Loading...
HomeMy WebLinkAboutSite_Inspection_20191006_10_26_2023_NPDESWetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20191006 TPB NCDOT - I-40/I-77 Interchange Improvements (I-3819B)Iredell TPB NCDOT - I-40/I-77 Interchange Improvements (I-3819B) NC DOT Division 12 10/26/2023 Routine Records/File Review (DOT) Version: 4 Status:Issued Project Type:Road maintenance/repair/improveme ntsRegion:Mooresville Longitude:-80° 45' 40''+35° 48' 35'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Mary B Plummer 704-235-2193 Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:NPDES SW - Roadway (DOT) Operation and Maintenance Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20191006 10/26/2023 Stafford, Mark E Records/File Review (DOT)Routine Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? Are the inspection and maintenance records complete and available for review? Reviewed 42 weeks/January - October of NPDES records weekly inspections being conducted, precipitation monitored through MPE. Comment: page:2