LETTER OF APPROVAL WITH MODIFICATIONS
Forza Xl, Inc.
ATTN: Mr. Jim Leffew
160 Mine Lake Ct., Suite 200
Raleigh, NC 27615
RE: Project Name: UNIVERSAL TECHNOLOGY PARK FORZA PROJECT MARINE
Acres Approved: 11.33
Project ID: MCDOW-2024-003
County: McDowell
City: Marion
Address: 100 Impact Dr.
River Basin: Catawba
Stream Classification: UT to Youngs Fork- Class C
Submitted By: Advantage Civil Engineering, PA- Mr. Michael Lovoy, PE
Date Received by LQS: August 11, 2023
Plan Type: Industrial
Dear Mr. Leffew,
This office has reviewed the subject erosion and sedimentation control plan. We find
the plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications. The Modifications Required for Approval are listed on the attached page.This
plan approval shall expire three (3) years following the date of approval, if no land-
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is processed, you will receive the COC via email. As the Financially Responsible
Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to
commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program
staff in the Raleigh central office. If the owner/operator of this project changes in the future,
the new responsible party must obtain a new COC.
DE Q North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Asheville Regional Office 12090 U.S.Highway 70 I Swannanoa,North Carolina 28778
NORTH CAROUNA
(*.Went^f EmIrorenental ft\ 06/ 828.296.4500
Letter of Approval with Modifications
Forza X1, Inc.
ATTN: Mr.Jim Leffew
September 7, 2023
Page 2 of 3
Title 15A NCAC 4B.0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land-disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. You are requested to file an
amended form if there is any change in the information included on the form. In addition,it
would be helpful if you notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
I)OA,
ed Walker, PE
Engineer III
Land Quality Section
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
Modifications Required for Approval
ec: Michael Lovoy, PE (mlovoy@aceasheville.com)
Dwight Kensil (dkensil@aceasheville.com)
Shawna Riddle- NCDEQ-LQS (shawna.riddle@deq.nc.gov)
Joey Winston - NCDEQ-DWR (joey.wintson@deq.nc.gov)
cc: Regional Office file
Letter of Approval with Modifications
Forza X1, Inc.
ATTN: Mr. Jim Leffew
September 7, 2023
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: UNIVERSAL TECHNOLOGY PARK FORZA PROJECT MARINE
Project ID: MCDOW-2024-003
County: McDowell
1. Provide a signed notarized Financial Responsibility/Ownership form with Part
B.2.(a) completed to match information on file with the N.C. Secretary of State. CT
Corporation System is listed on the NCSOS corporation search webpage which can
be found at: https://www.sosnc.gov/search/index/corp. {G.S. 113A-54.1.(a)}
2. Provide wire-backed double row silt fence or super silt fence between construction
activities and downgradient wetland areas. {G.S. 113A-57.(3)}
= = zs *s M
• ,w CI) Q
0 to
4_07f. �
WI 04) in
*4 G? tv C Q, I� w
in •v a.)
i
J
O
� 6A Il1t v i.J
' 1:4 P '
r-1 •c •�,
= ". v' •
/ ril;LI E '..* CI t* 1"8
1 •'111 `� �, 'C _
6
f� C
Oi I u a CJ
CI
.•
/ 41:i Ail CA*94 = = f.f.)4' = 6 cl ...4 jetwoT
-1(' 4,- \._ - ,) lli 6 ''''' .4-) ;--, *-, '1 ° CI,J C,
. ,..+�_ ., �..�/
E i
a) \\ 4
"C3 •
, • pia r " .., p "� Q;
r
O 0 ct el
�1� E
J--+ •p — ram' V O :� z
g CJ mr A V O C� N �
r—, O,.... 1.0- ••••o CZ •1 .) E o
CII4
CI • ¢, �^s1�'' /���' a O I am•
W W et rti
C i- i•r
Fact Sheet on the New NCG01 Permit
April 2019 �ro
The NC Construction General Permit (also known as"NCG01")was renewed on April 1, 2019.The updated permit
does not significantly change the measures that are required to be implemented on construction sites. However,
there are some organizational and technical updates to the permit as described below. Most notably, there is a new
process in which construction sites will obtain official coverage under an NCGO1 permit through an electronic
process. DEMLR worked with a broad team of stakeholders to make all of these updates. If you have questions,
contact Annette Lucas at Annette.lucas@ncdenr.gov or(919) 707-3639.
Organizational Updates Acronyms to Know
The new permit: COC: Certificate of Coverage, proof of coverage under an NCG01 permit
• Repeats state requirements for E&SC DEMLR: NC Division of Energy, Mineral, and Land Resources
Plans and organizes them with federal E&SC: Erosion &Sedimentation Control
construction activity requirements; e-NOI: Notice of Intent, application form for the NCG01 permit
• Is clearly organized by topic; and e-NOT: Notice of Termination, form for closing out the NCGO1 permit
• Has less text and more tables. SWPPP: Stormwater Pollution Prevention Plan, required by the NCGO1
Technical Updates t ` `
The new permit: , , •
• Requires that the E&SC Plan meet i' t
SWPPP requirements (p. 2); '+,I.�. _i -
• Provides a list of items that must be
included in the SWPPP, such as the R.--.
construction sequence, plans,
calculations,etc. (p. 2-4);1
• Has updated language on bypasses and
upsets that is tailored to construction
activities (p. 10); f i °
• Puts all timeframes for inspections,
record-keeping and reporting in The NCG01 Process
"calendar days" for clarity and The new NCGO1 applies to permits approved on or after April 1,2019.
consistency(p. 11 14);z Permittees will no longer receive a copy of the NCGO1 permit in the mail
• Changes the inspection frequency
with their E&SC Plan approvals and be considered as covered under the
(during business hours) to at least permit. Federal rules require that DEMLR receive an NOI on each
once per 7 calendar days and after construction project and issue each construction project its own COC.
every storm > 1.0 inch (previously 0.5
inch);3 and Under the new NCGO1 process, construction sites will continue to
• Excludes weekends, state and federal receive approval for E&SC Plans from either DEMLR or the delegated
holidays from normal business hours local E&SC program just like before. After receiving E&SC Plan approval,
unless construction activities take permittees will officially obtain coverage under the NCGO1 by
place (p. 23). completing an e-NOI (available at deci.nc.gov/NCG01). The e-NOI will
only take about 20 minutes to fill out and submit on-line.
1 This list is based on website guidance
by the DEMLR Sediment Program.
Initially, there will be no charge associated with applying for an NCGO1
2 The number of calendar days was permit but on or around June 1, 2019, DEMLR will begin charging a $100
selected to be as equivalent as annual general permit fee as required per§143-215.3D.
possible with the previous permit. DEMLR is working on creating a single application form that will allow an
3 The intent is to provide predictability applicant to simultaneously apply for an E&SC permit and an NCG01
to the inspection schedule. COC. That effort is part of a larger Permit Transformation project at
DEMLR.
Q&A About the New NCGO1 Permit
Why do construction sites have to do this extra application step? How does the new NCGO1 affect the
DEMLR is required by the EPA to issue a specific COC to every construction delegated local E&SC Programs?
site that disturbs one acre or more. DEMLR is working to create a form Local programs will continue to review
that combines the E&SC plan approval and e-NOI processes, but that will and approve E&SC plans. However,
take more time. For now, DEMLR has created an efficient e-NOI process. they will no longer send copies of the
NCGO1 with E&SC Plan approvals.
If an E&SC Plan is approved before April 1,which permit applies? DEMLR will provide sample language to
Projects with already approved E&SC Plans will automatically follow the use in local E&SC Plan approvals to
new NCGO1 permit, but will not need to fill out an e-NOI or pay an annual advise permittees that they must
permit fee. However,the permittees should print the new permit and the submit an e-NOI to DEMLR.
two standard detail sheets and have them on site. s
• a; ', xN;
Will DEMLR offer tools to help permittees comply with the new NCGO1? " �i } ''
Yes, DEMLR will provide two sample plan sheets at deq.nc.gov/NCG01 that - ✓ d�'�'
can be placed into the E&SC plan set.The first covers the site stabilization F k , lgt f 1} „`6 \
and materials handling portions of the permit. The second sheet covers �sJ %� ,s'�.
..
the inspection, record-keeping and reporting portions of the permit. ^±�aN ` ;�'r°714�',
How will the new e-NOI submittal and COC process work? • 24 "'"'
Permittees will apply for E&SC Plan approvals from either DEMLR or the l.�_.:.. ' 41 kK;F. A,,
delegated local E&SC program like before.The E&SC approval letter will
instruct the permittee to visit deq.nc.gov/NCGO1 to submit an e-NOI form Local programs are not required to
to DEMLR.The permittee may begin the construction activity after check if permittees have submitted e-
submittal of the e-NOI.The permittee is required to print a copy of the NOls to DEMLR. However, if they wish
permit and retain it on site. Initially, the COC will be issued for free but on to do this voluntarily,there will be a
or around June 1, 2019, a $100 annual general permit fee will be charged. tool available on DEMLR's web site for
them to view a list of construction
Who is allowed to submit an e-NOI form? projects that have submitted e-NOIs.
Submittal must be by a responsible corporate officer that owns or
operates the activity, such as a president, secretary, treasurer, or vice When local programs close out an E&SC
president or a manager that is authorized in accordance with IV.B.6 of the Plan, the close-out letter will advise
NCGO1 permit. Additional signatory options are set forth in IV.B.6 of the permittees that they must submit an e
permit. It is possible for consultant to prepare the e-NOI, save it as a draft, NOT. DEMLR will provide sample
and email it to the responsible entity for signature &submittal. language.
Local programs may approve E&SC
What happens to the COC when the construction activity is complete? plans that meet state sediment laws
When a project is complete, the permittees will contact DEMLR or the local and rules even if those plans are not
delegated program to close out the E&SC Plan. After DEMLR or the local compliant with all of the NCGO1
E&SC program inform the permittee of the project close out via inspection requirements. However, their
report, the permittee will visit deq.nc.gov/NCG01 to submit an e-NOT. permittees will be required to add two
Will there be a grace period for adherence to the new process? plan sheets(which will be provided by
DEMLR does not have the authority to grant a grace period from a DEMLR)to their E&SC Plans to ensure
federally mandated permit. Permittees will be informed of the new that they fully comply with the ground
process via web site, E&SC Plan approval letters and list servs. If a stabilization, materials handling, and
construction activity disturbs one acre or more (or is part of common plan inspection, record keeping and
of development that disturbs one acre or more)fails to submit an e-NOI reporting portion of the NCGO1 permit.
after approval of its E&SC Plan,this is a violation of federal permitting
requirements and the permittee could be subject to a penalty assessment.