HomeMy WebLinkAboutNCC202376_NOT Closeout Documents_20231027 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center, Raleigh,NC 27699 (919) 791-4200
JAN 2 7 2023
County: Lee Project: Project Forge Entrance Road River basin: Cape Fear
Person financially responsible:City of Sanford-Hal Hegwer,City Manager Project#: lee-2020-038
Address: PO Box 3729,Sanford,NC 27331
1. Project Location: Colon Road,Sanford
Pictures: Yes-Digital
2. Weather and soil conditions: Sunny,Dry and workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): None Title:
Inspection report: Sent Report Date given/sent: October 27,2022
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG01)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Ivana Barham Others present: Lauren Garcia
Date of inspection: October 04,2022 Time arriving on site: 10:00 AM Time leaving site: 10:15 AM
cc: