HomeMy WebLinkAbout20231463 Ver 1_Shoreline Stabilization_20231031Submission Form
I. Applicant Information [15A NCAC 02H .0502(a)]
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Primary Contact Email* maples.johnl@gmail.com
Please provide an email address for payment and requests for more information here.
Pre -Filing Meeting Date Request was 10/25/2023
submitted on: *
Owner Information:
....... ........ ........ ........ ......... ......... ......... ........
Name: * John Maples
Email: * maples.johnl@gmail.com
Phone Number: (630)730-0734
(xxx)xxx-xxxx
Mailing Address: * Street Address
1047 Catherine Avenue
Address Line 2
City
Naperville
Postal / Zip Code
60540-6572
.........................................................................................................................................................
Is there an agent working on the project?* Yes
No
Agent/Consultant Information
...............................................................................................................................................................................
Name: * Janice Estep
Company Affiliation: * CBC Stone & Recycling, LLC
Email: * info@cbcstoneandrecycling.com
Phone Number:* (704)660-5111
(xxx)xxx-xxxx
State / Province / Region
IL
Country
US
Mailing Address: *
Street Address
638 Oakridge Farm Hwy
Address Line 2
City
Mooresville
Postal / Zip Code
28115
A signed and dated copy of the Agent Authorization letter:
Agent Form.pdf
Link to: Sample Agent Authorization Form
Project Information [15A NCAC 02H .0502(a) & (b)]
Project Name: * Maples Shoreline
State / Province / Region
NC
Country
United States
589.47KB
If your project has a formal name please use this. If your project does not have a formal name, please identify your project
by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses
any other names that have been used to identify the project in the past.
1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to
local landmarks such as towns, rivers, and roads.*
Upload File
Look up address
Property Address Lookup: * Street Address
121 Bear Creek Road
Address Line 2
City
Mooresville
Postal / Zip Code
28117-7318
Latitude: * 35.507424
State / Province / Region
NC
Country
US
Longitude: *-80.947836
2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing,
structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below
Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under
section 12.normal pool lake level/normal water level*
Please use the diagram at the link below:
https:Hedocs.deq.nc.gov/WaterResources/o/edoc/616616/Shoreline%2OLayout.docx
3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard
stick, shovel handle, etc.)
4. Location of the property (where work is to be conducted)
Nearest Town: * Mooresville
County: * Iredell
Lake/ river/ ocean adjacent to Norman
property:
Subdivisions name or site address: * Lot 377 Crescent Land & Timber Corp.
Include phase/lot number
Directions to site:*
610 E Center Ave
Mooresville, NC 28115
Head south on Evergreen St toward E Center Ave
11 sec (197 ft)
Take NC-1100 to Tuskarora Trail
24 min (11.7 mi)
Turn right onto E Center Ave
0.5 mi
Turn left onto S Church St
0.4 mi
Turn right onto E Wilson Ave
1.5 mi
Continue onto NC- 1100/Brawley School Rd
1.0 mi
Continue straight to stay on NC-1100Brawley School Rd
6.4 mi
At the traffic circle, take the 2nd exit onto NC-1100
2.0 mi
Continue on Tuskarora Trail. Drive to Bear Creek Rd
2 min (0.8 mi)
Turn right onto Tuskarora Trail
0.7 mi
Turn left onto Bear Creek Rd
Destination will be on the left
486 ft
121 Bear Creek Rd
Mooresville, NC 28117
Please include road names and numbers, landmarks etc.
5. Describe the existing land use or condition of the site at the time of this application:
Residential
Residential, undeveloped, etc.
6. Property Size 0.692 acres
Acres
7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or
why it is necessary):
Remove old wood wall and haul off. Install a VA Fieldstone wall with cap to replace old wall. Existing rip rap at base of old wall
will be re -installed at the base of new wall. Install TN Crab Orchard steps for lake access.
8. How will the work be done?* From Land
From Water
9. Total amount of disturbance below the normal pool lake level/ normal water level:
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
T below (340sf)
square feet
10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land-
ward: *
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
1' above (170 sf) 10' x 50' access
corridor (500 sf of temp. impact)
square feet
11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to
be impacted:*
(number of trees, for instance)
Grass buffer, no trees removed, minimal disturbance to buffer. Access corridor will be restored to original condition once project is
completed.
Sketch:
Application Fee:
Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The
application fee is as follows (pursuant to G.S. 143-215.3D):
0 $323.00 for impacts to lake (below normal water level) of less than 1 acre
0 $767.00 for impacts to lake (below normal water level) of greater or equal to 1 acre
By digitally signing below, I certify that:
o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best
of my knowledge and belief
o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of
the NC General Statutes (the "Uniform Electronic Transactions Act");
o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act");
0 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
o I intend to electronically sign and submit the Shoreline Stabilization online form.
Full Name:* Janice Estep
Signature:
Submittal Date: 10/25/2023
Initial Review
Is this accepted into the review process?* Yes No
Project Number:* 20231463 Version: *
Select Reviewer: *
Select Reviewing Office
Has payment been received?*
What amount is owed?*
Andrew Pitner:andrew.pitner
Mooresville Regional Office - (704) 663-1699
No Payment Needed
Fee Received
Need Fee - send electronic notification
$240.00 $570.00
$323.00
$767.00