Loading...
HomeMy WebLinkAboutNCC233238_ESC Approval Submitted_20231030 CARY NORTH CAROLINA Stormwater Division LETTER OF APPROVAL 10/12/2023 Taylor Morrison of Carolinas, Inc. ATTN: Christian Sheppard 15501 Weston Parkway, Suite 100 Cary, NC 27513 Project Name: Hidden Creek Subdivision Development Plan#: 22-DP-4277 Address: 1135 Yates Store Rd. Acres Approved: 18.8 River Basin: Jordan Lake Submitted By: Christian Sheppard Date Received: 12/11/2023 Dear Taylor Morrison of Carolinas, Inc. This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. This plan shall expire three(3)years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. This letter also gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure compliance with the approved plan. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations,and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. At this time,you may contact Cary 311 (or 919-469-4000 outside Cary limits)to schedule the required pre- construction meeting in accordance with the approved erosion and sedimentation control plan.This letter is not a substitute for the required Grading Permit that will be issued separately following the pre-construction meeting and all other pre-requisite requirements. Per Cary LDO section 3.13.7,following issuance of the grading permit and commencement of land-disturbing activity, if the Town determines that the approved erosion and sedimentation control plan is inadequate, then the Town may require revisions to the approved plan. The applicant may apply at any time to amend the approved erosion and sedimentation control plan. Until such time as the Town approves a revised erosion and sedimentation control plan, the land-disturbing activity shall not proceed except in accordance with the originally approved plan. Please Note: as of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI)form requesting a Certificate of Coverage(COC)under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the applicable annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOl form and fee details may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOl form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,the new responsible party must obtain a new COC.Please refer to NCG01/NPDES requirements at https://deq.nc.gov/about/divisions/energy-mineral-land- resources/energy-mineral-land-permits/stormwater-permits/construction-sw. Sincerely, Lisa Booze, CFM Stormwater Development& Floodplain Administrator TOWN Of CARY 316 North Academy Street•Cary,NC 27513•PO Box 8005•Cary,NC 27512-8005 tel 311 or 919-469-4000 •fax 919-460-4935•www.carync.gov