HomeMy WebLinkAboutNCC212748_NOT Closeout Documents_20231027 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall,Washington,NC 27889 (252) 946-6481
County: Wayne Project: Wayne Executive Jetport-Apron RePavement River basin: Neuse
Person financially responsible:Craig Honeycutt,Wayne County Manager Project#: WAYNE-2021-023
Address: PO Box 227,Goldsboro,NC 27530
1. Project Location: Aviation Rd,Pikeville
Pictures: No
2. Weather and soil conditions: Cloudy,warm,wet Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): No one on site Title:
Inspection report: Sent Report Date given/sent: May 31,2023
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-
inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under
10. Comments: the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee
via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.
Please note that this correspondence must be uploaded as part of completing the NOT process.
Reported by: Bradley West Others present:
Date of inspection: May 30,2023 Time arriving on site: 11:00 AM Time leaving site: 11:30 AM
cc: