9 1 3 ww w . c d g e . c o m Li c e n s e N o . C - 4 9 7 3 S EW N RCP PIPE BEDDING DETAIL SCALE: H - 1" = 30' V - 1" = 6' RAVINE CENTERLINE PLAN / PROFILE VIEWS N.T.S. PROVIDE BEDDING MATERIAL COMPACTED TO A 90% PROCTOR 6" THICK, 6" BEYOND OUTSIDE RADIUS OF MANHOLE BASE. SUPPORT SEWER PIPES WITH BEDDING MATERIAL. 690 700 710 720 690 700 710 720 0+00 +1+00 1+50 6' 2' EX. GRADE @ C/L DITCH PROP. 4:1 GRADE @ CROSS SECTION W/ MATTING "B" MATTING "A" 720 700 710 70 0 710 71 0 X X X X 0+ 0 0 1+ 0 0 1+ 5 0 700 700 705 705 710 7 1 0 715 FES 1 MH 1 COMPACTED FILL 4" PRESTO GEOWEB GW20V4 (DEPTH = 4") 4" 4" M I N . CO V E R COMPACTED FILL EXISTING CONSOLIDATED AND STABILIZED WASTE LAYER OR RELOCATED WASTE WITH DAILY COVER. AMEND WITH FILL TYPE S1 TO BRIDGE AREAS OF RUTTING OR PUMPING PER SPECIFICATIONS. MATTING "B" MATTING "C" DR A W I N G N O : SH E E T T I T L E : PR O J E C T # DA T E : DE S I G N B Y : DR A W N B Y : AP P R O V E D : SC A L E : RE V I S I O N S RE V . DA T E CO M M E N T S 1 2 3 4 12 2 0 1 2 1 - 0 1 JU L Y , 2 0 2 3 AS S H O W N DWDW RL G 11 NC D E Q - D I V I S I O N O F W A S T E MA N A G E M E N T 21 7 W E S T J O N E S S T R E E T RA L E I G H , N O R T H C A R O L I N A (9 1 9 ) 7 0 7 - 8 3 3 1 RA V I N E P L A N & D E T A I L S NC D E Q S U B M I T T A L 09 - 1 2 - 2 3 RE V 2 RE V 2 D A T E RE V 3 RE V 3 D A T E RE V 4 RE V 4 D A T E C:\U s e r s \ d a v e . w e i k l e \ C D G , I n c \ C h a r l o t t e P r o j e c t s - 1 2 2 0 1 2 1 - S i m ' s L e g i o n P a r k \ P r o j e c t D e t a i l s \ D r a w i n g s \ 1 2 2 0 1 2 1 S T O R M . d w g , 10 / 2 7 / 2 0 2 3 9 : 2 0 A M , Da v e W e i k l e SI M S L E G I O N P A R K L A N D F I L L 10 0 1 D R . M A R T I N L U T H E R K I N G J R . H W Y . GA S T O N I A , GA S T O N C O U N T Y , NO R T H C A R O L I N A EN G I N E E R ' S S E A L : 43 0 1 T A G G A R T C R E E K R O A D CH A R L O T T E , N C 2 8 2 0 8 Ph o n e : 7 0 4 - 3 9 4 - 6 9 1 3 ww w . c d g e . c o m Li c e n s e N o . C - 4 9 7 3 SCALE: H - 1" = 30' V - 1" = 6' 1"=30' 0 12030153060 (IN FEET) GRAPHIC SCALES EW N RAVINE GENERAL NOTES: 1.THE RAVINE IS TO BE EXCAVATED TO A SUBGRADE NO LESS THAN ONE FOOT BELOW FINISH GRADE. 2.WASTE REMOVED FROM THE RAVINE EXCAVATION IS TO BE STOCKPILED OR PLACED IN THE IN THE PREPARED BURIAL PIT AS SHOWN ON DRAWING #???. 3.THE BURIAL PIT SHOULD BE LINED WITH A GEOTEXTILE FABRIC (MATTING "C") AS SHOWN IN DETAIL THIS SHEET TO SEPARATE ALL EXPOSED WASTE MATERIAL AND FILL COVER SOIL. 4.AFTER THE RAVINE HAS REACHED SUBGRADE (FINISH GRADE MINUS ONE FOOT IN ELEVATION), PLACE AND COMPACT 4" OF FILL SOIL AS SHOWN ON PROFILE DETAIL, THIS SHEET. ABOVE THE FILL SOIL, PLACE GEOTEXTILE FABRIC (MATTING "C") OVER ENTIRE AREA. PLACE PRESTO GEOWEB GW20V4 (DEPTH = 4") OVER FABRIC AND REINFORCE IN PLACE USING STAKES AND KEYS AS RECOMMENDED BY THE MANUFACTURER. 5.MATTING "A" IS TO BE PLACED BELOW THE RIP RAP OUTFALL BEYOND THE EXTENDED 42" RCP STORM PIPE. PATTERN 'E' IS TO BE USED TO PIN THE MATTING ALONG THE LENGTH OF THE 6-FOOT WIDE CHANNEL. THE MATTING IS TO BE PLACED TO A VERTICAL HEIGHT OF 2-FEET. 6.IT IS ESSENTIAL THAT ENOUGH PLASTIC POLY SHEETING BE KEPT ONSITE TO BE ABLE TO COVER THE ENTIRE DISTURBED AREA OF THE RAVINE. THE SHEETING MUST BE PLACED DURING ANY RAINSTORM OR BEFORE ANY FORECASTED RAIN EVENT. MATERIALS TO HOLD THE SHEETING IN PLACE DURING HEAVY RAINS AND/OR WINDS MUST ALSO BE UTILIZED WHEN COVERING DISTURBED AREAS. METHODS TO RESTRAIN THE SHEETING COULD INCLUDE USING HEAVY ITEMS (TIRES, CONSTRUCTION CHAINS, LOGS, LARGE ROCKS, ETC.). GROUND COVER ANCHORING PINS COULD ALSO BE USED (MINIMUM LENGTH OF 6-INCHES) IF THE SHEETING MATRIAL IS FOLDED OVER AT LEAST TWICE SO THAT THE PINS PUNCTURE THROUGH AT LEAST THREE LAYERS OF THE SHEETING. BY COVERING THE OPEN AREAS DURING EACH PHASE, THIS WILL HELP ELIMINATE SEDIMENTATION. 7.ALL DISTURBED AREAS ARE TO BE SEEDED AND MATTED PER THE NOTES ON THIS PAGE IMMEDIATELY AFTER FINAL GRADING HAS BEEN ESTABLISHED. GEOWEB® SLOPE STABILIZATION GEOWEB SLOPE PROTECTION WITH ATRA ANCHORS www.prestogeo.com PRESTO GEOSYSTEMS P.O. BOX 2399, 670 NORTH PERKINS ST. APPLETON, WI 54912-2399 TOLL FREE:1-800-548-3424 PHONE: (920) 738-1328 013-036 - Presto Geosystems - Geoweb Slope with ATRA Anchors CADdetails.com 10/08/2023013-036 - Presto Geosystems - Geoweb PROTECTED BY COPYRIGHT ©2022 CADDETAILS.COM LTD. REVISION DATE MANUFACTURER NOTES: 1. ATRA ANCHORS SHALL CONSIST OF NO. 4 REBAR WITH AN ATRA STAKE CLIP INSERTED INTO THE END OF THE REBAR. LENGTH OF THE ATRA ANCHORS SHALL BE AS SPECIFIED. 2. ONE-PIECE MOLDED POLYMER ATRA SPEED STAKES AND PRE-ASSEMBLED ATRA GFRP (POLYMER) ARE AVAILABLE FROM PRESTO GEOSYSTEMS IN VARIOUS LENGTHS. 3. THE GEOWEB CELLS SHALL BE FILLED WITH THE SPECIFIED MATERIAL (TOPSOIL, STONE, OR CONCRETE) AND SHALL BE SUITABLE TO WITHSTAND THE APPLICABLE HYDRAULIC CONDITIONS. 4. THE GEOWEB SECTIONS SHALL BE ANCHORED TO RESIST SLIDING DUE TO DRIVING AND HYDRAULIC FORCES. 5. IF VEGETATION IS DESIRED, PROVIDE AN EROSION CONTROL BLANKET OR TURF REINFORCEMENT MAT IF THERE IS A POTENTIAL FOR EROSION PRIOR TO ESTABLISHING VEGETATION. 6. THE GEOWEB PANELS SHALL BE CONNECTED WITH ATRA KEYS AT EACH INTERLEAF AND END TO END CONNECTION. 7. REFER TO THE GENERAL DETAIL DRAWINGS FOR ANCHOR DETAILS. STAKE ANCHOR INSTALLATION STEPS: 1. POSITION THE ATRA ANCHOR NEXT TO THE UP-SLOPE CELL WALL. 2. DRIVE ATRA ANCHOR INTO THE GROUND UNTIL ARM OF ANCHOR IS LOCATED ABOVE GEOWEB CELL WALL. 3. ENGAGE ARM OF ANCHOR TO CELL WALL AND DRIVE UNTIL TIGHT. PLAN VIEW SECTION B-B SECTION A-A GEOTEXTILE ATRA ANCHOR. ENGAGE ANCHOR ARM WITH GEOWEB CELL WALL ATRA®ANCHORS IN SPECIFIED PATTERN. ENGAGE ARM OF ANCHOR WITH GEOWEB CELL WALL 6 OZ. NONWOVEN GEOTEXTILE REFER TO CREST ANCHOR DETAILS GENUINE GEOWEB SLOPE PROTECTION SYSTEM WITH SPECIFIED INFILL VEGETATION, IF DESIRED. REFER TO NOTES. VARIES 1 PROVIDE ATRA KEY CONNECTION FOR EACH END TO END AND INTERLEAF CONNECTION (TYP) A A ATRA ANCHOR (SPEED STAKE, GFRP, STAKE CLIP / REBAR) VARIES B B LENGTH VARIES ATRA ANCHOR DETAIL TYPICAL ATRA ANCHOR SYSTEM SECTION STAKE ANCHOR DETAIL MISCELLANEOUS MATTING / LINING NOTES: THE FOLLOWING SPECIFICATIONS REFER TO THE DIFFERENT LINERS THAT WILL BE USED THROUGHOUT THE PROJECT IN VARIOUS CONDITIONS: ·MATTING "A" = A PERMANENT TURF REINFORCEMENT EROSION CONTROL MATTING CAPABLE OF EXCEEDING AN "UNVEGETATED" FLOW VELOCITY OF 8.5 FPS., "UNVEGETATED" SHEAR STRESS OF 2.3 PSF, TENSILE STRENGTH OF 450 LBS/FT. ·MATTING "B" = A BIODEGRADABLE EROSION CONTROL BLANKET CAPABLE OF EXCEEDING AN UNVEGETATED FLOW VELOCITY OF 5.00 FPS., "UNVEGETATED" SHEAR STRESS OF 1.6 PSF, TENSILE STRENGTH OF 90 LBS/FT. ·MATTING "C" = NONWOVEN GEOTECTILE FABRIC WITH A GRAB TENSILE STRENGTH NO LESS THAN 160 LBS., TRAPEZOID TEAR STRENGTH OF 60 LBS., A CBR PUNCTURE STRENGTH OF 410 LBS., AND A FLOW RATE NO LESS THAN 110 GAL/MIN/SF. RAVINE CROSS SECTION PLAN / PROFILE VIEWS N.T.S. GEOGRID PROFILE FOR RAVINE AREA N.T.S. SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER MULCH: APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE FOR LATE WINTER AND EARLY SPRING: SEEDING MIXTURE: RYE (GRAIN) - 120 LB/ACRE ANNUAL LESPEDEZA (KOBE) - 50 LB/ACRE (OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE) SEEDING DATES: JAN. 1 - MAY 1 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER MULCH: APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE FOR SUMMER: SEEDING MIXTURE: GERMAN MILLET - 40 LB/ACRE (A SMALL-STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LB/ACRE) SEEDING DATES: MAY 1 - AUG. 15 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB/ACRE 10-10-10 FERTILIZER MULCH: APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL MAINTENANCE: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. FOR FALL: SEEDING MIXTURE: RYE (GRAIN) - 120 LB/ACRE SEEDING DATES: AUG. 15 - DEC 30 TEMPORARY SEEDING SCHEDULE PERMANENT SEEDING SPECIFICATIONS