Loading...
HomeMy WebLinkAboutWQ0044683_WQ0044683 Briar Farm-Phase IIB (Town of Stantonsburg) 09.27.2023_20230927State of North Carolina Update Application Department of Environmental Quality D- R Received 09/27/2023 Division of Water Resources NCDEQ FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources INSTRUCTIONS FOR FORM: FTA 06-21 & SUPPORTING DOCUMENTATION This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's Minimum Design Criteria (Gravity Sewer & Pump Stations/Force Mains) and that plans, specifications and supporting documents have been prepared in accordance with 15A NCAC 02T, 15A NCAC 02T .0300, Division policies, and good engineering practices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These documents shall be immediately available upon request by the Division. Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A NCAC 02T.0303. Projects not eligible for review via the fast track process (must be submitted for full technical review): ➢ Projects that do not meet any part of the minimum design criteria (MDC) documents; ➢ Projects that involve more than one variance from the requirements of 15A NCAC 02T; ➢ Pressure sewer systems utilizing simplex septic tank -effluent pumps (STEPS) or simplex grinder pumps; ➢ Simplex STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains); ➢ Vacuum sewer systems. General — When submitting an application, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of the application and supporting documentation. A. One Original and One Copy (second copy may be digital) of Application and Supporting Documents ® Required unless otherwise noted. Signatures on original must be "wet ink" or secure digital signatures. Please do not submit engineering design plans with the application unless specifically requested. B. Cover Letter/Narrative Description (Required for All Application Packages): ® List all items included in the application package, as well as a brief description of the requested permitting action. ➢ Be specific as to the system type, number of homes served, flow allocation required, etc. ➢ Include the permit number/status of any other required sewer permits (downstream/upstream) ➢ If necessary for clarity, include attachments to the application form. C. Application Fee (All New and Modification Application Packages): ® Submit a check or money order in the amount of $480.00, dated no more than 90 days prior to application submittal. ➢ Payable to North Carolina Department of Environmental Quality (NCDEQ) D. Fast Track Application (Required for All Application Packages, Form FTA 05-21): ® Submit the completed and appropriately executed application. ➢ If necessary for clarity or due to space restrictions, attachments to the application may be made. ❑ If the Applicant Type in Item I.2 is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. ❑ If the Applicant Type in Item I.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in the county of business. ® The Project Name in Item II.1 shall be consistent with the project name on the flow acceptance letters, agreements, etc. ® The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina licensed Professional Engineer. ® The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0106 b . Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). INSTRUCTIONS FOR FORM: FTA 06-21 & SUPPORTING DOCUMENTATION Pagel of 3 E. Flow Tracking/Acceptance Form (Form: FTSE 04-16) (If Applicable): ® Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility. ➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different. ➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year prior to the application date. ➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143-215.671 al. ➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE. F. Site Maps (All Application Packages): ® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area, including the closest surface waters. ➢ General location of the project components (gravity sewer, pump stations, & force main) ➢ Downstream connection points and permit number (if known) for thereceivingsewer ® Include an aerial location map showing general project area (such as street names or latitude/longitude) so that Division staff can easily locate it in the field. G. Existing Permit (Application Packages for Modifications to an Existing Permit): ❑ Submit a copy of the most recently issued existing permit. ❑ Include a descriptive and clear narrative identifying the previously permitted items to remain in the permit, items to be added, and/or items to be modified (the application form itself should include only include items to be added/modified). The narrative should also include whether any previously permitted items have been certified. ❑ The narrative should clearly identify the requested permitting action and accurately describe the sewers to be listed in the final permit. H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station): ❑ Per 15A NCAC 02T .0305(hl(1), submit documentation of power reliability for pumping stations. ➢ This alternative is only available for average daily flows less than 15,000 gallons per day ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed contractor, stating that "the portable power generation unit or portable, independently -powered pumping units, associated appurtenances and personnel are available for distribution and operation of this pump station." ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification) I. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities): ❑ Per 15A NCAC 02T .0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension, or ❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold): ❑ Home/Property Owners' Associations ❑ Per 15A NCAC 02T .0115(cl, submit the properly executed Operational A reement FORM: HOA . ❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws. ❑ Developers of lots to be sold ❑ Per 15A NCAC 02T .0115(b). submit the properly executed Operational Agreement FORM: DEV . For more information, visit the Division's collection systems website INSTRUCTIONS FOR FORM: FTA 05-21 & SUPPORTING DOCUMENTATION Page 2 of 3 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE I ADDRESS I COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Water Quality Section Swannanoa, North Carolina 28778-8211 Clay, Graham, Haywood, Henderson, Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Favetteville Regional Office 225 Green Street Suite 714 I Anson, Bladen, Cumberland, Harnett, Hoke, Water Quality Section Fayetteville, North Carolina 28301-5095 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910) 486-0707 Fax Mooresville Regional Office Water Quality Section Raleigh Regional Office Water Quality Section Washington Regional Office Water Quality Section Wilmington Regional Office Water Quality Section 610 E. Center Avenue Mooresville, North Carolina 28115 (704) 663-1699 (704) 663-6040 Fax 3800 Barrett Drive Raleigh, North Carolina 27609 (919) 791-4200 (919) 571-4718 Fax 943 Washington Square Mall Washington, North Carolina 27889 (252) 946-6481 (252) 975-3716 Fax 127 Cardinal Drive Extension Wilmington, North Carolina 28405 (910) 796-7215 (910) 350-2004 Fax Alexander, Cabarrus, Catawba, Cleveland, Gaston, Iredell, Lincoln, Mecklenburg, Rowan, Stanly, Union Chatham, Durham, Edgecombe, Franklin, Granville, Halifax, Johnston, Lee, Nash, Northampton, Orange, Person, Vance, Wake, Warren, Wilson Beaufort, Bertie, Camden, Chowan, Craven, Currituck, Dare, Gates, Greene, Hertford, Hyde, Jones, Lenoir, Martin, Pamlico, Pasquotank, Perquimans, Pitt, Tyrrell, Washington, Wayne Brunswick, Carteret, Columbus, Duplin, New Hanover, Onslow, Pender Winston-Salem Regional Office 450 W. Hanes Mill Road Alamance, Alleghany, Ashe, Caswell, Davidson, Water Quality Section Suite 300 Davie, Forsyth, Guilford, Rockingham, Randolph, Winston-Salem, North Carolina 27105 Stokes, Surry, Watauga, Wilkes, Yadkin (336) 776-9800 (336) 776-9797 Fax INSTRUCTIONS FOR FORM: FTA 05-21 & SUPPORTING DOCUMENTATION Page 3 of 3 State of North Carolina Department of Environmental Quality Division of Water Resources ,,MR FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 06-21 & SUPPORTING DOCUMENTATION Application Number: (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Town of Stantonsbur2 (company, municipality, HOA, utility, etc.) 2. Applicant type: ' ❑ Individual ❑ Corporation ❑ General Partnership ❑ Federal ❑ State/County ® Municipal 3. Signature authority's name: Brian L. Hawley per 15A NCAC 02T .0106(bl Title: Town Manager 4. Applicant's mailing address: 108 Commercial Ave. City: Stantinsbur State: NC Zip: 27883- 5. Applicant's contact information: Phone number: 252 238-3608 Email Address: bhawleyCaltownofstantonsburg.com I III 9:1031_x"8_I_0_2111-Nu /:11111610 1. Project name: Briar Farm -Phase II ❑ Privately -Owned Public Utility ❑ Other 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ and issued date: , For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Wilson 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.6020Longitude:-77.810' 5. Parcel ID (if applicable): 3657-77-0648 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Robert S. Bartlett License Number: 20106 Firm: Bartlett Engineering & Surveving, PC Mailing address: 1906 Nash St. N. City: Wilson State: NC Zip: 27893- Phone number: (2M) 399-0704 Email Address: robertid,bartletteng.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Stantonsburp, WWTP Permit Number: NCO057606 Owner Name: Town of Stantonsbure V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQ 2. Downstream (Receiving) Sewer Information: 8 inch ❑ Gravity ❑ Force Main 3. System Wide Collection System Permit Number(s) (if applicable): WQCS00213 Owner Name(s): Town of Stantonsbur� FORM: FTA 06-21 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑ No ® N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV ) been attached? ❑ Yes ❑ No ® N/A 3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement ( FORM: HOA) and supplementary documentation as required by 15A NCAC 02T.0I 15(c) been attached? ❑ Yes [-]No ® N/A 4. Origin of wastewater: (check all that apply): ® Residential (Individually Owned) ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential (Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool/Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic % Commercial % Industrial (See 15A NCAC 02T .0103(20)) If Industrial, is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(i)? ❑ Yes ❑ No ➢ If ves, provide a copy of flow reduction approval letter with this avolication 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(i)) Daily Design Flow',' No. of Units Flow Residential 480 gal/day 9 4320 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 4320 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 4320 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ❑ Other (Explain): FORM: FTA 06-21 Page 2 of 5 VIL GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers}: 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 878 PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC(Pump Stations/Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3. Total number of pumps at the pump station: 3. Design flow of the pump station: millions gallons per day (firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s) per pump(s): gallons per minute (GPM) at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per MDCPSFM Section 2.01C.l.b. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify) 6. Power reliability in accordance with 15A NCAC 02T .0305[h)[ 1]: ❑ Standby power source or ❑ Standby pump ➢ Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: ➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 06-21 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305(� & ig)? ® Yes [-]No 15A NCAC 02T.0305(t) contains minimum separations that shall be provided for sewer systems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches 2Water mains (vertical - water over sewer preferred, including in benched trenches) 18 inches 2Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet "Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) 50 feet "Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ If noncompliance with 02T.0305(fl or g), see Section X.1 of this application * 15A NCAC 02T.0305(u) contains alternatives where separations in 02T.0305(f) cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Classifications webpm e 2. Does this project comply with the minimum- separation requirements for water mains? ❑ Yes ❑ No ® N/A ➢ If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ❑ Yes ❑ No ® N/A ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft separation requirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ❑ Yes Basin name: ® No If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ❑ Yes ® No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0 I 05(c)(6), directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" [:]Yes ®No Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 06-21 Page 4 of 5 0 CERTIFICATIONS: 1. Does the submitted system comply with 15A_NCAC 02T, the Minimum Desi-•n Criteria for the Permitting of Purnp__Stations and Force Mains (latest version), and the Graviy. Sewer Minimum Design Criteria Ilatest versior as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the rep uest is re uired yriorto submittal of the Fast Track Application and supportine documents. 2. Professional Engineer's Certification: 1, ► �%����'� �� ��� attest that this application for (Professional Engineer's name from Application Item III.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: N l;A;: 9' _ •SEAL 201G6 3. Applicant's Certification per 15A NCAC 02T .01.06(b): 1, _ _ attest that this application for. (Signature Authority's name & title from Application Item I.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6 and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: V41, d-'�' 9-3 FORM: FTA 04-16 Page 5 of 5 DWR Dtrlslon of Water Resources NC Uclu of �:rt��;rcm;lt�'n1r11 F,�tt�tlils State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACKSr ER STEM EXTENSION APPLICATION FT4-16SUPPORTING DOCUMENTATION Application Number: tOQO04'� (af5J (to be completed by DWR) All items must be completed or the a i tlication will be returned 1. APPLICANT INFORMATION: 1. Applicant's name: Town of Stantonsburg (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Federal ❑ State/County ® Municipal 3. Signature authority's name: Brian L. Hawley per 15A NCAC 02T .0106tb} Title: Town Manager 4. Applicant's mailing address: 108 Commercial Avenue City: Stantonsburg, State: NC Zip: 27883 5. Applicant's contact information: Phone number: 252) 238-3608 Email Address: bhawle%:ri.townofstantonsbur�.com H. PROJECT INFORMATION: 1. Projeck name: Briar Farin - Phase IIB ❑ Privately -Owned Public Utility ❑ Other 01 2'I Q� � t 2. Application/Project status: ®Proposed ew Permit} Existing Permit/Project If a modification, provide the existing permit n ber: WQ0000 3 an issued date: If new construction brit part of a master plan, pr vide the existing pe it number: WQ00 3- Counly %khere project is located: Witsnn 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.602' Longitude-77.8104 5. Parcel ID (if applicable): 3657-77-0648 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Robert S. Bartlett License Number: 20106 Firm: Bartlett Em-.ineeAr12 & Survey ink- PC Mailing address: 1906 Nash Street N. ('itv- Wikcnn CtntP- KP 71n• 11R01- 19673 BARTLETT ENGINEERING & SURVEYING, P.C. 1906 NASH STREE T NORTH WILSON, NC 27893-1726 02)399-0704 www.bartietteng.com Memo: 22476 Sewer permit 'AY Four Hundred Eighty and 00/100 Dollars -0 THE )RDER )F NCDEQ RALEIGH REGICNIAL OFFICE 1628 MAIL SERVICE CENTER Raleigh, NC 27699-1628 TRUkST 1 66-1121531 a s L'J CHECK NO. DATE AMOUNT ; 19673 Aug 9, 2023 **********$480.00 1 3 a State of North Carolina Department of Environmental Quality DWR Division of Water Resources Division of Water Resources RalelghReglMAXMCK SEWER SYSTEM EXTENSION APPLICATION FTA 06-21 & SUPPORTING DOCUMENTATION Application Number: JA_>Q 00 &0 (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: . Applicant's name: Town of Stantonsburg (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Federal ❑ Stale'County ® Municipal 3. Signature authority's name, Brian L. Hawley per I5A NCAC 02T .0106tb1 Title: Town Manager 4. Applicant's mailing address: 108 Commercial Ave. City: Stantonsburg State: NC Zip: 27883- 5. Applicant's contact information: Phone number: (252) 238-3608 Email Address: bhawleyt@townofstantonsbttr g; com 11. PROJECT INFORMATION: ❑ Privately -Owned Public Utility ❑ Other 1, Project name: Briar Farm -Phase II 2. Application Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ000 13 and issued date: , For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Wilson 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.602' Longitude:-77.81W 5. Parcel ID (if applicable): 3657-77-0648 (or Parcel ID to closest downstream sewer) 111. CONSULTANT INFORMATION: I. Professional Engineer: Robert S. Bartlett License Number: 20106 Finn: Bartlett Engineering & Surveying, PC Mailing address: 1906 Nash St. N. City: Wilson State: NC Zip: 27893- Phone number: 252) 399-0704 Email Address: robert@bartletteng com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Stantonsburg WWTP Permit Number: NCO057606 Owner Name: Town of Stantonsbure V. RECEIVING DOWNSTREAM SEWER INFORMATION: I. Permit Number(s): WQ 2. Downstream (Receiving) Sewer Information: 8 inch I-1 Gravity El Force Main 3. System Wide Collection System Penn it Number(s) (if applicable): WQCS00213 Owner Name(s): Town of Stantonsburg FORM: FTA 06-21 Page I of BAWMETT BrGINOAVG & WiVEYMG, PC 1906 Nash Street North Wilson, NC 27893-1726 Phone (252) 399-0704 Fax: (252) 399-0804 NC Dept e t of wwwbartletteng.com p nVlrp;ijj�ental Quality August 9, 2023 State of North Carolina Department of Environment and !Natural Resources Division of Water Quality Raleigh Regional Office 1628 Mail Service Center Raleigh, North Carolina 27699-1628 Reference: Fast Track Application for Gravity Sewers Public Sewer Extension Briar Farm — Phase 116 Peacock Bridge Road (SR 1540) Stantonsburg, North Carolina To Whom It May Concern: AUG 14 2023 Raleigh Rebronal Office The attached application is for a 9-lot residential development within the Town of Stantonsburg, Wilson County, North Carolina. The lots are along the east side frontage of Peacock Bridge Road and will require the extension of an 8" sewer main and manholes within the Peacock Bridge Road (SR 1540) Right -of -Way with laterals serving the lots. Enclosed for your review and approval are two (2) copies of the following items related to the above referenced project: ■ Fast Track Application for Gravity Sewers ■ Engineering Report ■ Flow Tracking / Acceptance Form ■ Quad Map ■ Feature Report ■ Google Image Location Map ■ $480.00 Sewer Permit Application Fee P t PROJECT FILESSnar Farm\Phase 21Permits\0FQ Sewer522.176 NCDPNR Cover [ euer doc NC Dept of cnvironmenta! Qtiahty ENGINEERING REPORT SEWER SYSTEM EXTENSION BRIAR FARM — PHASE IIB STANTONSBURG, NORTH CAROLINA Raleigh Regional Office MAY 26, 2023 Wastewater Treatment Facility Stantonsburg WWTP NPDES Permit No. NCO057606 Applicant/Owner Name & Address Town of Stantonsburg 108 Commercial Drive Stantonsburg, North Carolina 27883 Protect Name & Location Briar Farm — Phase 116 Peacock Bridge Road (SR 1540) Stantonsburg, North Carolina Protect Summary The project is for a new nine (9) lot residential subdivision located on the east side of Peacock Bridge Road (SR 1540), east of NC 58. This project will include the installation of approximately 878 linear feet of 8" diameter PVC gravity sewer line, three (3) standard manholes, one (1) 4' diameter doghouse manhole, nine (9) 4" sewer services and other necessary appurtenances. PA —PROJECT pILl:M6ar fumThne 21Pennhs EQ SewerW :16 Sewer Engineering Repon doe Should you have any questions or require further information during your review, please let us know. Respectfully teve Olive o Project Manager Enclosures P,5_PROJECi F ILESU36ar FarmThase 21Permits\DEQ Sewei,22.176 NCDENR Cover L iteudoc NC Dept of Environmowal Quality State of North Carolina Department of Environmental Quality DWR AUG Z 4 202,3 Division of Water Resources Division of Water Resources ,R81e1 Flow Tracking for Sewer Extension Applications L'�Regio! o:ce (FTSE 10-18) Entity Requesting Allocation: Town of Stantonsburg Project Name for which flow is being requested: Briar Farm - Phase IIB More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Stantonsburg WWTP b. WWTP Facility Permit #: NC0057606 All flows are in MGD c. WWTP facility's permitted flow 0.375 d. Estimated obligated flow not yet tributary to the WWTP 0.00 e. WWTP facility's actual avg. flow 0.131 f. Total flow for this specific request 0.014 g. Total actual and obligated flows to the facility 0.145 h. Percent of permitted flow used 38.7 % I1. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Finn! pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Stantonsburg WWTP Downstream Permit Number: NC0057606 Page l of 6 FTSE 10-18 III. Certification Statement: I _Brian Hawley certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. - 7 - z3 Signing Official Sign re Date Title of Signing Official Page 2 of 6 FTSE 10-18 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for % and MGD of the Available Capacity (E) in Pump Station ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately _ MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: Therefore; Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature Dale Page 3 of 6 FTSE 10-18 Instructions for Flow Tracking form (FTSE) and Planning Assessment Addendum (PAA) Section I a. WWTP Facility Name: Enter the name of the WWTP that will receive the wastewater flow. b. WWTP Facility Permit #: Enter the NPDES or Non -Discharge number for the WWTP receiving the wastewater flow. c. WWTP facility's permitted flow, MGD: From WWTP owner's NPDES or Non -Discharge permit. d. Estimated oblated_flow not }yet tributary to the WWTP MGD: This includes flows allocated to other construction projects not yet contributing flow to the collection system. Flows allocated through interlocal agreements or other contracts not yet contributing flow to the collection system are also included. For POTWs that implement a pretreatment program, include flows allocated to industrial users who may not be using all of their flow allocation. Please contact your Pretreatment Coordinator for information on industrial flow tributary to your WWTP. As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two years and reconciled their flow records, to the best of their ability, so it is known how much flow has been obligated and is not yet been made tributary to the WWTP, in accordance with local policies and procedures employed by the reporting entity. e. WWTP facility's actual avg. flow, MGD: Previous 12 month average. f. Total flow for this specific request, MGD: Enter the requested flow volume. g. Total actual and obligated flows to the -facility, MGD Equals [d — e + f] h. Percent of permitted flow used: Equals [(g / c)* 100] For example: On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there is 0.5 MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7 MGD. There is a proposed flow expansion of 0.015 MGD. The first Form FTSE submitted after January 15, 2008 may have numbers like this: c. — 6.0 MGD d. — 0.5 MGD e.=2.7 MGD f. = 0.015 MGD g.-3.215MGD h. — 53.6 % The next Form F,rSE may be updated like this with a proposed flow expansion of 0.102 MGD: c. — 6.0 MGD d. — 0.515 MGD e. — 2.73 MGD f. — 0.102 MGD g. = 3.349 MGD h. = 55.8 % Each subsequent FTSE form will be updated in the same manner. Page 4 of 6 FTSE 10-18 Section II List the pump station name or number and approximate pump station fine capacity, approximate design average daily flow (A) approximate current average daily flow (B), and the obligated, not yet tributary flow through the pump station (C) for each pump station that will be impacted by the proposed sewer extension project. Calculate the total current flow plus obligated flow (D=B+C) and the available capacity (E=A-D). Include the proposed flow for this project with other obligated flows that have been approved for the pump station but are not yet tributary (Q. Firm capacity is the maximum pumped flow that can be achieved with the largest pump out of service as per the Minimum Design Criteria. Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) of not less than 2.5. If the available capacity (E) for any pump station is < 0, then prepare a planning assessment for that pump station if the system has future specific plans related to capacity that should be considered in the permitting process. (A) (B) (C) (D)=(B+C) (E)=(A-D) Obligated, Design Approx. Not Yet Total Current Firm Average Current Avg. Tributary Flow Plus Pump Station Capacity Daily Flow Daily Flow, Daily Flow, Obligated Available (Name or Number) MGD (Firm l pf) MGD MGD Flow Capacity* Kaw Creek PS 0.800 0.320 0.252 0.080 0.332 -0.012 Valley Road PS 1.895 0.758 0.472 0.135 0.607 0.151 Page 5 of 6 FTSE 10-18 Planning Assessment Addendum Instructions Submit a planning assessment addendum for each pump station listed in Section II where available capacity is ` 0. A planning assessment for Kaw Creek PS (see example data above) may be performed to evaluate whether there is significant likelihood that needed improvements or reductions in obligated flows will be in place prior to activating the flows from the proposed sewer extension project. If the system decides to accept the flow based on a planning assessment addendum, it is responsible to manage the flow without capacity related sanitary overflows and must take all steps necessary to complete the project or control the rate of flow to prevent sanitary sewer overflows. The planning assessment may identify a funded project currently in design or construction, or a planned project in the future not yet funded but in a formal plan adopted by the system. The system should carefully weigh the certainty of successful timely project completion for any expansion, flow management diversion or infiltration and inflow elimination projects that are the foundation of a planned solution to capacity tracking and acceptance comp] lance. For example: Given that: a. The proportion and amount of obligated, not yet tributary flow accounts for 24 % and 0.080 MGD of the committed flow in Pump Station Kaw Creek; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.01 MGD per year; and that c. A funded capital project that will provide the required planned capacity, namely _ is in design or under construction with planned completion in ; and/or d. The following applies: The master lan and ten year capital plan contain recommended scope and funding for a capital project entitled Kaw Creek Pump Station upZrade with funding planned in July 2014., This uroject is planned to add 0.100 MGD to the firm capacity of the pump station by October 2015. Inclusion of this proposed capital project as a condition of this Flow Trackin Acce.ptance for Sewer Extension Permit Application. elevates this project's priority for funding and construction to be implemented ahead of the activation of obligated, not yet tributary flows in amounts that exceed the firm vump station capacities identified in Section 11 above. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. Page 6 of 6 FTSE 10-18 �•. UuPt or t"vironmental Quality AUG 14 2023 STATE OF NORTH CAROLINA DEPARTMENT OF NATURAL RESOURCES AND COMMUNITY DEVELOPMENT Raleigh Regional Office RALEIGH, NORTH CAROLINA 5055 to Rf 50' son' a AM 244 245 IsaRATOO l 246 1saw4raca 26Au 47 47'30" 1 "48 O+ \ 1 I 222 + M4 } - A 'i53t y .Cem \ •- +e 1 +t T \ \\y � � 1 � Ix362�� •� � ���. I 'ryj G6 -� ...� � �� '.'� x I �# • z 1Yavelm Rest tips/ Ch � ' •'� �GreatRr 2 • L\� � + IN. `3 '•S•onsburg •L T@nies: k\�\ `a.D PG�I`�• r—�� � y* � ` + o-r ZI� ern I 1682 s-mow: .i F Undpit 1$°�. I / ►� Marsh 1 r 1 e.9 Culftri A e _ _. —• - ._ _..1 _ �r ¢yam \\ 77-1 F jtr\� j 01 Wilsnow\ - 1dl f Sr --- - I �5• \ i v _ x / }011, I.�s W -.' ry O s r r0