Loading...
HomeMy WebLinkAboutNCG551275_CEI_20150717NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary July 17, 2015 Donna Stout 2 West Main St. Brevard, NC 28712 SUBJECT: Compliance Evaluation Inspection Cedar Mountain Business Park Permit No: NCG551275 Transylvania County Dear Ms. -Stout: Enclosed please find a copy of the Compliance Evaluation Inspection conducted on 6/26/2015. This inspection was conducted to verify that the new facility selling snacks and beverages in single use disposable containers would not overload the system which is limited to 1000 gallons a day. The site was found to be in good order. It is recommended that the right of way to the outfall pipe be kept clear of vegetation for easy inspection. A description of the proposed activities for the business park can be found in the inspection summary. No violations of permit requirements or applicable regulations were observed during this inspection. Please refer to the enclosed inspection report for additional observations and comments. If you or your staff have any questions, please contact me at 828-296-4500 or jeff.menzel@ncdenr.gov. Sincerely, Jeff Menzel Environmental Specialist Enc cc: MSC 1617-Central Files -Basement Asheville Files Water Qualify Reglonal Operafions —Asheville Regional office 2090 U.S. Highway 70, Smnnanos, North Carolina 28778 Phone: 828-296 4500 FAX. 828.299-7043 Internet; hffp.#portal.nodenr,orglweWq An Equal opportunity 1 Affirmative Action Employer G:IWR1WQlTransyivanialWastewater4GeneraANCG55 SFRWR's NCG551Cedar Mtn BPICEI 2015.doe United States Environmental Proteolion Agency Form Approved, EPA Washington, D.C. 20460 OMB No, 2040-0057 Water Compliance Inspection Report Approval expires8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yrlmorday Inspection Type Inspector FacType NLJLJ 3 L _N00561275 I11. 12 15106M 17 18U 19 G 20I 21 6 Inspection Work {lays Facility Self -Monitoring Evaluation Rating B1 QA -----Reserved---- 671 70 LJ 1� E 71 Li72 L M � 731 LLJI I 174 751 11 I I I I I80 LJ Secion. B: FaciFacilityQata Name and Lotatfon of Facility Inspected (For Industrial Users discharging to POTW, also include Entry TimelDats Permit Effective Date POTW name and NPDES permit Number) 01:00PM 15/06/28 13108/01 Cedar Mountain Business Park ExltTimelDate Permit Expiration Hate US Hwy Z7611559 Greenville Hwy Cedar Mountain NC 28718 01:45PM 15108/28 18/07/31 Name(s) of Qnsite Representative(s)rritles(s)1Phone and Fax Number(s) Other Facility Data rrr Name, Address of Responsi hie flficial/Tltle/Phone and Fax Number . Donna Stout,2 W Mal St Brevard NC 287121r829-877-3530r Contacted Yes Section C: Areas Evaluated During Inspection(Check Only those areas evaluated) Permit Facility Site Review Effluentlfteceiving Waters Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Sfgnature(s) of Inspectors) Agency/OfffcerPhone and Fax Numbere Date Jeff Menzel ARO WQ11828.286-4600r J Sig Management Q A Reviewer AgencylOfffcelPnone and Fax Numbers Date uE1 EPA Farm 3560-3 (Rev 9.941) Previous editions are obsolete. Page# NPOES ydmolday Inspection Type (Cont) 31 NGG551275 �11 12 t 51v8126 17 18 u Section D: Summary of FindinglComments (Attach additional sheets of narrative and checklists as necessary) This inspection was conducted to verify that the new Canteen selling snacks and beverages in single use disposable containers would not overload the system which is limited to 1000 gallons a day. The site was found to be in good order. It is recommended that the right of way to the outfall pipe be kept clear of vegetation for easy inspection. A description of the proposed activities for the business park can be found below. No violations of permit requirements or applicable regulations were observed during this inspection. This discharging system is limited to 1000 gallons a day of waste water. This number is to include the activities of all 3 buildings on the site. I have calculated the proposed flow for this facility to be 975 gallons per day. The narrative below provides a description of how l derived my calculation. The following is the proposed design flow for surface discharge on -site wastewater system at Cedar Mountain Business Park located in Transylvania County. These flows are calculated per 15A NCAC 02T .0114. The calculated cumulative design of 975 gpd is based on the description -of proposed flow to this system. An adjusted daily sewage flow design rate shall be granted for permitted but not yet tributary connections and future connections tributary to the system upon showing that a sewage system is adequate to meet actual daily wastewater flows from a facility included in Paragraph (b) or (c). of this Rule without causing flow violations at the receiving wastewater treatment plant or capacity related sanitary sewer overflows within the collection system as follows: (1) Documented, representative data from that facility or a comparable facility shall be submitted by an authorized signing official in accordance with Rule .0106 of this Section to the Division as follows for all flow reduction request: (A) Dates of flow meter calibrations during the time frame evaluated and indication if any adjustments were necessary. (B) A breakdown of the type of connections (e.g. two bedroom units, three bedroom units) and number of customers for each month of submitted data as applicable. Identification of any non-residential connections including subdivision clubhouseslpools, restaurants, schools, churches and businesses. For each non-residential connection, information as identified in Paragraph (c) of this Rule (e.g. 200 seat church, 40 seat restaurant, 35 person pool bathhouse). (C) Owner of the collection system. (D) Age of the collection system. (E) Analysis of inflow and infiltration within the collection system or receiving treatment plant, as applicable. (F) Where a dedicated wastewater treatment plant serves the specific area and is representative of the residential wastewater usage, at least the 12 most recent consecutive monthly average wastewater flow readings and the daily total wastewater flow readings for the highest average wastewater flow month per customers as reported to the Division. (G) Where daily data from a wastewater treatment plant cannot be utilized or is not representative of the project area: at least 12 months worth of monthly average wastewater flows from the receiving treatment plant shall be evaluated to determine the peak sewage month. Daily wastewater flows shall then be taken from a flow meter installed at the most downstream point of the collection area for the peak month selected that is representative of the project area. Justification for the selected placement of the flow meter shall also be provided. (H).An estimated minimum design daily sewage flow rate shall be taken by calculating the numerical average of the top three daily readings for the highest average flow month. The calculations shall also account for seasonal variations, excessive inflow and 'infiltration; age and suspected meter reading/recording errors. (2) The Division shall evaluate -all data -submitted but shall -also consider -other factors in granting, with Page# Permit: NCG551275. owner - FacIlity: Cedar Mountain Business Park Inspection Date: 06M/2016 Inspection Type: Compliance Evaluation or without adjustment, or denying a flow reduction request including: applicable weather conditions during the data period (i.e. rainy or drought), other historical monitoring data for the particular facility or other similar facilities available to the Division, the general accuracy of monitoring reports and flow meter readings, and facility usage (i.e., resort area). (3) Flow increases shall be required if the calculations in Subparagraph (f)(1) of this Rule yield design flows higher than that specified in Paragraphs (b) or, (c) of this Rule. (4) The applicant/owner shall retain the letter of any approved adjusted daily design flow rate for the life of the facility and shall transfer such letter to any new system owner. Metal Building ##1 This former Real Estate office is now occupied as storage and studio space for an individual artist, and by a photographer who utilizes digital printers and has a large mat cutting and framing area. Both artists are individuals. Neither one has any employees. They share a bathroom with 1 toilet and 1 sink. The former retail space is used as a Canteen selling snacks and beverages in single use disposable containers. This section of the building has two restrooms with 1 toilet and 1 sink in each. 4 employees x 25 gpolemployee = 100 gallons 40 seats x 20 gal/seat bars, single service articles = 800 Metal Building #2 (Contractors Warehouse) This former Hardware Store is now used by a contractor as his warehouse. The entire space is used as tool storage/tool room and boat/trailer storage. No Employees. Single bathroom only with 1 toilet and 1 sink. 1 employees x 25 gpolemployee = 25 gallons Metal.Building #2 (Carpenters Wood shop) This former small retail space is a single hobbyist woodworker/carpenters storage and wood inventory with small workspace. No Employees. This unit has no bathroom or plumbing. 1 employees x 25 gpolemployee T 25 gallons Metal Building #3 (Storage Warehouse) No permanent business. Only warehouse storage for a regional traveling contractor who uses this for storage of his personal equipment and trucks. No Employees. Single bathroom only with 1 toilet and 1 sink. 1 employees x 25 gpolemployee m 25 gallons Page# Permit: N00551275 Owner • Facility: Cedar Mountain Business Park Inspection Date: 0612612015 Inspection Type: Complianoo Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ 0 El . application? Is the facility as described in the permit? ■ ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ ❑ ■ ❑ Is access to the plant site restricted to the general public? ■ ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? ■ ❑ ❑ . ❑ Comment: Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ ■ ❑ Comment: It is recommended that the ric I ht of way to th6 0utfal; P i p e be kee k clear of ve etation for easy inspection. Page# 4