Loading...
HomeMy WebLinkAbout20171292 Ver 1_RES Yadkin 01 UMB - Compass Point Mitigation Site/MY3 credit releaseCAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good Afternoon Jamey, Attached is the Year 3 monitoring credit release letter for the: RES Yadkin 01 UMB – Compass Point Mitigation Site/ SAW‐2017-01465/ Yadkin County. IRT comments on the MY3 Report are incorporated in this email. Make sure all comments are addressed in the next monitoring report. **The Corps agrees to the M&M bond reduction for Bond No. SUR0063561 in conjunction with the Year 3 credit release, in the amount of $90,758, per the bond reduction schedule. Maria Polizzi (NCDWR) comments: 1. Why is supplemental planting from low stem density in MY2 (submitted 8/31/22) occurring this winter as opposed to last? Better vegetative performance would be expected if issues are addressed quickly and replanting efforts occur as soon as possible after being identified. 2. Thank you for including photos of the problem areas related to low stem density and stream bank erosion. Will any grading be associated with the stream bank locations? 3. The bankfull entrenchment ratio for cross section 14 has dipped slightly below the >2.2 threshold due to some aggradation. In the text, vegetation growth is described as a potential cause. Will vegetation management be performed in this area? Casay Haywood and Steve Kichefski (USACE) comments: 1. The request letter mentions there are two low stem density areas that will be supplementally planted, but the report (page 7) only mentions one. If there is a second, please indicate the area on Figure 2 and include it in the VPA photo documentation. 2. Please note that some vegetation plots are dominated by a single species (VP8, R2). Per the 2016 Guidance, and as indicated on page 4 of the report, any single species can only account for up to 50 percent of the required stems within any vegetation plot, and any stems in excess of 50 percent should not be used to demonstrate success. 3. Please continue to closely monitor cross section 12 & 14 to determine if remedial action will be needed. Noted that 2 areas of bank erosion on DW1-C will be repaired. We appreciate the inclusion of the photos for the VPAs and SPAs in the report. Please include photos of the repairs in next year’s report. 4. The MY3 report noted that geomorphology data for MY3 was collected during May 2023. The MY2 data was collected in June and the MY1 data was collected in July. Each year geomorphology data collection has moved earlier and is too early in the monitoring year to adequately reflect MY3 progression. Please ensure MY4 data collection is done later in the monitoring year and strive for consistency over the length of the entire monitoring period. This electronic copy is an official Department of the Army Notification. If you wish to receive a paper copy, one will be mailed upon request. Please let me know if you have any questions. Regards, Steve Kichefski Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District, Mitigation Branch (828)-271-7980 Ext. 4234 (828)-933-8032 cell The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at https://regulatory.ops.usace.army.mil/customer-service-survey/ <Blockedhttps://regulatory.ops.usace.army.mil/customer-service-survey/> to complete the survey online. From: Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil> Sent: Friday, September 15, 2023 2:07 PM To: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil>; Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.T.Isenhour@usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Davis, Erin B CIV USARMY CESAW (USA) <Erin.B.Davis@usace.army.mil>; byron_hamstead@fws.gov; Polizzi, Maria <maria.polizzi@deq.nc.gov>; Haupt, Mac <mac.haupt@deq.nc.gov>; Bowers, Todd <bowers.todd@epa.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Munzer, Olivia <olivia.munzer@ncwildlife.org>; McHenry, David G <david.mchenry@ncwildlife.org> Cc: Jamey Mceachran (jmceachran@res.us) <jmceachran@res.us>; Katie Obenauf <kobenauf@res.us> Subject: Notice of Year 3 Monitoring Report Review/ RES Yadkin 01 UMB - Compass Point Mitigation Site/ SAW‐2017-01469/ Yadkin County Hello IRT, The below referenced Annual Monitoring Report review and associated MY 3 Credit Release has been requested by the bank sponsor. The Annual Monitoring Report has been posted to the RIBITS site for this bank and are now available for download (see link to Cyber Repository below). Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the credit release approval process, which requires an IRT review period with a comment deadline of 15 calendar days after the date of this email notification or from the date of a site visit, should it be required. Comments provided after the comment deadline (shown below) may not be considered. Within 30 days of the conclusion of the IRT review period, a copy of all comments will be provided to the sponsor and the NCIRT along with District Engineer's approval or disapproval of the credit release. 15-Day Comment Start Date: September 19, 2023 15-Day Comment Deadline: October 04, 2023 45-Day Credit Release Approval Deadline: November 03, 2023 Project Information: Bank Name: RES Yadkin 01 UMB Site Name: Compass Point Mitigation Site Sponsor: RES Sponsor POC: Katie Obenauf, Project Ecologist, kobenauf@res.us <mailto:kobenauf@res.us> , (336) 705-3041 USACE ID: SAW‐2017-01465 Location: 36.269624, -80.638420 County: Yadkin HUC: 03040101 River Basin: Upper Yadkin Watershed; Upper Pee Dee River Basin USACE Bank PM: Steve Kichefski Steven.L.Kichefski@usace.army.mil <mailto:Steven.L.Kichefski@usace.army.mil> , (828)-933-8032 USACE Bank Mit Specialist: Casey Haywood Casey.M.Haywood@usace.army.mil <mailto:Casey.M.Haywood@usace.army.mil> , (919) 750-7397 Credit Release Activities: Year 3 Annual Monitoring (10% SMUs) Credit Release Requested: 415.5 Cool Water Stream Credits RIBITS Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?p=107:10:17316054062860::::P10_BANK_ID:4725 <https://ribits.ops.usace.army.mil/ords/f?p=107:10:17316054062860::::P10_BANK_ID:472 5> Please note that you must be logged in to access documents in the cyber repository. When submitting comments please indicate if you are requesting a site visit. Please reach out if you have any questions. Thank you, Casey Haywood Mitigation Specialist, Regulatory Division U.S. Army Corps of Engineers, Wilmington District (919) 750-7397 work cell 碎梢㷒㩶᧡䤭쀟싛䛖鐾瞲粧ꂸ㖣왮곽걚鋁㈧罟头୻穠찳ꠧ㏓ﱳ쾡ꊌ괃鍒崗哻넽婮呂ᆡ㇧폇郐팦䊚ꩋ볒�撧㋰Ợ儠꽡䔄⤎댓읕Ꜷ廢ˢ曨�勍䆛猫팏뇦署�ᡡꀧᅧ狋袍퐯ⴢ伶Ḹ陔嘦㣳ꧮ윋꽩镯鲄巍鹩客̮ʯăĀ芣省舰猁ᔰ̆ᵕХ『،⬊ĆĄ㞂̊〉؝唃ฝᘄᐄ᾵�㉳簽ᵯ뎟⢶᪳䐩�到̆ᵕБかꑉぇㅅ」؋唃଄Г位剐㐱㈰̆ѕጅ㈫㤲㠸⬷㤸ㄶ攵㤰戭敤ⵥ㐴㘴㠭ㄶⵥ㜸づ㌱㔹戸㔲ἰ̆ᵕУ〘耖䄔⇰蟄菺オఊⷜ꣬꭪すٙ唃Ἕ刄倰丰䲠䪠䢆 瑨灴⼺振汲洮捩潲潳瑦挮浯瀯楫振汲瀯潲畤瑣⽳楍䍣牥楌䍳㉁㄰弱〲ㄱ〭ⴳ㤲挮汲崰ࠆثԁ܅ā億估䴰ࠆثԁ܅Ȱ䆆瑨灴⼺眯睷洮捩潲潳瑦挮浯瀯楫振牥獴䴯捩敃䱲獩䅃〲ㄱ㉟㄰ⴱ㌰㈭⸹牣ぴ،唃ጝāӿ。 ؍⨉䢆čଁ舃Ă砀ퟤ㬐ꌖ輛뒖⢮띹㿀쳝佧솯豻ꥤ㰂೉삑䥖옚풚ꏤ嫁凰㴧⋶ᆑ牽咟怼㏸扴ꬖृ汀붜뵿楢�芙謢�஺ి獍＀脎�缫桫浈ꜰƣ鄴鐭潎㒻鷽郎虯캗�ỳᖆ㆗薷ᠳ풛ẽ㲺耦떏⒉ệ懥�᧤�례폶ﱽ䥖奥녫帖ᾙ麤쩍调嫓⽠Ⴠ눤ꏮ骯 D꽂㽞ﱥፆ辬矬௰酪嶷惇赸뛍躖戀ʡ习붏敓殸厼篗鷅﯉汩䉧་푩疛챥눳符❗釠뒧긅懱瘞ﴢᛏḦ诗娷쥷᧓및谮ףּ�ꕧ莭倸立櫬ꊞ㓏柹�ࣳꢣ骦ꑊ�⹥킚沮쇜ᨄ犬ᄑ㸼ᕂ◦㺜쎞ࡨ�ᛩ浓繟搘凅䙻꫐⋃ᖢ狔ꨙꋘ᮲Ѩ뒲�쳏帋ᝅጄ馗➏䎈ⶴ‐陿ㄍڑ햊ꗺ䎃�죷궮벓糯⸎박૖Ӥ忖绵鵫鑺놻৾⓲뷍ⰍᲱ㨸혆寒ᲂ�ﰏ㪝఺鿔⥻✠할ﳯ쇎ꑍ枸ぎނ」҂ꃵȃȁਂᅡ鉬 4. The MY3 report noted that geomorphology data for MY3 was collected during May 2023. The MY2 data was collected in June and the MY1 data was collected in July. Each year geomorphology data collection has moved earlier and is too early in the monitoring year to adequately reflect MY3 progression. Please ensure MY4 data collection is done later in the monitoring year and strive for consistency over the length of the entire monitoring period. This electronic copy is an official Department of the Army Notification. If you wish to receive a paper copy, one will be mailed upon request. Please let me know if you have any questions. Regards, Steve Kichefski Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District, Mitigation Branch (828)-271-7980 Ext. 4234 (828)-933-8032 cell The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at https://regulatory.ops.usace.army.mil/customer-service-survey/ to complete the survey online. From: Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil> Sent: Friday, September 15, 2023 2:07 PM To: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil>; Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.T.Isenhour@usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Davis, Erin B CIV USARMY CESAW (USA) <Erin.B.Davis@usace.army.mil>; byron_hamstead@fws.gov; Polizzi, Maria <maria.polizzi@deq.nc.gov>; Haupt, Mac <mac.haupt@deq.nc.gov>; Bowers, Todd <bowers.todd@epa.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Munzer, Olivia <olivia.munzer@ncwildlife.org>; McHenry, David G <david.mchenry@ncwildlife.org> Cc: Jamey Mceachran (jmceachran@res.us) <jmceachran@res.us>; Katie Obenauf <kobenauf@res.us> Subject: Notice of Year 3 Monitoring Report Review/ RES Yadkin 01 UMB - Compass Point Mitigation Site/ SAW‐2017- 01469/ Yadkin County Hello IRT, The below referenced Annual Monitoring Report review and associated MY 3 Credit Release has been requested by the bank sponsor. The Annual Monitoring Report has been posted to the RIBITS site for this bank and are now available for download (see link to Cyber Repository below). Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the credit release approval process, which requires an IRT review period with a comment deadline of 15 calendar days after the date of this email notification or from the date of a site visit, should it be required. Comments provided after the comment deadline (shown below) may not be considered. Within 30 days of the conclusion of the IRT review period, a copy of all comments will be provided to the sponsor and the NCIRT along with District Engineer's approval or disapproval of the credit release. 15-Day Comment Start Date: September 19, 2023 15-Day Comment Deadline: October 04, 2023 45-Day Credit Release Approval Deadline: November 03, 2023 2 Project Information: Bank Name: RES Yadkin 01 UMB Site Name: Compass Point Mitigation Site Sponsor: RES Sponsor POC: Katie Obenauf, Project Ecologist, kobenauf@res.us, (336) 705-3041 USACE ID: SAW-01465 Location: 36.269624, -80.638420 County: Yadkin HUC: 03040101 River Basin: Upper Yadkin Watershed; Upper Pee Dee River Basin USACE Bank PM: Steve Kichefski Steven.L.Kichefski@usace.army.mil, (828)-933-8032 USACE Bank Mit Specialist: Casey Haywood Casey.M.Haywood@usace.army.mil, (919) 750-7397 Credit Release Activities: Year 3 Annual Monitoring (10% SMUs) Credit Release Requested: 415.5 Cool Water Stream Credits RIBITS Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?p=107:10:17316054062860::::P10_BANK_ID:4725 Please note that you must be logged in to access documents in the cyber repository. When submitting comments please indicate if you are requesting a site visit. Please reach out if you have any questions. Thank you, Casey Haywood Mitigation Specialist, Regulatory Division U.S. Army Corps of Engineers, Wilmington District (919) 750-7397 work cell 3