HomeMy WebLinkAboutNCC203961_NOT Closeout Documents_20231027 < Cti Greenville
NOk i H CAROLINA
ENGINEERING
Engineering Department-Sedimentation/Erosion Control Program
October 3, 2023
Letter of Final Inspection
Jon Scott Stancil
FAP, LLC
1432 E. Firetower Road
Greenville,NC 27858
Re: Project Name: Family Foot&Ankle Physicians
Project Number: ESCP-2020-0010
County: Pitt
Disturbed Acreage: 1.0
Responsible Party: FFAP, LLC
Dear Mr. Stancil,
At your request, this office has completed its final site inspection of the referenced project. We
find the site stable and in compliance with the approved Sedimentation and Erosion Control
Plan.
Upon issuance of this letter,the referenced Sedimentation and Erosion Control Plan has been
closed for this project and you will need to terminate your NCG01 permit.
Please do not hesitate to call if you have any questions.
Re pectfully,
C —7r-r7
Victor C. Long
Engineering Assistant 111
Engineering Department
City of Greenville
vlong@greenvillenc.gov
www.greenvillenc.gov
252-329-488
52-329-4467 1500 Beatty Street, Greenville, NC 27835-7207 greenvillenc.go