Loading...
HomeMy WebLinkAboutNCC215148_NOT Signed Certification_20231026 NCGO1 Notice of Termination (NOT) Certification Form Directions: Print this form,complete,scan and upload to the electronic NOT(Rescission)form. Then, mail the original signed form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral& Land Resources Stormwater Program 512 N. Salisbury Street,6th Floor 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.221 General Permit Certificate of Coverage (COC) No.: NCC215148 Name of Project: MCB Courthouse Bay Fire Station (P1203) Per NC General Statute 143-215.68(i), any person who knowingly makes any false statement,representation, or certification in any application, record,report,plan,or other document filed or required to be maintained under this Article or a rule implementing this Article. . . shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request,and to the best of my knowledge and belief, such information is true, complete, and accurate. Legally Responsible Organizational Entity: MCB Camp Lejeune `Legally Responsible Person: Jenni Reed Title of Legally Responsible Person: Deputy Public Works Officer *Signature: A.1.441t„ Date: 1O(Z(o123 Print Name and Title of Signed (only if authorized individual signing differs from Legally Responsible Person): Talia Prendergast, PWD Civil Engineer * IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,Section B, Item (6)of the NCG010000 permit. For more information on signatory requirements,see Part IV, Section B, Item(6)of the NCG010000 permit.